MacDonnell Heights Town Center

Similar documents
WATERS EDGE AT DOBBS FERRY DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME I

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

STATELINE RETAIL CENTER FINAL ENVIRONMENTAL IMPACT STATEMENT

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

Cumberland Comprehensive Plan Town Council adopted August 2003, State adopted June 2004 TABLE OF CONTENTS

ENVIRONMENTAL IMPACT REPORT COMPREHENSIVE GENERAL PLAN AND ZONING ORDINANCE SCH NUMBER:

Located in the Town of North Castle 1700 Old Orchard Street, North Castle, Westchester County, NY Tax ID:

Holmberg & Howe, Land Surveyors and Civil Engineers Zoning District: R-35

State Environmental Quality Review Act (SEQRA) Findings Statement. MacDonnell Heights Town Center Town of Poughkeepsie, Dutchess County, New York

Town of Windham. Planning Department 8 School Road Windham, ME voice fax

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

2. Description of the Proposed Action and Project

Institutional Master Plan The Arnold Arboretum of Harvard University

Application for Certificate of Environmental Compatibility and Public Need

SCOPING DOCUMENT FOR BAKER RESIDENTIAL CLUSTER SUBDIVISION DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS)

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

Essential Skills: Reading and Interpreting Maps and Plans

STATE UNIVERSITY CONSTRUCTION FUND Lead Agency, State Environmental Quality Review Act

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Town of Malta Planning Board 2540 Route 9 Malta, NY (518) Fax: (518)

EXECUTIVE SUMMARY. This Second Revised Draft Generic Environmental Impact Statement ( revised DGEIS

TOWN OF NORTH CASTLE WESTCHESTER COUNTY 17 Bedford Road Armonk, New York R E S O L U T I O N

the To: April 8, 2016 Date: Ltd., to amend Permits, to of the Work municipal Ridge Town of and Center in The Lower Blind Branch.

DALEY FARM PLANNED DEVELOPMENT DISTRICT Town of LaGrange, New York

Northern Branch Corridor SDEIS March Table of Contents

HUDSON HERITAGE PROJECT. Town of Poughkeepsie, New York Draft Environmental Impact Statement (DEIS) Draft Scope

ROCKEFELLER UNIVERSITY

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Advance Engineering & Surveying PLLC

Stormwater Pollution Prevention Plan Oneonta Heights Oneonta, NY TABLE OF CONTENTS PAGE

DRAFT ENVIRONMENTAL IMPACT REPORT NORTH HOLLYWOOD-VALLEY VILLAGE COMMUNITY PLAN AREA

MINUTES TOWN OF HORSEHEADS PLANNING BOARD MEETING August 2, 2017

Chapter 4 - Preparation of Stormwater Site Plans

Scoping Document A. C. Dutton Tract Redevelopment City and Town of Poughkeepsie, New York

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size)

AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH

Site Development Plan (SDP) Checklist

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

Procedures IV. V. Rural Road Design Option

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Elderberry, Pioneer, Junction

SECTION 1 Introduction...1. SECTION 2 Regional Context Criteria for Planning Districts Description of Planning District...

CHECKLIST FOR PHASE II DRAINAGE REPORT

Town of Ontario Planning Board Minutes. October 9, 2018

R E S O L U T I O N. Designation: Section 2, Block 17, Lot 20.G-1 ( ) R-2A (1-Family, 2-acre Minimum Lot Size) 46 North Greenwich Road

DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) RESOLUTION

Development Permit Application Form. Property Owner Information as Registered on Legal Title Property Owner Name: Phone:

Gadsden County Planning Commission Agenda Request

TOWN OF NEW CASTLE - Master Plan Update

Appendix I. Checklists

Chapter Master Planned Communities (MPC) District

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Major Subdivision Sketch Plan Checklist

A Guide to Open Space Design Development in Halifax Regional Municipality

Thompson Education Center

Project Narrative For Fruita RV Resort Conditional Use Permit

Neo-Traditional Overlay Application

4. Contractor (and subcontractors if applicable) certification statement(s)

4-Town Comprehensive Plan DRAFT 7/30/07

Town of West Point Plan of Development


Preliminary Port Towns Sector Plan and Proposed Sectional Map Amendment March 2009

Project Description June 24, DESCRIPTION OF THE PROPOSED ACTION. 2.1 Introduction

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

Draft Rhode Island Stormwater Design and Installation Standards Manual

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Urban Planning and Land Use

Division of Land / Environmental Review. Volume I FINAL ENVIRONMENTAL IMPACT REPORT WEST LOS ANGELES COMMUNITY PLAN AREA

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Final Plan Submittal Application Requirements.

