A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Similar documents
Utilizing Green Infrastructure to Protect Public Health at Beaches: A Case Study in Suttons Bay, MI

Stormwater Low Impact Development - A Natural Solution

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Homeowners Guide to Stormwater BMP Maintenance

Monica Smith, PE President Robinson Engineering Company

Urban Watershed Mentors

Kittson Parkway / Watershed Park Parking Lot

The Benefits and Challenges Associated with Green Infrastructure Practices

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Use of Best Management Practices

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Small Town Sustainable Stormwater Solutions

Municipal Guide to. Storm Water Management Techniques

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Swan Creek Urban BMP Inventory and Assessment. Jeff Grabarkiewicz, Kari Gerwin, Ann-Drea Hensley TMACOG, Lucas SWCD/Engineers, and Partners

Structural Stormwater Best Management Practices

Green Infrastructure & Low Impact Development

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Watershed Moments. Kids Creek Gets Treatment at Munson. May 2013

Controlling Urban Stormwater at the University of Wisconsin - Madison

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

Urban Stormwater Retrofit Program Highlights

Inventory and Assessment of Stormwater Infrastructure

Green Infrastructure Overview

Small Project Guidance Document

Case Study: Dallas Green Infrastructure for Stormwater

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Low Impact Development for your homes, businesses & streets

2016 WORKSHOP LVR Field Trip

Working Group Meeting

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

From and

Climate Smart Communities Green Infrastructure Case Studies

Rain Gardens. A Welcome Addition to Your Landscape

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Green Infrastructure and Low-Impact Development Technologies

Inventory and Assessment of Stormwater Infrastructure

Green Street BMP Matrix

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Landowner's Guide to the Lower St. Croix Riverway. Protect. Restore. Celebrate. stcroixriverassociation.org

Impervious Cover Assessment for Salem City, Salem County, New Jersey

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

4. CONCEPT PLAN DEVELOPMENT

Impervious Cover Assessment for Berlin Township, Camden County, New Jersey

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Draft Impervious Cover Assessment for Branchburg Township, Somerset County, New Jersey

Impervious Cover Assessment for Netcong Borough, Morris County, New Jersey

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Stormwater Prevention and Control

Low Impact Development in Northern Nevada: Bioretention

Draft Impervious Cover Assessment for Millstone Township, Monmouth County, New Jersey

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

SUNY Green Infrastructure Summit. April 17, 2014

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Cost Effective Low Impact Development

Draft Impervious Cover Assessment for West New York, Hudson County, New Jersey

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Holland Country Club Golf Course to Wetlands

Town of Bolton Stormwater Retrofit Opportunities

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Worksheet #14 Water Runoff Management

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

University of Minnesota Duluth Stormwater Features on the UMD Campus

Old Mill Community Association Bioretention Facility

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Craven Street Stormwater Improvement Projects

Green Infrastructure. NYS Department of Environmental Conservation

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

Draft Impervious Cover Assessment for North Plainfield Borough, Somerset County, New Jersey

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

Chapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development. Break Out Group 10:30 am to 12 pm

BEACON HILL INTERNATIONAL SCHOOL

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Lesson 2: Stormwater Best Management Practices (BMPs)

Third Ave CSO Integrated Green Infrastructure

Draft Impervious Cover Assessment for Mountainside Borough, Union County, New Jersey

STORWATER AWARNESS TRAINING

A Property Management Model for Green Infrastructure Site Maintenance. #ProjectCleanLake

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

Impervious Cover Assessment for Edison Township, Middlesex County, New Jersey

STORMWATER STRATEGY PROJECTS IN ACTION

Bioretention cell schematic key

Transcription:

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region Sarah U Ren Program Director The Watershed Center of Grand Traverse Bay 231-935-1514, suren@gtbay.org

Our Mission: The Watershed Center advocates for clean water in Grand Traverse Bay and acts to protect and preserve the Bay s watershed 973 square miles 132 Miles of Shoreline 4 Counties, 44 townships, 11 municipalities

GI Projects In GT Bay Watershed 2018: Village of Northport $499,370 EPA GLRI funded 2013: Suttons Bay $987,102 EPA GLRI funded 2012 - current: Kids Creek Restoration Project $5+ million Various sources (EPA GLRI, DEQ, GLFT, foundations, etc.)

