GPPS-2017-Put 4 digit paper number here

Similar documents
State Grid Zhejiang Electric Power Corporation Electric Power Research Institute, Hangzhou, , China

4th International Conference on Sensors, Measurement and Intelligent Materials (ICSMIM 2015)

Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful

Feasibility study on an energy-saving desiccant wheel system with CO 2 heat pump

Homework #4 (group) Tuesday, 27 by 4:00 pm 5290 exercises (individual) Tuesday, 27 by 4:00 pm extra credit (individual) Tuesday, 27 by 4:00 pm

CHAPTER 3 BASIC STEAM CYCLE

Yarway Narvik Steam Desuperheater Series 4300 TempLow

Steam Power Cycles Part II

Development of a Novel Structure Rotary Compressor for Separate Sensible and Latent Cooling Air-Conditioning System

Homework Chapter2. Homework Chapter3

Experimental Study and Analysis of Condenser Performance under Dual Backpressure Operation Mode

Chapter 10 VAPOR AND COMBINED POWER CYCLES

Week 13 Chapter 10 Vapor & Combined Power Cycles

Renovation, Modernization and Life Time Extension Measures on Steam Turbines Sustainable Growth - Strategies for efficiency Increase

Impact of indirect evaporative air cooler type on the performance of desiccant systems

Feasibility of Controlling Heat and Enthalpy Wheel Effectiveness to Achieve Optimal Closed DOAS Operation

Experimental Study on Compact Heat Pump System for Clothes Drying Using CO 2 as a Refrigerant. Abstract

POWER Selecting Shell Side Design Temperature for Feedwater Heaters

Chapter 8. Production of Power from Heat

ICONE DRAFT Proceedings of the 16th International Conference on Nuclear Engineering ICONE16 May 11-15, 2008, Orlando, Florida, USA

Refrigeration Cycle And Compressor Performance For Various Low GWP Refrigerants

Performance Comparison of Ejector Expansion Refrigeration Cycle with Throttled Expansion Cycle Using R-170 as Refrigerant

Experimental Research On Gas Injection High Temperature Heat Pump With An Economizer

Thermodynamics: Homework A Set 7 Jennifer West (2004)

(Refer Slide Time: 00:00:40 min)

Cooperation of a Steam Condenser with a Low-pressure Part of a Steam Turbine in Off-design Conditions

Available online at Energy Procedia 6 (2011) MEDGREEN 2011-LB

Article Energy Saving Benefits of Adiabatic Humidification in the Air Conditioning Systems of Semiconductor Cleanrooms

Off Design Operation of Hybrid Noncondensable Gas Removal Systems for Flash Steam Cycle Geothermal Power Plants

Drive Power and Torque in Paper Machine Dryers

Hebei Datang International Wangtan Power Company, China

An Experiment of Heat Exchanger Produces Hot Water Using Waste Heat Recovery from Air Conditioning

Evaporation System: Types and Design Aspects

Thermodynamic analysis of air cycle refrigeration system for Chinese train air conditioning

POWERENERGY

Introduction to Material and Energy Balance

Analysis of Oil Pumping in the Hermetic Reciprocating Compressor for Household Refrigerators

SOLAR WATER DISTILLATION BY USING WATER IN THE INNER GLASS EVACUATED TUBES

3. (a) Explain the working of a rotary screw compressor. [10] (b) How the capacity control is achieved in refrigerant compressor?

Performance Investigation of Refrigerant Vapor- Injection Technique for Residential Heat Pump Systems

ScienceDirect. Development progress of critical equipment in the CSNS cryogenic hydrogen system

Design of Divided Condensers for Desiccant Wheel-Assisted Separate Sensible and Latent Cooling AC Systems

CONSIDERATIONS IN CONVERTING A DUAL SHELL OR A DUAL PRESSURE COAL FIRED PLANT CONDENSER INTO A COMBINED CYCLE PLANT CONDENSER

Effect of Flow Distortion in Inlet Duct on the Performance of Centrifugal Blower

Influence of Feed Water Heaters on the Performance of Coal Fired Power Plants

ETI-Z Series Centrifugal Chiller Applied Low GWP Refrigerant to Contribute to the Prevention of Global Warming

