Agustin Lara Elementary Academy

Similar documents
Josefa Ortiz De Dominguez Elementary School

Edward Jenner Elementary Academy of the Arts

Washington Irving Elementary School

Richard Henry Lee Elementary School

Charles W Earle Elementary School

Oscar DePriest Elementary School

Genevieve Melody Elementary School

Calmeca Academy of Fine Arts and Dual Language

Joseph Brennemann Elementary School

Francis M McKay Elementary School

Sidney Sawyer Elementary School

George B Swift Elementary Specialty School

DeWitt Clinton Elementary School

John Palmer Elementary School

Alessandro Volta Elementary School

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

NYC Department of Education

PLAN REVIEW SUBMITTAL GUIDE

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

NYC Department of Education

NYC Department of Education

Mechanical Inspection Plumbing

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

NYC Department of Education

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

NYC Department of Education

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Cook - Wissahickon Elementary School

NYC Department of Education

NYC Department of Education

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

NYC Department of Education

DOCUMENT TABLE OF CONTENTS

Briar Crest Elementary

Appendix B. Facilities Assessment Report

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

NYC Department of Education

2014 Bond Project Guide

NYC Department of Education

NYC Department of Education

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

Mechanical System Description

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

RECAPP Facility Evaluation Report

NYC Department of Education

Ashland School District Facility & Capacity Assessment Report 2005

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

NYC Department of Education

NYC Department of Education

GARCIA GALUSKA DESOUSA Consulting Engineers

NYC Department of Education

NYC Department of Education

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

NYC Department of Education

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

GARCIA GALUSKA DESOUSA Consulting Engineers

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

PLATTEVILLE MIDDLE SCHOOL

4. Plumbing fixtures. a) The plumbing fixtures are from the original building. They are appear old and not to comply with ADA requirements.

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

RECAPP Facility Evaluation Report

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy CHIMNEY 1 2 3 4 5 6 GRE 6 664 7 664 SF $18,800 $18,800 Metal Flue 1 2 3 4 5 6 7 27 127 LF Assessment Date: 4/25/2013 Page 1 of 16

DOORS Exterior Steel Door Side Lite Store Front Door Transom Lite 1 2 3 4 5 6 GRE 6 10 7 GRE 7 3 2 8 10 EA $3,303 3 EA 1 18 EA $3,303 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Power Door Operator and Controls Ramp Handrails Stair Handrails 1 2 3 4 5 6 GRE 6 12 GRE 6 3 30 7 GRE 6 137 GRE 6 3 12 LF $1,287 33 LF $5,563 137 LF 3 LF $6,850 FOUNDATION Concrete Foundation 1 2 3 4 5 6 7 GRE 7 797 797 LF LIGHTING Exterior Lights - Wall Mounted 1 2 3 4 5 6 7 2 1 LINTELS Lintels - Steel 1 2 3 4 5 6 GRE 6 838 7 838 LF $31,636 $31,636 Assessment Date: 4/25/2013 Page 2 of 16

PARAPET Coping - Stone Parapet > 30" Height Parapet 16" to 30" Height 1 2 3 4 5 6 7,005 GRE 6 72 GRE 6 957 1,005 LF 72 LF $18,687 957 LF $198,708 $217,395 ROOF SYSTEM Interior Downspouts Modified Bitumen Roof Roof Structure: Steel/Metal Deck/Concrete Topping 1 2 3 4 5 6 GRE 6 310 BLU 5 25,368 1,302 7 6,670 310 LF 26,670 SF $308,495 26,670 SF $308,495 SUPERSTRUCTURE Metal Deck/Concrete Topping 1 2 3 4 5 6 7 WALLS Brick Stone - Cast 1 2 3 4 5 6 7 GRE 6 677 23,201 GRE 7 4,397 23,878 SF $15,335 4,397 SF $15,335 WINDOWS Window - Guards perforated Windows - Decorative Windows - Sash Aluminum Double-pane 1 2 3 4 5 6 GRE 6 3,904 7 GRE 7 72 GRE 6 1,312 5,248 3,904 SF 72 SF 6,560 SF $90,337 $90,337 Assessment Date: 4/25/2013 Page 3 of 16

