Memorandum CITY OF DALLAS

Similar documents
Q:%4~ Memorandum CITY OF DALLAS

Drainage Design Practices Part 1. Overview of Current Drainage and Erosion Control Practices

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

APPENDIX G: TOWN ORDINANCE REVIEW

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Going Green with the NYS Stormwater Design Standards

City of Fort Worth. December 1, 2004

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

J. Paul Guyer, P.E., R.A.

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Managing Stormwater Naturally. July 17, 2013

Chapter 3 Site Planning and Low Impact Development

Appendix D - Technical Design Criteria for BMPs

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

APPENDIX E. Flood Plain Management

Post Construction BMPs

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Guidelines and Princi les FINANCIAL ACTION SUMMARY

When planning stormwater management facilities, the following principles shall be applied where possible.

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Rhode Island Stormwater Design and Installation Standards Manual

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

3. Are there any projects exempt from the definition of Regulated Projects?

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

Technical guidance to meet stormwater management design requirements; and,

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Green Infrastructure Planning Design Guidelines

Community LID Workgroup Issue Paper #6

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Green Infrastructure & Low Impact Development

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Importance of Master Planning Marcy Colclough

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Stormwater Low Impact Development - A Natural Solution

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

2012 Saginaw Bay Watershed Conference

Draft Rhode Island Stormwater Design and Installation Standards Manual

understanding Green Infrastructure In Zoning

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

Neighborhood Drainage Infrastructure Improvements Using Green Initiatives. Village of Hinsdale, IL

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Non-Residential&Multi-Family PropertyCreditManual

Rebecca Dohn October 13, 2017

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Stormwater Utility Literature Review

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

What does LEED characterize?

Why a new Food & Farm Ordinance?

DEALING WITH STORM WATER MANAGEMENT

The Benefits and Challenges Associated with Green Infrastructure Practices

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

Chapter 4 - Preparation of Stormwater Site Plans

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Green Infrastructure Incentives. Abby Hall EPA Headquarters Office of Policy, Economics and Innovation

LOW IMPACT DEVELOPMENT TOOLS FOR VERMONT TOWNS

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES

Huntington Stormwater Utility

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

County of Fairfax, Virginia

Stormwater & South Carolina. A Case for Low Impact Development

Appendix I. Checklists

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Municipal Stormwater Management: Does Your Town Need More than the Minimum?

Problem Understanding

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Low Density Projects. Design Objective

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Article 20 Stormwater Management

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Low Impact Development Guidance Manual

One County s Success in Linking Watershed Protection and Land Use Planning

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

Emergency Management. questions. need

Stormwater Prevention and Control

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

New Development Stormwater Guidelines

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

New England Grows February 8, (c) 2013, Chris Webb & Associates, Inc., PS 1

Transcription:

Memorandum DATE August 7, 2009 CITY OF DALLAS Members of the Transportation and Environment Committee: Linda L. Koop (Chair), Sheffie Kadane (Vice Chair). Jerry A. Allen, Tennell Atkins, Carolyn R. Davis. Angela Hunt, Delia Jasso, Pauline Medrano and Ron Natinsky Adoption of iswm Briefing Attached is the ISWM Manual briefing that will be presented to you August 11, 2009. Please contact me if you need additional information. JiA. Jordar1 Assistant City Manager C: The Honorable Mayor and Members of the City Council Mary K. Suhm, City Manager Thomas P. Perkins, Jr., City Attorney Deborah Watkins, City Secretary Craig Kinton, City Auditor Judge C. Victor Lander, Administrative Judge Ryan S. Evans, First Assistant City Manager A. C. Gonzalez, P.E., Assistant City Manager Forest Turner, Assistant City Manager David Cook, Chief Financial Officer Jeanne Chipperfield, Director, Budget and Management Services Edward Scott, Director, Controller s Office Helena Stevens-Thompson, Assistant to the City Manager Council Office Rick Galceran, P.E., Director, Public Works and Transportation Theresa O Donnell, Director, Development Services Zaida Basora, AlA, LEED AP, Director, Building Official (h ( \.rk. \ihnt

Adoption of iswm Presented to the Transportation and Environment Committee August 11, 2009 1

iswm (INTEGRATED STORM WATER MANAGEMENT) MANUAL PURPOSE Explain the iswm manual and the proposed adoption of the iswm manual into the City s drainage design criteria, which is used in public projects and private sector development projects (e.g., design and construction of alleys, storm drainage systems, and culverts). 2