R07. Answer any FIVE Questions All Questions carry equal marks *****

Steam Generator (Boiler) & Steam Turbine. Steam Generator (Boiler) ME 268. Model Lab

EFFECT OF PAG OIL CIRCULATION RATE ON THE HEAT TRANSFER PERFORMANCE OF AIR-COOLED HEAT EXCHANGER IN CARBON DIOXIDE HEAT PUMP SYSTEM

Speransa 2008: Round table: Nuclear and sustainable development Universitad Politecnica de Valencia \UPV - Passive safety systems -

A New Control Approach for a Direct Expansion (DX) Air Conditioning (A/C)System with Variable Speed Compressor and Variable Speed Supply Fan

CHP-turbine room. CHP can capture almost EXTRACTED STEAM 20 PSI HIGH-PRESSURE STEAM 1250 PSI HEAT EXCHANGER HOT WATER SUPPLY F

Experimental Study on Match for Indoor and Outdoor Heat Exchanger of Residential Airconditioner

A STUDY ON THE BEHAVIOR OF STEAM CONDENSATION IN U-SHAPED HEAT TUBE

REFRIGERATION CYCLE Principles of Mechanical Refrigeration Level 2: Cycle Analysis

BENSON Boiler Technology

Open Access Operation Modes and Energy Analysis of a New Ice-Storage Air- Conditioning System

A Study of the Condenser in Nuclear Power Plants

Analysis the effect of condenser pressure (vacuum) on efficiency and heat rate of steam turbine

MECHANICAL SCIENCE Module 2 Heat Exchangers

Study of R161 Refrigerant for Residential Airconditioning

Dedicated Closed Circuit Hydrostatic Fan Drive Control

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road AUTONOMOUS QUESTION BANK (DESCRIPTIVE) UNIT I

Single Screw Ammonia Heat Pumps. Harness Your Heat... Don t Reject It

9707 Key West Avenue, Suite 100 Rockville, MD Phone: Fax:

S.A. Klein and G.F. Nellis Cambridge University Press, 2011

Study and Design Considerations of HRSG Evaporators in Fast Start Combined Cycle Plants. Govind Rengarajan, P.E.CEM, Dan Taylor

HOW TO SELECT AN INDIRECT THERMAL TECHNOLOGY FOR INDUSTRIAL MATERIALS PROCESSING

AND AIR-CONDITIONING. Dr Ali Jawarneh Department of Mechanical Engineering Hashemite University

Engineering Thermodynamics. Chapter 7

R32 Compressor for Air conditioning and Refrigeration applications in China

Efficiency of Application the Condensing Heat Utilizers in the Existing Boiler's Unit in Heat Power Station

A Numerical study of the Fire-extinguishing Performance of Water Mist in an Opening Machinery Space

Enhancement of the Separate Sensible and Latent Cooling Air-Conditioning Systems

DRYING YELLOW-POPLAR IN A SOLAR-DEHUMIDIFIER KILN WITH HEAT STORAGE AND HEAT RECOVERY SYSTEMS

THE PSYCHROMETRIC CALCULATOR By: Stanley F. Gallos, The Bastian-Blessing Company INTRODUCTION PROPERTIES OF THE RSES CALCULATOR

Performance analysis of a vapour compression refrigeration system with a diffuser for theeco-friendly refrigerants R-134a, R-600a and R-152a

Laboratory study on the cooling effect of flash water evaporative cooling technology for ventilation and air-conditioning of buildings

Comparison Simulation between Ventilation and Recirculation of Solar Desiccant Cooling System by TRNSYS in Hot and Humid Area

Full-scale Experiment of Longitudinal Ventilation Smoke Control System and Central Smoke Exhaust System in City Underwater Tunnel

Effects of Flash and Vapor Injection on the Air-to- Air Heat Pump System

Boiler Basics. Design and operation

HEAT EXCHANGER FORMULAS & EXAMPLE

The Energy Consumption Investigation of the Hotel Central. Air-conditioning System and the Research of Energy Saving Measures