EXTERIOR $692,152 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection 1 2 3 4 5 6 7 GRE 7 9,377 GRE 7 6,264,792 1 4 GRE 7 8 9,377 SF 6,264 SF 1,792 SF 1 24 EA 8 EA MAIN SERVICE Main Electrical service 1600 A 277/480/3PH 1 2 3 4 5 6 7 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 1 2 3 4 5 6 7 2 GRE 7 4 GRE 7 3 1 4 EA 3 EA Assessment Date: 4/25/2013 Page 4 of 16

ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 1 2 3 4 5 6 7 PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump 1 2 3 4 5 6 7 SPRINKLER SYSTEM Sprinkler Heads Wet Sprinkler System FIRE PROTECTION 1 2 3 4 5 6 7 MECHANICAL AIR CONDITIONING 1 2 3 4 5 6 7 Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 201 to 300 tons YEL 4 1 $420,420 $420,420 Assessment Date: 4/25/2013 Page 5 of 16

AIR HANDLING SYSTEMS Air Handling Package - Multi Zone - Hot Water 6,001 to 10,000 cfm Air Handling Package - Multi Zone - Hot Water above 30,000 cfm Air intake for all Air Handling s except built up AHU Make Up Air - Roof Mounted - Gas-Heating less than 6,000 cfm Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor greater than 20,000 CFM Roof Top - Single Zone - Gas-Heating 11 to 20 tons Variable Air Volume (VAV) Box With Hot Water Coil 1 2 3 4 5 6 GRE 6 1 7 GRE 6 1 BLU 5 1 GRE 6 55 $5,577 $2,860 $25,740 55 EA $18,090 $52,267 BOILER SYSTEMS Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 3,001MBH-4,000 MBH Boiler Auxiliary Non-Condensing Hot Water Boiler 3,001MBH-4,000 MBH Chemical Pot Feeder - Hot Water Combustion Dampers Glycol Feed System 1 2 3 4 5 6 GRE 6 2 7 GRE 6 2 $26,026 $601 $26,627 HEATING DEVICES Cabinet Heaters With Hot Water Coils Fin Tube Hot Water Heater - Hot Water 1 2 3 4 5 6 7 GRE 7 7 GRE 6 48 22 GRE 7 4 7 EA 70 LF $824 4 EA $824 MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Copper Pumps - Chilled Water 10 to 20 HP 1 2 3 4 5 6 7 00 200 LF Assessment Date: 4/25/2013 Page 6 of 16

Pumps - Hot Water 5 to 10 HP TEMPERATURE CONTROL Hybrid Pneumatic/Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Thermostats - Pneumatic 1 2 3 4 5 6 GRE 6 67,964 7 GRE 7 35 6 $68,032 35 EA 16 EA $68,032 VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 2 3 4 5 6 7 GRE 6 5 GRE 6 2 GRE 6 1 5 EA $2,145 $458 $157 $2,760 $570,929 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR Storage Tank less than 500 gallons 1 2 3 4 5 6 7 BLU 5 1 $7,436 $7,436 PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures 1 2 3 4 5 6 7 Assessment Date: 4/25/2013 Page 7 of 16

Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping PUMPS Domestic Booster Pump duplex PLUMBING 1 2 3 4 5 6 7 $7,436 INTERIOR ADMINISTRATIVE SUITES Ceiling - Exposed Ceiling - Lay-In Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 1 2 3 4 5 6 GRE 6 47 GRE 6 262 2,101 7 GRE 6 1,007 237 GRE 6 76 GRE 6 1,090 GRE 6 1 34 GRE 6 3,659 641 GRE 6 1,922 707 47 SF $89 2,363 SF $5,990 1,244 SF $1,440 76 SF $359 1,090 SF $1,559 35 SF $1 1 SF 4,300 SF $10,465 2,629 SF $4,535 $24,437 Assessment Date: 4/25/2013 Page 8 of 16

DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door 1 2 3 4 5 6 GRE 6 48 7 GRE 6 1 58 1 GRE 6 600 GRE 6 12 48 EA $13,591 60 EA $16,894 600 SF $11,154 1 $2,831 $44,470 DRINKING FOUNTAINS Single Fountain GYMNASIUM / AUDITORIUM Ceiling - Exposed Flooring - Tile/Sheet Lighting - Pendant/Surface Walls - Concrete Block KITCHEN 1 2 3 4 5 6 GRE 6 10 1 2 3 4 5 6 GRE 6 3,503 GRE 6 3,503 GRE 6 20 GRE 6 6,847 7 7 10 EA $3,861 $3,861 3,503 SF $26,649 3,503 SF $5,009 20 EA $2,431 6,847 SF $58,747 $92,837 Ceiling - Plaster/Drywall Flooring - Concrete Lighting - Lay-In Wall - Concrete Block 1 2 3 4 5 6 GRE 6 1,079 GRE 6 1,079 7 GRE 6 2 7 GRE 6 1,935 1,079 SF $4,073 1,079 SF $5,092 9 SF $4 1,935 SF $5,534 $14,704 LIBRARY Casework 1 2 3 4 5 6 GRE 6 130 7 130 LF $3,988 Assessment Date: 4/25/2013 Page 9 of 16

Flooring Carpet Lighting - Pendant/ Surface LOCKER/SHOWER ROOM GRE 6 2,171 GRE 7 48 2,171 SF $3,105 48 SF $7,092 Lockers Showers LUNCHROOM 1 2 3 4 5 6 GRE 6 10 GRE 6 2 7 10 EA $491 $486 $977 Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Serving Line Wall - Concrete Block Wall - Plaster/Drywall 1 2 3 4 5 6 GRE 6 5,431 GRE 6 5,431 GRE 6 62 7 GRE 7 42 GRE 6 4,114 GRE 6 1,105 5,431 SF $11,649 5,431 SF $7,766 62 SF $44 42 LF 4,114 SF $11,766 1,105 SF $2,607 $33,833 MDF/IDF Finishes Ventilation and Cooling 1 2 3 4 5 6 7 08 BLU 5 108 108 SF 108 EA $756,756 $756,756 MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room 1 2 3 4 5 6 7 GRE 7 825 GRE 6 3 GRE 6 107 1,090 1,262 GRE 6 83 829 1,637 825 SF 3 SF $14 2,459 SF $6,356 2,549 SF $4,852 $11,222 Assessment Date: 4/25/2013 Page 10 of 16

STAFF RESTROOM Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Structural Glazed Tile Water Closet 1 2 3 4 5 6 7 GRE 6 848 384 1,096 GRE 6 2,208 248 GRE 6 7 13 GRE 6 848 1,314 248 GRE 6 46 GRE 6 2 4 GRE 6 7 21 GRE 6 33 11 GRE 6 2 GRE 6 3 21 GRE 6 1 15 GRE 6 2,155 5,020 GRE 6 587 2,311 GRE 6 36 2,328 SF $24,574 2,456 SF $6,252 20 EA $2,102 2,410 SF $10,202 46 SF $66 6 EA $1,433 28 EA $2,603 44 SF $24 2 SF $1 24 EA $5,482 16 EA $3,718 7,175 SF $6,163 2,898 SF $4,197 36 EA $13,385 $80,202 VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic 1 2 3 4 5 6 7 VOCATIONAL SHOP Work Sink INTERIOR 1 2 3 4 5 6 7 GRE 6 1 8 3 1 $5,019 $5,019 $1,075,410 Assessment Date: 4/25/2013 Page 11 of 16