BACKGROUND Traditionally, in development projects and street designs, engineers have focused only on the quantity of storm water (i.e., flooding) and not water quality. The EPA, through National Pollutant Discharge Elimination System (NPDES) permits, is now looking at both the quantity and quality of storm water runoff. Consequently, NCTCOG and over sixty area cities began meeting to also consider storm water quality in development projects and street designs. 3

BACKGROUND Through these meetings, NCTCOG developed the iswm manual to help area cities implement more environmentally friendly approaches for storm water management. The iswm goal is to manage storm water runoff as close to the development site as possible to reduce: the volume of the development runoff and the pollutants leaving the development site. NCTCOG and the other area cities completed the iswm manual in January 2006 with the aim that each area city would adopt the iswm manual and add their own local criteria to supplement the iswm manual s regional approach. 4

BACKGROUND In 2007, as part of the green building initiatives, a Subdivision/iSWM Task Force was formed. The task force included citizens, professional groups, developers, and staff members. The task force concentrated their efforts on storm water management and suggested that the City adopt the iswm Manual. In February 2008, city council authorized a contract with Freese and Nichols to develop our local criteria and to update the City s drainage design criteria to include the iswm manual. 5

BACKGROUND The task force has worked with Freese and Nichols to draft the City s local criteria for development. At the request of staff, Freese and Nichols established a website link to the City of Dallas green website, which has the draft local criteria, the iswm manual, other green building related information, and COG's website. The task force held four public meetings (two in October 2008, one in December 2008, and one in January 2009) to receive input from the development and professional community on adopting the iswm manual, the draft local criteria, and proposed incentives. 6

iswm MANUAL REQUIREMENTS For any development or redevelopment project, Assess and mitigate downstream impacts (City already requires). Assess discharge from the site to minimize downstream bank and channel erosion (City already requires). Control conveyance of runoff within and from the site to minimize flood risk to people and property (City already requires). NEW: If the impervious area is increased more than five percent over existing conditions, developer must either: Treat the storm water runoff on-site at developer s cost; or Use a certain number of integrated site design practices in lieu of treatment (i.e., preservation of open space/natural features, natural pathways for drainage, or pervious surfaces). 7

INTEGRATED SITE DESIGN PRACTICES The following practices are listed in the iswm manual: Create/preserve undisturbed natural areas such as: Use natural drainage ways. Wetlands. Undisturbed forest. Conservation easements. Use natural drainage way instead of constructing manmade storm sewer systems, such as: Natural open channels. Preserve natural flows. Direct runoff to natural drainage ways, ensuring that peak flows and velocities will not cause channel erosion. 8

INTEGRATED SITE DESIGN PRACTICES Preserve riparian buffers by: Conserving natural areas along stream, wetlands or shorelines. Use open space development: Conservation areas. Open space. Clustering development. Incorporate creative designs, such as: Eco-rooftops/roof gardens. Avoid steep slopes: Build on flat areas of development. Preserve natural state of GSA next to escarpment. 9

INTEGRATED SITE DESIGN PRACTICES Minimize siting on porous or eroding soils: Locate buildings on portions of a site with least permeable soils. Avoid siting on highly erodible soils. Conserve areas with highly permeable soils such as sand. Drain rooftop runoff to pervious areas: Drain rooftops to permeable areas on site. Use vegetated areas to filter rooftop storm runoff. Use vegetated infiltration basins/rain gardens to capture rooftop runoff. 10

INTEGRATED SITE DESIGN PRACTICES Fit design to terrain: Preserve natural drainage ways. Provide vegetated swales. Leave undisturbed vegetation on slopes. Reduce the limit of clearing and grading: Preserve more undisturbed natural areas on a development site. Protect natural conservation areas and other site features. Locate development in less sensitive areas: Use natural site features to prevent/mitigate storm water impact. Lay out site to minimize the hydrologic impact of structures and impervious surface. 11

INTEGRATED SITE DESIGN PRACTICES Use buffers and undisturbed areas: Direct runoff towards buffers and undisturbed areas. Use natural depressions for runoff storages. Use vegetated swale design: Open vegetated channels along roadway. Grass channels and enhanced dry swales in developments. Storm water rain gardens. Storm water curb extensions. Create parking lot storm water islands: Integrate porous areas such as landscape islands, swales, filter strips and bio-retention areas in parking lot design. 12

INTEGRATED SITE DESIGN PRACTICES Reduce parking footprint: Consider using parking structures and shared parking. Use alternative porous surface areas. Use fewer or alternative cul-de-sacs (hammerhead turnaround). 13

