OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

Similar documents
HVAC Controls Upgrades: Requirement Details ( )

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Job Name Control Systems Description Date

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

HVAC Controls Upgrades: Requirement Details ( )

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Computing Services Center

Modeling projects that require very tight space temperature control

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

DACC Health Sciences Building Air Handler Assessment/Study

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

SESSION Michigan Energy Code (MEC) Update (3 Technical) Per SMACNA Standard (TAB, Duct Design) and ASHRAE ( ) ASHRAE Detroit Members:

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Civil Engineering Building

ASHRAE JOURNAL ON REHEAT

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Digital Precise Air Control - DPAC

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Selected Laboratory Energy Efficiency Measures

UNIFIED FACILITIES GUIDE SPECIFICATIONS

b.) Technical Information:

Harrington Tower Building

Inspection Phase Three. Mechanical, Electrical & Plumbing Section 503

BAS Point Trend Data Guidance

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.

City of Duluth Festival Center 04/25

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

INTRODUCTION TO: ASHRAE STANDARD 90.1, HVAC System Requirements for Reducing Energy Consumption in Commercial Buildings

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

TEC Controller VAV 0-10V Fan Control with Hot Water Heat, Application Application Note Building Technologies

FAN TERMINAL UNITS Constant Volume (Series Flow), Standard Design

Raised Access Floor - (AE Breadth Area)

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

Your Home. Jacco & Assoc.

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP 100% OUTSIDE AIR

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

Verasys System Operation Overview Technical Bulletin

Air Conditioning Clinic

Paul McCown, PE, CEM, LEED AP, CxA Sr. Mechanical Engineer SSRCx, LLC Nashville, TN USA

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

1 - This title will copy onto other forms Date

SYNOPSIS. Part-Load Control Strategies for Packaged Rooftop Units. In this issue... Bin Hour Profile Charlotte, NC

TESTING, ADJUSTING AND BALANCING

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

COMcheck Software Version Review Mechanical Compliance Certificate

Zoning System Design Manual

4. OVERVIEW OF MECHANICAL SYSTEM

Mechanical Redesign, Proposal Elizabeth C. Krauss Mechanical Option September 18, 2013

York 25-Ton VAV Rooftop Unit

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Continuous Commissioning Report

Linear Floor Heaters

Technical Report Three

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

HVAC Mandatory Provisions Part II, Page 1

IAQ: Re-tuning Commercial Buildings

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

DESIGNING MODULAR VAV SYSTEMS

Fan Selection. and Energy Savings

Description of All Alternatives Considered-

2 Existing Mechanical System

Physical Plant Complex

Energy-Efficient Makeup Air Units BY HUGH CROWTHER, P.ENG., MEMBER ASHRAE

2009 IECC Commercial Mechanical Requirements

High-Performance VAV Systems

2009 Washington State Non-Residential Energy Code Scott Rushing, PE, LEED AP - Rushing Company Lisa Rosenow, CSBA, LEED AP NEEC

Technical Assignment 3 11/15/04. Executive Summary

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

TAP v2.10 Version Date: 6/12/13. Document Microprocessor Controller for Tempered Air Products

COMcheck Software Version Mechanical Compliance Certificate

REPRODUCTION/DISTRIBUTION IS PROHIBITED. Energy-Savings Strategies for. Rooftop

Reference Guide for Microprocessor Controller

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

BULLETIN. Temperature Controls (Chilled / Hot Water)

SEQUENCE OF OPERATIONS

Displacement Ventilation in Classrooms

Zoned Rooftop Systems. Light commercial packaged rooftop systems from Trane

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

Hello, my name is Audra Benzschawel and I m a marketing engineer in the C.D.S. Slide 1 TRACE 700

COMcheck Software Version Mechanical Compliance Certificate

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

Architectural Engineering Senior Thesis Mechanical System Redesign

Transcription:

OSU Alumni Center Phase I Implementation Review Prepared for Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon 97331 October 31, 2011 Job No. 02.11.00113

