TERRACE VIEW APARTMENTS HUNT CLUB ROAD BLACKSBURG, VIRGINIA APARTMENT FINISHES AND UPGRADES UNIT TYPE 2 x 1.5 Phase 5-8 Unit Number 11 Units Total 1) 4200C 2) 4200K 3) 4500D 4) 4500G 5) 4500H 6) 5400A 7) 5400i 8) 5600B 9) 6800i 10) 7300F 11) 7500i
SCOPE OF WORK A-106 2 Bedroom 1-1/2 Bath RENOVATION NOTES ENTIRE UNIT 1. Demo Bathroom tub/shower and medicine cabinet and light. (leave ceiling exhaust fan in place), demo heater unit and controls and door. BY CONTRACTOR 2. Demo floor covering (vinyl and/or carpet) including existing wood baseboards. BY OTHERS 3. Demo toilet, sink/vanity. BY OTHERS. 4. Demo bedroom closet bi-fold doors and closet shelf. 5. Demo hall closet bid-fold door and closet shelf. 6. Remove appliances from unit to either parking lot or dumpster. (Maintenance will determine what appliances can be used for parts prior to removal). 7. Keep window coverings (replace as needed By Owner). 8. Check windows and Clean Metal (remove old paint). ALTERNATE EU#1 Repair and Float any major wall / blemishes or issues. 9. FLOORING a. 1 st Floor i. Concrete go over with GLUE DOWN VLP. (Prep as needed). BY OTHERS ii. Carpet (Demo and Remove) to existing concrete and go over with GLUE DOWN VLP. (Prep as needed). BY OTHERS iii. Cutting Concrete (trenching) on first floor units is necessary to move baths and/or add baths. iv. Furnish and Install GLUE DOWN VLP Flooring. - BY OTHERS v. Furnish and Install Cove Base. - BY OTHERS b. 2 nd and 3 rd Floor i. Remove existing flooring to subfloor. BY OTHERS ii. Replace any bad boards and screw them down. BY OTHERS iii. Add 3/8 4-Ply Sure Ply (Brand) underlayment BY OTHERS iv. Furnish and Install GLUE DOWN VLP Flooring. BY OTHERS v. Furnish and Install Cove Base. BY OTHERS 10. ELECTRICAL a. Remove and Replace all switches and outlets with WHITE Décor Style Rocker switches. (OWNER Supplied Materials). b. Install 1 USB Outlet / Electrical plug for each room (Dining, Living, kitchen, Bedroom). (See plan USB Markup for Locations). (OWNER Supplied Materials). c. Install Electrical Outlet for washer and dryer in new laundry room (closet). (OWNER Supplied Materials). A-106 2 Bedroom / 1-1/2 Bathroom 3/21/2018
d. Install new Light Fixtures throughout unit (including new laundry room). (OWNER Supplied Materials). e. Install GFI as needed per code. (OWNER Supplied Materials). f. Change communication (TV/Cable) outlets to NEW WHITE DÉCOR Style. (OWNER Supplied Materials). g. Remove and Plaster over any boxes (wall plates) no longer active, such as phone, communications. 11. LAUNDRY HALL CLOSET a. Remove Closet Door and Frame. b. Remove Closet Shelving. c. Enlarge opening. Install New 2 8 Pre-Hung 6 Panel Door with BLACK HINGES. (OWNER Supplied Materials). d. Install Door Hardware. (OWNER Supplied Materials). e. Install all Plumbing and Electrical for ventless Washer Dryer units (supplied by Owner). (OWNER Supplied Materials). f. Install New Washer Connection Box with Plumbing lines. (OWNER Supplied Materials). g. OWNER to Receive Delivery on Washer and Dryer, Delivery Company to set units in place. h. Contractor to connect Washer and Dryer to Plumbing and Electric. (OWNER Supplied Materials). i. Install New Light Fixture in Laundry. (OWNER Supplied Materials). j. Install Wire Shelf over Washer and Dryer. (See Wire Shelf Layout Plan for Unit Type). (OWNER Supplied Materials). 12. KITCHEN a. Keep window coverings (replace as needed). b. Check windows and Clean Metal (remove old paint). c. Demo existing cabinets and any backsplash. BY OTHERS d. Remove existing appliances to parking lot or dumpster. (Maintenance will determine which appliances will be kept for parts prior to removal). e. Remove HOOD FAN up for microwave. f. Delete old valves and Cap Lines. g. Install new P-Trap and Shut Off Valves. Make sure they fit below sink basin. (OWNER Supplied Materials). h. Remove Flooring and Baseboards BY OTHERS i. Remove Pantry Bi-fold doors and track. j. Change Rough Opening at Pantry to Finished Opening (Plaster). (OWNER Supplied Materials). k. Install Door Casing at the Finished Opening on Kitchen Pantry. (OWNER Supplied Materials). l. Remove Light Fixture. Install New Light Fixture. (OWNER Supplied Materials). A-106 2 Bedroom / 1-1/2 Bathroom 3/21/2018