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Appendix C Agency Correspondence

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

RANDOLPH M A S T E R P L A N. Township of W H E R E L I F E I S W O R T H L I V I N G. Morris County, New Jersey

Environmental Assessment

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Historic Town of Hyde Park

CAPE COD COMMISSION MAIN STREET P.O. BOX226 BARNSTABLE, MA (508) FAX (508)

Drexel, Barrell & Co.

Town of Liberty, NY COMPREHENSIVE PLAN & ZONING UPDATES

SUBMITTAL REQUIREMENTS

Town of Poughkeepsie

D1 September 11, 2013 Public Hearing APPLICANT:

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

Table of Contents. Executive Summary...S-1

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

M E M O R A N D U M. Chair and Members of North West Planning Advisory Committee

Drexel, Barrell & Co.

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Town of Washington Master Plan & Regulatory Audit: Interim Results

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

MINUTES OF TOWN BOARD MEETING HELD ON OCTOBER 18, 2017 AT 7:00 PM AT TOWN HALL, ONE OVEROCKER ROAD POUGHKEEPSIE, NEW YORK

Transcription:

Draft Environmental Impact Statement MacDonnell Heights Town Center Town of Poughkeepsie, Dutchess County, New York LEAD AGENCY Town of Poughkeepsie Planning Board One Overocker Road Poughkeepsie, NY 12603 Contact: Mr. John T. Weisman, Planning Board Chairman 845.485.3657 PREPARED BY VHB Engineering, Surveying, and Landscape Architecture, P.C. 50 Main Street Suite 360 White Plains, NY 10522 914.617.6600 Submission Date: September 14, 2017 Date Accepted: _September 26, 2017_ Public Hearing: October 19, 2017 DEIS Comments due by: 10 days after the close of the public hearing

Lead Agency: Town of Poughkeepsie Planning Board One Overocker Road Poughkeepsie, NY 12603 (845) 485-3657 Contact: John T. Weisman, Planning Board Chairman Applicant: Kirchhoff Properties LLC and MHTC Development, LLC 199 West Road Pleasant Valley NY 12569 (845) 635-2000 Contact: Richard M. Rang, PE Town Planner: Town of Poughkeepsie Planning Department One Overocker Road Poughkeepsie, NY 12603 (845) 485-3657 Contact: Neil Wilson, Esq. Consultants that contributed to this document include: Planning/EIS Preparation/Traffic Engineering/Natural Resources/Cultural Resources: VHB Engineering, Surveying, and Landscape Architecture, P.C. 50 Main Street, Suite 360 (914) 467-6600 Contacts: Valerie Monastra, AICP Wendy Holsberger, PE, PTOE Site Engineering, Landscape Design: Insite Engineering, Surveying, and Landscape Architecture, P.C. 3 Garrett Place Carmel, NY 10512 (845) 225-9690 Contact: Eric M. Schlobohm, PE Architecture and Urban Design: Union Studio Architecture & Community Design 140 Union Street Providence, RI 02903 (401) 272-4724 Contact: Stephanie R. Zurek, AIA, LEEP AP, CNU

1. Executive Summary... 1-1 A. DESCRIPTION OF PROPOSED ACTION... 1-1 B. REQUIRED APPROVALS AND PERMITS... 1-1 C. INVOLVED AND INTERESTED AGENCIES... 1-2 D. STATEMENT OF PROJECT PURPOSE AND NEED... 1-4 E. SUMMARY OF SIGNIFICANT IMPACTS AND PROPOSED MITIGATION MEASURES 1-4 F. ALTERNATIVES... 1-15 2. Description of Proposed Project... 2-1 A. DESCRIPTION OF PROPOSED ACTION... 2-1 B. PROJECT IDENTIFICATION... 2-1 C. DESCRIPTION OF PROPOSED PROJECT... 2-3 D. PROJECT PURPOSE AND NEED... 2-9 E. LIST OF INVOLVED AND INTERESTED AGENCIES... 2-9 3. Existing Environmental Conditions, Anticipated Impacts and Mitigation A. LAND USE, ZONING, AND PUBLIC POLICY... 3A-1 1. Land Use... 3A-1 a) Existing Conditions... 3A-1 b) Future Without the Proposed Project... 3A-2 c) Potential Impacts as a Result of the Proposed Project... 3A-3 d) Proposed Mitigation... 3A-3 2. Zoning... 3A-4 a) Existing Conditions... 3A-4 b) Future Without the Proposed Project... 3A-9 c) Potential Impacts as a Result of the Proposed Project... 3A-9 d) Proposed Mitigation... 3A-10 3. Public Policy... 3A-11 a) Existing Conditions... 3A-11 b) Future Without the Proposed Project... 3A-14 i

