Atmos EasySolar. Installation Instructions for. Sloping roof and flat roof installation with evacuated tube collector

Similar documents
Atmos EasySolar. Installation Instructions for. In-roof and flat roof installation with flat plate collectors

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

OWNER S GUIDE SEQUENTIAL THERMOSTATIC SHOWER VALVE. 150mm Inlet Pipe Centres. Shower Control. Handles and. may differ depending.

Twin & Triple Exposed Thermostatic Shower Valve Installation & Operating Guide

Francis Pegler Memento Single Sequential Exposed Thermostatic Shower

BLADE BATH SHOWER MIXER DECK MOUNTED CHR WITH KIT INSTALLATION INSTRUCTIONS P BS-E A/2

Enzo Concealed Shower Mixing Valve

EcoStyle Dual Concealed Thermostatic Shower. Telephone Product Specification. Cleaning

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

Minimalist Bottom Outlet Thermostatic Bar Shower. Telephone Product Specification

INTA ION MODERN BAR / BATH SHOWER MIXER CP

Installation guide Billi B-3000 Sparkling Dual levered slimline tap option

Enzo Safe Touch Thermostatic Shower EZ10010CP & EZ10014CP

Telo Shower Mixing Valve TL10016CP

Plus Bath Shower Mixing Valve CP and PL30020CP

Morco House Riverview Road Beverley HU17 0LD

HW3 Handwash Installation and Operating Instructions

Inta City Concealed Shower Mixing Valve CT80010CP

ENERSTORE. Vented Hot Water Storage System INSTRUCTIONS PLEASE LEAVE WITH HOUSEHOLDER

Inta City Shower Mixing Valve CT20010CP

Puro Mini Dual Control Shower Mixer PU90010CP

Cube Triplel Concealed Thermostatic Shower. Telephone Product Specification. Cleaning

INTADUO THERMOSTATIC BATH/SHOWER MIXER

Deluge Shower Mixing Valve 10045CP

pod Installation, Operation & Maintenance viridian Pod-PV, Pod-ST solar v

Installation Instructions and User Guide. Thermostatic Recessed Dual Control Shower Valve. Models covered: CAS SHCVO C, COB SHCVO C, ORB SHCVO C,

by Water Purification Supplies

Morco House Riverview Road Beverley HU17 0LD

Traditional Rigid Riser With Eight Inch Rose

Enzo and Enzo Deluxe Safe Touch Thermostatic Shower EN10031CP & EN10035CP

Kiko Bath Shower Mixing Valve KK90015CP

Thermostatic Bar Valves

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

user manual Dishwasher ESL 46510

Installation guide Sahara & Sahara Plus

Mio Concealed Shower Mixing Valve MI40010CP

IN00333 (rev C) Quadrant Shower Cabin with Monsoon Head

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Atmos Energy. Thermostatic Concentric Mixer Valve with Overhead. Fitting Instructions

Deluge Concealed Shower Mixing Valve DL40010CP

User Manual for MullToa 10 and 25

INSTALLATION INSTRUCTION

WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS

Installation & Operating Guide

Self-help Temperature Adjustment

Itho Solar System CombiSolar 150. Installation and service manual

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

SCHWAN INSTALLATION GUIDE

General System Layout Sketch

Powerflow Unvented water heater

POWER SHOWERS Models 4500M 5002M 4500T 5002T

Empura Water Filter. Installation Instructions & User Guide. Please keep these instructions for future reference and request of replacement parts

Dual Control Concealed & Exposed Thermostatic Shower Valve

GENERAL FITTING GUIDE THERMOSTATIC BAR SHOWER MIXER with RIGID RISER KIT

Thermostatic Concealed Shower Valve

INSTALLATION INSTRUCTIONS

installation INSTRUCTIONS

Zip Tudor. Affix Model Number Label Here Installation Section & Operating Heading Instructions. Single point open outlet (vented) water heaters

IMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring

Technical Specifications: Your product has a high quality finish and should be treated with care to preserve the visible surfaces.

Where the tap has a removable aerator on the spout exit it can be removed and cleaned periodically to maintain optimum flow performance.

