The second application granted full planning permission for the development of a new sports centre facility.

Similar documents
Gurnell Leisure Centre, Ealing Redevelopment proposals. Prepared for LB Ealing_December 2014

The journey so far. The new masterplan for Dargavel Village

Place Brief. National Collections Facility (NCF site)

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Welcome. Welcome to our public exhibition to explain the future of Griffin Park.

Draft Masterplan Consultation Report Summer 2015 Spring (Updated following community review)

Welcome THE SITE PHASE 1 EXCLUSION ZONE.

WELCOME TO THE NEW WILTON PARK

WELCOME. This consultation at this early stage is an opportunity to share your comments and suggestions with us.

Highland Council Allotment Policy

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

Notting Hill Housing & The Development Team

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

THE WHARVES DEPTFORD STATEMENT OF COMMUNITY INVOLVEMENT EXECUTIVE SUMMARY. May 2015 MOVING FORWARD

Welcome to our public exhibition

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

The London 2012 Olympic Park and Green Network Legacy

Welcome to our exhibition

Welcome to our public exhibition

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Welcome. Who are we? The Site. ZM Land and Capital and Plutus Estates (WGC) Ltd. Metropolitan

Welcome to the Queen s Square, Croydon Consultation

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

Welcome to our public exhibition


BLACKHEATH SQUASH CLUB Blackheath Sports Club, Rectory Field, Charlton Road, London, SE7 7EY. Planning, Design and Access Statement

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

WELCOME. ORPINGTON. Welcome to this exhibition of our proposals for the redevelopment of Bassetts Campus.

Discover Scottish Gardens Growth Fund Case Study. DSG Launch Campaign

LITTLE FRANCE PARK, EDINBURGH

BLACKHALL COMMUNITY TRUST CONSULTATION ON POSSIBLE RAVELSTON PARK PAVILION IMPROVEMENTS

doyle + o troithigh landscape - architecture

3.1 The hybrid planning application proposes the following description of development:

25 MARCH pm A GUIDE FOR SCOTTISH LOCAL AUTHORITIES KEEP MOVING ON CLIMATE CHANGE. wwfscotland.org.uk/earthhour #EarthHour

Biodiversity Standard

Basic Conditions Statement

EDC 016/004 Annex A. Framework Masterplan Stakeholder and public engagement

Public Consultation 23 January Peel Hall, Warrington Board 1. A message from Satnam... Site history...

The future of South Grove

COMMUNITY LED REGENERATION CURRENT & FUTURE INITIATIVES FRANK RALLINGS - UNIVERSITY OF BRIGHTON

01 welcome. Introduction. Your Feedback LEYTON CORONATION SQUARE

Anston House, Brighton

GREATER CARPENTERS NEIGHBOURHOOD PLANNING EVENT REPORT. Event held on 24th Carpenters Primary School Friendship Way Stratford, London E15 2JQ

UBC Athletics + Recreation Facilities Strategy

Green Networks in Planning Policy and Management

Local Development Plan for Glasgow

quarters Building Our Cultural Quarters Together

Linden Homes Proposals for land off Ringwood Road, Verwood

Policy and Resources Committee 10 th October Green Infrastructure Supplementary Planning Document (SPD) Summary. Title

UPDATE ON ESTATES AND FACILITIES PROJECTS APRIL Projects Completed within last 24 months. 1. Richmond and Workshop Cladding ( 6.

WELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.

Building Distinctive Safe and Pleasant. Better

Welcome to the community information evening about Taylor Wimpey Central London s proposed development of Mount Pleasant.

Welcome. Our first public consultation event was held on the where information was presented relative to the following:

Welcome! Joyce Avenue & Snell s Park Estate Regeneration. Please make sure that you fill out our feedback form after you have seen the exhibition!

What We Heard Report: Westmount Architectural Heritage Area Rezoning Drop-in Workshop

FOR SALE RESIDENTIAL DEVELOPMENT OPPORTUNITY BLAIRTUMMOCK EASTERHOUSE

Frequently Asked Questions

Cannards Grave Road Shepton Mallet Design Workshop 1 st June2016

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

Neighbourhood Planning Local Green Spaces

Linden Homes Proposals for the redevelopment of Battersea Police Station, Battersea Bridge Road

The Chinese University of Hong Kong Campus Master Plan Stage 3 Stakeholders' Engagement Report

Vancouver. Title of the Initiative. Initiative Duration. Submitted by. Comments by the Jury

A new park will be delivered as part of the Elephant Park regeneration.