ROOM CASEWORK Casework 1 2 3 4 5 6 7 GRE 6 363 953 1,316 LF $12,977 $12,977 CEILING Lay-In/Drop 1 2 3 4 5 6 7 GRE 6 1,943 4,061 20,728 26,732 SF $19,714 $19,714 CHALK BOARD 1 2 3 4 5 6 7 Chalk Board YEL 4 370 370 LF $44,974 $44,974 CORRIDORS Concrete Block Concrete Epoxy/Painted Drop/Lay-In Exposed Lay-In Pendant/Surface Plaster/Drywall Stair Handrails Stairs Structural Glazed Tile Tile Ceramic/Porcelain Tile/Sheet Flooring Walls 1 2 3 4 5 6 7 GRE 6 7,151 9,810 GRE 6 492 GRE 6 64 8,186 GRE 6 1,644 GRE 6 9,377 GRE 6 1,419 GRE 6 157 GRE 6 372 GRE 6 156 GRE 6 6,363 GRE 6 332 GRE 6 9,972 GRE 6 20 16,961 SF $20,452 492 SF $2,322 8,250 SF $17,921 1,644 SF $3,103 9,377 EA $6,705 1,419 EA $1,015 157 SF $370 372 LF 156 EA $1,115 6,363 SF $45,495 332 SF $845 9,972 SF $14,260 20 SF $47 $113,651 Assessment Date: 4/25/2013 Page 12 of 16

CORRIDORS CEILING Plaster/Drywall FLOOR Tile/Sheet LIBRARY_CEILING 1 2 3 4 5 6 GRE 6 1,127 1 2 3 4 5 6 GRE 6 26,732 7 7 1,127 SF $3,191 $3,191 26,732 SF $38,227 $38,227 1 2 3 4 5 6 7 Drop/Lay-In BLU 5 2,171 2,171 SF $12,294 $12,294 LIBRARY_WALL Concrete Block 1 2 3 4 5 6 GRE 6 1,087 7 1,087 SF $3,109 Plaster/Drywall GRE 6 430 430 $1,015 LIGHTING $4,123 Lay-In Pendant/Surface 1 2 3 4 5 6 7 67 4 267 EA 24 EA MARKER BOARD Marker Board 1 2 3 4 5 6 7 GRE 6 32 16 34 82 LF $4,347 $4,347 Assessment Date: 4/25/2013 Page 13 of 16

WALL Concrete Block Plaster/Drywall ROOM 1 2 3 4 5 6 7 GRE 6 3,635 11,845 GRE 6 1,724 13,866 15,480 SF $10,396 15,590 SF $4,068 $14,464 $267,961 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 2 3 4 5 6 GRE 6 4 7 GRE 7 4 4 EA $2,174 4 EA $2,174 FENCING Chain Link Ornamental Iron 1 2 3 4 5 6 7 8 GRE 6 20 865 18 LF 885 LF $20,103 $20,103 LANDSCAPE Benches Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Trash Receptacles 1 2 3 4 5 6 7 GRE 6 800 6,669 11,756,360 GRE 6 3 13,856 GRE 7 4 19,225 SF $11,847 2,360 SF 16 EA $7,362 2,856 SF 4 EA $19,209 Assessment Date: 4/25/2013 Page 14 of 16

PARKING LOT Lights, Pole Mounted 1 2 3 4 5 6 7 GRE 7 6 6 EA PLAYGROUND Playground Equipment - Pre-K 3-5 Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface 1 2 3 4 5 6 7 GRE 7 4,656 4,656 SF SIDEWALKS Internal Walks Perimeter Sidewalks 1 2 3 4 5 6 7 GRE 7 313 GRE 7 5,008 313 LF 5,008 SF SIGNAGE Flag Pole Marquee - Building Mounted Back Lighted SITE 1 2 3 4 5 6 7 $41,485 Assessment Date: 4/25/2013 Page 15 of 16

Campus Need ² ³ $2,655,374 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 4/25/2013 Page 16 of 16