Introduction: Glumac was engaged by OSU to prepare implementation documents for energy efficiency measures (EEMS) selected from a July 20,2011 ASHRAE Level II Energy Audit Report prepared by Glumac. The following report further evaluates the feasibility of the selected measures, recommends a course of action for completion of implementation documents, and provides a cost opinion of the proposed work. EXECUTIVE SUMMARY: Glumac reviewed the installed control and sheet metal installation to determine the feasibility of implementing measures selected by OSU from the Glumac Level II Energy Audit. The following report describes recommendations for each measure. In general we found that while many of the recommended measures were originally included in the 2004 building DDC Alerton retrofit, significant improvement can be made to properly implement control function, reduce poor operation, and eliminate unnecessary heating and cooling. The cost for the recommended modifications and retrocommissioning is expected to be significantly less than the cost opinions provided as part of the original EEM report. As part of the Phase 1 implementation analysis Glumac reviewed the original installed ductwork system. We found that the installed system does not substantially deviate from the original design documents. While there are ductwork conditions that result in higher pressure drop than design assumptions, Glumac does not recommend incurring the cost that would be involved in designing and implementing corrections to these conditions. Finally, Glumac was asked to review the heating control issue caused by the current need to operate the 2-stage gas heat in the VAV units during occupied periods. Glumac noted that with proper outside air damper, we believe the need for this operation should be minimized or eliminated. Nevertheless, Glumac evaluated the potential benefit and rough order magnitude cost to replace the existing gas furnace heat on the two large VAV units with a hot water heating system. Such a system would have a significant first cost estimated at $137,500. The anticipated benefits would be Reduced operation of costly local electric reheat Reduced operating cost during night low limit and warmup operation. Improved comfort and control in the event that high outside air quantities are necessary mandating operation of VAV unit heating. In conclusion Glumac recommends proceeding with revisions to the existing sequences of control, lighting measures, and implementation of new control EEM for the ballroom package units. We recommend evaluating the results from this effort. If ventilation requirements still result in high outside air quantities, we recommend further evaluation of a hot water heating retrofit to the two packaged VAV units. Page 1

EEM 1: SUPPLY AIR RESET ACU-NM & ACU-SM Existing Condition: As part of the Glumac energy report research Glumac reviewed trend logs for both ACU-NM and SM. We saw little discharge temperature reset over a wide range of days. Subsequently the sequence of control for the two VAV package units was made available to Glumac This sequence indicates that a supply air temperature reset schedule was programmed that resets discharge temperature based on VAV terminal box position. We noted also that no discharge static pressure reset sequence was included. Glumac Recommendation: Glumac makes two recommendations regarding the discharge temperature and pressure reset. 1. Revise the supply air temperature (SAT) reset to a simple outside air dry-bulb reset scheme that resets SAT from 55 F to 65 F as outside air drops from 65 F to 45 F. As a limit to minimize failure to meet zone loads, poll the terminal zones to confirm all space setpoints are met. Adjust SAT downward by 2 F in 15 minute increments until all zones are met. 2. Add static pressure reset control to the control of the supply fan VFD. The reset scheme proposed would use the existing SAT trim and respond sequence. Poll terminal controllers looking for the VAV terminal in the furthest-open position. Reset supply fan speed to provide just enough pressure so that at least one damper is nearly wide open. 3. Retrocommissioning: As part of the implementation of the revised sequences the contractor is to participate in a retrocommissioning effort led by Glumac Commissioning. Page 2

EEM 2: DEMAND CONTROL OF ECONOMIZER DAMPERS: ACU-NM & ACU-SM Existing Condition: As part of the Glumac research for the energy report Glumac reviewed trend logs for both ACU-NM and found very high outside air percentages throughout the occupied and unoccupied hours. Dampers appeared not to be in control. A CO2 sensor is located in the return air path prior to the return damper. The sequence of control calls for an outside air damper minimum of 20% at a CO2 setpoint of 400 ppm modulating outside air linearly to 40% outside air position at 800 ppm. In practice, unless the damper minimum was set using test and balance measurements, a damper position that is determined simply by setting the minimum at 20% of full actuator travel will always overshoot 20% ventilation air Glumac Recommendations: 1. Glumac will prepare retrocommission specifications for economizer control including outside air damper position. a. Determine if the 20% outside position is the result of test and balance measurements tied to original design ventilation minimums? b. Confirm calibration of the CO2 sensors. c. Conduct test and balance to determine a calibration curve for the outside air damper position. d. Since the CO2 sensor is intended to provide limits on total building CO2 as an indication of proper ventilation, use the return sensor to control the damper minimum using a more realistic setpoint of 1100 ppm. (See ASHRAE 62.1 2007, Appendix C recommendations of 500-700 ppm over outside air levels.) Page 3

EEM 3: TERMINAL UNIT OCCUPANCY SENSOR CONTROL Existing Condition: Appendix D of the Glumac energy report listed occupancy controls by space. The Energy Efficiency Measure uses the existing occupancy sensor equipped with auxiliary contacts to add terminal unit control. Glumac Recommendation: 1. Based on subsequent space review, Glumac recommends that occupancy control be added for the following terminal zones: Occupancy VAV Terminal Sensor Location 201 VVR-SM-2-4 202 VVR-SM-2-5 212 VVR-NM-2-4 209 VVR-NM-2-5 220 VVR-NM-2-2 239 VVR-SM-2-7 246 VVR-NM-2-10 250 VVR-SM-2-8 256 VVR-SM-2-11 259 VVR-SM-13 136 VVR-SM-1-3 137 VVR-SM-1-4 141 VVR-SM-1-7 142 VVR-SM-1-8 2. Glumac will prepare implementation specification and drawings for this control. Page 4

