Hunting the Mighty Milliwatt The next Technology Step

Similar documents
Hunting the Mighty Milliwatt- The next Technology Step

Permanent Infrared Hotspot Detection

PD alarm system brings peace of mind in Malta

Substation Monitoring System

Tempest Projector Enclosures in Hot and Humid Outdoor Environments

APPLICATION DATA SHEET

UltraLITE Model ELU Centralized Emergency Lighting Inverter 4.2 KW- 5 KW

Reducing Arc Flash Risks with Electrical Maintenance Safety Devices - Part 2

APPLICATION DATA SHEET

CLIMATE SEPARATION SOLUTION. SensAir

WHITE PAPER: Thermal Management Solutions

Liebert PPC Second Generation Power Distribution Cabinet

Fieldbus Foundation TM Bus diagnostics and troubleshooting

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION IBAS LIGHTING CONTROL

Products Solutions Services. Energy Solutions. Food & Beverage industry. Slide 2

Phoenix Artificial Lift Downhole Monitoring. Improving artificial lift system performance

AmpLight group management

SEL Arc-Flash Solutions

Obstruction Lighting

Real Time Pipeline Leak Detection on Shell s North Western Ethylene Pipeline

For Complete Fire and Gas Solutions

Temperature Control for

The evolution of level switches and detectors

Specification for On-Line UPS Battery Monitoring and Data Management System

Important Considerations When Selecting a Fan for Forced Air Cooling. By: Jeff Smoot, CUI Inc

Surface Acoustic Wave Technology based Temperature Monitoring of High Voltage and High Current Switchgear Boxes

Moving to the Cloud: The Potential of Hosted Central Station Services

Frequently asked questions: Intelligent Transmitter Series

SEL Arc-Flash Solutions

6 th Pipeline Technology Conference 2011

CCU Family of Modules

Common Misconceptions Relating to Infrared Inspection Ports

Case Study. Custom Solutions for High Arc Flash Incident Energy and. Interlocked Electrical Enclosures. Overview: iriss.com

02/11/2015

5U Compact System. Installation Manual V1.0. Manufactured by Enatel Ltd. 321 Tuam Street PO Box Christchurch New Zealand

D1000 Arc-fault Protection System

Rotary Screw Compressors SX Series With the world-renowned SIGMA PROFILE Free air delivery from 0.26 to 0.81 m³/min, Pressure 5.

MODBUS MESSAGING to the S5 BATTERY VALIDATION SYSTEM

02/11/2015

SECURITY SOLUTIONS Banking and finance

Rotary Screw Compressors. SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar COMPRESSORS

Aspir A ation spir P R O D U C T S

Integrated Process Solutions. Series 48 Heaters. heater jackets sizes 1 1/2'' to 4'' (nw 40 to nw 100)

Rotary Screw Compressors. SK Series With the world-renowned SIGMA PROFILE Flow rate 0.53 to 2.70 m³/min, Pressure 5.5 to 15 bar

INPUT / OUTPUT MINI MODULES

Q1. Carefully read the following extract from a safety leaflet. Then answer the questions.

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

Leak Detection - Application Note

HIGHLY SENSITIVE FOR NUCLEAR POWER PLANTS Real-Time Continuous Water Monitor

Advanced Pattern Recognition for Anomaly Detection Chance Kleineke/Michael Santucci Engineering Consultants Group Inc.

LaserFOCUS VLF-250 Engineering Specification

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

Tankless Electric Water Heater Available up to 54 KW in Single or Three Phase Voltages

ABSTRACT. KEYWORDS: New Combination, New Product Development, Open Innovation, IoT (Internet of Things), Auto Alert System

8.0 Table of Contents. Monitoring system WIREM

Arc Fault Protection System D1000

D3 Wireless temperature alarm & monitoring system family. tek-troniks

CT EN rel. 10/09 Copyright Eliwell Controls s.r.l All rights reserved

Vocia VACIE. Reference Guide

Tankless On Demand Electric Water Heater

Dräger Flame 2500 Flame Detection

Delta T Alert: Wireless Temperature Monitoring of Electrical Enclosures

Architectural and Engineering Specification for a Real-Time Locating System Flare

Bionics Instrument. Alarm Handling. Gas Alarm Systems

The Evolution of Cleaning Methods in the PCB Reworking Process

Remote Monitoring of Offshore Structures using Acoustic Emission.