Evaluation of HCFC Alternative Refrigerants

Drying principles and general considerations

SIMULATION ANALYSIS ON THE FRESH AIR HANDLING UNIT WITH LIQUID DESICCANT TOTAL HEAT RECOVERY

SIR C.R.REDDY COLLEGE OF ENGINEERING, ELURU DEPARTMENT OF MECHANICAL ENGINEERING ETD-II. Model Short Answer Questions And Answers

ETA ACCU 90% HIGHEST EFFICIENCY AIR HANDLING UNIT

THE ANALYSIS AND EXPERIMENTAL INVESTIGATION OF HEAT PUMP SYSTEM USING THERMOBANK AND COS EJECTOR CYCLE

Available online at ScienceDirect. Energy Procedia 91 (2016 ) 35 41

Solution of I Mid Term Steam Engineering 6ME5A

Reducing energy consumption of airconditioning systems in moderate climates by applying indirect evaporative cooling

Copy Right By: Thomas T.S. Wan

PRESSURE-ENTHALPY CHARTS AND THEIR USE By: Dr. Ralph C. Downing E.I. du Pont de Nemours & Co., Inc. Freon Products Division

EBAC MODEL CD30 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

AUTOMATION OF BOILERS USING LABVIEW

100% Outdoor Air Dehumidification Methods

Understanding Process Vacuum for Process Improvement

Secondary Systems: Condensate/Feedwater Cycle

Transcription:

Proceedings of Shanghai 2017 Global Power and Propulsion Forum 30 th October 1 st November, 2017 http://www.gpps.global GPPS-2017-Put 4 digit paper number here THE RESEARCH ABOUT INFLUENCE OF WET STEAM ON OVERSPEED FOR NUCLEAR STEAM TURBINE Kangna SUN Shanghai Electric Power Generation Equipment Co., Ltd. Shanghai Turbine Plant sunkn@shanghai-electric.com Shanghai, China ABSTRACT The overspeed results is one of the most important technical specifications for the safety design of nuclear steam turbine. Because of the low parameter and high humidity of steam in Nuclear Turbine, it should pay more attention to wet steam influence for nuclear units compared to fossil units in overspeed calculation, but it usually be ignored in a lot of overspeed calculation. In order to enhance the attention to influence of wet steam on overspeed calculation for nuclear turbine, to explore how to lower the wet steam influence of nuclear turbine in technical aspect, to lower the overspeed results, and to improve the safety and reliability for nuclear unit,this paper analysis and research the wet steam influence on overspeed of Nuclear Turbine, and summary overspeed calculation method of Nuclear Turbine considering wet steam influence, and get the results of calculation. Meanwhile, this paper also give a brief description and calculationabout the other Influencing Factors that play an important role in overspeed for Nuclear Turbine. These analysis and calculation are very significant to provide reference for overspeed calculation and on-site data analysis about nuclear unit. 1. INTRODUCTION The overspeed calculation results is one of the most important technical specifications for the safety design of nuclear steam turbine.the excessive overspeed of the rotor will cause a serious accidents of the electric power generation equipment. And because of the low parameter and high humidity of steam in nuclear steam turbine, it should pay more attention to wet steam influence for nuclear units compared to fossil units in overspeed calculation, but usually be ignored in a lot of overspeed calculation. The wet steamin nuclear unit have greatenergy,the amount of energy and how to reduce it are all interested to the researchers. In order to enhance the attention to influence of wet steam on overspeed calculation for Nuclear Turbine, to explore how to lower the wet steam influence of Nuclear Turbine in technical aspect, to lower the overspeed results, and to improve the safety and reliability for nuclear unit,this paper analysis and research the wet steam influence on overspeed of Nuclear Turbine, summary overspeed calculation method of nuclear steam turbine considering wet steam influence, and get the increment about the results of overspeed calculation considering the influence of wet steam by means of example calculation. Meanwhile, this paper also give a brief description and calculationabout the other Influencing Factors that play an important role in overspeed for Nuclear Turbine. 2. PRINCIPLE FOR OVERSPEED High pressure steam, generated by the nuclear island (boiler), enters the turbine through the throttle and governing valves. The turbine blading uses the energy of this expanding steam to generate power. If there is an electrical problem on the grid, the breaker is opened, and the restraining torque on the rotor is lost. The steam energy which previously was directed toward producing electricity now accelerates the rotor, the result may produce an overspeed condition. There are two protective functions built into modern steam turbine controls, the explanation is as follows. 1) If the turbine load is above 30% and the generator s breaker is open, a portion of the overspeed protective controller(opc) system initiates an action called Load Drop Anticipator(LDA).This then causes the rapid closure of the governor and intercept valves. 2) If the LDA fails to arrest the speed before it reaches 110%, a mechanical trip is activated, which results in the rapid closing of all steam valves. There are different types of overspeed protective system in the different turbine-generator unit design, but the fundamental is consistent between different overspeed protective systems. Basically, when the turbine in load rejection condition, at first it activate the signal of the rapid closure of the control(governor and intercept) valves, if after a load rejection the control valves fail to close or for other reasons that make the overspeed reaching 110% rated speed, then the overspeed protection trips the turbine and starts to This work is licensed under a Creative Commons Attribution 4.0 International License CC-BY 4.0

