ASHINGTON BLYTH & TYNE RAIL RE-OPENING PROJECT. The Case For A Station at SEGHILL

Similar documents
North Somerset Council Local Development Framework

Newcourt Masterplan. November Exeter Local Development Framework

Chapter V-Transportation

Making the case for Sustainable Transport Project Potential

Phase 2 Preliminary Business Case. Appendix F Henbury Station Locations Options Appraisal

We are improving the A69 Styford and Bridge End junctions to cut congestion and journey times for motorists using them and to improve safety.

The Fairfield Partnership Vision for North-East Elsenham

TOD 101 CREATING LIVABLE COMMUNITIES WITH TRANSIT

Emergency Ventilation System Design - Preliminary Report Shishir Gupta

Road pricing in the Netherlands. Overview

Chapter 9 Route window W18 Slough station. Transport for London

Hot Issues in Fire Engineering July 2014

BEFORE THE AUCKLAND UNITARY PLAN INDEPENDENT HEARINGS PANEL STATEMENT OF EVIDENCE OF MARTIN PEAKE ON BEHALF OF AUCKLAND COUNCIL

Midtown Corridor Alternatives Analysis. Appendix A - Initially Considered Alternatives Screening

Scotswood to North Brunton improvement scheme

Welcome to our exhibition

Welcome to the Public Consultation Exhibition

A1 Scotswood to North Brunton Report on Public Engagement

Congestion Management Safety Plan. Michael Corbett State Program Administrator September 2017

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

REVIEW AND EVALUATION OF REGIONAL LAND USE

Strasbourg SUMP Award: Finalist factsheet. Local Transport facts. Urban transport policy objectives of the city:

Inspiring Technovation

A46 Coventry Junctions Public information exhibitions

On behalf of Metrolinx, in coordination with the City of Mississauga. and Presentation Materials (draft)

Dumbarton Rail Corridor. Project Scoping Meeting Nov 15, :15 PM City of Newark Nov 16, :15 PM City of Menlo Park

EXECUTIVE SUMMARY. Introduction

AGINCOURT SECONDARY PLAN

Principal development issues

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

Alaskan Way, Promenade, and Overlook Walk Final EIS Appendix D - Supplemental Draft EIS Comments and Responses October 2016.

Access Statement for Mr & Mrs Smith s

BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

8.0 Design and Form of Development 43/

Wednesbury to Brierley Hill Extension

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Jim Harkins DUNDEE WATER FRONT CIRCULATOR DUNDEE WATER FRONT CIRCULATOR. Specialists in Affordable & Sustainable Tramways. A short presentation by

Access Statement for Craster Rocks

TEHRAN LONG TERM URBAN RAIL PLAN

Chapter 1.0 Introduction

ACCESS STATEMENT FOR THE STUDIO

Fishermans Bend Draft Framework. Submission to public consultation

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

Kibworth Harcourt. Introduction. Introduction

Are we creating and exploiting synergies on our transit investments?

Integration of the Public Transport System in Madrid Region

Three Decades of Smart Growth: Arlington s Urban Village

Slough International Freight Exchange Proposals, Colnbrook+

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Growth Point Connectivity: Executive Summary

GREATER CAMBRIDGE CITY DEAL. Urban Design Guidance for Transport Infrastructure Projects

Urban Planning and Land Use

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

COMMISSION IMPLEMENTING REGULATION (EU) /... of XXX. on the European Rail Traffic Management System European deployment plan

COUNCIL COMMUNICATION

LONGDEN VILLAGE DEVELOPMENT STATEMENT

Planning and Regulatory Committee 20 May Applicant Local Councillor Purpose of Report

Paignton Neighbourhood Plan (Submission version 2017)

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

Land at Fiddington Hill Nursery, Market Lavington

Making Transit Oriented Development Work For Boonton, NJ

West Midlands Local Transport Plan ( ) Making the Connections

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Project Update. Hillsborough County 2045 Population and Employment Projections and Allocations. Board of County Commissioners February 13, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Manywells, Cullingworth

South Davis County COMMUNITY SPOTLIGHT

Shift Rapid Transit Public Participation Meeting May 3, 2017

An Urban Transportation Perspective of Mumbai, The Maximum City

Key Principles. 290 Phasing Principles and Programme

The role of public transport in the Strategic Sustainable Mobility Plan of the Madrid Region, Vision 2025