c) Potential Impacts as a Result of the Proposed Project... 3A-14 d) Proposed Mitigation... 3A-17 B. COMMUNITY CHARACTER AND VISUAL IMPACTS... 3B-1 1. Existing Conditions... 3B-1 2. Future without the Proposed Project... 3B-6 3. Potential Impacts as a Result of the Proposed Project... 3B-6 4. Proposed Mitigation... 3B-10 C. GEOLOGY SOILS, TOPOGRAPHY, AND STEEP SLOPES... 3C-1 1. Existing Conditions... 3C-1 2. Future without the Proposed Project... 3C-3 3. Potential Impacts as a Result of the Proposed Project... 3C-3 4. Proposed Mitigation... 3C-5 D. SURFACE WATER RESOURCES... 3D-1 1. Existing Conditions... 3D-1 2. Future without the Proposed Project... 3D-3 3. Potential Impacts as a Result of the Proposed Project... 3D-3 4. Proposed Mitigation... 3D-4 E. STORMWATER MANAGEMENT... 3E-1 1. Existing Conditions... 3E-1 2. Future without the Proposed Project... 3E-2 3. Potential Impacts as a Result of the Proposed Project... 3E-2 4. Proposed Mitigation... 3E-7 F. WATER... 3F-1 1. Existing Conditions... 3F-1 2. Future without the Proposed Project... 3F-2 3. Potential Impacts as a Result of the Proposed Project... 3F-2 4. Proposed Mitigation... 3F-4 G. SANITARY SEWAGE... 3G-1 1. Existing Conditions... 3G-1 2. Future without the Proposed Project... 3G-1 3. Potential Impacts as a Result of the Proposed Project... 3G-2 4. Proposed Mitigation... 3G-4 H. SOLID WASTE... 3H-1 1. Existing Conditions... 3H-1 2. Future without the Proposed Project... 3H-1 3. Potential Impacts as a Result of the Proposed Project... 3H-1 4. Proposed Mitigation... 3H-2 I. VEGTATION AND WILDLIFE... 3I-1 1. Existing Conditions... 3I-1 2. Future without the Proposed Project... 3I-4 ii

3. Potential Impacts as a Result of the Proposed Action... 3I-4 4. Proposed Mitigation... 3I-6 J. TRAFFIC, TRANSPORTION, PEDESTRIANS AND TRANSIT... 3J-1 1. Existing Conditions... 3J-1 2. Potential Impacts... 3J-7 3. Proposed Mitigation Measures... 3J-16 K. COMMUNITY SERVICES... 3K-1 1. Demographics... 3K-1 2. Police Services... 3K-4 3. Fire and Emergency Services... 3K-6 4. Recreation and Open Space... 3K-9 5. Other Community Services and Community Needs... 3K-12 6. Schools... 3K-14 L. FISCAL AND ECONOMIC... 3L-1 1. Existing Conditions... 3L-1 2. Future without the Proposed Project... 3L-2 3. Potential Impacts as a Result of the Proposed Project... 3L-2 4. Proposed Mitigation... 3L-7 M. HISTORIC AND CULTURAL RESOURCES... 3M-1 1. Existing Conditions... 3M-1 2. Future without the Proposed Project... 3M-4 3. Potential Impacts as a Result of the Proposed Project... 3M-5 4. Proposed Mitigation... 3M-5 N. HAZARDOUS MATERIALS... 3N-1 1. Existing Conditions... 3N-1 2. Future without the Proposed Project... 3N-2 3. Potential Impacts as a Result of the Proposed Project... 3N-2 4. Proposed Mitigation... 3N-3 O. NOISE... 3O-1 1. Existing Conditions... 3O-1 2. Future without the Proposed Project... 3O-1 3. Potential Impacts as a Result of the Proposed Project... 3O-2 4. Proposed Mitigation... 3O-5 P. AIR QUALITY... 3P-1 1. Existing Conditions... 3P-1 2. Future without the Proposed Project... 3P-3 3. Potential Impacts as a Result of the Proposed Project... 3P-3 4. Proposed Mitigation... 3P-4 Q. CONSTRUCTION IMPACTS... 3Q-1 1. Construction Plan... 3Q-1 iii