VACIE REFERENCE GUIDE REVISION 1.2.6

Scanlight Next generation dimmable addressable lighting control

Copyright 2017 by Eddy Home Inc. All Rights Reserved.

Wallace & Tiernan Controllers & Analysers ChemTrim Disinfection Controller

Safety Instrumented Systems

Title Page. Report Title: Downhole Power Generation and Wireless Communications. for Intelligent Completions Applications

ART TEC Solar Differential Temperature Controller DTC-1 Manual

Condition monitoring using FAG products. Technical Product Information

THE ULTIMATE SOLUTION FOR GAS DETECTION SYSTEMS. DRÄGER REGARD

Tri-Tech Medical Inc.

Fire and Gas Monitoring Panel ST7-HV

1U ULTRA Compact System

Removing The Potential For Condensation In An Electronic Cabinet

Effective Alarm Management for Dynamic and Vessel Control Systems

SAFETY INTEGRITY LEVEL MANUAL. IEC and IEC XP95 and Discovery SIL Approved Product Range

Rotary Screw Compressors. SM Series With the world-renowned SIGMA PROFILE Flow rate 0.39 to 1.64 m³/min, Pressure 5.5 to 15 bar COMPRESSORS

FIRERAY 5000 range USER GUIDE

ACCURATE ELECTRONICS INC

Open Source Home Security System

TRACENET TM TCM18 CONTROL AND MONITORING SYSTEM

SAFETY MANUAL. PointWatch Eclipse Infrared Hydrocarbon Gas Detector Safety Certified Model PIRECL

PowerWave 2 Busway System

Case Study. A Geothermal Energy Generation Facility Embraces Infrared. Polymer Window Inspections. Overview: iriss.com

OTC, OTM and OTI Series Options Index for PLC Control Systems:

Fike set out to develop a better understanding of the power density trends in data centers around the world.

WG Buried Cable Perimeter Detection System

TraceNet TM TCM2 CONTROL AND MONITORING SYSTEM SPECIFICATION GUIDE

Appearance and sensing characteristic Specification (temperature range) Model 10 to 70 C ES1B. 2 mm 20 mm 40 mm 60 mm. 40 dia. 60 dia.

Dry Contact Probe DCP (#30008)

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

Date SECTION MEASUREMENT AND CONTROL INSTRUMENTATION Project Name Page 1

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection

Temperature Data Logging

THERMODYNAMICS STEAM P7690 AND STEAM BENCHES CUSSONS TECHNOLOGY LABORATORY RECOMMENDATION

Transcription:

24x7 Thermal Monitoring Hunting the Mighty Milliwatt The next Technology Step Presented for 7x24 Exchange National Conference Orlando Florida June 2006 Dr Francesco Pompi PhD, President Exergen Corp Ross Kennedy, C.E.O QHi Group Ltd Abstract: Milliwatts can turn into Mighty Milliwatts (MMW), when resistance increases, typically in loose or bad connections. These MMW, if not detected and allowed to develop can become Megawatts of energy causing catastrophic failure. The exponential growth from milliwatt to megawatt is completed in seconds, but the milliwatt energy signature prior to this situation is typically at too low a level to be detected by conventional metering / lcurrent measurement. The only way to detect these elusive MMW is via the thermal increase at the joint / connection, which can be detected utilising non-contact infrared sensors of sufficient sensitivity & reliability. Periodic thermal imaging inspections once or twice per year rely heavily on luck and variable site specific conditions. Expensive intervention (shutdown) maintenance every 1 > 3 years is thus still required. For high downtime cost organisations (i.e. Datacentres), new infrared technology now enables continuous 24x7 thermal monitoring of mission critical equipment INSIDE the panels to be cost effectively achieved. The developed system can also be fully integrated into existing BMS/SCADA systems, web enabled, provide on-line real time data. The best detection method is thermal measurement and non-contact infrared technology has become the universally accepted method for detecting such faults. Such detection is of particular importance to organisations that have high downtime costs. Examples include financial services, telecommunications, data centres, large scale manufacturing, utilities, media, shipping and urban transportation systems. Throughout all these diverse industries the common denominator is POWER. So what is the Mighty Milliwatt and how relevant is it to the circumstances described above? Small amounts of resistive energy losses, converted to heat from electrical circuit elements in high power electrical systems, usually at connections, are manifested as a temperature rise above ambient. 0.001Watt in resistive energy lost by circuits using kilowatts to megawatts of power represent less than 0.0001 of the energy transmitted. Bad joints and connections are the most common cause of failure in electrical equipment yet they can not be detected by conventional metering or load measurement

