Meeting Summary. 1 July 7, 2015 BAC Meeting Summary

Similar documents
Transportation Committee

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Blue Line LRT Extension

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Corridor Management Committee. April 14, 2016

West Broadway Transit Study Initial Screening of Alternatives Memo

Blue Line Extension Corridor Management Committee

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Right-of-Way Acquisitions and Relocations Technical Memorandum

ROBBINSDALE LRT STATION CDI DEVELOPMENT GUIDELINES

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

East Corridor Final Environmental Impact Statement

Robbinsdale LRT Station. CDI Development Guidelines. August Overview

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Blue Line Extension Corridor Management Committee

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

BeltLine Corridor Environmental Study

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

Route 1 Corridor Study

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Corridor Management Committee. September 29, 2017

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting February 2017

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Chapter 1.0 Introduction

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

METRO Gold Line BRT CBAC Meeting. August 23, 2018

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

REVIEW AND EVALUATION OF REGIONAL LAND USE

1.0 Introduction. Purpose and Basis for Updating the TMP. Introduction 1

This Review Is Divided Into Two Phases:

Commissioners Road West Realignment Environmental Assessment

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

METRO Gold Line BRT CMC Meeting

Shift Rapid Transit Public Participation Meeting May 3, 2017

WELCOME! MINNEHAHA-HIAWATHA Community Works Project. 46th Street Area Lighting Project July 2009

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Railyard Alternatives and I-280 Boulevard Feasibility Study. MTA Board Meeting May 6, 2014

Lake Oswego to Portland Transit Project. Lessons Learned. John Cullerton Senior Project Manager, URS 2012 APTA/TRB Light Rail Conference

Kanata Light Rail Transit Planning and Environmental Assessment Study

Technical Report Visual Quality

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Southeast Extension to RidgeGate Parkway Scoping Booklet

PLANNING COORDINATING COMMITTEE

Place and Opportunity: An Equity Assessment of the Twin Cities Region (

Allen Street Civic District Redevelopment Area Plan Redevelopment Plan & Proposal State College Planning Commission State College Redevelopment

City of Lake Elmo Planning Commission Meeting Minutes of August 10, 2015

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Chapter 1: Introduction

Local Growth Planning in North Central Green Line Communities

POLICY ADVISORY COMMITTEE

Project Update. Hillsborough County 2045 Population and Employment Projections and Allocations. Board of County Commissioners February 13, 2018

Public Officials/Design Advisory Meeting #12. Bensalem Township Municipal building, 2400 Byberry Road Bensalem, PA

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

2040 Long Range Transportation Plan

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

City of Meriden Harbor Brook Flood Control Project Overview

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

Community Working Group Meeting #3. Agenda

Executive Summary. NY 7 / NY 2 Corridor

Mississippi Skyway Preliminary Engineering Report

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

S C O P E O F W O R K A P R I L

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

St. Louis Park Wooddale LRT Station Site development guidelines

BROOKLYN PARK / 85TH AVE LRT STATION CDI DEVELOPMENT GUIDELINES DRAFT

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Appendix G Response to Comments

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

Tracking the Blue Line Extension

FDOT D4 Complete Streets

POTOMAC YARD METRORAIL STATION

Corridor Enhancements

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Dallas CBD Second Light Rail Alignment (D2)

Cotton Belt Regional Rail Corridor Project

Dallas CBD Second Light Rail Alignment (D2)

Urban Planning and Land Use

Pace University Land Use and Sustainable Development Conference Tensions and Opportunities in Urban Revitalization

Infrastructure Engineering Planning Construction Suite 300 Minneapolis, MN Tel: Fax:

US 24 & SR 66 Interchange Modification and Corridor Improvement Project Public Involvement Meeting December 5, 2007

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

Kenilworth Avenue and Town of Cheverly Industrial Study Briefing

Port Credit Local Advisory Panel October 20 th Meeting

Transcription:

METRO Blue Line Extension Business Advisory Committee Meeting #3 July 7, 2015 Blue Line Project Office 5514 West Broadway Avenue, Suite 200 Crystal, MN 55428 8:00 AM 9:30 AM Meeting Summary BAC Members: Randy Boushek, Brad Clift, Jeff Geisler, Charlie Jacobsen, Alison Pence, John Slama, Mark Steinhauser, Jeff Washburne,, Denny Walsh, Jim White Agency Staff and Guests: Dan Pfeiffer, David Davies, Jessica Laabs, John Welbes, Juan Rangel, Nick Landwer, Dan Soler, Jim Toulouse, Kathryn O Brien, Paul Danielson, Alicia Vap, Janet Kennison, Erik Hansen, Jim Geisler 1. Welcome and Introductions 2. Outreach Update: Community Open Houses Wrapped up round of open houses: June 4 Mpls/Golden Valley open house June 11 Robbinsdale June 17 Brooklyn Park Another round of open houses in each city is being scheduled for late July/early August. 3. Community Works Update Darlene Walser gave update on Hennepin County s efforts in working closely with the cities on station area planning. At the end of the day, it will be each city that will adopt and implement these station area plans. Station area planning sets the table for the look, feel, and fit of the station into the community. Station area planning is about ½ mile around each station, or 10-minute walk. Looking at land use, types and character of buildings, access and circulation (how people get there), and public spaces including streets and trails. There is a specific effort to look at health issues how can we design stations to promote people having health lives. 1 July 7, 2015 BAC Meeting Summary

By next spring, station area planning should be done. Next piece will be to come up with an investment framework/implementation plan, since some of the items that will come out of station area planning are not part of the LRT project budget. Walsh: For example at 93 rd, with the ½ mile radius, there is a lot of new stuff and not a lot of opportunity for redevelopment. But Crystal has more opportunity for redevelopment. People have great ideas, how does it work? Who does it, how does it get done? Walser: Could open doors for city to make zoning changes to allow the type of development they would like. Part will be public investment, part will be public investment. Walsh: Does the public investment come only from the city or Hennepin County? Walser: All partners have to figure out what you need, and then what the best partners would be for getting it done. Slama: We have the rail in place in other parts of the cities, do we have info on what has developed and where money has come from? These would be useful examples as we talk to our cities. Washburne: How much latitude to we have to make recommendations or ask for tools that have worked for previous lines? County Commissioners are considering today a shift of funds to cover the gap on the Southwest line. It seems that local and regional organizations aren t making tools available on other projects. Soler: Where station area planning effort ties to LRT effort is when we build LRT line, we have to take into consideration what s there today, what stays. But, we also have to understand and use the station area planning efforts to determine if there are any other decisions we can make to best serve potential future uses, or not significantly impact the ability for potential future uses. Vap: Met Council TOD office has some information about redevelopment that has occurred along Hiawatha that could be shared. Washburne: A lot of great ideas have come out of local planning, but it will happen in a much quicker timeframe if there are incentives. Soler: Biggest challenge is how to lay out what will happen where there is nothing, i.e. north of 610. You want to make decisions that provide the most flexibility, so we have to be careful. Jacobson: How do you coordinate so you have space for a park-and-ride north of 610? Soler: We re working with the city and Target about plans. Erik Hansen: There are plans for around the Oak Grove station, but the issue is more how do you implement the infrastructure so it doesn t inhibit that development. Several members noted it would be great if there was a database of information or some examples from previous lines or a city that we re looking at modeling ourselves after. Walsh: Example, at Crystal station at one corner there is blighted housing, I know the city would like to redevelop but the feasibility of rebuilding is probably not financially workable without incentives. What are some examples of how something like that has been done? Darlene will pull some examples together from other cities as well as St. Paul. There was a collaborative that worked to promote and secure funding sources. 2 July 7, 2015 BAC Meeting Summary