m. Remove and Patch existing phone jack / outlet. Match existing wall texture. n. Remove all outlets and switches. o. Install Outlets and Switches with New White DÉCOR style (1 with USB) (Parts supplied by Owner. See USB Layout plan by unit type) p. Check outlets / switches and move outside of the sink (above) area and out of conflict with Stove or other items/appliances. q. Install Stove outlet up into wall. (OWNER Supplied Materials). r. Cabinets i. New Cabinets (see layout) FURNISHED BY OTHERS. ii. Install New Cabinets (see layout). INSTALLED by GC / Contractor. s. Counter Top i. Furnish Quartz Counter Tops (see layout). FURNISHED BY OTHERS. ii. Install New Quartz Counter Tops (see layout) INSTALLED by GC / Contractor. t. FURNISH AND INSTALL New Subway Tile Backsplash (correct bullnose) use sanded and regular matching grout caulking. (CONTRACTOR Supplied Materials). u. FURNISH AND INSTALL Tile Sealer to new tile. (CONTRACTOR Supplied Materials). v. Install electrical outlet in upper cabinet to plug in Microwave. (OWNER Supplied Materials). w. New Appliances (Stove, Refrigerator (no ice maker), Dishwasher, and Microwave). FURNISHED By Owner. x. Install and Connect - New Appliances (above) by GC / Contractor. y. Install and Connect New Sink and Faucet. (OWNER Supplied Materials). z. Install and Connect - Garbage Disposal. (OWNER Supplied Materials). aa. OWNER to receive all kitchen appliances and washer/dryer. bb. CONNECT all Kitchen appliances BY CONTRACTOR cc. ALTERNATE #1-1 st Floor units may have water damage behind kitchen wall. Fix as needed and use Kilz as needed. dd. ALTERNATE #2 Move and Align plumbing lines to line up with new sink. ee. ALTERNATE #3 Check outlets / switches and move outside of sink (above area and out of conflict with Stove or other items/appliances. 13. COMMON AREA a. Remove baseboards and prep/fix wall according to receive 4 Cove Base. BY OTHERS b. Check Windows (replace as needed) and clean metal (remove old paint) c. Install New Light Fixtures as per spec sheet. (OWNER Supplied Materials). d. Install outlets and switches with New White DÉCOR Style. (OWNER Supplied Materials). e. Install 1 USB outlet. (Owner Supplied Materials. See USB Layout Plan by Unit Type). f. FLOAT Finish (Smooth) the Blackboard Wall Area. (Level 4 Finish). A-106 2 Bedroom / 1-1/2 Bathroom 3/21/2018
14. DINING a. Install New Light Chandelier. (Owner Supplied Materials). b. Furnish and Install 1 USB outlet. Install 1 USB outlet. (Owner Supplied Materials. See USB Layout Plan by Unit Type). 15. BEDROOM (1) Rear a. Check Windows (replace as needed) and clean metal (remove old paint). b. Remove interior of Walk-in Closet. c. Move Wall of Walk-in Closet. (see plans). d. Remove existing toilet, vanity-sink, exhaust fan, medicine cabinet, light fixture. e. Install all plumbing and electric, exhaust and fixtures to build a new bathroom. (Owner Supplied Materials). f. Install New P-Trap and Shutoff Valves. (Owner Supplied Materials). g. Install new toilet flange and adjust to being code compliant and appropriate place / location. (Owner Supplied Materials). h. Install New tub/shower with new valves and trim out. (Owner Supplied Materials). i. Install New Toilet. (Owner Supplied Materials). j. Install New Vanity. (Owner Supplied Materials). k. Install New Vanity Top and Faucet. (Owner Supplied Materials). l. Install New Mirror. (Owner Supplied Materials). m. Install Electric GFI outlet, Wall Switches for Exhaust Fan and Light. (Owner Supplied Materials). n. Install New Light Fixture. (Owner Supplied Materials). o. Install New 2 4 Pre-Hung 6 Panel Hollow Core Door with BLACK HINGES. (Owner Supplied Materials). p. Install Door Hardware. (Owner Supplied Materials). q. FURNISH AND INSTALL Swirl