GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS KMI GoGas RANGE HIGH EFFICIENCY, HIGH INTENSITY INFRARED HEATERS

Similar documents
GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS DU/DUH DUAL OUTPUT RANGE INFRARED TUBE HEATERS

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS SL/SLV SIRIUS LINEAR RANGE HIGH EFFICIENCY CONTINUOUS INFRARED SYSTEMS

Line Pressure ( w.c.) Gas Supply Min. Max. Pressure ( w.c.) Natural Gas Propane Gas

1.03 DELIVERY, STORAGE, AND HANDLING Heater will be stored to secure against damage and handled per manufacturer s recommendations.

INFRARED RADIANT HEATER RSCA SERIES CERAMIC HEATERS NATURAL GAS PROPANE GAS DATE: PROJECT: ARCHITECT/ENGINEER: CONTRACTOR: SUBMITTED BY:

GAS-FIRED HIGH INTENSITY INFRARED HEATERS

SECTION GAS-FIRED RADIANT HEATERS

A. Product Data: Include rated capacities, furnished specialties and accessories.

BEACON/MORRIS RBD SERIES INFRARED RADIANT HEATER

INFRARED RADIANT HEATERS

Installation, Operation and Service Instructions H RANGE STANDARD EFFICIENCY HIGH INTENSITY HEATERS

GAS-FIRED PRESSURIZED LOW INTENSITY INFRARED HEATERS SERIES TLP

GAS-FIRED HIGH AND LOW INTENSITY INFRARED HEATERS

Series RE Infrared Heater

GAS-FIRED HIGH AND LOW INTENSITY INFRARED HEATERS

Installation, Operation and Service Instructions HD RANGE SINGLE STAGE DIRECT SPARK HIGH INTENSITY HEATERS

Omega II SUBMITTAL DATA. Pre Engineered Packages. Products by: COMBUSTION RESEARCH CORPORATION PROJECT: LOW-INTENSITY INFRARED HEATING SYSTEMS

INFRARED RADIANT TUBE HEATER

Copyright 2011 AIA MasterSpec Full Length 06/11 PRODUCT MASTERSPEC LICENSED BY ARCOM TO CALCANA USA LTD.

WATER-TUBE POOL HEATERS

DIVISION FINNED WATER-TUBE WATER HEATERS

WATER-TUBE POOL HEATERS

Synergy WARNING FOR YOUR SAFETY. High Intensity Infrared Heaters. Installation, Service, and Maintenance Manual COMBUSTION RESEARCH CORPORATION

FINNED WATER-TUBE POOL HEATERS

INFRARED RADIANT TUBE HEATER

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

Installation, Operation and Service Instructions RS RANGE RESIDENTIAL INFRARED HEATERS

DIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS

DIVISION FINNED WATER-TUBE WATER HEATERS

LUMINOUS A PATIO HEATER LIKE NO OTHER

FINNED WATER-TUBE POOL HEATERS

Series GR/ET Infrared Heater

INFRARED RADIANT TUBE HEATER RSTP15C NATURAL GAS RSTP17C

WARNING. SPECIFICATIONS: Completely Self-contained Rain Protected Wind Resistant No Electrical Required WARNING FOR OUTDOOR USE ONLY!

RADIANT HEATER CATALOG

STS-JZ (premierschwank) POSITIVE PRESSURE SERIES GAS FIRED INFRA-RED TUBE HEATERS

FOR YOUR SAFETY. Applies to: Models RIH, RIHV, RIHVN, and RIHVL Gas-Fired High-Intensity Infrared Heaters. Models RIH/RIHV

XTHERM, TYPE WH - MODELS 1005A- 2005A DIVISION COMMERCIAL, WATER-TUBE, CONDENSING GAS DOMESTIC WATER HEATERS

INSTALLATION AND OPERATION INSTRUCTIONS. INFRARED RADIANT TUBE HEATER Single and Two Stage Pull Through System (Negative Pressure)

DIVISION FINNED WATER-TUBE BOILERS

INSTALLATION AND OPERATION INSTRUCTIONS

INSTALLATION / OWNER S MANUAL

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

Series S Infrared Heater

INSTALLATION AND OPERATION INSTRUCTIONS

INSTALLATION AND OPERATION INSTRUCTIONS

GARAGE / WORKSHOP INFRARED HEATERS

DIVISION FINNED WATER-TUBE BOILERS

INSTALLATION AND OPERATION INSTRUCTIONS

Owner: Keep this manual in a safe place in order to provide your service technician with the necessary information.