HS2 Interchange Station Design

ENVIRONMENTAL AND LANDSCAPE MAPPING

From: Sent: To: Subject: Zoning: Landscaping:

Feasibility study for new foot/cycle bridge across the River Tillingham

SODC LOCAL PLAN 2032 SECOND PREFERRED OPTIONS RESPONSE

Engagement Summary Gastown Streets: Local Business Visioning Workshop

Southeast Extension to RidgeGate Parkway Scoping Booklet

Environmental: Urban land..51 acre wet (.30%); 1.01 acres/.59% within a 100 year floodplain; no other environmental indicators limit development.

Full Name /title*. Address 1. Address 2 Post Code* *.. Phone* *Required fields for draw

NEW CENTRE OF ŁÓDŹ OPERATION ON AN OPEN CITY

Sharing Innovation in Transport between EU and Singapore Singapore, November 2015

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Urban Charter of Ferizaj/Uroševac City Centre

Sustainably Repositioning Greyfield Sites. Greyfield Sites Anywhere

I-84 Hartford Project Open Planning Studio #12. April 25, 2017

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Ingenuity at the service of sustainable regional development: four cases in point

SUSTAINABLE URBAN MOBILITY PLAN TRAINING WORKSHOP. Module 1 Concept & Approach

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

SH1 link to Matakana Road

Donnybrook Station Development Concepts

Fire Protection and Safety in Tunnels Conference Opening Remarks. Dr Fathi Tarada Secretary, PIARC Tunnel Operations Committee

Chapter 13 Learning Guide Urban Patterns

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

New Century Park Welcome

Danish Rail Conference 14th may Light Rail : a Tool to Rejuvenate the City. Light Rail : a Tool to Rejuvenate the City May

PARAPET HOUSE, LENHAM KENT. Transport Statement

Transcription:

1. Introduction ASHINGTON BLYTH & TYNE RAIL RE-OPENING PROJECT The Case For A Station at SEGHILL SENRUG The South East Northumberland Rail User Group has been campaigning for the reintroduction of passenger services between Newcastle and Ashington and Woodhorn, on the existing Ashington Blyth & Tyne freight railway line, since 2004. More recently this campaign has been adopted by Northumberland County Council who, having completed Market Appraisal and Demand Assessment studies, is now proceeding through the Network Rail GRIP 1 process to achieve full re-opening. The business case for re-opening the line is mainly to assist the economic regeneration of South East Northumberland by providing access to work; the majority of passengers on the line are thus expected to be commuters. The model being progressed envisages a half hourly peak service and hourly off peak service each way between Newcastle and Ashington / Woodhorn, every day of the week until late evening. All stations other than Newcastle would be unstaffed. Earlier technical studies have confirmed that an hourly service each way can be delivered with the existing infrastructure, notwithstanding the single track section of line between Benton Junction and Newsham, and taking into account current freight services. However, to deliver the half hourly peak service would either require the freight operator to surrender a single freight train path, or would need the creation of a long passing loop, enabling trains to pass at speed, somewhere near Seghill. SENRUG has always envisaged that the new passenger route will include stations at (from south to north) Northumberland Park (providing a metro connection), Seghill, Seaton Delaval, Newsham for Blyth, Bebside, Bedlington, Ashington and Woodhorn. However, earlier Council papers referred to a station at either Seghill or Seaton Delaval, but not both, on grounds of cost, given the relatively small size of each community. This paper sets out whilst SENRUG believes a station at both Seghill and Seaton Delaval will be required and should therefore be provided. Authors: Dan Nesbitt / Dennis Fancett. SENRUG Page 1 of 5