INSTALLATION GUIDE NZ AU C

THROUGH-WALL AIR-TO-AIR HEAT PUMP AND AIR CONDITIONER. Instruction Manual. Model AMB-12H

BMW E36 Thermostat Removal And Coolant Flush

Rise. Digital. Bath with overflow filler. Rise Digital Bath installation instuctions page 1

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

INSTALLATION AND OPERATION MANUAL

RM530WC+ DIAL EXPOSED THERMO SHOWER VALVE INSTALLATION INSTRUCTIONS

Zen Boiling Tap Range

METIS. Installation instructions. Riser rail kit INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER.

RAMOR Shower Tower Thermostatic mixer Installation and Operating Instructions

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Please tape down. NewTeam Ltd. Customer Service Dept. Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW

SCHWAN INSTALLATION GUIDE

INDIRECT SYSTEM FOR FROST LOCATIONS

Installation Guide BUILT-IN SXS REFRIGERATOR UPSXB2627**

Thermostatic Shower Tower Installation and Operating Instructions

HOME INSPECTION CHECKLIST

Concealed Twin & Triple Thermostatic Shower Valve with Diverter. Installation & Operating Guide

Quartz. Digital. Concealed with adjustable height and fixed head. Quartz Digital concelaed adjustable/fixed installation instuctions page 1

FAULT FINDING. Water Gas Cassette Toilet FAULT FINDING

SINGLE LEVER CERAMIC DISC MANUAL SHOWER VALVE

Installation, Operating and Maintenance Guide

CONTENTS. Page. Contents 1. Introduction, features and benefits 2. PART ONE Overview of the softening process 4-5

Kiko Concealed Shower Mixing Valve KK80010CP

Thames thermostatic bar mixer with diverter Installation and operating instructions

SEALED THERMAL STORE

Alpha SolarSmart 100

INSTALLATION GUIDE NZ AU

Thanks for shopping with Improvements! Solar Rainmaker Automatic Plant Watering System Item #

PLEASE READ ALL SECTIONS OF THIS GUIDE BEFORE COMMENCING YOUR INSTALLATION AND IN CONJUNCTION WITH YOUR DRAWINGS.

EXPOSED BATH SHOWER MIXER INSTRUCTION MANUAL W INST 300. Please note: Tap heads shown is for illustration purposes only.

HE220, HE260 Humidifier Installation Kit

Maintenance Tips for Tenants

Thermostatic Bar Valve

Please tape down. NewTeam Ltd. Customer Service Dept. Brunel Road Earlstrees Industrial Estate Corby Northants NN17 4JW

Installation & Service Guide

INSTANTANEOUS ELECTRIC SHOWER

Installation and User Instructions

Transcription:

Atmos EasySolar Installation Instructions for Atmos EasySolar Sloping roof and flat roof installation with evacuated tube collector Atmos Heating Systems TBS Building Supplies Ltd Hackwood Road Daventry Northants, NN11 4ES Tel: 01327 871990 Fax: 01327 871905 e-mail: sales@atmos.co.uk internet: www.atmos.co.uk Issue 1.6.13

Atmos EasySolar Installation Instructions Evacuated Tube Collector Table of Contents 1 Introduction... 3 2 System Components... 4 3 Siting & requirements... 7 4 Installation... 8 4.1 Safety & insulation... 8 4.2 Storage tank... 9 4.3 Domestic water connections... 9 4.4 Hard water... 9 4.5 Tank in unheated space... 9 4.6 Protection of plastic pipe and pipe insulation... 10 4.7 Vented hot water systems... 10 4.8 Unvented hot water systems... 10 4.9 Connection to combi boiler... 10 4.10 Connection to an unvented hot water cylinder... 12 4.11 Connection to a vented hot water cylinder... 13 4.12 Evacuated tube collector on sloping roof... 14 4.13 Evacuated tube collector on flat roof... 20 4.14 Filling the tank... 24 4.15 Flushing the pump... 25 4.16 Connecting the collector circuit... 25 4.17 Connecting the optional booster pump... 26 5 Maintenance... 27 6 Technical specifications... 28 7 Commissioning checklists... 30 2