SERIES. 10 year limited warranty on Burner Core 5 year limited warranty on All combustion and. 2 year limited warranty on All Burner Controls

INSTALLATION AND OPERATION INSTRUCTIONS

C1210ES Tankless Water Heater

RADIANT HEATER CATALOG

Sunpak Models S25 & S34

940ES Tankless Water Heater

Installation, Operation and Service Instructions DU/DUH RANGE DUAL OUTPUT INFRARED HEATERS

DIVISION FINNED WATER-TUBE BOILERS

INSTALLATION AND OPERATION INSTRUCTIONS

100% Safety Shutoff Control 40,000 BTUH Input Rating Constant Pilot Propane Gas

INSTALLATION AND OPERATION INSTRUCTIONS. INFRARED RADIANT TUBE HEATER Single Stage Push Through System (Positive Pressure)

FSA, FOA, SEP & HED Series Unit Heaters and Duct Furnaces

Owner: Keep this manual in a safe place in order to provide your service technician with the necessary information.

940ES Tankless Water Heater

T-CLASS GAS-FIRED UNIT HEATERS Separated Combustion - Direct Vent - Horizontal - 60 HZ. Thermal Efficiency - up to 82% Input - 40,000 to 300,000 Btuh

INSTALLATION AND OPERATION INSTRUCTIONS. INFRARED RADIANT TUBE HEATER Two Stage Push Through System (Positive Pressure)

We offer ceramic radiant heaters and infra-red radiant tubes.

Form C-IR (Version F) COMMERCIAL/INDUSTRIAL RADIANT HEATERS. Heats Objects and People, Not the Air

Residential/Commercial Gas Condensing Tankless Models

STERLING RSS SERIES INFRARED RADIANT TUBE HEATER

SUBMITTAL SCHEDULE & DATA

INSTALLATION AND OPERATION INSTRUCTIONS. INFRARED RADIANT TUBE HEATER Single and Two Stage Push Through System (Positive Pressure)

Brooders. Better Brooding for Your Chicks... Since 1924

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

Bosch Greentherm T9800 SE 199 Gas Tankless Water Heater

COMPACT UNIT HEATERS Low Profile - Horizontal - 60 HZ. Steady-State Efficiency - up to 81% Input - 30,000 to 75,000 Btuh

ASSEMBLY INSTRUCTIONS - NXS SERIES. INFRARED RADIANT TUBE HEATER Single and Two Stage Pull Through System (Negative Pressure)

INSTALLATION / OWNER S MANUAL SCHWANK GAS FIRED INFRA RED HEATERS supraschwank 40 primoschwank 40 SERIES HIGH EFFICIENCY COMBINED INTENSITY

CINCINNATI, OH USA

DIVISION FINNED WATER-TUBE BOILERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

Setting A New Standard For Extra High Efficient, Infrared Tube Heaters 30% More Efficient Than Typical Models

WATER HEATERS / BOILERS GWB8-E. Gas-Fired Hot Water Boiler PRODUCT SPECIFICATIONS. AFUE up to 83.9% Heating Input 50,000 to 299,000 Btuh

CLEARANCES TO COMBUSTIBLES

Owner: Keep this manual in a safe place in order to provide your service technician with the necessary information.

Tube Heater General Manual

INSTALLATION AND OPERATION INSTRUCTIONS. SUNSTAR ECLIPSE INFRARED RADIANT TUBE HEATER Single Stage Pull Through System (Negative Pressure)

Greater temperature control

WARNING WARNING. Infrared Dynamics SUNPAK. Gas-Fired, Unvented High-Intensity Infrared Heaters. Installation, Operation & Maintenance Manual

INSTALLATION AND OPERATION INSTRUCTIONS. INFRARED RADIANT TUBE HEATER Two Stage Pull Through System (Negative Pressure)

INSTALLATION / OWNER S MANUAL

Engineering Submittal Data PPRTH Patio Radiant Tube Heaters.

