HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications

Similar documents
Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Task Force on Water-land Interface

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Task Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study

HARBOUR-FRONT ENHANCEMENT REVIEW WAN CHAI, CAUSEWAY BAY & ADJOINING AREAS REALIZATION STAGE

Task Force on Kai Tak Harbourfront Development. Station Square at Kai Tak

Planning for Liveability in Hong Kong

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

URBAN DESIGN STUDY FOR THE WAN CHAI NORTH AND NORTH POINT HARBOURFRONT AREAS FEASIBILITY STUDY

Task Force on Kai Tak Harbourfront Development

PHASE ONE. A summary report: What the community told Alcoa during Phase One of the community engagement program for Point Henry 575.

Summary of Public comments on Draft Harbour Planning Guidelines and Responses

Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Task Force on Harbourfront Developments on Hong Kong Island

The Proposed Auckland Unitary Plan (notified 30 September 2013)

Task Force on Kai Tak Harbourfront Development

Proposal to designate the Queen of Sweden Historic Marine Protected Area - Partial Business Regulatory Impact Assessment (BRIA)

City Center Neighborhood Plan

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Lynn Waterfront Master Plan

10.0 Open Space and Public Realm

Waterfront Project VISION, GOALS AND OBJECTIVES

2.0 Urban Design Concepts

A Growing Community Rural Settlement Areas

3 Summary of Major Views and Responses

As is referenced in the site analysis, the current site access is along Loggers Lane and on to Galbraith Avenue.

City of Kingston. North King s Town Secondary Plan Open House + Workshop #1 February 28, 2018

PUBLIC REALM STUDY AREA

ELK GROVE GENERAL PLAN VISION

Preliminary Land Use Proposal for the Western Part of Kennedy Town Task Force on Harbourfront Developments on Hong Kong Island

Hobart A Strategic Framework

New Towns in Hong Kong: Planning for the Next Generation

Tauranga City Centre Spatial Framework

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

Parks Renaissance. Strategy. Director, Operations. General Committee. Presentation to. May 16, Barb Rabicki

Prepared by: a for the of the. Waterspace Strategy Sustainable Development Liverpool South Docks

Strategic Plan. Updated April City of St. Augustine

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

Appendix A. Planning Processes. Introduction

2017 STRATEGIC PLAN CITY OF ST. AUGUSTINE

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

3.5 Principle 5/Response

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Streets for People, Place-Making and Prosperity. #TOcompletestreets

3.1 Existing Land Use

Designing Hong Kong Harbour District

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Welcome! HORSESHOE BAY PARK. Welcome!

Task Force on Harbourfront Developments on Hong Kong Island

Task Force on Kai Tak Harbourfront Development. Update on Implementation of Public Creatives in Kai Tak Development

I604. Hobsonville Marina Precinct

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

THE TOWN OF WASAGA BEACH

Wireless Hill Vision 2020

PUBLIC. Ai + Architecture LLC., 90 Belknap Street, Concord, MA 01742, USA (t) (f)

Eastern City District Plan

Sustainable Urban Development

Harbour-front Enhancement Committee. Urban Design Study for the New Central Harbourfront Revised Planning and Urban Design Concepts

Hamilton Pier 7&8 Public Meeting and Workshop #1

Cohasset Municipal Harbor Plan Public Meeting #1. Harriman GEI Consultants FXM Associates May 31, 2018

Table 8-4: Road Classification Local Roads, second table, of Chapter 8 Create a Multi-Modal City, be amended by adding the following:

Urban Design Report. America s Cup Wynyard Hobson. McIndoeUrban

1 Port Street East: Delivering on the Vision. Andrew Whittemore Director, City Planning Strategies. Ruth Marland. TOPCA May 23, 2017

DRAFT GREATER SYDNEY REGION PLAN OBJECTIVES, STRATEGIES AND ACTIONS

PLANNING ADVISORY BOARD AGENDA OCTOBER

Methodology on Functional Linkage between Marine and Terrestrial Areas

Representing Hong Kong Institution of Engineers. Representing Society for Protection of the Harbour

North District What we heard

QUEEN S WHARF BRISBANE PRIORITY DEVELOPMENT AREA PROPOSED DEVELOPMENT SCHEME AILA COMMENTS

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

Four Big Ideas. Three Key Opportunities. Principles. Draft Place Making Master Plan. 1. The Foreshore 2. Green Links. 3.