close all the stop valves. Finally to prevent the speed of the turbine-generator train from surpassing design limitations of 120 percent of rated speed. According to the overspeed calculation principle by American Society of Mechanical Engineers (ASME),the overspeed energy mainly include the rotor initial kinetic energy, entrapped steam energy in the turbine, energy added due to delays in trips and valve closing and the capability of including the energy of flashing water has been added(asme PTC 20.2, 1965). 3. INFLUENCE OF WET STEAM ON OVERSPEED CALCULATION 3.1 THE ENERGY OF WET STEAM IN NUCLEAR UNIT According to ASME overspeed calculated method, the energy of flashing water in zone is a part of all overspeed energy. When turbine in rejection condition, there is a greater pressure drop in the zone, according to the steam properties and thermal process, the saturated water in the zone will convert to the steam and expand. And the steam with a certain temperature and pressure would expand to generate power to cause the overspeed. To the fossil units, because of the high steam parameter which could usually reach subcritical, supercritical and ultra-supercritical, there is few wet steam zone in the turbine, so the flashing water energy is very low, we can use estimated value in simplified calculation. But to the nuclear units, the steam parameter is low, the HP (High Pressure) admission is saturated steam with a certain humidity. Here we list the conventional island HP admission parameter for several popular reactors, see the Table 1.The admission humidity is 0.4% ~ 0.5%, and humidity is increasing after the steam enter into the blading in HP casing to create power, the HP exhaust humidity can reach up to 12% to 15%. The LP (Low Pressure) inlet steam is superheated steam which is from HP exhaust and through the Moisture Separator and Reheater (MSR) to reheat and dehumidify. There is a gradual decline in the steam parameter when it enter into LP casing because of the steam expand to generate power, and then the superheated steam gradually convert to wet steam. The LP exhaust humidity can reach up to 12% to 14%. Table 1 Advanced nuclear reactor parameter Reactor type temperature ( ) pressure (MPa) flow rate(t/h) humidity M310 268.1 5.34 2016 0.5% CPR1000 280.1 6.43 5808 0.47% HPR1000 280.9 6.5 6125 0.5% AP1000 268.6 5.38 6795 0.45% CAP1700 270.3 5.53 10260 0.36% 3.2 DIFFERENT FORM OF FLASHING WATER The accumulative water could present in several form in turbine zone, a part of that is the water in the steam, existing as a vaporific or granular form in the steam, another part is the drainage which haven t been removed from the casing. Besides, the wet steam could be accumulated to form water film with a certain thickness on the inside wall of inner casing and on the surface of the stationary and rotating blades, the part of water film also have flashing energy when the pressure drop in the zone during the rejection condition. Except for all above, the flashing water energy in extraction piping and feed water heaters should be taken into account for the last two stage extraction steam pipes which have no non-return valve, and the other extraction steam pipes also have the similar calculated methods under the failure condition of non-return valves.(wang et al.,2003;wu et al.,2015) 3.3 THE EFFECTIVE DEHUMIDIFICATION METHODS Take the PWR (pressurized water reactor) 1000MW unit for example, all the steam in turbine is almost in the wet steam environment except for the less of stage. Because of the high humidity in nuclear turbine, the wet steam have great effect on result of overspeed, so it is necessary to take measures to lower the steam humidity to avoid overspeed. Almost all the nuclear units have effective dehumidification structure, including the dehumidification grooves, drainage holes and other dehumidification systems. These structures could greatly reduce the water in the turbine. Except for what have mentioned above, last stage hollow stationary blade and heating last stage diagraph to dehumidify are the advance dehumidification methods at present,the explanation is as follows. 1) Hollow stationary blade to dehumidify: in the design of the hollow stationary blade, the stationary blade is welded to a hollow structure, and some thin slots which connect to the hollow structure are machined in the blades at appropriate area, because of negative pressure in the hollow structure, any water passing on the surface of the blades may be drawn into the thin slots to the hollow structure and finally drain into the condenser. Hollow stationary blade work well for dehumidification, the shape of the hollow blade is the same as the normal blade, so it won t reduce the turbine efficiency. 2) Heating last stage diagraph to dehumidify: in this design, the last stage diagraph is designed as a special hollow structure, it could be equivalent to heat exchanger. Inside the diagraph, it is the high parameter steam from one of HP extractions, and outside is the mainstream wet steam, so the inside steam parameter determine the evaporation capacity (heat exchange capacity) (Sun,2017). 3.4 OVERSPEED CALCULATION ADDED THE ENERGY OF FLASHING WATER 3.4.1 THEORY ENERGY CALCULATION METHOD According to overspeed calculation specification of Westinghouse Corporation in early stage, the method of calculating the additional energy added by flashing water have a simplified method is based on the concept that after the heater has been evacuated of all of its available energy, the state point of the remaining water will be at the saturated conditions at the pressure level in the zone to which this steam expanded. The amount of energy available from this steam can be estimated from the following equation: 2