2. Potential Impacts of the Proposed Project... 3Q-4 3. Proposed Mitigation... 3Q-6 4. Alternatives... 4-1 A. ALTERNATIVE 1 THE NO ACTION ALTERNATIVE... 4-1 B. ALTERNATIVE 2 FULL BUILD-OUT UNDER ZONING... 4-2 C. ALTERNATIVE 3 DEVELOPMENT WITH REDUCED HEIGHT... 4-2 D. ALTERNATIVE 4 MODIFIED PHASED CONSTRUCTION... 4-3 E. ALTERNATIVE 5 ALTERNATIVE PLAN BASED ON IDENTIFIED SIGNIFICANT ENVIRONMENTAL IMPACTS... 4-3 5. Significant Impacts That Cannot Be Avoided... 5-1 6. Growth Inducing Impacts... 6-1 7. Effects on the Use and Conservation of Energy Resources... 7-1 8. Irreversible and Irretrievable Commitment of Resources... 8-1 iv

Appendices A. SCOPING DOUCMENT AND SEQRA DOCUMENTATION B. SOIL SURVEY MAP AND SOIL CLASSIFICATION REPORT C. WETLAND DELINEATION REPORT D. EROSION AND SEDIMENT CONTROL PLAN E. PRELIMINARY STORMWATER POLLUTION PREVENTION PLAN (SWPPP) F. FACILITIES PLAN (EXISTING CONDITIONS AND ENVIRONMENTAL IMPACT STATEMENT) G. HUDSONIA REPORT, SPECIES OF CONSERVATION CONCERN H. TRAFFIC IMPACT AND ACCESS STUDY I. COMMUNITY PROVIDERS LETTERS AND RESPONSES J. PHASE I A/B ARCHEOLOGICAL REPORT K. PHASE I A/B ARCHITECTURAL AND STRUCTURES REPORT L. PHASE I AND II ENVIRONMENTAL SITE ASSESSMENT M. LETTER FROM SARAH DAVIS, TOWN OF POUGHKEEPSIE ZONING OFFICER, DATED FEBRUARY 21, 2017 N. SITE PLAN SET v

List of Tables Table No. Description Page Table 1-1 Project Approvals and Reviews... 1-1 Table 2-1 Development Program for Residential Uses... 2-4 Table 2-2 Development Program for Nonresidential Uses... 2-5 Table 2-3 Involved Agencies... 2-9 Table 3A-1 Site Parcels... 3A-2 Table 3A-2 Zoning Compliance... 3A-9 Table 3B-1 Visual Analysis Photographs... 3B-5 Table 3C-1 Project Site Soils... 3C-1 Table 3C-2 Soils Disturbance by Type... 3C-4 Table 3E-1 Pre-Development Peak Flows... 3E-2 Table 3E-2 Infiltration Area Water Quality Volume Treatment Summary... 3E-4 Table 3E-3 Pond Sizing Summary... 3E-5 Table 3E-4 Pre- and Post-Development Peak Flows... 3E-6 Table 3F-1 Daily Domestic Water Demands by Use... 3F-2 Table 3G-1 Design Hydraulic Loading MacDonnell Heights Town Center... 3G-3 Table 3G-2 Design Hydraulic Loading Poughkeepsie Corporate Center Wastewater Treatment Plant... 3G-4 Table 3I-1 Land Cover Type... 3I-2 Table 3I-2 Observed List of Avian Species... 3I-3 Table 3J-1 Existing Intersection Levels of Service Summary... 3J-3 Table 3J-2 Summary of 3-year Crash History... 3J-5 Table 3J-3 Peak Hour Travel Time Summary in Minutes... 3J-7 Table 3J-4 2023 No-Build Intersection Levels of Service Summary... 3J-8 Table 3J-5 Project Trip Generation Summary...3J-10 Table 3J-6 2023 Build Intersection Levels of Service Summary...3J-12 Table 3J-7 2023 Build w/ Mitigation Levels of Service Summary...3J-18 vi