AMBLESIDE WATERFRONT

Summary of strategic directions

CENTRAL HARBOURFRONT AND ME (CHarM) DESIGN BRIEF

Auckland City Council

Marinas, Mooring and Boating Facilities 23

A 10-Year Strategic Plan for Recreation, Parks, Arenas and Culture City of Peterborough

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

Planning for Waterfront Communities

January Galashiels Development Parcels

6. THE COAST POLICY INDEX

Taking forward the All London Green Grid

Abu Dhabi Public Realm Design Manual

SECTION ONE: INTRODUCTION. introduction

Chelsea Creek Municipal Harbor Plan

Public Workshop #2 October , Welcome. Former Kingston Penitentiary & Portsmouth Olympic Harbour

Kingston Inner Harbour: A Cultural Heritage Landscape Pilot Study

Cold Lake Marina Master Plan

for Biosphere Reserves

Shoreline Master Program Town of La Conner, Washington

The New Planning System 5 June 2015

The role of Universities: Civic Design and planning futures

Ann Arbor Downtown Street Design Manual. Ann Arbor DDA IDA 2015 Awards Planning Category

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Highest & Best Use Study Marina Park Lands

DRAFT PLANNING SCHEME AMENDMENT GC81


Smart City Governance URBIS Solutions. David Ludlow, Assoc. Professor European Smart Cities University of the West of England, Bristol

Transcription:

HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications Presentation on the Initial Findings 9 February 2011 Harbour Business Forum

Background This Study is an initiative of the HBF which further expands its database of existing assets and uses on and around the harbour and builds on its vision for a harbour which is planned and managed on a holistic and integrated basis The study is ongoing and final proposals and recommendations are still under review

HBF Vision for the harbour To revitalise Victoria Harbour and its harbourfront to become an attractive, diverse, vibrant, accessible and sustainable world class asset for the economy, people and visitors of Hong Kong: a harbour for the people, a harbour of life

Study Objectives Focus attention on water dependent and water related uses which are important to Hong Kong and which require landside facilities and amenities to prosper Demonstrate that uses of both land and water around the harbour are inter related and interdependent and together contribute to its vibrancy Develop a set of recommendations via which delivery of optimal and integrated harbour and harbourfront planning and development decisions can be made

Goals Complete development of a comprehensive Excel database a harbour use audit of existing and planned marine/maritime and waterside uses and marine infrastructure assets and facilities and a related, Google Earth based multi layered GIS Review of potential changes in marine activity in the future and demand for new harbour uses and the implications for land/water interfaces Recommend specific projects and programmes to enable delivery of an integrated strategic plan to ensure a more cohesive, logical, attractive and vibrant harbour for all

Water Dependent and Related Uses Water dependent (WD) must physically be located on, over or adjacent to water to achieve its primary purpose/service e.g. moorings, piers, typhoon shelters, ferries Water related (WR) not dependent on direct water access to achieve primary purpose but provides support to water dependent uses e.g. ship repair, ship supplies, slipways Many are economically important while others add to the enjoyment of the Harbour by residents and tourists

Study Framework Final Study Report will comprise: Baseline audit and analysis of marine, water and waterfront uses (existing and committed) in and around the harbour with focus on WD and WR uses with GIS enablement via Google Earth Pro Identification and characterization of geographic subdivisions within the harbour Gap analysis as to potential harbour and waterfront opportunities based on HBF s vision and stakeholder input

Baseline Data Further development of the WPI 2010 Study GIS database of marine related structures in or on the harbour Expanded to include following key features: Marine uses and structures including piers, moorings, typhoon shelters, breakwaters, etc., Fairways, Ferry Routes, Fishing areas, Marinas and boat clubs, Military facilities, Open water, Passenger transport and Port facilities, Land uses and zonings along the waterfront and their frontage to the water