Ef=1.056-3*(W2-W1)*(hg1-hiso)*eff/2 W2 is the remaining weight of water (lbs). W1 is the initial weight of water (lbs). hg1 is the enthalpy of saturated steam at the zone pressure(btu/lb). hiso is the enthalpy of the steam after an isentropic pressure drop from the zone pressure to the pressure in the zone to which this steam will expand(from steam tables) (BTU/lb). eff is the assumed blading efficiency,0.80. The factor of 2 at the end of the equation is because the energy added must be integrated between the beginning and end of the process. The value at the end is zero, so if the process is assumed linear, dividing the initial energy by two is equivalent to the integration. W2,the amount of water that remains is found from the following equation: W2=W1*(hfgavg-uf1)/(hfgavg-uf2) W2 is the remaining weight of water(lbs). W1 is the initial weight of water(lbs). hfgavg is the average latent energy throughout the process(btu/lb). To be found by averaging the saturated latent energy at the initial zone pressure and the saturated latent energy at the pressure in the zone to which this steam will expand (from steam tables). Uf1is the initial energy(btu/lb). To be calculated from the equation: u=h-0.185*p*v, Where u(btu/lb), h(btu/lb), p(psia) and v(ft^3/lb) are found in the steam tables at the saturated liquid conditions at the initial zone pressure. Uf2 is the final internal energy (calculated as above) at the pressure in the zone to which this steam will expand (from steam tables). The difference between the initial water and final water is the amount of steam that will expand through the turbine. 3.4.2 CALCULATING EXAMPLE According to ASME overspeed calculated method, the input for overspeed calculation mainly included the whole closure time of valves, volume and parameters of the steam in the zones, weight moment of inertia for the turbine rotor and generator rotor, energy loss, rated speed and calculation power etc. The rated calculated load or the maximum calculated load (about 103~105% rated load for nuclear units, this is usually maximum guaranteed load) is one of the calculated initial condition, we could obtain the data from heat balance diagrams. And the end condition is the zero load or (about 5~8% rated condition). There is the maximal overspeed result in the condition of maximum calculated load rejection to zero load. We take a 1000MW nuclear unit for the example of overspeed calculation. Figure 1 is the simulation model of the unit. The unit is a half speed (1500 r/min), single shaft, three casings with four exhausts, reheat, condensing nuclear turbine, the steam turbine consists of one High Pressure (HP) and two Low Pressure (LP) casings. The exhaust from HP casing enter the Moisture Separator and Reheater (MSR), and then enter into LP casing. The steam turbine and the generator are arranged in one line. Figure 1 The simulation model of a 1000MW nuclear unit. The parameters and volume in the zones of steam turbine and flashing water quality in wet steam zone are listed in the table 2, which are the key input information for calculation. Because of the drainage and dehumidification measure in nuclear units, so there are relatively less water in the zone, the flashing water mainly is water film on the inside wall of inner casing and on the surface of the stationary and rotating blades. According to the energy calculation method of flashing water which have been mentioned in the chapter 3.4.1 of this paper, the main input information to calculate the energy of flashing water is the initial weight of water W1.Thickness for the water film have an experienced calculation value. To calculate the quality of the flashing water, so except for the thickness of the water film, superficial area of all parts which in the wet steam circumstance is needed. Table 2 The parameters in the zones of 1000MW nuclear steam turbine. Zone Volume of steam (m 3 ) Pressure (MPa) Enthalpy (KJ/Kg) Flash water (kg) HP Zone 1 22 6.45 2772 35 HP Zone 2 2.5 6.02 2753 9 HP Zone 3 36 3.04 2654 164 HP exhaust - 1.07 2497 LP Zone 1 135 1.02 2983 LP Zone 2 112 0.985 2962 LP Zone 3 370 0.185 2668 2880 Condenser - 0.0058 2497 Some other parametric boundaries are as follows. Rated power: 1000MW,Rated speed: 1500 r/min, Delay time: 0.135 s, Valve closing time: 0.5 s etc. According to the calculation, we get the LDA and Emergency overspeed calculation results for different rejected load conditions in different effective of flashing water (table 3 and table 4). The results showed that the overspeed rises 0.5%-0.6% if the wet steam energy is considered for 1000MW nuclear unit, so the energy for flashing water in nuclear unit could not be ignored. Table 3 LDA overspeed results comparison for considering wet steam or not Load rejection Not Including Including increment 3