Atmos Heating Systems 1 Introduction Thank you for purchasing an Atmos EasySolar hot water system. This will provides you with free hot water for many years to come, provided that it is correctly installed and maintained. Most of us dislike reading installation manuals, and prefer to fit it and read later, so we have summarised some of the 7 most important installation requirements below, BUT, please do not use this as an excuse not to read the manual properly. Remember that the warranty will be invalidated if the installation is not correct. 1. LOCATION; Ideally the solar collectors should be facing directly south, and mounted on a slope of between 30 and 40 degrees to the horizontal. Any deviation from this will result in less energy being collected, although between south east and south west it will at most result in less than 10% loss of performance. 2. SHADING. If there are trees or buildings shading the location of the solar collectors, this will also reduce the performance. Ideally there should be no shading. 3. DO NOT fit the collector on a slope of less than 20 degrees. If you do the system will not only lose performance, but the drain back action will be impaired. That means the collectors will freeze and break in the cold winter. In the summer it will cause boiling, which is dangerous. 4. The storage tank MUST be located below the header of the evacuated tube collector. 5. The storage tank is fitted with a pump which has a 3m or 4m head. The vertical distance between the base of the tank and the top of the solar collector MUST NOT be greater than the pump head. If it is, the system will not work. A booster pump is available from Atmos to give additional pump head if you make a mistake, but they are not cheap. 6. The pipes from the collector to the storage tank MUST have a continuous slope down towards the tank, otherwise the drain back will not work. They must be properly fixed so that they cannot droop or sag, or be pulled down by someone. 7. PLEASE make sure you use the insulation provided on the red and blue pipes, and make sure it is neatly and correctly fitted. Up to 20% of the heat collected by the solar collector can be lost if the insulation is not fitted (or badly fitted). 3

Atmos EasySolar Installation Instructions Evacuated Tube Collector 2 System Components Boxes and parts The system is packaged in several boxes. Check that the boxes are not damaged and that you have received the correct boxes for the system you have ordered. See table below. Inform your supplier if you have received incorrect or damaged boxes. Numbers of boxes per system TC = tube collector S = sloping roof F = flat roof Storage tank 100L 3M Article No. 000574 Storage tank 100L 4M Article No. 000667 15 Tube collector Article No. 000893 20 Tube collector Article No.000894 24 Tube collector Article No. 000874 EasySolar 15TC S 3M Article No. 000892 1 1 1 EasySolar 20TC S 3M Article No. 000895 1 1 1 EasySolar 24TC S 3M Article No. 000877 1 1 1 EasySolar 15TC S 4M Article No. 000896 1 1 1 EasySolar 20TC S 4M Article No. 000897 1 1 1 EasySolar 24TC S 4M Article No. 000878 1 1 1 Installation kit sloping roof Article No. 000942 Installation kit flat roof Article No. 000876 EasySolar 15TC F 3M Article No. 000900 1 1 1 EasySolar 20TC F 3M Article No. 000901 1 1 1 EasySolar 24TC F 3M Article No. 000902 1 1 1 EasySolar 15TC F 4M Article No. 000903 1 1 1 EasySolar 20TC F 4M Article No. 000904 1 1 1 EasySolar 24TC F 4M Article No. 000905 1 1 1 For sloping roof installations specify which roof bracket is required *1]Standard *1]Medium *1]Wide *2]Slate *3]Bitumen/wall (roof bracket 30-39mm) (roof bracket k 40-50 mm) (roof bracket 51-63 mm) *1] *2] *3] 4

Atmos Heating Systems Components in installation kits picture Sloping roof Flat roof Installation and User Instructions 1 1 Adaptor 12 Volt 1 1 Wakaflex 1 0 Collector return pipe blue L=650cm 1 1 Collector flow pipe red (insulation supplied loose) L=650cm 1 1 Insulated flexible connecting pipes for domestic water L=90 cm incl. rings 2 2 Flow restrictor 1 1 Elbow 2 2 Compression elbow 2 2 5

Atmos EasySolar Installation Instructions Evacuated Tube Collector Pipe gland 0 1 Filling plug 1 1 Overflow plug 1 1 Overflow connector 1 1 Yellow filling hose with connector ¾ 1 1 6

Atmos Heating Systems 3 Siting & requirements When choosing the location for the storage tank the following needs to be considered: The vertical distance between the base of the tank and the top of the collectors should not exceed the combined capacity of the storage tank pump and any booster pump that may be added to provide extra pump height. The distance between the storage tank and the appliance (combi boiler or hot water cylinder) to which pre-heated water is supplied, needs to be kept as short as practical. The storage tank needs to be sited on a firm horizontal surface that is able to take the weight when the tank is filled with water (116kg). Atmos supply a brackets and shelf set for optional wall mounting of the storage tank. The following are needed in the vicinity of the storage tank: o 240V electrical socket within 1.5 meter distance o Water tap with ¾ bsp hose union connection within 2.5 meter distance It is preferable to locate the storage tank and the connecting domestic water pipes in a frost free room. If the tank is installed in an unheated space particular care must be taken to protect the domestic water pipes against freezing. See paragraph 4.5. The following tools are needed to install the system: Sloping roof Spanner 24 mm Spanner 8 mm Tape measure HSS drill bit 5 mm Sharp knife Hole saw 30 mm Battery drill with pozi bit Ducting tape Flat roof Ballast (paving slabs) Spanner 24 mm Spanner 8 mm Tape measure Hole saw 50 mm Sharp knife Rubber tiles for roof protection Roof sealant for roof penetration Ducting tape 7