Slama: Interesting that you mention community health. Northwest Family Physicians are in an ideal spot now in terms of rail access, good example of what can happen. 4. Design Update/Discussion Target Field Station Connection to I-94 Interchange: Recommendation ABRT pilot stations, coordinating with this effort as well as Southwest and other improvements planned for the area. Key issues need to coordinate with SLWRT and how they are connecting; unique geometry of 7 th Street intersection; safety for peds and bikes. BLRT needs to be down underneath SWLRT, which is above grade. BLRT will be responsible for rebuilding 7 th Street intersection. Will have double thru lanes. Proposed is for a single phase pedestrian movement should be able to get across in one signal. Intersection still operates acceptably in 2040 with this scenario. Recommendation: to continue design according to this plan, LRT crosses and continues centerrunning through Olson Memorial Highway. Slama: Signals missing from the Sketch-Up model? Landwer: Yes, those aren t yet developed in the model yet. Soler: Will be like typical LRT intersection. I-94 Interchange: Recommendation Key issues include LRT center running on existing bridge; structural reinforcement under LRT guideway; bridge left intact outside guideway; new signals installed at intersections. Proposed bridge modifications similar to what was done on Highway 280 Bridge on the Green Line (Central Corridor) project. Reviewing what has been the cause of some of the accidents on this bridge to see what can be done to improve. Washburne: When cut out bridge deck and build new, are they independent systems? Landwer: Structure not independent, but road deck structure is separate from LRT guideway, so if there are improvements needed to the road deck, those could happen. Soler: Benefits of not replacing, don t have to close bridge to implement LRT; can take middle out and still maintain traffic on the sides. 85 th Station Configuration Alicia Vap presented current status of this station. Exhibits will be brought out to the public for input. Many bus routes access this location, so we re continuing to work on bus access. Also working with the college about platform location and safe passenger drop-off, potential for dedicated parking spaces. Jacobsen: Is the roadway being widened? Vap: Yes, need to widen to accommodate center platform. Most impacts different from the DEIS are to the college property. Soler: West Broadway will get wide because tracks will be in the middle, and here it will get a little bit wider still. 93rd Station Configuration 3 July 7, 2015 BAC Meeting Summary

Looked at multiple configurations including side platforms and split platforms on different sides. Primary access at 93 rd intersection; secondary access at 92 nd Avenue. Talking with Ebenezer Church to coordinate with their plans for expansion and inquire about spaces for passenger drop-off. Same station layout with center platform and similar station access at all stations along West Broadway. Washburne: What is the use? Erik Hansen: Spec warehouse. Walsh: Doesn t look like a good place for anyone to be dropped off; kind of a no-man s land. Erik Hansen: By the time the rail is operational, all of the development identified as future will be there. Walsh: Doesn t seem like there is anywhere to park. Vap: Will talk to the church about potential for shared parking. If this doesn t work out, it s a drop-off/feeder bus/walk-up station. Jacobsen: There is probably more people coming from the reverse direction to their job at these more industrial-type businesses. Erik Hansen: One business has located here because the station will be here. Soler: Will be important for us to find an area where we can have a pull-off. 5. DEIS Scope and Cost Estimate Update Dan Soler gave an overview of the scope and cost of the project. $1.002 billion is estimated cost to construct BLRT project as it was identified in the DEIS based on 1% actual engineering and a lot of assumptions. The more we know, the more refined the estimate will become. Cost doesn t include only construction cost. Around June 2016, need a budget for the project. To do this 1) revise, modify scope of project from what was studied in DEIS. This committee will have input into how the scope should change; 2) identify and account for risks; 3) accounting for unknown unknowns, contingency. As we learn more, contingency will reduce. We already know the cost estimate will need to be escalated to reflect a 2018-2020 construction period, instead of a construction midpoint of 2017 as previously assumed. Risks include requirements (i.e. BNSF negotiations), design issues (i.e. floodplains, poor soils), market (i.e. schedule delays, commodity prices). What s included in the cost estimate today: ballasted track, guideway structures (new bridges and bridge modifications), soil mitigation, 10 stations, OMF, roadway bridge reconstruction, roadway bridge minor modifications, partial reconstruction of OMH, reconstruction of at-grade crossings, park-and-ride sites (93 rd, 63 rd, Robbinsdale), relocation of 14 transmission towers, systems, some full and partial acquisitions, LRT vehicles. What s not included in the cost estimate today: embedded track, grade separation at intersections (42 nd and 73 rd ), corridor protection (BNSF), Plymouth Avenue station, pedestrian overpass at 63 rd Avenue station, OMF site roadway realignment, space and equipment for major repairs, Park-andride at Golden Valley Road station, Bass Lake Road station, gated crossings on West Broadway. 4 July 7, 2015 BAC Meeting Summary

Washburne: Appreciate the information about costs and variables there are a lot of unknowns. 6. Member and Committee Reports/Public Forum No comments. 7. Adjourn: Next BAC meeting August 4. 5 July 7, 2015 BAC Meeting Summary