ARTICLE III COMBINED SEWERS

Similar documents
HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

NAPA COUNTY PUBLIC WORKS Standards & Specifications

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

ORDINANCE NO WHEREAS, the Council has received the following record of recent actions taken by the HSW Board which:

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

City of Waco Stormwater Management Regulations

ARIZONA WATER COMPANY

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT


Chapter 1: General Program Information

Pollutant Removal Benefits

DCA , Stormwater Quality and Facilities Ordinance June 23, 2009

GLOBAL CENTRE FOR PLURALISM 330 Sussex Drive Ottawa, Ontario SITE SERVICING & STORMWATER MANAGEMENT OVERVIEW UPDATE REPORT.

Washington County, Maryland Division of Public Works Policy Manual

PHASE III DRAINAGE REPORT

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Article 20 Stormwater Management

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

When planning stormwater management facilities, the following principles shall be applied where possible.

CHECKLIST FOR PHASE II DRAINAGE REPORT

County Council Of Howard County, Maryland

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

DRAINAGE CALCULATIONS

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Going Green with the NYS Stormwater Design Standards

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

CHAPTER 38. The City Council makes the following findings regarding storm water runoff and the City s storm drain and flood control systems:

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

Figure 1 Cypress Street Study Area Location Map

General Technical Guidance for Treatment Measures

Erosion & Sediment Control Plan Application Form & Checklist

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

ARTICLE 6: Special and Planned Development Districts

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

General Technical Guidance for Treatment Measures

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES

SEMSWA s Role in the Land Development Process

CHAPTER 156 POST-CONSTRUCTION STORM WATER RUNOFF...

GRACE CHURCH EXPANSION

Why a new Food & Farm Ordinance?

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

General Technical Guidance for Treatment Measures

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Bioretention cell schematic key

South Bismarck Watershed Model Update and Stormwater Improvement Project

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Appendix K. Stormwater Management Plan

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

26 Attachment 2. Township of New Britain APPENDIX B STORMWATER MANAGEMENT DESIGN CRITERIA

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

4. UTILITIES ELEMENT.

A. Regional Detention Requirements

Table of Contents G.1.a Water Resources - Surface Water - Drainage

2. As a condition of the City s MS4 Permit, the City is obliged to adopt and enforce a POST- CONSTRUCTION STORMWATER CONTROL ordinance.

CITY OF URBANA STORMWATER UTILITY FEE FREQUENTLY ASKED QUESTIONS

STORM WATER UTILITY FREQUENTLY ASKED QUESTIONS

Brigitte A. Berger, Director of Engineering

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

Draft Rhode Island Stormwater Design and Installation Standards Manual

City of Richmond. Engineering Design Specifications

2012 Saginaw Bay Watershed Conference

Detroit Stormwater Rules and Drainage Fee Updates

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

Environmental Protection Ordinances (Performance Zoning) Bedminster Township, Bucks County

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Understanding Stormwater Drainage Maintenance

County of Fairfax, Virginia

4. CONCEPT PLAN DEVELOPMENT

Kingswood Site Development Preliminary Site Evaluation Report March 23, 2015

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Old Mill Community Association Bioretention Facility

Boston Water and Sewer Commission

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Rain Gardens Water Quality the Way Mother Nature Intended

STREAM BUFFER PROTECTION AND MANAGEMENT

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Planning, Design, and Construction of Green Infrastructure.

Review Zone Application for D&R Canal Commission Decision

CHESAPEAKE LANDSCAPE ORDINANCE

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

Chapter 4 - Preparation of Stormwater Site Plans

UNIVERSITY PRESBYTERIAN CHURCH - RENOVATION & ADDITION 209 EAST FRANKLIN ST., CHAPEL HILL, NC 27514

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

Regional Stormwater Management Program

SMALL PROJECTS SIMPLIFIED APPROACH

APPENDIX B. Hydrologic and Hydraulic Analysis

LDC Amendment Request

3. Are there any projects exempt from the definition of Regulated Projects?

New Development Stormwater Guidelines

Urban Planning and Land Use

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria

Transcription:

I ' j I' ARTICLE III COMBINED SEWERS COM'RS MIN.. VOL.281 JAN 2 2001 IMAGE Section 301 Construction; Extension of Sewers The construction of and/or extension to combined sewers are hereby prohibited, unless approved by the District. Section 302 Connections to Combined Sewers Except as may be modified by the Codes of the State of Ohio and the City of Cincinnati, Ohio, Basic building Code-Plumbing Code Section 1151-69, individual properties shall install a separation manhole at the junction of the building sewer-storm and building sewer-sanitary at the public right-of-way for the purpose of discharging combined wastes to a public combined sewer in accordance with Standard Drawing Ace. No. 49063. In selected areas designated by the Director, separation for residential properties shall be provided for all new connections to the combined sewer systems. For residential properties, a "Y " connection and cleanout in accordance with Standard Drawing Ace. No. 49047 may be used in lieu of a separation manhole. Section 303 Detention Requirements for Stormwater Connections or Modifications Stormwater connections or modifications which involve stormwater ultimately tributary to the combined sewer system shall be subject to the District's Policy for Storm water Detention Facilities, as specified below: POLICY FOR STORMWATER DETENTION FACILITIES A. The volume of storm water detained shall be the difference in runoff volume from the predeveloped site over a ten-year event of one hour duration and the postdeveloped site under a twenty-five year event of one hour duration. The peak rate of runoff from the site after development for a twenty-five year storm event of one hour duration shall not exceed the predevelopment site peak runoff for a ten-year event of one hour duration. B. Peak flow rates shall be determined by the Rational Method which is appropriate for small drainage areas. The basic formula for the Rational Method is Q = CiA Where Q is the peak rate of runoff in cubic feet per second, C is the runoff coefficient, aruii is the 17