Heating safely with gas-fired infrared heaters

INSTALLATION AND OPERATION INSTRUCTIONS

ITH-SERIES GAS-FIRED INFRARED TUBE HEATERS TECHNICAL MANUAL

Infrared Heating Catalog

LF24. UNIT HEATERS Horizontal - 60 HZ. Thermal Efficiency - up to 80.5% Input - 100,000 to 390,000 Btuh LF A MODEL NUMBER IDENTIFICATION

INSTALLATION AND OPERATION INSTRUCTIONS. COLD BLOCKER INFRARED RADIANT TUBE HEATER Single and Two Stage Pull Through System (Negative Pressure)

SUBMITTAL DATA S100 & S100U POSITIVE PRESSURE SERIES GAS FIRED INFRA-RED TUBE HEATERS. Page 1 PROJECT: ENGINEER: CONTRACTOR:

C1050ES Tankless Water Heater

Transcription:

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS KMI GoGas RANGE HIGH EFFICIENCY, HIGH INTENSITY INFRARED HEATERS SECTION 15540 - FUEL - FIRED HEATERS (Alternate - SECTION 235523 - GAS-FIRED RADIANT HEATERS) This section is based on the products of Advanced Radiant Systems, located at: Location: 315 N Madison Street Fortville, IN 46040 Contact: Toll Free: 1 (800)874-3285 Phone: 1(317-577-0337 Email: sales@advancedradiantsystems.com Web: www.advancedradiantsystems.com Advanced Radiant Systems manufactures a full range of gas fired, high and low intensity, infrared space heating equipment. PART 1 GENERAL 1.1 SECTION INCLUDES A. High intensity heaters. 1.2 RELATED SECTIONS A. Section 15050 Basic Mechanical Materials and Methods: Fuel service, safety valves and connections. B. Section 16050 Basic Electrical Materials and Methods: Power service and connections. 1.3 REFERENCES A. CSA CSA Group. Canadian Standards Association (CSA). 1.4 SUBMITTALS A. Submit under provisions of Section 01300. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Rated capacities, operating characteristics and accessories for each type of gas-fired radiant heater. 2. Preparation instructions and recommendations. 3. Storage and handling requirements and recommendations. 4. Installation methods. Page 1 of 7

1.5 QUALITY ASSURANCE 5. Shop Drawings: Submit complete shop drawings indicating system components, control diagrams and load calculations. 6. Field quality-control test reports. 7. Installation, Operation and Maintenance Data: Provide copy of IO&M document. 8. Warranty: Provide copy of manufacturer s warranty statement. A. Assemblies: Assemblies shall be CSA approved. 1. High intensity heaters to ANS1 Z83.19 (latest revision) and CSA 2.35 (latest revision). B. Approval shall include components of the complete heater, including burners, hangers, reflectors, accessories, thermostats and associated controls as noted in Contract Document plans and specifications. C. Code Compliance: Installations of units shall comply with local building codes, or in their absence, the latest edition of the national regulations and procedures listed below: 1. Electrical: Heaters shall be electrically grounded in accordance with the National Electric Code, ANSI/NFPA 70 in the US, and the Canadian Electric Code, CSA C22.1 in Canada, and shall comply with all local requirements. 2. General Installation and Gas Codes: Heaters shall be installed only for use with the type of gas appearing on the rating plate, and the installation shall conform to the National Fuel Gas Code, ANSI Z223.1 (NFPA 54) in the US and the Natural Gas and Propane Installation Code, CAN/CGA B 149.1 & B149.2 in Canada. 3. Aircraft Hangar Installation: Installation in aircraft hangars shall conform to the Standard for Aircraft Hangars, ANSI/NFPA 409 in the US and CAN/CGA B149.1 & B149.2 in Canada. 4. Public Garage Installation: Installation in public garages shall conform to the Standard for Parking Structures, NFPA-88A or Standard for Repair Garages, NFPA 88B, in the US and CAN/CGA B149.1 & B149.2 in Canada. 5. Parking Structures: Technical requirements are outlined in the Standard for Parking Structures, ANSI/NFPA 88a, in the US and CAN/CGA B149.1 & B149.2 in Canada. 6. Gas Supply Lines: a. Gas supply pipe sizing shall be in accordance with the National Fuel Gas Code, ANSI Z223.1 (NFPA 54) in the US and the Natural Gas and Propane Installation Code, CAN/CGA B149.1 & B149.2 in Canada. b. A 1/8 inch (3 mm) NPT plugged tap shall be installed in the gas line connection immediately upstream of the burner farthest from the gas supply meter to allow checking of system gas pressure. Page 2 of 7