EEM 4: NIGHT SETBACK Existing Condition: The existing sequence of operation calls for scheduled operation with night low and high limits. Glumac Recommendations: 1. Glumac recommends revising the sequence of operations for the two VAV units as follows: a. Close outside air dampers during all unoccupied hours including during periods when the AC units are enabled to address low or high limit conditions. b. The current sequence calls for both VAV units to operate if 2 or more zones are flagged as exceeding low or high setpoints. During unoccupied hours, we recommend that each VAV unit be operated independently of each other and that 2 or more zones (adj) within each VAV unit system be flagged before initiating operation of that AC unit. c. After revision of control sequence, Glumac recommends including the new sequence in a retrocommissioning process. Page 5

EEM 5: VAV UNIT INVESTIGATION Existing Condition: During both the field work for the energy study and during our most recent work we ve heard of several issues and possible causes for poor operation and comfort with the two VAV AC units. The specific issues noted are: Cold weather operation: o During cold weather conditions when mixed air temperature drops below 50 F the 2-stage furnace is energized to maintain SAT. This results in sudden elevation of SAT (as high as 90 F), oscillating control, and poor comfort conditions. Anecdotal information is that either or both the supply and return ductwork is restricted resulting in poor operation. Glumac Review: 1. Ductwork Issues: Glumac visited the site on November 18 to conduct a review of ductwork compared to the original sheet metal design. In collaboration with OSU staff we reviewed ductwork at seven locations; five locations on the 2 nd level and two locations on the 1 st floor. We chose areas where main trunk ductwork was transitioning in size or direction. We found the following: a. In general the main trunk ductwork conforms to the original sheet metal design. Main return and supply trunk sizes are per plan or equivalent. b. Ample ceiling spaces were provided in the architectural design. As a consequence we saw no instances of highly constricted ductwork. c. Some instances occur of multiple elbows that likely impose a high pressure drop penalty. We noticed this especially above Office 221 where the main return duct for the 2 nd floor north makes two hard 90 elbows. We suspect these elbows were installed with double thickness turning vanes. Such an installation has a fairly high pressure drop as compared to single thickness vanes with long trailing edges. d. We obtained a copy of the 2004 test and balance report subsequent to our visit. This report found an unusually high pressure drop in the 24 round north perimeter supply duct serving the first floor. A 0.80 w.g. pressure drop was found across the fire damper where the duct exits the ceiling space above the ballroom. This pressure drop results in the north VAV unit operating at a static pressure of 3.2 w.c., 0.75 w.g. higher than the south AC unit. This represents an added operating cost of roughly $200 annually for the increased fan horsepower expended over 3000 hours. It s possible that replacing this fitting and fire damper with a lower pressure drop arrangement could reduce this waste. Page 6

2. Relief Fan Economizer Control Issues: Variable Relief fan economizer systems are ideal for systems with ceiling relief plenums that have very low return air pressure drops. When used for buildings like the Alumni Center with fully ducted return, the supply fan must be capable of handling the entire system pressure drops. Glumac reviewed the system pressure drops. Given that the existing York units were supplied with the largest supply fan motors available (30 hp) from York we believe the supply fan was adequately specified and submitted. Even with properly specified fans, however, pressure and economizer control can be unstable with this relief fan design. The problem occurs especially at transition to minimum outside air mode from full economizer mode. Here is what happens: In full economizer mode, the negative pressure in the mixed air plenum C is very moderate (-0.25 w.g.) and the negative pressure in the return plenum B is high because of the extensive return ductwork. When the unit transitions to minimum OSA, the recirculating or return damper begins to open to mix return air with OSA but since the return plenum is more negative than the mixed air plenum OSA flows from the mixed plenum to the relief fan and the building pressure rises since the relief fan is really exhausting OSA not return air. The economizer control system attempts to stabilize the building pressure by increasing the relief fan speed and the economizer mixed air temperature control opens the return damper and closes the OSA damper further until stability is reached. The deficiencies in this system are inherent in the design and are not easily remedied. Mitigating actions that could reduce the instability are: Confirm that the relief fan/vfd combination can turndown to minimum exhaust levels. In the case of the Alumni Center, this value is should be approximately 2000 cfm or as low as 15%. Page 7