Texture to New Bathroom Walls and Ceiling. (CONTRACTOR Supplied Materials). r. Frame and Build New Bedroom Closet (as per plans). s. Install 2-4 Pre-Hung 6-Panel Hollow Core Door with BLACK HINGES. (Owner Supplied Materials). t. Install New Door Hardware. (Owner Supplied Materials). u. Install wire shelf at Closet. (Owner Supplied Materials. See Wire Shelf Layout Plan by Unit Type). v. Install Light Fixture in New Closet. (Owner Supplied Materials). w. Install Lighting Fixtures / Fan (as applicable) as per spec sheet. (Owner Supplied Materials). x. Install outlets and switches with New White DÉCOR Style. (Owner Supplied Materials). y. Install 1 USB outlet. (Owner Supplied Materials. See USB Layout Plan by Unit Type). A-106 2 Bedroom / 1-1/2 Bathroom 3/21/2018
16. BEDROOM (1) Front a. Check Windows (replace as needed) and clean metal (remove old paint). b. Remove existing bi-fold closet door and closet shelf. c. Install 6-Panel Bi-Pass Doors (6 0 with 2 3 0 slabs with Bi-Pass Hardware). Closet Door. (Owner Supplied Materials). d. Remove existing bedroom door and frame. e. Install Pre-Hung 6 Panel Hollow Core door with BLACK HINGES. (Owner Supplied Materials). f. Install Door Hardware. (Owner Supplied Materials). g. Install wire shelf at Closet. (Owner Supplied Materials. See Wire Shelf Layout Plan by Unit Type). h. Install Lighting Fixture. (Owner Supplied Materials). i. Install Ceiling Fan or Light as per spec and unit type. (Owner Supplied Materials). j. Install outlets and switches with New White DÉCOR Style. (Owner Supplied Materials). k. Install 1 USB outlet. (Owner Supplied Materials. See USB Layout Plan by Unit Type). 17. BATHROOM Existing (see spec sheet) a. See specific unit spec for additions. b. Disconnect and Demo existing baseboard heaters, capping wires and removal of controls. Blocking and Patching any wall areas where heating or controls were removed. c. Install new light fixture (fix wall accordingly). (Owner Supplied Materials). d. Demo and Remove medicine cabinet. e. Install New Mirror. (Owner Supplied Materials). f. Install outlets and switches with New White DÉCOR Style. (GFI per code). (Owner Supplied Materials). g. Demo and Remove vanity, top and fixtures. BY OTHERS h. Delete old valves and Cap Lines. i. Install New P-Trap and Shut Off Valves. (Owner Supplied Materials). j. Demo and Remove existing toilet. BY OTHERS k. Demo metal clothes hamper. Patch wall and match existing texture. l. Install new toilet flange and adjust to being code compliant and appropriate place / location. (Owner Supplied Materials). m. Install new toilet. (Owner Supplied Materials). n. Demo and Remove base boards and floor covering. BY OTHERS o. Demo and Remove tub / shower. p. Install tub / shower with new valves and trim out. (Owner Supplied Materials). q. Install Vanity Top, faucet. (Owner Supplied Materials). A-106 2 Bedroom / 1-1/2 Bathroom 3/21/2018
r. Install new 6 Panel Hollow Core Pre-hung Door with Black Hinges. (Owner Supplied Materials). s. Install Door Hardware. (Owner Supplied Materials). t. Install new shower curtain rod. (Owner Supplied Materials). u. Install all new bathroom accessories and hardware. (Owner Supplied Materials). v. FURNISH AND INSTALL swirl texture to walls and ceilings. (CONTRACTOR Supplied Materials). 18. MECHANICAL a. Remove all Air Vents, Registers and Return Air Grilles. b. Replace with New WHITE Air Vents, Registers and Return Air Grilles. (Owner Supplied Materials). c. Remove and Demo Door and Frame. d. Install New 6 Panel Pre-Hung Door with Black Hinges and New Hardware. (Owner Supplied Materials). 19. PAINTING a. Interior Painting (to be Furnished and Installed by Others). 20. CLEANING a. Bump Cleaning (to be performed by OTHERS) prior to Painting. b. Final Cleaning (to be performed by OTHERS) after Vinyl Flooring and Cove Base Installed. A-106 2 Bedroom / 1-1/2 Bathroom 3/21/2018
Typical Bedroom Closet Shelf Unit Length Varies Height Standard TBD Standard hardware, brackets and fittings.