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4 Installation 4.1 Safety & insulation Before you start work consider your own safety and that of others. The EasySolar hot water system has electrical parts. Apart from the adaptor which plugs into the 240V socket, these parts are all low voltage (12V) and therefore perfectly safe. However it is advisable to take care not to damage any electrical insulation and to avoid electrical parts becoming wet. The heat exchanger and the flexible connecting pipes for domestic water are subject to mains water pressure and can become hot. For this reason the flexible connecting pipes for domestic water need to be insulated. Insulation for these pipes is included in the assembly kit. The insulation must extend over the connections to the tank. Secure the insulation with tape. Ensure that the tank and connecting pipes have cooled down before any maintenance work is undertaken. The tank and connecting pipes can be cooled down by drawing off hot water. The pipes connecting the storage tank and the collectors can also become hot. The red flow pipe needs to be insulated along its full length. Insulation for this pipe is included in the assembly kit. Ensure that the pipes have cooled down before any maintenance work is undertaken. Assemble all components according to the installation instructions and avoid components getting damaged during installation or subsequent use. Put in place sufficient safety measures when working on the roof. Use scaffolding if necessary. 8

Atmos Heating Systems 4.2 Storage tank Connections Filling Collector cold Collector hot Collector sensor Domestic water hot Domestic water cold - - - - - - 4.3 Domestic water connections The flexible connecting pipes provided in the assembly kit are for the domestic water hot and cold connections. Use the washers for sealing the connection between the flexible pipes and the storage tank. The blue connecting point is for incoming cold water and the red connecting point is the outlet for pre-heated domestic water. The mains water pressure should be no more than 8 bar. If the mains water pressure is likely to exceed 8 bar, a pressure reducing valve should be fitted before connection to the storage tank. 4.4 Hard water In areas of hard water (hardness in excess of 200ppm) an approved water conditioner device must be fitted in accordance with the Building Regulations. Atmos can supply a suitable conditioner for fitting to the cold feed to the storage tank. In areas of hard water, failure to fit a suitable conditioner will invalidate the warranty. 4.5 Tank in unheated space If the tank is installed in an unheated space particular care must be taken to protect the domestic water pipes against freezing. Insulation for the domestic water flexible connecting pipes is supplied with the assembly kit. It may be necessary to apply additional insulation to these pipes and to other domestic water pipes particularly if the unheated space is subject to draught. 9

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4.6 Protection of plastic pipe and pipe insulation The red and blue collector pipes are made of plastic. It can occur that plastic pipes or pipe insulation material is damaged by rodents such as mice, rats or squirrels. Take appropriate precautions to protect the pipes and insulation material from this kind of attack if considered necessary. 4.7 Vented hot water systems The Atmos EasySolar system can be used as a preheat tank with a vented hot water system. The base of the cold water feed tank must be at least 1m above the base of the EasySolar tank, and the cold feed to the hot water cylinder passes through the cold/hot connections of the EasySolar tank. In most cases where the cold tank is in the roof space, a platform will be required of strong construction in accordance with the current standards. 4.8 Unvented hot water systems The Atmos EasySolar system can be used to provide preheated water to an unvented hot water cylinder. However the pressure reducing valve assembly as fitted on the cold water inlet feed of an unvented cylinder must be fitted before the EasySolar tank, and then the warm outlet from the EasySolar tank is connected to the cold inlet on the hot water cylinder (see page 12) 4.9 Connection to combi boiler The Atmos EasySolar hot water system can be used provide preheated water to a combi boiler. However the following points must be noted; a) If the boiler is solar compatible (eg Atmos HE32 InterCombi) it can be connected directly to the cold water inlet as per the diagram on page 11. b) If the boiler is not solar compatible, but can accept cold water at 28 deg C, a Combisol valve must be fitted (available from Atmos) c) In all cases for combi boilers which are not solar compatible, the installer should check with the manufacturers that the boiler is able to accept cold water at 28 deg C inlet. If this is not acceptable, then an EasySolar system should not be fitted, or the boiler should be changed to a solar compatible type. 10