14

15

16

Examples of Porous Paver Surfaces (Sources: Invisible Structures, Inc.; EP Henry Corp.) 17

18

Comparison of a Traditional Residential Subdivision Design with an Innovative Site Plan Developed Using integrated Site Design Practices. RESIDENTIAL SUBDIVISION #2 - CONVENTIONAL DESIGN 19

i RESIDENTIAL SUBDIVISION #2 integrated SITE DESIGN 20

i RESIDENTIAL SUBDIVISION #2 - CONVENTIONAL DESIGN RESIDENTIAL SUBDIVISION #2 integrated SITE DESIGN 21

iswm PROCEDURES An iswm site plan will be required for all developments larger than three acres. The iswm site plan must show: existing site conditions, proposed development, and integrated site design practices that the developer will use. If the impervious area is increased more than five percent over existing conditions, developer must either: Treat the storm water runoff on-site at developer s cost; or Use a certain number of integrated site design practices in lieu of treatment. 22

iswm PROCEDURES Each integrated site design practice has an assigned number of points. If the development earns the minimum points required using integrated site design practices, no on-site treatment is required. If the development exceeds the minimum points required using additional integrated site design practices, incentives may be available to developers. 23

PROPOSED INCENTIVES The following incentives may be offered to developers who exceed the minimum points required using integrated site design practices in their development: Reduced ROW requirements in residential subdivisions. Narrower pavement widths for minor streets. Bar ditches in lieu of curb and underground storm sewer pipes / culverts for subdivisions with lots that are 7,500 square feet or more. Reduced parking requirements for warehouse / industrial / retail (not including restaurants). Increase density in a community unit development. Reduced tree mitigation requirements. 24

BENEFITS OF ADOPTING iswm MANUAL Reduces the volume of storm water runoff leaving the site, which also provides an opportunity for groundwater recharge. Higher quality of storm water runoff leaving the site. Promotes green space/natural drainage pathways and preserves natural creeks. IMPLEMENTION OF THE iswm MANUAL: On March 19, 2009, the mayor testified before the United States House of Representatives Committee on Transportation and Infrastructures Subcommittee on Water and the Environment and discussed implementing the iswm manual in the following three phases. 25

STAFF RECOMMENDATION - PHASE I RECOMMENDATION The iswm manual will be recommended as part of the drainage design criteria, but not required. Developers will be required to provide an iswm site plan so that staff can begin gathering information on iswm practices and effectiveness. ACTIONS REQUIRED Amend Dallas Development Code Section 51A-8.601 to provide that the iswm manual is recommended as part of the drainage design criteria, but not required. ZOAC and CPC must make a recommendation to City Council on the code amendment. TIME FRAME Implement fiscal year 2009-2010. 26

STAFF RECOMMENDATION - PHASE II RECOMMENDATION iswm manual is recommended as part of the drainage design criteria, but not required. Determine the incentives that may be offered to developers for using iswm integrated site design practices. Adopt local criteria to include incentives and supplement the regional iswm manual. ACTIONS REQUIRED Amend Article IV (zoning regulations), Article VIII (plat regulations), and possibly other articles to provide incentives. ZOAC and CPC must make a recommendation to City Council on code amendments. Adopt by resolution amendments to the iswm manual through the local criteria, including incentives for using integrated site design practices. Local criteria for the iswm manual is recommended as part of the drainage design criteria, but is not required. TIME FRAME Implement fiscal year 2010-2011. 27

STAFF RECOMMENDATION - PHASE III RECOMMENDATION Assess effectiveness of the iswm manual practices. Brief city council within three years of implementing Phase I on the findings, and make a recommendation on whether the iswm manual should be mandatory. TIME FRAME Implement fiscal year 2012-2013. 28

Other Storm Water Treatment Programs City of Austin Requires the developer to treat the storm water runoff for any new development or redevelopment. Maintains treatment facilities for residential developments, developer maintains treatment facilities for nonresidential development. 29

Other Storm Water Treatment Programs City of Austin Allows developers to pay an impact fee in lieu of design/construction and maintenance of treatment facilities. Impact fee is based on the type of development and Area of imperviousness For a five acre development that is 70% impervious, fee is approximately $100,000. 30

Other Storm Water Treatment Programs Nationwide Seattle, Washington; Portland, Oregon; and Maryland, North Carolina have policies similar to Austin for treatment of storm water runoff. 31

Questions? 32