Newcourt Masterplan. November Exeter Local Development Framework

Basic Conditions Statement

A NEW LOOK FOR THE BISHOP CENTRE. Land Securities. Our environment. Our communities

ISIS BCC MADE. Warwick Bar Development in Eastside Birmingham. Artist s Brief

Planning Area Committee 25 June 2018 Addendum to Officers Report RESTRICTION OF PERMITTED DEVELOPMENT RIGHTS - EXTENSIONS

Has there been interest in the site from other parties since St. Modwen owned it? No

Introducing Turley Scotland. Experts in hospitality and leisure

04Design. Methodology. Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement

Amy Burbidge North Northants Joint Planning and Delivery Unit Tresham Garden Village

Oteley Road South Shrewsbury

Maryhill Burgh Halls. Submitted by Ian Alexander / Henry McKeown Output No. 1

WELCOME. We are interested in your ideas and feedback, so please fill out one of our feedback forms.

PROPOSED RESIDENTIAL DEVELOPMENT LAND AT GREEN LANE, YARM

Welcome to our exhibition

Scottish Natural Heritage. Better places for people and nature

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Our City Centre is a vibrant, creative and welcoming destination, with a modern business, cultural, shopping, leisure and residential offer

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

HS2 Interchange Station Design

Croydon s Future. Councillor Paul Scott Chair Of the Planning Committee Croydon Council

SOUTH AFRICA S PREPARATIONS FOR HABITAT III COMMON AFRICAN POSITION FOR HABITAT III. Habitat III Urban Breakfast 5 October 2016

Million Pollinator Garden Challenge. Toolkit. Help Us P lant One Million Gardens

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary

Raithwaite Estate is proposing plans to extend its luxury accommodation and leisure facilities. 01 Welcome

1. Welcome. Background

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

Chairperson s Annual Report

Hammersmith and Fulham Borough council parks department

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Vision for Mayfair and Belgravia

Barnsley MBC Neighbourhood Services Draft 4 Allotment Action Plan

1 Introduction. Chapter. In this chapter:

Transcription:

Meadowbank Masterplanning Consultation Autumn 2018 Frequently Asked Questions & Answers Background On 29 June 2018, the City of Edinburgh Council Planning Committee approved two planning applications. The first one was for the redevelopment of surplus land for mixed uses. This is what we refer to as the masterplan area and is the land surrounding the new sports centre. The second application granted full planning permission for the development of a new sports centre facility. The two applications were considered separately which means the construction of the new sports centre can commence in advance of the approval of the masterplan. The completed masterplan will show the approved design of the Sport Centre. 1) Is permission in place for the works that are currently on site? The demolition of the velodrome and existing stadium that is underway on the site is permitted development and does not constitute works on site as per the Planning condition. 2) What is the aim of the masterplanning process? The council is committed to developing a proposal for a masterplan that shows a development with a number of different uses in line with those identified in the planning permission. It is important that the masterplan reflects the needs and aspirations of the many and varied communities in the area. The first stage is to understand what people would like to see as part of the new development in terms of uses as well as community facilities, greenspaces and local amenities. The aim of the masterplanning exercise may be summarised as follows: Ensure that Meadowbank and its community are at the heart of the masterplan and its development. Undertake a collaborative, design led approach with co-creation and stakeholders working at the centre of the design process. Create an exceptional place that is rooted in its historic context. Develop a vibrant new neighbourhood combining residential and commercial use in a holistic and sustainable way. Create a positive relationship with the area, new development and shared open space to enhance the quality of life for local residents and visitors. 1