condition flashing water flashing water 1586.9r/min (105.79%) 1588.5r/min (105.9%) 1576.0r/min (105.1%) 1577.8r/min (105.19) 1595.8r/min (106.39%) 1597.4r/min (106.49%) 1583.9r/min (105.59%) 1585.7r/min (105.71) 8.9r/min (0.6%) 8.9r/min (0.59%) 7.9r/min 7.9r/min (0.52%) Table 4 Emergency overspeed results comparison for considering wet steam or not load rejection condition Not Including flashing water 1729.4r/min (115.29) 1730.9r/min (115.4%) 1703.0r/min (113.53%) 1705.1r/min (113.67) Including flashing water 1737.6r/min (115.84%) 1739.1r/min (115.94%) 1710.3r/min (114.02) 1712.5 r/min (114.16) increment 8.2r/min (0.55%) 8.2r/min (0.54%) 7.3r/min 7.4r/min LDA overspeed: This is peak overspeed assuming an LDA action, which closes governor and interceptor, given in RPM and in percent of rated speed. Emergency overspeed: This is the peak overspeed after mechanical trip set point has been exceeded. Values are given in RPM and in percent of rated speed. 4 OTHER INFLUENCING FACTORS ON OVERSPEED CALCULATION 4.1VALVE DELAY AND CLOSING TIME The main steam valve are arranged in front of the HP admission, connecting to the island main steam to adjust admission steam and protective turbine. The reheat valves are arranged on the hot reheat pipes between the MSR and LP casing to cut off the LP inlet steam flow when necessary. At the beginning of unit rejection, the main steam valve cut off the steam flow from island, and the reheat valve cut off the steam flow from MSR to protect turbine to avoid overspeed. According the energy principle of overspeed calculation, the delayed closing time would bring additional high parameter steam into the HP and LP casing, and the extra steam energy will accelerate the rotor s speed.(tang,2015) So choosing the valve with short closure time is better to control the overspeed value. Take the 1000MW nuclear unit for example, when the closure time of reheat valve decrease to 0.5s from 1s, the average overspeed value can decrease over 1%. 4.2 ALLOCATION OF EXTRACTION CHECK VALVES According to the requirement of overspeed protection and water prevention to turbine, it s need to arrange extraction check valves on the extraction pipes to keep the steam which is from heater or deaerator out of turbine at rejection and trip condition. When overspeed occurred at the rejection condition, once one of the non-return valve break down, steam in the extraction pipe and heater will flow backward to the turbine due to differential pressure. The portion of steam with energy get into turbine to generate mechanical energy, and accelerate the rotor s speed. According to the energy calculation, overspeed value will increase nearly 0.2% at non-return valve of one extraction line failure for 1000MWclass nuclear unit. So to the unit with high overspeed protective requirement, especially to nuclear unit, the 1+1 extraction check