7. Venting: Refer to the National Fuel Gas Code, ANSI Z223.1 (NFPA 54) in the US and the Natural Gas and Propane Installation Code, CAN/CGA B149.1 and B149.2 in Canada for proper location, sizing and installation of ventilation as required for unvented heaters. D. Manufacturer Qualifications: Successfully completed and passed the auditing requirements for ISO 9001 - Quality Management System (QMS). E. Installer Qualifications: Authorized distributor of products and systems. 1.6 DELIVERY, STORAGE, AND HANDLING A. Store products in manufacturer's unopened packaging until ready for installation. 1.7 PROJECT CONDITIONS A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits. 1.8 WARRANTY A. Manufacturer's standard warranty agrees to provide parts to repair or replace components of gasfired radiant heater that fails in materials or workmanship within specified warranty period. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturer: 1. The Manufacturer warrants to the original owner that the product will be free of defects in material and workmanship. For the HD/HM Range, the warranty for all components except for the ceramic burner head assembly is limited to 24 months from the date of installation. 2. The ceramic burner head assembly shall be warranted for an additional 8 years for units which are proven to the satisfaction of the manufacturer to be inoperative due to defects in material or workmanship. Location: 315 N Madison Street Fortville, IN 46040 Contact: Toll Free: 1 (800)874-3285 Phone: 1(317-577-0337 Email: sales@advancedradiantsystems.com Web: www.advancedradiantsystems.com B. Substitutions: Not permitted. 2.2 HIGH INTENSITY HEATERS A. Basis-of-Design Product: Subject to compliance with requirements, provide Advanced Radiant Page 3 of 7

Systems Model KMI high efficiency high intensity type gas-fired radiant infrared heaters. Heater shall have radiant efficiency of minimum 81% as determined by independent testing to EN419-2. Test reports shall be available on request. B. Products. 1. Product shall be high efficiency, high intensity heater Model KMI as manufactured by Advanced Radiant Systems. Product firing rates as called for in the Contract documents within the range of 21 MBH to 125 MBH. 2. Service: a. Electrical Rating: 24VAC. b. Gas Connection: 1/2 inch (13 mm) NPT. c. Minimum Gas Inlet: Natural gas 6.5 inches (165 mm) W.C. LPG 12.0 inches (305 mm) W.C. d. Manifold Pressure: Natural gas 5 inches (127 mm) W.C. LPG 11 inches (279 mm) W.C. 3. Construction: a. 100% insulated reflectors prevents convective heat loss. b. High-grid technology improves heat yield. c. Increased efficiency through maximum preheating of the mixture. d. Innovative injector burner works almost pollutant-free and guarantees optimum combustion. e. Adjustable reflector panels direct the heat straight to the point required. f. Reduced maintenance costs with easy removal of combustion chamber. g. High output delivery from ceilings up to 200 feet (60960 mm) high. C. General: High intensity radiant heater (Model KMI only). 1. Complete with single body burner head, ignition control, valve & gas pressure switch. 2. Provide radiant factor of at least 81% as tested to EN 419-2 standard and provide documentation upon request. 3. Shall cover entire infrared spectrum from short to long wavelengths. 4. Clearance to combustibles shall comply with those in the Installation and Operations Manual for the firing rate specified. 5. Approved flexible connectors shall be provided. 6. The heater unit shall operate at a minimum gas inlet pressure of 6.5 inches W.C. for NG and 12 inches for propane; maximum inlet pressure for both fuel types shall be 14 inches WC. 7. Electrical loads: Unit shall draw no more than 0.6A, 120VAC, 60Hz. 8. Unit shall be subjected to a function test before it leaves the factory and is preset to the relevant gas type. Page 4 of 7