Economizer controls should include a sequence specifically for transition to minimum OSA mode. In this sequence, at the transition point, o Relief fan ramp down to minimum speed. 0 Space pressure control locked out. o OSA/RA mixing dampers adjust to meet mixed air temperature matching SAT o Relief fan speed control unlocked to permit control of space pressure. 3. ASHRAE 62.1-2007 indoor ventilation requirements: Using the ASHRAE 62.1-2007 standard for acceptable indoor air quality Glumac estimated the ventilation air required from each of the two VAV air handlers as follows: Air Handler Calculated Minimum Ventilation Air AC Unit Total Cooling CFM and Min. CFM Ventilation Percent Cooling/Heating ACU-SM 1700 CFM 20776/8841 8% / 20% ACU-NM 2200 CFM 19035/8633 12% / 25% 4. Mixed Air Temperature Maintenance: Outside air/return air mixed temperature is a function of economizer damper control. With a 70 F return air and 20 F outside air temperature: Percent OSA Mixed Air Temperature 20% 60 F 30% 55 F 40% 50 F 50% 45 F We can see from the above that based with proper mixed air control, outside air quantities below 40% will result in discharge temperatures above the need for heating in the air handler.. Unfortunately, a complicating factor with VAV AC units is that a damper setup for full cooling load conditions, supply fan at 100% speed, will not necessarily result in the same outside air percentages when the supply fan is turned down 50%. Moreover, if the minimum damper position is set based on 20% of actuator motion, the actual outside air introduced could be significantly higher than 20% at any fan speed. At 50% speed, pressure drop across the dampers is only 25% of that at full load. The lesson is that outside air quantity will not necessarily reduce in a linear fashion. 5. Heating Control: In our opinion, it s likely that once the revisions to the economizer control are implemented, the need for gas unit heat during occupied hours will likely be eliminated. Nevertheless, we ve investigated the possibility of retrofitting the heating in the YORK VAV units to provide closer control. Here is what we ve found: a. York Air Conditioning does not offer a retrofit for modulating control of the 2 stage gas furnaces in the York VAV units, b. The York units are available with a factory option for hot water heat as an alternative to gas furnaces. Glumac is investigating the availability of replacing the furnaces with this hot water heating section. Such a system would have a significant first cost estimated at $137,500. The anticipated benefits would be Page 8

o Reduced operation of costly local electric reheat o Reduced operating cost during night low limit and warmup operation. o Improved comfort and control in the event that high outside air quantities are necessary mandating operation of VAV unit heating. c. A cost opinion is provided for retrofitting the two VAV units with a hot water heat. The cost analysis assumes a hot water heating system would be installed on the roof of the building between the package units. Actual location of the boiler plant could also be in the existing kitchen boiler room. The system would be based on providing a one million btu boiler with two 50 gpm pumps located in a lightweight shed structure. The existing package unit furnaces would be removed and new coil sections added. Prefabricated boiler system enclosure Prefabricated boiler system Page 9

Glumac Recommendations: 1. Below 55 F outside air temperature, mixed air damper control should be controlled primarily to achieve a mixed air temperature that is coordinated with SAT. The return air CO2 sensor should function then, primarily as a limit. We recommend a CO2 setpoint of 1100 ppm and we anticipate this will result in keeping ventilation air quantity within the 20-30% needed to achieve good winter time DAT control. EEM 7 & 8: LIGHTING CONTROL RETROFITS Glumac has completed field investigation for implementing EEM 6 and 7 and on OSU approval to proceed will complete the implementation design for these measures. EEM 9: ALERTON CONTROL RETROFIT OF ACU-NB, SB, AND EB BALLROOM HVAC UNITS This measure was identified in the kick off meeting to the implementation phase. The measure would replace the local electronic thermostat control located inconveniently in the kitchen boiler room with new adjustable control stats in the reception area. The new control will enable more convenient local resetting of space setpoints, enable the EMS shop to monitor and respond to failures, and permit the implementation of default unoccupied control. Glumac Recommendations: 1. Glumac will prepare implementation documents for this added measure. Page 10

COST OPINION: The following tabulation of cost opinions incorporates Environmental Controls Incorporated budget quote and Glumac cost opinions for measures not priced by ECC. Measure Glumac Cost Opinion Pricing from Environmental Controls Inc. EEM-1 Revised VAV SAT Reset $ 976 EEM-2 Economizer control Revisions $ 1,952 EEM-3 Terminal Unit Occ Sensor Control $ 6,381 EEM-4 Night unoccupied control $ 976 EEM-7 Occ sensor control for ballrooms $3,559 EEM-9 (New) New Ballroom HVAC control $ 13,158 Glumac cost opinions EEM-5 Economizer Corrective Work NA EEM- 8 Exterior Lighting Control $ 4,000 TOTAL The cost values here are significantly less than the original rough order estimate provided in the ECM report. As such we anticipate the measures, effectively implemented, will have paybacks well under 1 year in all cases. Item Glumac Cost Opinion 1 million btu condensing boiler $30,000 Two circulating pumps and hydronic accessories $10,000 Piping $15,000 Insulation $500 Boiler enclosure shed. $5,000 Controls $15,000 HW Coil and package unit modification $24,000 Engineering $15,000 OH&P, 10% contingency $22,900 TOTAL $137,500 Page 11