Linen Closet Width Varies 80 OFF F.F. 12 Install first shelf at 80 off F.F. Then install 3 additional shelf units. 12 Each 12 inches from the one above each shelf. Standard 12 width with hardware, brackets and fittings as needed. 12 Finish Floor
94 3 4" 141 1 4" 1 1 2" 54 1 4" 30" 24" 31 1 2" 1 1 2" 54 1 4" 30" 24" 31 1 2" W3030 W2430 W311724 B30 DB24-3 REP384-L GTE18ITH 2 - TK96 4 - F330 2 - F1.530 3 - Scribe BF3B12-L 30-RANGE1 B15-R SB30 SK.23-1BOWL 24.DISHWBF3 21 3 16" 4 13 16" WF330 W1230-L MW.HOOD W3012 W1530-R W3018 W2430WF330 1 1 2" 12" 30" 15" 30" 26" 28 1 2" 72" 14" 1 1 2" 12" 30" 15" 30" 24" 2" 114 1 2" 3 4" All dimensions size designations given are subject to verification on job site and adjustment to fit job conditions. DRAWINGS BY: PATRICK RHODES This is an original design and must not be released or copied unless applicable fee has been paid or job order placed. Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit All Drawing #: 1 Scale : 0 1/2" = 1'
141 1 4" 54 1 4" 30" 24" 1 1 2" 31 1 2" 17" W3030 W2430 W311724 1 1 8" 96" 12" 18 1 8" 31 3 8" 13" 12" REP384-L 54" GTE18ITH 65 7 8" 34 1 2" B30 DB24-3 1" 29 1 2" 1" All dimensions size designations given are subject to verification on job site and adjustment to fit job conditions. DRAWINGS BY: PATRICK RHODES This is an original design and must not be released or copied unless applicable fee has been paid or job order placed. Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit REF Wall Drawing #: 1 Scale : 0 9/16" = 1'
114 1 2" 1 1 2" 12" 30" 15" 30" 24" 2" W3012 12" W3018 WF330 W1230-L MW.HOOD W1530-R W2430WF330 54" 1 1 2" 96" 12" 1 1 2" 10 1 2" 6" 60" 34 1 2" BF3B12-L 30-RANGE1 B15-R SB30 24.DISHWBF3 1 1 2" 12" 28 1 2" 30" 15" 30" 72" 26" 14" All dimensions size designations given are subject to verification on job site and adjustment to fit job conditions. DRAWINGS BY: PATRICK RHODES This is an original design and must not be released or copied unless applicable fee has been paid or job order placed. Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Sink Wall Drawing #: 1 Scale : 0 9/16" = 1'
25" 55" 30" 13 1 2" 71" 25" All dimensions size designations given are subject to verification on job site and adjustment to fit job conditions. DRAWINGS BY: PATRICK RHODES This is an original design and must not be released or copied unless applicable fee has been paid or job order placed. Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Countertops Drawing #: 1 Scale : 0 1/2" = 1'
Note: This drawing is an artistic interpretation of the general appearance of the design. It is not meant to be an exact rendition. DRAWINGS BY: PATRICK RHODES Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Countertops Drawing #: 1
Note: This drawing is an artistic interpretation of the general appearance of the design. It is not meant to be an exact rendition. DRAWINGS BY: PATRICK RHODES Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Countertops Drawing #: 1
Note: This drawing is an artistic interpretation of the general appearance of the design. It is not meant to be an exact rendition. DRAWINGS BY: PATRICK RHODES Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Countertops Drawing #: 1
Note: This drawing is an artistic interpretation of the general appearance of the design. It is not meant to be an exact rendition. DRAWINGS BY: PATRICK RHODES Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Countertops Drawing #: 1
Note: This drawing is an artistic interpretation of the general appearance of the design. It is not meant to be an exact rendition. DRAWINGS BY: PATRICK RHODES Designed: 2/21/2018 Printed: 3/8/2018 02-21-18 Galley Kitchen.kit Countertops Drawing #: 1