D. Performance: 1. The heater shall perform a controlled and clean surface combustion 2. The resultant quantity of noxious components CO and NOx shall be very low (CO: 20 200 ppm; NOx: 4 10 ppm). E. Heater Body: 1. Heater body shall comprise of Burner-head (mixing chamber, ceramic emitter tiles and steel mesh), insulated double wall parabolic outer body and reflector assemblies. 2. Burner head shall be stainless steel with single venturi and shall be placed in the insulated reflector housing in such a way that all the 3 sides are heated by warm air from products of combustion in turn the three sides shall pre-heat the air-fuel mixture to achieve higher efficiency. 3. Burner head shall be independently placed in the reflector assembly to minimize expansion stress and for ease of serviceability. 4. Hood shall be hot-dip aluminized steel with high temperature resistant ceramic fiber insulation and shall be fastened to the combustion chamber to expand without damaging the unit. 5. Reflectors shall be FERAN. 6. Directing of radiant pattern shall be accomplished through use of adjustable reflectors and rotating the heater around long axis. 7. The rotation shall be in both the directions around horizontal mounting and shall not have the limitation to rotate in only one direction. 8. Chromium-Nickel Stainless steel mesh shall be in close proximity of emitter tiles to maximize radiant performance. F. Equipment Controls: 1. Ignition shall be solid-state direct spark. 2. Ignition control shall: a. Make 3 ignition attempts before lockout. b. Recycle again in one hour with 3 ignition attempts. c. Ignition module will check for false flame condition, i.e. shorted sensor to ground. 3. Have openly accessible sense current contacts. 4. Gas valve shall include a manual valve, two magnetic operators and a standard gas pressure regulator. 5. Gas valve shall have pressure taps to measure inlet and manifold pressures. Page 5 of 7

PART 3 EXECUTION 3.1 EXAMINATION 6. Control shall incorporate a gas pressure switch capable of shutting off power to the ignition module in case of inlet gas pressure drops below the minimum requirement. A. Do not begin installation until services and supports have been properly prepared. B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. 3.2 INSTALLATION A. Installation shall comply with manufacturer supplied Instruction manual, approved drawings and applicable local codes and/or gas utility requirements. In the absence of any of the former, reference should be made to CAN 1-B149.1 and B149.2 Installation Codes and/or National Fuel Gas Code ANSI Z223.1 (NFPA54). Comply with manufacturer s recommendations including the following: 1. Clearance to combustibles shall comply with those in the I/O manual for the firing rate specified. 2. Provide approved flexible connectors. 3. Wire heaters in accordance with the National Electrical Code ANSI/NFPA 70 and local ordinances and/or Canadian Electrical Code. 4. Suspend heater units in accordance with manufacturer s instruction with chain and turnbuckles exceeding 540 lb (245 kg) pull test. 4 inch (102 mm) turnbuckles and 2/0 chain. 5. Install and connect gas-fired radiant heaters and associated fuel and vent features and systems according to either NFPA 54 or CAN/CSA B149.1 as applicable for local codes and regulations. 6. Install products in accordance to manufacturer's written installation instructions. 7. Hang suspended units from substrate using chain hanger kits and building attachments as required for safe installation and to meet all seismic requirements for specific building location. B. Connections: Provide all electrical connections required for complete installation including installation of electrical devices furnished with heaters but not specified to be factory mounted. 1. Install piping to gas-fired radiant heaters to allow service and maintenance as required. 2. Connect gas piping to gas train inlet; provide union with enough clearance for burner removal and service. 3. Connect vent connections as required. Page 6 of 7

3.3 FIELD QUALITY CONTROL A. Manufacturer's Field Service: Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test and adjust components, assemblies, and equipment installations, including connections, and to assist in testing. Testing shall include the following: 1. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. 2. Test Reports: Prepare a written report to record the following: a. Test procedures used. b. Test results that comply with requirements. c. Test results that do not comply with requirements and corrective action taken to achieve compliance with requirements. B. Remove and replace malfunctioning units and retest until satisfactory results are obtained. 3.4 DEMONSTRATION A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain gas-fired radiant heaters. 3.5 PROTECTION A. Protect installed products until completion of project. B. Touch-up, repair or replace damaged products before Substantial Completion. END OF SECTION Page 7 of 7