valve allocation is recommended, namely, there are one extraction check valve with actuator and one extraction check valve without actuator in every extraction line and be arranged in one line, it can be seen in figure2. Figure 2 The 1+1 extraction check valvesallocation diagraph 4.3 MOMENT OF INERTIA ON ROTOR We can consider moment of inertia on rotor as inertance of rotor. The amount of moment of inertia on rotor have a large effective on overspeed result. Also take the 1000MW nuclear unit for example, every 15% increase in moment of inertia on rotor, the overspeed result would decrease about 1%. So it s beneficial to decrease overspeed result through enhancing the moment of inertia on rotor. So in the phase of structure design, we could optimize the rotor structure in reasonable range to enhance the moment of inertia on rotor to decrease overspeed level in a certain extent. 5 CONCLUSION This paper analysis and research the wet steam influence on overspeed of nuclear steam turbine, including energy and form of flashing water in wet steam zone. And summary overspeed calculation method of nuclear steam turbine considering wet steam influence, and get the increment about the results of overspeed calculation considering the influence of wet steam by means of example calculation. Furthermore, this paper explore how to lower the wet steam influence of nuclear turbine in technical aspect, such as the drainage and dehumidification measure to lower the overspeed to improve the safety and reliability for nuclear unit. Besides, other Influencing Factors that play an important role in overspeed also be summarized in this paper, such as the valve delay and closing time, allocation of extraction check valves, moment of inertia on rotor. These results could also provide reference for overspeed calculation and on-site data analysis for other nuclear units. NOMENCLATURE Abbreviations HP high pressure LP low pressure MSR Moisture Separator and Reheater 4

REFERENCES [1] ASME PTC 20.2(1965).Overspeed trip systems for steam turbine generator units. [2] Sun K.N.(2017). Analysis of Influencing Factors for Overspeed of Nuclear Turbine, Thermal Turbine, 46(1), 6-8.(In Chinese) doi:10.13707/j.cnki.31-1922/th.2017.01.002 [3] TangM.J.,Wu S.F.(2015). A new overspeed calculation method of steam turbine under the condition of nonreturn valve failure or main valve leakage, Proceedings of the International Conference on Power Engineering- 15(ICOPE-15)November 30-December 4,2015, Yokohama,Japan. [4] Wang L.L., Cai X.S.(2003). Progress in research on water droplet size in two phase wet steam flow in steam turbine, University of Shanghai for Science and Technology, 25(4),307-310.(In Chinese) [5] Wu X.M.,Yang J.D. and LI L. (2015) Study on Wet Flow in a Nuclear Turbine, Thermal Turbine, 44 (4), 233-237.(in Chinese) doi:10.13707/j.cnki.31-1922/th.2015.04.002 5