.,..,J.'f--avera e intensity of a storm of given frequency for a selected duration in inches per hour, and A '. is the;afea in acres. C. The required storage volume, S, in cubic feet, for the detention facility shall be computed by the following: S = V*(l-Ql/Q2)*1.15 where V = Q2*3600 is the volume of runoff and 1.15 represents a 15 percent safety factor which may be applied at the discretion of the District. Q2 is the post development peak flow for a twenty-five year storm of one hour duration and QJ is the predevelopment peak flow for a ten-year storm of one hour duration. 01 is also the maximum allowable release rate at storage volumes. The above equation reduces to the simplified form: S = 4140(Q2 CQl) or S = 3630 (Q2 - Q 1) without the safety factor. D. The applicable rainfall intensities for these storm events are provided below: i = 2.03 inches/hour (ten-year) - i = 2.42 inches/hour (twenty-five year) These rainfall intensities have been developed for Cincinnati from the latest precipitation data contained in the U.S. Department of Commerce Technical Memorandum NWS HYDR0-35 and Technical Paper No. 40, and supersede all previous work. E. Runoff coefficients (C-values) adopted for use in the Rational stormwater drainage in Cincinnati are provided below: Runoff Coefficients for the Rational Method Land Use Runoff Coefficient Residential 0.5 Multi-family 0.6 Commercial and Business Districts 0.8 Industrial-Districts 0.7 18

Open Space (parks, golf courses, cemeteries 0.3 meadows, grass, woods, lawns, etc.) Impervious Areas (parking lots, roads, rooftops) 0.9 Steep wooded hillside slope > 10 percent 0.5 Composite Runoff Coefficients- If the runoff coefficient varies over a subarea, a composite coefficient can be calculated as an average, weighted by the area of the various runoff coefficients. F. All detention facilities shall provide a passive emergency discharge outlet which shall be used only when the required storage volume is exceeded. G. Stormwater detention facilities shall be private with operation, maintenance and associated liability thereof being the responsibility of the owner. A stormwater detention pond or lake location must have its private storm drainage limits prepared by the Developer or his Engineer on a record plat by the metes and bounds description. The record plat is to be submitted to MSD for review and approval. The District shall have the plat recorded. The said limit area and all improvements in it sh_?ll be maintained continuously by the Owner. No structures, planting or other material, shall be placed or permitted to remain which may obstruct, retard or change the direction of the flow of water through the drainage channel in the said limits. Similar requirements shall apply for private storm basin easement limits when multiple owners are involved. H. Any waiver of or exception to these requirements shall be determined by the Director on a caseby-case basis. For protection of the environment and downstream property, the District's detention requirements may be more restrictive in sensitive areas. Responsibility for proper maintenance of detention facilities and appurtenances shall be with the property owner granted permission to make connection with the District's combined sewer system. It shall be the responsibility of any current or subsequent owner to transfer and record this responsibility should property ownership change. Under no circumstances shall alterations affecting the volume, operation, or release rate be made without first obtaining written permission from the District. Other governmental agencies may impose their own jurisdictional detention requirements providing the release rates and storage volumes meet or exceed those satisfactory to the District as determined by the Director. 19-21 of 222 -

Section 304 Amendments October 1, 2003

ARTICLE Ill COMBINED SEWERS Section 304 Basement Flooding Problems In Areas Served By Combined Sewers Th olffiy-et tl:te--board-al ew&-f-elf-cefls felefa-tion-ot c-est--shar:ffig-betwee-r-the--beaf 1 aoo-a -lecal jurisdictien for improvements made ifl-bft area served by a G-ombined sewef-system te alleviate G4ro n i c basemeht-fl.oedifl h-a-5-}=>fbvhle-d-be-low. The Director of the Metropolitan Sewer District shall identify to the Board of County Commissioners each project proposed for the reduction of combined sewer basement flooding, and he shall describe the project scope, its estimated total cost, and his recommendation for apportionment of costs among participating agencies. The Board shall approve in advance of any such project being undertaken. The Director shall recommend only those projects where he has determined that the combined sewer contributes to chronic basement flooding. The Director shall determine that the combined sewer does not presently have the capacity to convey the flow from a 1 0-year, 24-hour storm. The basement flooding must be localized to a small area. The improvement must significantly reduce the incidence of basement flooding. The proposed project shall be the most cost effective alternative for the resolution of the chronic basement flooding problem. The MS.Qshare-of--tl=te-propeset!rmprovementsha l-be -less than-9g-%,-,