Table 3J-8 Table 3J-9 ETC+10 2033 Build w/ Mitigation Levels of Service Summary...3J-20 ETC+10 2033 Build Site Access Levels of Service Summary...3J-22 Table 3K-1 Population Trends... 3K-1 Table 3K-2 Population Ages... 3K-2 Table 3K-3 Resident Population Projection by Age... 3K-3 Table 3K-4 Residential Population Projection by Unit Type... 3K-3 Table 3K-5 Recreation/Open Space West Side... 3K-10 Table 3K-6 Recreation/Open Space West Side... 3K-11 Table 3K-7 Arlington Central School District Enrollment Trends... 3K-14 Table 3K-8 Arlington Central School District Projected Enrollment and Existing Capacity... 3K-15 Table 3K-9 Program Costs and Tax Levy Per Pupil... 3K-16 Table 3K-10 Projected School Aged Children... 3K-17 Table 3L-1 Lot Size and Assessed Value of Each Tax Lot... 3L-1 Table 3L-2 Current Property Taxes Generated by Parcel... 3L-1 Table 3L-3 Expected Residential Rents... 3L-4 Table 3L-4 Expected Non-Residential Rents... 3L-5 Table 3L-5 Potential Property Tax Generation at Full Build-Out by Taxing Jurisdiction 3L-5 Table 3L-6 Employment Generated During Operational Phase... 3L-6 Table 3O-1 Noise Levels of Construction Equipment... 3O-2 Table 3O-2 Typical Site Average Noise Levels by Construction Activity (dba) All Equipment at Project Site... 3O-2 Table 3O-3 Typical Site Average Noise Levels by Construction Activity (dba) Minimum Amount of Equipment Required at Project Site... 3O-3 Table 3P-1 National Ambient Air Quality Standards... 3P-2 Table 3P-2 Air Quality Monitoring Concentrations... 3P-3 Table 4-1 Comparison of Alternatives... 4-4 vii

List of Exhibits Exhibit No. Title 2-1 Site Location 2-2 Overall Site Plan 3A-1 Parcels 3A-2 Compilation of Surveys 3A-3 Land Uses within a Quarter Mile of Project Site 3A-4 Zoning Districts 3B-1 Visual Analysis Photo Locations Existing Conditions Leaf-On 3B-2 Existing Visual Conditions Photographs 3B-3 Typical Commercial Building Design 3B-4 Typical Live-Work Building Design 3B-5 Kirchhoff Office Design 3B-6 Bank Building and Daycare Building Design 3B-7 Breezeway Residential Building Elevations 3B-8 Townhouse and Multifamily Residential Building Elevations 3B-9 Photograph Simulation Location Map 3B-10 Photograph Location 3 Simulation 3B-11 Photograph Location 4 Simulation 3B-12 Photograph Location 7 Simulation 3B-13 Photograph Location 9 Simulation 3B-14 Photograph Location 19 Simulation 3B-15 Photograph Location 20 Simulation 3C-1 USDA Soils Series 3C-2 Existing Conditions Plan 3C-3A Grading and Drainage Plan West Side 3C-3B Grading and Drainage Plan East Side 3C-4 Slope of Disturbance Plan 3C-5 Depth of Cut Worksheet viii

Exhibit No. Title 3D-1 Natural Resources Map 3D-2 FEMA Flood Hazard Map 3E-1 Overall Drainage Map 3E-2 Pre-Development Drainage Map 3E-3 Post-Development Drainage Map 3H-1A 3H-1B Layout & Landscaping Plan West Side Layout & Landscaping Plan East Side 3I-1 Land Cover Map 3K-1 Overall Conceptual Plan 3Q-1 Overall Construction Phasing Plan and SWPPP Notes 4-1 Proposed Action 4-2 Alternative 2 Full Build-Out Under Zoning Alternative 4-3 Alternative 3 Development with Reduced Height ix