Atmos Heating Systems Connection to combi boiler EXPLANATORY NOTES: 1) TMV1 is a non-adjustable thermostatic mixer valve. Connect as shown and ignore the arrows on the body of the valve. This is a diverter valve and works in reverse. The operation is that if the water from the solar storage tank is greater than 45 deg C, it goes straight to the taps. If it is lower it is diverted through the boiler and is heated up. 2) TMV2 is an adjustable thermostatic mixer valve with a black adjuster head. This should be fitted as shown, and the arrows on the body are correct. K means Cold (cold inlet), W means Warm (hot inlet), and M means Mixed (or blended) out to the taps. Adjust hot water to desired tap outlet temperature (clockwise gets colder, and anti-clockwise gets warmer). CONNECTIONS: 1) Heated water from solar store connects into M on TMV1 2) W on TMV1 connects into cold inlet on combi boiler 3) K on TMV1 connects to W on TMV2 with T-off from domestic hot water outlet on combi boiler. 4) Incoming cold water connects into K on TMV2 5) M on TMV2 connects to domestic hot water taps 11

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4.10 Connection to an unvented hot water cylinder The Atmos EasySolar hot water system can provide pre-heated water to an unvented hot water cylinder. The diagram below shows how the EasySolar system is connected to an unvented hot water cylinder. EXPLANATORY NOTES: 1. The pressure reducing valve and the 6 bar pressure relief valve must be fitted before the solar storage tank and before the T-off to the cold connection on the thermostatic mixer valve. 2. No valve must be fitted between the unvented cylinder and the solar storage tank or between the solar storage tank and the pressure relief valve. 12

Atmos Heating Systems 4.11 Connection to a vented hot water cylinder The Atmos EasySolar hot water system can provide pre-heated water to a vented hot water cylinder. The diagram below shows how the EasySolar system is connected to a vented hot water cylinder. 13

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4.12 Evacuated tube collector on sloping roof Fixing profiles: The length of the fixing profiles various according to the number of evacuated tubes. The image below shows the flow and return connections on the rear side of the collector header. return flow 14

Atmos Heating Systems Assemble the frame as shown: Remove the tiles where the roof hooks are to be located. Place the roof hooks in the valley of the tile and hook behind the roof batten. The width of the frame can be adjusted to fit the position of the roof hooks. Determine the location of the remaining 4 roof hooks and drill 8.5mm holes in the profiles A to fix the roof hooks to the profiles A. After this the tiles can be replaced. 15

Atmos EasySolar Installation Instructions Evacuated Tube Collector Once the frame and the roof hooks have been fixed to the roof the header can be fitted to the frame. It is important that the header is fitted level, so that the water in the header drains back correctly. Use an angle grinder to cut a section out of a roof tile. Cut two pieces of wakaflex each 50cm long. Use a hollow punch to make two 20mm holes in one of the two pieces of Wakaflex. Fix the pipe gland to the holes. If the correct size hollow punch is not available it is possible to use a 22mm compression ring instead. Place the wakaflex with the pipe gland over the tile with the section cut out and underneath the tile higher up. Do not stick the wakaflex down till after the red and blue collector pipes have been taken through the pipe gland. Place the second piece of wakaflex on top and above the first piece and underneath the tiles higher up. 16

Atmos Heating Systems hot cold 17

Atmos EasySolar Installation Instructions Evacuated Tube Collector Fit the compression elbows to the pipes coming out at the rear of the header. Connect the red and blue collector pipes and take these through the pipe gland. Ensure that AT ALL POINTS THE PIPES SLOPE DOWN away from the collector header. Fit the pipe insulation to the red and blue collector pipes. Ensure that there is enough slack in the pipes for thermal contraction (max 5%). Stick the wakaflex to the tiles. Fit the evacuated tubes and the fixing cups. Apply the heat transfer paste to the metal ends of the glass tubes. Using soapy liquid on the ends of the glass tubes will make it easier to slide them in. Fixing cup: 18