3) What do you mean by a mixed use development? Mixed use includes housing, student accommodation, hotel, and community facilities such as a GP surgery, community centre and nurseries. 4) How many trees will be removed in order to deliver the new Sports Centre? There is a clear replacement plan for trees that will be removed during the construction of the Sports Centre. Of the 61 trees to be removed, 3 are Wheatley Elms. The new plaza and car park area will have 48 new trees planted. This will include 19 disease resistant elm species. 5) Will any more trees be removed as part of the wider development plans? Our aim is to minimise the need for any further tree removal beyond that needed to build the new Sports Centre. We are aware that the Wheatley Elms currently provide foraging habitat for the local bat population as well as the potential for bird nesting. Due to the rarity and value of the Wheatley Elms, and because of new buildings proposed adjacent to the trees, we have commissioned additional radar survey work to confirm the actual extent and condition of the mature tree roots. 6) At the Planning Committee, it was agreed you would look at creating more spectator space for Edinburgh City. Is this now in the plans? We are currently looking at potential options to see what, if anything, is feasible. Further discussions are planned with Edinburgh City in the near future. 7) How many homes are planned for the site? The intention is that there will be a mix of affordable homes as well as private homes for sale on the site. These will be shown as part of the final masterplan. There are several issues that will affect the final number of homes. This includes whether these 2

are flats or houses, how we ensure that height of buildings work well with what is already in the area and minimise impact on neighbours. 8) What do you mean by affordable housing? Affordable housing includes homes for social rent, homes for mid-market rent as well as low cost home ownership options such as shared equity. 9) What further consultation events are planned? There will be number of other public events in the coming months to allow feedback on the options that are developed which will aim to balance the views received with the overall Council objectives. These will be widely advertised. 10) How did you promote the first drop in sessions? 11,000 leaflets drop in the local area Posters distributed to local venues Promotion via Facebook and Twitter on the Council s accounts Targeted Facebook posts to people living in the area Promotion via schools (websites and/or newsletters) to parents in local schools Messages to key local stakeholders with request they share with their own networks Meadowbank hoarding posters these may not be in place for the initial drop in sessions but we hope to be able to use these to promote future events 11) Can you share examples of previous projects where community input has shaped the development? All projects we deliver through the Council s housebuilding programme 21 st Century Homes, are delivered through a process of consultation and ongoing engagement with the local communities. This has included incorporation of play parks within developments as well as reconfiguration of buildings, redistribution of housing to avoid over concentration, enhanced community space and inclusion of growing space. 12) What is the decision making progress for agreeing the masterplan? 3

Development of the masterplan is an iterative process and will need to balance the community feedback through the consultation process with the Council s objectives to deliver a Sports Centre on the site, as well as a new mixed use development. 13) What is the current position with the funding of the Sports Centre? An updated position on the funding strategy will be presented to the Finance and Resources Committee in October 2018. 14) Can I gain access to the Meadowbank site? There is no public access to the site, the gate is kept locked at all times. All visitor access must be pre- arranged through the Council s project manager. 15) The amount of sport facility provision in the new centre appears to have reduced by 40% compared to the old Meadowbank Stadium? This calculation is based on a comparison of the total number of rooms in the old building compared to the new design. This includes spaces within the old facility that have not been used for a number of years. The comparison does not take cognisance of the fact that whilst the total number of spaces may have reduced, there have been increases in the size of several sport spaces so a like for like comparison is inaccurate. The indoor athletics hall, gym, fitness studios, gymnastics hall and dojos have all increased in size. 16) What materials have been recycled from the old stadium? Equipment and fixtures from the site have been reused in other areas of the city or returned to the governing bodies of the relevant sports. Some older/outdated equipment with the potential to become unsafe was disposed of. Below are some of the main items: Athletics equipment sent to be used at Saughton (Competition high jump Mat from Glasgow 2014 in excellent condition put in storage for new facility). Gymnastics equipment, including Trampolines, mainly owned by Meadowbank Gymnastic Club, mainly all moved to Jack Kane Sports Centre and Ainslie Park Leisure Centre. 3G football goals, moved to other Edinburgh Leisure pitches. Gym Health and Fitness kit moved to other sites or sold. Left over free weight equipment given to local Fire Brigade for fitness training. 4

Boxing equipment owned by Meadowbank Boxing club taken by club. Competition Judo mats moved to Judo Scotland for use in Competitions (these were from London 2012 Olympics and will be returned to site at re-opening). All balls, training kit for Footballs, basketballs, netballs etc taken by Edinburgh Leisure Physical Activity team for outreach events. All shooting equipment returned to Scottish Target Shooting. All IT equipment that could be reused was reused by Edinburgh Leisure ICT department. All items of historical interest, programmes, plaques, trophies sent to the Museum of Edinburgh. The 3G pitch has not been recycled as would be a complex and expensive process with no certainty that the relocated pitch would be safe to use. 5