2 / 5 1. The Calculations Figure 1 shows the level of milliwatts created from a connection 1 inch square in area and 1 degree F warmer than ambient. As can be seen it is just 2 milliwatts. Milliwatts are created as the resistance from a loose connection increases. Figure 1: KW s 1 Warmer than ambient Undetectable via Meter However the Mighty Milliwatt is well named. When Current is increased and Resistance increases i.e. if the connection were to loosen with time/oxidation and the resistance increased to 1 Ω then For 100 Amp Circuit Power = I 2 R = (100) 2 (1) = 10,000 w = 10kw 1= in 2 Area KW s The Mighty Milliwatt has turned into ten kilowatts - enough energy to melt 1 ounce of copper in 0.6 second and for the organisation involved - catastrophic failure! q=hr x A x (T - TA) = 1 x 1 x 1 =.007 Btu/hr Ft2 144 Convert to Watts.007 3.4 =.002 Watts = 2 Milliwatts When the resistive loss exceeds a threshold value temperature increase causes rapid and irreversible increase in resistance triggering positive feedback that will escalate to exponential level. See Figure 3. Figure 2 shows the example for a 100 amp cable. Figure 3 Normal Milliwatts > Mighty milliwatts > Megawatts = catastrophic Failure Figure 2: V 1 R V 2 Megawatts V= Voltage Volts R = Resistance Ω I = Current Amps I Kilowatts Watts Milliwatts P = I 2 x R = Heat Dissipated as MMW Calculate R for 2MMW (1 F Rise) For 100 Amp Cable P =.002 = I 2 R = (100) 2 R R =.002 =.002 =.0000002 Ω (100)2 10,000

3 / 5 2. Evolution The resistive energy has lost approximately 50% via radiation and 50% via convection to the local environment. However, the radiation component is detectable via infrared radiation methods of sufficient sensitivity and reliability as a temperature rise above ambient. Temperature rise is very sensitive to load, when load changes by factor of 3, ΔT changes by factor of 10. Thus for high downtime cost organisations continuous thermal monitoring would certainly provide a significant increase in risk mitigation of power failure. Further, with available trend data, intervention maintenance cycles can be extended with confidence, generating significant downtime savings. If we were starting with a blank sheet of paper the requirements for continuous thermal monitoring could be summarised as: Technology Step No. 1 Involved non switch off periodic inspection utilising an engineers hand to gauge the temperature on the panel and determining if it was abnormal. Whilst often effective, this is clearly an unacceptable technology for mission critical equipment in today s high downtime cost environment. Technology Step No. 2 1 Small reliable infrared (non-contact sensors) continuously measuring temperature rises above ambient, capable of placement INSIDE the enclosure. 2 Variable F.O.V./distance from target 3 Negligible metallic cross section (non conductive) 4 Self-Powered 5 Local signal conditioning outside electrical panels 6 Wired or wireless data transmission to monitoring computer 7 Appropriate software/integration capability We have thus determined that these Mighty Milliwatts represent the initial stages of a situation, which if left to develop, can cause catastrophic failure, & can only be detected using continuous infrared (non-contact) thermal measurement, (periodic inspection may detect the problem but is reliant on luck, and a number of site specific variables). Let us thus look at how this next technology step has evolved. Was the introduction of periodic infrared thermal imaging technology, enabling no switch off inspections to be carried out on a more objective basis and whilst still dependent on operator skill/experience represented a significant step forward. However, this still did not resolve certain key issues. It was still periodic; representing 1 or 2 days out of 365, and thereby remained reliant on quite a significant degree of luck, ( 1 > 2 days out of 365), since it requires the problem to have developed to a point it is detectable, but not to the point of failure. A further problem was that the inspection was conducted outside the enclosure, measuring the exterior surface of the panel, rather than the actual equipment inside the panel. Consequently, it requires correlation between external & internal component temperatures, that can vary significantly, according to climatic and equipment variances.