Atmos Heating Systems End result: The sensor cable from the collector header should be taken underneath the roof tiles and down to the storage tank. The flow and return pipes must at all points slope down towards the storage tank. This is essential in order for the water in the collectors and in the pipes to flow back to the storage tank when the pump is not running. Ensure that there is no tension on the flow and return pipes or leakage may occur. The red flow pipe should be insulated along the whole of its length, using the pipe insulation provided. The blue return pipe should be insulated only above roof level. The sensor cable can be extended if necessary using a two wire cable. 19

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4.13 Evacuated tube collector on flat roof Assemble the frame. There are different options with regard to the angle of the collector. The lowest possible angle is 35. Place rubber tiles for roof protection underneath the frame. The horizontal L profiles for the ballast are needed when ballast is used. Ensure that the L profiles are secured under the ballast and cannot slide free. Fit the header to the frame and insert the glass tubes. Ensure that the header is level. This is necessary so that the water in the header drains back correctly. Apply the contact paste to the metal ends of the glass tubes. Soapy water can be used to make it easier to slide the glass tubes into the sockets on the header. 20

Atmos Heating Systems Put ballast on the four corners of the frame. The tables show the minimum required ballast weight in kg needed to secure the collector. This applies for collectors at 35 angle. Area I is an area of the country prone to high winds. Area II is an area with medium high winds. Area III has normal or moderate winds. Minimum required ballast for 15 tube collector Built up area Open countryside Height above ground [m] Area I Area II Area III Area I Area II Area III 2 255 207 169 255 207 169 3 255 207 169 283 207 169 4 255 207 169 321 245 169 5 255 207 169 350 274 169 6 255 207 169 378 297 169 7 255 207 169 402 321 169 8 255 207 169 421 335 169 9 255 207 169 435 354 169 10 283 231 188 454 369 188 11 312 255 207 468 383 207 12 335 274 226 482 397 226 21

Atmos EasySolar Installation Instructions Evacuated Tube Collector Minimum required ballast for 20 tube collector Built up area Open countryside Minimum required ballast for 24 tube collector Built up area Open countryside Height above ground[m] Area I Area II Area III Area I Area II Area III Height above ground[m] Area I Area II Area III Area I Area II Area III 2 337 273 222 337 273 222 3 337 273 222 375 273 222 4 337 273 222 425 324 241 5 337 273 222 463 362 279 6 337 273 222 501 394 305 7 337 273 222 533 425 330 8 337 273 222 558 444 356 9 337 273 222 577 470 375 10 375 305 248 603 489 394 11 413 337 273 622 508 413 12 444 362 299 641 527 425 2 403 327 266 403 327 266 3 403 327 266 449 327 266 4 403 327 266 510 388 289 5 403 327 266 555 434 335 6 403 327 266 601 472 365 7 403 327 266 639 510 396 8 403 327 266 669 532 426 9 403 327 266 692 563 449 10 449 365 297 722 586 472 11 494 403 327 745 608 494 12 532 434 358 768 631 510 The ballast figures apply for a collector angle of 35. Collector angles more than 35 require greater ballast weight. 22

Atmos Heating Systems Drill a 60mm hole in the roof Fit the compression elbows to the pipes coming out at the rear of the header. Connect the red and blue collector pipes. Take the red and blue collector tubes and the sensor cable through the pipe gland to the storage tank. Ensure that AT ALL POINTS THE PIPES SLOPE DOWN away from the collector header and also ensure that there is enough slack in the pipes for thermal contraction (max 5%). Fix and seal the pipe gland to the roof using roof sealant. Fit insulation to the red collector tube along the whole of its length and to the blue collector tube only above roof level. The pipes must be fixed sufficiently to prevent excessive movement on occasions of strong wind. 23

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4.14 Filling the tank The procedure for filling the storage tank with water is as follows: Remove the plug from the overflow outlet and insert the overflow connector. Put a tray or bucket underneath to catch any water coming out. Use the yellow hose provided for filling the tank. Insert this into the filling connection point on the tank. Fill the tank slowly with clean water. Make sure the yellow hose is held firmly in position whilst water is flowing into the tank. Stop filling as soon as water flows from the overflow outlet. Allow the surplus water to flow out before replacing the overflow plug and inserting the filling plug. 24