Live Database Multi layered and easily searchable GIS developed in Google Earth related to Excel database with ability to use Street View and other photographs of harbour/harbourfront Numbers, percentages, distances, etc. can all be provided and graphically displayed Land lots and frontage/hinterland areas linked to latest proposals as to future use Can be further developed and expanded to reflect changing conditions

Harbour Subdivisions Tsuen Wan Port Eastern: example shown Inner Harbour Core Junk Bay: (Extension) Western

Interfaces: Eastern Harbour Predominant use of land-water interface (existing and committed) N.B. PCWAs likely to be closed Total water frontage 22.3km including piers North Point Fire Service Pier Infrastructure 6 ferry piers 4 vehicle piers 3 public piers 4 private piers 5 government piers 24 landing steps

Hinterland: Eastern Harbour Committed predominant use of hinterland: Commercial 18% Industrial/Logistics 1% Municipal/community 16% Recreational/ open space 33% Residential 32%

Water character: Eastern Harbour To Kwa Wan Ferry Pier Kwun Tong Ferry Piers North Point Ferry Piers Sam Ka Tsuen Ferry Pier Sai Wan Ho Ferry Pier Aspirational water uses in Eastern Harbour: Passenger transportation across and along harbour Continued yacht racing Typhoon shelters used for recreational purposes: watersports facilities dragonboat/ rowing arena marina fishing sampan mooring maritime heritage

Water land zones: Eastern Harbour New MTR North Point MTR New Kai Tak Stadium New Cruise Terminal Quarry Bay MTR Ngau Tau Kok MTR Sai Wan Ho MTR Kwun Tong MTR Yau Tong MTR Opportunities: Integrate land use planning in relation to water use More flexible, efficient water transport, better linked to MTR/buses Develop existing harbour heritage as leisure destinations Sheltered water capable of being used more intensively and to provide facilities for leisure boating Develop natural arenas and spectator facilities for water based sports and events

Stakeholder Workshop and Interviews Wide ranging group with interests in both marine and leisure harbour activities Government, NGO and private sector representation Discussed existing and potential harbour uses (gaps) within the themes of Working Harbour, Connected Harbour and Harbour Places and how they might contribute to achieving the HBF Harbour Vision

Assessment Guidelines Active uses of the harbour s water bodies, with integrated and appropriate land/water interfaces, need to be maintained (or introduced) to ensure vibrancy Presumption that priority given to essential or valued harbourfront uses that are waterdependent and/or water related Flexible water transport should be encouraged as a medium to connect people and places Limited good reclamation may be justified to protect and enhance use of the harbour for public benefit

Proposed Projects and Programmes Following initial SWOT analysis of the stakeholder proposals in the light of the assessment guidelines, their likely contribution to fulfilling the HBF Vision and their technical feasibility the following opportunities have been identified: Flexible water transport system New harbour marina Water based events arena and facilities Rationalisation of Working Harbour Dock for heritage vessels Revitalisation of piers

Ongoing Work The study team is currently preparing: Project Definition Statements for the proposed enhancement PPs which will address both water and land based issues and/or challenges Environmental, social and economic impact analysis to include intangibles such as brand value and catalytic impacts Review of institutional and other regulatory issues associated with implementation of the proposals

Final Report Provide comprehensive marine and land use baseline data on which to base integrated rationale/criteria for decisions on future PPs in or on the harbour Put forward specific PPs to enhance use of the harbour based on proposed integrated criteria Provide strategy for water characterization and location of land/water interfaces Form solid basis for future strategic planning of the harbour and the harbourfront

Relevance of the Study Harbour s edge is now a finite resource and so interface between water and land uses must be planned carefully and within an overall context Up to date and comprehensive audit of existing marine/water based uses and users Initial attempt to identify predominant future water uses in an integrated and strategic context Initial effort to identify all land/water interface requirements

Thank you