4 / 5 2. Evolution cont... Technology Step No. 3 Was the introduction of thermal windows. These can either be mesh/screen or crystal. Whilst this significantly improved infrared transmission, mesh dissipates heat think of the principle of a fire guard. Thus, whilst improving the IR they typically indicate the area of a problem rather than the location. Crystal windows vary, but typically cut transmission by approximately 30-70%. The trade o is that the better the crystal transmission the more delicate the material. However both need direct line off site to the target, can add significant cost, and still remain periodic rather than continuous. Thus the conclusion is that whilst periodic thermal imaging was a huge step forward, allowing more objective, recordable, non switch off inspection, and thermal windows provided a further technology step, improving inspection accuracy, both remain preventative i.e. time based inspection, rather than predictive i.e. continuous monitoring, utilising trend analysis and alarms to predict failure before the event. So is continuous monitoring really required? If we look at the lengths to which high downtime cost organisations go to in an effort to avoid power failures we can see that other measures include: 1 Over specification based on design load (often 50% plus) 2 Dual redundancy 3 UPS often more than one 4 And in addition to all these measures significant sums are spent on fire detection/suppression Even with all these safe guards in place, it is normal for such organisations to still carry out periodic thermal inspections once or even twice per year. Clearly, risk mitigation could be significantly reduced via the use of continuous thermal monitoring on mission critical electrical equipment. Technology Step No. 4 Was the introduction of the infrared thermocouple (IRt/c ). Perhaps the most important feature of this unique device is the fact that it is self-powered. All other IR devices require power to the sensor. Because the signal level is so small (microvolts) IR devices require an amplifier to avoid the small signal level being swamped by the power. The amplifier introduces the possibility of electronic drift and thus calibration will have to be checked on a regular basis. This would be of particular significance to organisations with ISO quality standard systems. The IRt/c is self-powered (just like a standard thermocouple) and thus requires no amplifier and thus lifetime repeatable calibration. The IRt/c sensors are small, plastic, low cost, ultra reliable, non-contact devices, which measure the rise above ambient, and have recently gained UL certification. There has also been the recent introduction of specifically designed small plastic cable sensors, also measuring rise above ambient. These can be used where there are cable joints as opposed to copper bus bar, and thus non-contact is not a requirement. The increase in temperature, resulting from the increased resistance from the bad connection is conducted down the cable to the sensor which is normally located within a few inches of the connection. Data Acquisition cards (DAC s), have been developed which both linearise and condition the signal of these unique sensors, making them suitable for noisy electrical environments. These DAC s can accept 8 mixed (IRt/c cable) inputs and are din rail mounted either in existing spare enclosures within a panel or externally in their own enclosure. This avoids bulky cable looms within the panel, and providing a secondary benefit for clear accurate cable marking. The DAC s per panel are linked via 485 data cable, (typically using a good quality shielded CAT 5 cable).

5 / 5 3. The Solution There are then a number of options regarding/software/integration. 24x7 Thermal Monitoring Option 1 Option 2 Option 3 Option 4 Interlink all data cards on system and connect back to host computer utilising proprietary software. IRt/c. Field of View & Dimensions As option 1 with addition of alarm relay to existing BMS Introduce protocol conversion hardware prior to host computer thus enabling the system to be integrated with over 400 existing BMS/ SCADA systems Utilise data acquisition card capability to provide output protocol in Modbus Probus, BACnet, Devicenet, Ethernet to enable direct connection per panel to existing host system bus cable and subsequent full integration into host system..06(1,5) 1.28 (32,5).25(6,4) O.D. 0.725 x 18 T.P.I. REF. (Din Pg 11 Threads) Self Powered IRt/c Circuit Diagram Rs Black ABS Plastic.550(14,0) Vs + R3 R1 R2 RT V+ C1.497(12,6) dia. V- This continuous thermal monitoring technology can be designed into new installations or retro fitted to existing installations at next suitable shut down. Where total shut downs are not possible (i.e. data centres/large scale manufacturing) the system can be fitted on a partial and progressive basis. In choosing what to monitor perhaps the first question to be asked is what is periodically thermally imaged. That would form the basis of what should be continuously monitored. In essence it would be critical joints and connections on the mission critical element of the electrical equipment. The key word is critical. There are some secondary benefits which derive from continuous monitoring: 1 Can potentially provide circa 20% extra life on major capital assets on basis of trend data 2 Extend conventional intervention maintenance by circa 2 to 3 years, thus achieving downtime savings which make the thermal monitoring self financing within a short time frame 3 Where removal of panels for live imaging is carried out a major risk mitigation in personnel safety is achieved 4 The cost of the installed monitoring as a percentage of job cost is typically 1-2%, which can be amortised over the life of the equipment This new infrared technology has provided the next technology step enabling continuous 24x7 thermal monitoring of mission critical equipment to be carried out inside the enclosures enabling the prediction of failures before they happen. Why take a snapshot when you can have the whole picture?