Atmos Heating Systems 4.15 Flushing the pump It is necessary to flush the pump in order to remove any air. The procedure for this is as follows: Connect the two connection points on the tank for the collector pipes with a short length of pipe (can be either red or blue). Connect the two terminals on the sensor cable connection point using a short piece of wire. Supply power to the storage tank through the 12V adaptor. The pump will start running. Leave it running for one minute before removing the short piece of wire and the short length of pipe. 4.16 Connecting the collector circuit Connect the collector flow and return pipes to the connectors on the tank. To avoid leaks ensure that the pipe ends have been cut square. Before connecting the blue pipe to the tank, insert the flow restrictor to a depth of at least 3cm. Connect the sensor cable from one of the collectors to the sensor cable connecting point on the tank. Fit the pipe insulation provided for this purpose to the red collector flow pipe along its full length. 25

Atmos EasySolar Installation Instructions Evacuated Tube Collector 4.17 Connecting the optional booster pump A booster pump is a pressure activated pump which serves the purpose of increasing the total pump height of the system. It must be fitted to the wall with the pipe connections at the top. The booster pump must not be above the overflow level of the tank and not lower than 500mm below this level. It is connected to the blue collector return pipe and it has its own power supply through a 12V adaptor. Flow restrictor Note! The flow restrictor is not fitted at the connection to the tank but at the connection to the booster pump. 26

Atmos Heating Systems 5 Maintenance Storage tank Annually check the sensor wiring and top up the tank. See 4.14 Collectors Annually check the collector. Remove any debris and check that the collector is still firmly fixed. Check that no water can leak through the roof. Pipes Do a yearly check on the pipes to ensure that the pipe insulation is still in place and properly secured and that the collector pipes are correctly sloping down towards the storage tank at all points. Faults The dial on the front of the tank gives an indication of the amount of heat stored in the tank. If the storage tank is not collecting heat even though the sun shines this indicates a fault. To check for any malfunction follow the following procedure. This will only work when the sun is shining. Ensure the storage tank is cold by drawing off hot water. This may take 10 minutes if the storage tank is very warm to start with. 1. Is there 240V on the socket? Yes=>2, No=>13 2. Is there 12V feed to the storage tank? Yes=>3. No=>4 3. Are the wires from the collector thermostat and the 12V feed to the tank connected correctly? Yes=>6. No=>5 4. The 12V adaptor is faulty. Atmos can supply a replacement. 5. Ensure the wires are connected correctly. The wires from the collector thermostat are interchangeable. Does the pump start up within 10 minutes? Yes=>6, No=>7 6. Does the red pipe become warm after a few minutes? No=>8 7. Disconnect the wires to the collector thermostat from the connector block on the tank and then connect the two terminals on this block with a short piece of wire. Does the pump start up? Yes=>9, No=>10 8. Unplug the 12V adaptor from the socket. Top up the tank with water. Plug the 12V adaptor back into the socket. Does warm water begin to flow into the tank after a few minutes? Yes=>12, No=>11 9. The collector thermostat is faulty or the wiring to the collector thermostat is interrupted. 10. There is a fault with the storage tank pump or the wiring to the pump is interrupted. 11. Are the red pipe and the blue pipe to the collectors sloping back towards the storage tank at all points? Yes=>14. No=>15 12. Check the system for leakage. 13. Ensure there is 240V on the socket. 14. Check the flow restrictors for blockages. There is one flow restrictor for each collector and one for the storage tank. 15. Ensure that the red pipe and the blue pipe to the collectors are sloping back towards the storage tank at all points. Flush the pump on the storage tank as described in 5.15 27

Atmos EasySolar Installation Instructions Evacuated Tube Collector 6 Technical specifications Evacuated tube collector Dimensions 15 tubes 1925 x 1184 x 135mm (length x width x height) 20 tubes 1925 x 1560 x 135mm 24 tubes 1925 x 1855 x 135mm Installation angle (from horizontal) Between 20 and 80 Absorber element Evacuated double glass tube Frame material Aluminium Pipes in collector header Copper Test standard EN12975 / Solar Keymark 28

Atmos Heating Systems Storage Tank General Storage volume Weight empty Weight filled 100L 16 kg 116 kg Dimensions Domestic water sided Content 1,5 L Maximum pressure 800 kpa Maximum temperature 80 C Connections ½ BU Pressure drop: Collector sided Content 98,5L Medium clean drinking water Maximum pressure no pressure Maximum temperature 80 C Connections 10mm dismountable push-fit Electrical Power supply 12 V/DC 29

Atmos EasySolar Installation Instructions Evacuated Tube Collector 7 Commissioning checklist 30