Village of Northport Nagonaba Street Stormwater Reduction

Nagonaba Street Stormwater Reduction Issues: No stormdrain system on Nagonaba Street 1,800 feet long, steep hill directly to marina, localized flooding Potential contamination of nearshore waters bacteria and nutrients Public health risk, beach closings Excessive algae growth Runoff Path down Nagonaba Street to Grand Traverse Bay Public Beach Public Beach Project Engineers: Aerial photo courtesy of Anderson Aerial Photography

GI Elements: Nagonaba Street Underground Infiltration 1,800 ft Tree Box Filters Perforated half-pipe system Set in a bed of gravel to encourage infiltration Pre-treatment to remove sediments/trash Receive runoff from catch basins on street Interconnected with underground storage

Underground Infiltration Trench Construction Filter fabric surrounding excavated area and gravel placement around chambers. Fabric folded over the top to prevent sediment from entering system. 15 connected chambers 8 feet wide 68 feet length total Inside view of infiltration chamber. Note gravel on bottom and the white inlet pipe at the end of chamber

Tree Box Installation Before/After Nagonaba Street south side before 6 Boxes total - species include Sugar Tyme Crabapple Red Baron Crabapple Nagonaba Street north side before Nagonaba Street south side after Nagonaba Street north side after

Pollutants Reduced Estimated Stormwater Runoff Reduction Underground Infiltration at Village Office 950,000 gallons/year StormTree Boxes on east Nagonaba 926,000 gallons/year Estimated Pollutant Load Reductions (STEPL) Total suspended solids 1 ton/yr Total nitrogen 24 lb/yr Total phosphorus 4 lb/yr Tree box filter installation, set in bed of gravel and wrapped with filter fabric

Suttons Bay Stormwater Project

Project Overview: Issues: Three main storm drains outlet to Suttons Bay: Grove, Madison, Broadway Street Drains Bacterial contamination of nearshore waters (at South Shore Park, possible at Marina Park) Public health risk Public Beach Public Beach

GI Elements: High Infiltration Rates: 12 20+ in/hr Rain Gardens Infiltration Trenches Increase infiltration and reduce amount of runoff making it to pipe outlets: Rain Gardens Underground Infiltration Trenches Combine 2 outfalls and redirect to wetland outlet Designed to capture all but 2.5% of storm events (infiltrating 97.5 % percent of storm events) Project Engineer:

Rain Gardens 18 installed in residential areas Runoff enters via curb cut or sheet flow Overflow to stormdrain system Southwest corner Madison Ave and M-22

Rain Gardens Before, During, After Northwest corner St. Mary s and Broadway Ave

Installation of Infiltration Trenches 3,612 feet installed (3/4 mile) Alleys and side road closest to Bay Set in bed of gravel, wrapped with filter fabric Oil/grit separator pretreatment

General Observations First and Second Years Rain Gardens Watch closely the first few weeks, note where water is coming in and look for erosion Mulch will float until a mat forms, some will be transported into pipe Clean storm inlets regularly, leaves will clog Rocks will be helpful around inlets to rain garden and storm drains Spring clean-up necessary blow/rake out excess sand, grit, and leaves Public prefers rain gardens with curbing Instituted Friends of the Rain Gardens group in 2015 to help take care of gardens over next few years Above: Note floating mulch, gullies in newly planted gardens Left: Mulch and leaves blocking overflow inlet to drain system

General Observations First and Second Years Infiltration Trenches Oil grit separators must be cleaned periodically Trenches must be power washed and vacuumed out at least yearly Above and Left: Village of Suttons Bay Public Works employees clean out oil/grit separators early Winter (after heavy Fall rains)

Educational Signage Educational signs at gardens located by local ice cream store and busy restaurant

Created Friends of the Rain Gardens Group Community members adopted gardens Watering during hot, dry summer spells (important for 2014-2016) Annual weeding

Kids Creek Restoration Project

Kids Creek Subwatershed On State Impaired Waters List (303(d) List) for: Aquatic Life and Wildlife Impaired Reach Issues: 2-mile portion of Kids Creek impaired due to sedimentation, flow regime alteration, and other humancaused sources all of which relate to stormwater

Kids Creek Restoration Project Goal: Reduce sediment and stormwater inputs to Kids Creek Funds Raised: $5 million State/Federal ~ $3.8million Private Grants: $100K Foundations: $193K Matching Funds (Private Businesses): $1million Key Partners: EPA, DEQ, DNR Local units of gov t City of TC, Garfield Twp Grand Traverse Conservation District Munson Medical Center Village at Grand Traverse Commons Grand Traverse Pavilions (GT County)

Kids Creek Restoration Project Activities Include: Stream daylighting Green infrastructure installations Floodplain reconnection, buffer establishments Streambank stabilizations Habitat Improvements Kids Creek Daylighting Underground infiltration trench at Cancer Center

Project Map Completed Sites Kids Creek Trib A and Trib AA 1. Bioretention basin retrofits 2. Medical Campus Drive - tree box planters and rain gardens 3. Stormwater wetland 4. Rain garden 5. Stream restoration Tributary AA - floodplain and buffer 6. Rain garden retrofits 7. Dirt road paving with new rain gardens 8. Capture and slow release at new parking deck 9. Downspout planter boxes, pervious pavers, and basin retrofit to wetland 10.Green roof retrofit 11.Cowell Family Cancer Center - green roof, underground infiltration trenches, and rain garden 12.Tributary A daylighting

Kids Creek Daylighting Stream Daylighting ~ $1.1 million Relocated 900 feet of underground culverts and channelized ditches to a natural meandering channel that is1,275 feet in length Eliminated 72,000 ft 2 of impervious surfaces Cowell Family Cancer Center Site Completed Fall 2013

-- Cowell Family Cancer Center Installed 2014/2015 Underground infiltration trenches Rain Garden Pervious Pavement Green Roof

-- MMC Main Building NW Tower A Green Roof Covers 3,100 ft 2 Absorbs 3,400 gallons of rain Installed Fall 2016

-- MMC Foundation Building Installed Fall 2015 Pervious Pavement Downspout Planter Boxes

-- MMC Foundation Building Rain Garden Before 1 Year After (2016) *Note: Make sure landowner is aware that full growth will take a number of years! 2 Years After (2017)

-- Elmwood Ave. State Office Building Rain Garden Installed Fall 2017 *Note: This garden planted with plugs and filled to make aesthetically pleasing earlier

-- Cottageview Drive Rain Garden Retrofits Installed Fall 2017 *Note: Grassy areas separated from shrubs to help with maintenance and identification of invasives

-- Elmwood Ave/Medical Campus Drive Stormwater Wetland Installed Spring 2017 Retrofitted to stormwater wetland Increase size of basin (volume and area) Increase retention time (reducing peak flow to creek) New volume capacity 64,813 ft 3 (increase of 46%)

-- Yellow Drive Paving and Dry Wells Installed Spring 2018 Dry Wells Paved road Added dry wells Avoid contaminated soils

-- Medical Campus Drive Various BMPs Roadside rain garden Tree boxes (5) Biodetention basins (2) Installed Spring 2018 Biodention Basins Tree Boxes Rain Garden Site of MMC Foundation Building BMPs Completed in 2015

-- Medical Campus Drive Biodetention Basin example Biodention basin by helipad

-- Medical Campus Drive Tree Boxes 5 Boxes Total - species Include: Japanese Lilac (3) Prairie Fire Crabapple (2)

Questions? Sarah U Ren Program Director The Watershed Center Grand Traverse Bay 231-935-1514, suren@gtbay.org