2. SIZE OF COMMUNITIES The population of Seaton Delaval is 7,721 2 whereas Seghill is 2,965 2. SENRUG thus acknowledges that Seaton Delaval is the larger community and if a station were to be provided at only one of these two localities, then Seaton Delaval would be the winner. However, a station at Seaton Delaval would only serve Seaton Delaval. It would not be able serve both communities, for the reasons set out below. 3. ACCESS FROM SEGHILL TO SEATON DELAVAL (See also Annex 1) 3.1 Walking Although the running distance by rail is only 0.93 miles, the walking distance from Seghill to Seaton Delaval is 1.1 miles from the nearest part of Seghill (Deneside) 3 to 2.1 miles from the furthest part of Seghill (Reid s Lane) 4 see fig 1. Fig 1: Rail route and walking routes: Seghill to Seaton Delaval The walking route from Reid s Lane can be reduced to 1.9 miles if an unlit / unpaved footpath is used 5. The muddy nature of this footpath means it would be unsuitable for commuters who need to look smart in the office, and due to its isolated location it would be potentially dangerous, particularly during winter months when both morning and evening commuter journeys would be in the dark. Therefore, this route should be dis-regarded. Authors: Dan Nesbitt / Dennis Fancett. SENRUG Page 2 of 5

Thus walking distances are 1.1 to 2.1 miles on safe and comfortable routes. But research 6 indicates passengers will not walk more than 0.5 miles to access rail services. Residents of Seghill would therefore not walk to Seaton Delaval station to catch a train. 3.2 Bus Bus journey times from Seghill to Seaton Delaval are 11 to 15 minutes (route X7) with a 4.20 return fare, and 30-minute frequency (peak hours) The additional cost of bus will almost double the likely stand-alone rail fare from Seghill station to Newcastle estimated at 5 (currently 6 for Newcastle Cramlington). Additionally, the time penalty of 11-15 minutes plus an optimistic minimum of 10 minutes waiting at the station (assuming bus times could be co-ordinated to connect with train times, which is by no means certain) would add at least 20 minutes to the overall journey time. Additionally, there is resistance to passengers taking a bus north when their intended direction of travel is south and then returning through their starting point non-stop, as would be the case for Seghill commuters travelling to Newcastle. SENRUG submits that the additional bus journey times, coupled with what may not be optimum bus arrival and train departure connection times, and the additional fares means that bus access from Seghill to a station at Seaton Delaval would not be feasible for regular committing. 3.3 Car The option of driving to the station is not available at all to those without access to a car. Although most households do have a car, many households have more people in work or seeking work than there are cars in the household. Therefore, to achieve the desired economic regeneration benefits, use of the railway line should be accessible to those without a car. Even for those with a car, there is resistance to driving north in order to catch a train south, such people are therefore likely to continue using Northumberland Park metro station, rather than Seaton Delaval. In addition, station car parking facilities at Seaton Delaval are likely to be constrained and only sufficient for residents of Seaton Delaval itself. To manage parking through the introduction of charges would be counterproductive and again increase the cost of getting to work, and additional vehicle traffic from Seghill to Seaton Delaval would create peak hour traffic congestion in Seaton Delaval village centre. 4. ACCESS FROM SEGHILL TO OTHER RAIL SERVICES (See also Annex 1) 4.1 Walking The nearest alternative rail service to Seghill other than the proposed Seaton Delaval station is West Monkseaton Metro station but the walking distance is 3.8 to 4.9 miles (from the nearest and furthest points in Seghill respectively). These distances are too long for people to walk. Authors: Dan Nesbitt / Dennis Fancett. SENRUG Page 3 of 5

4.2 Bus Whilst there is currently a bus, route 57A, from Seghill to West Monkseaton, the service is hourly only and does not run in the evening. (An hourly evening service funded by Seaton Valley Community Council is about to be re-introduced for a one year trial, but there is no guarantee it will be continued after that). The return fare is 5.90 and the journey takes 16-21 minutes. An alternative route to Northumberland Park Metro station is available but this requires a change of busses, namely route 57A to Holywell then route 19 to Northumberland Park. Evening service is similarly dependant on the future re-instatement and continuation of the 57A. The return fare is 10.60 and the journey takes 25 mins. The two bus routes are run by different companies (57A by Arriva and 19 by Go North East) limiting the scope for reducing the total fare by through ticketing. As with the bus route to Seaton Delaval, SENRUG submits that the additional bus journey times, coupled with what may not be optimum bus arrival and train departure connection times, the additional fares and the uncertainty over the evening service means that bus access from Seghill to West Monkseaton or Northumberland Park would not be feasible for regular commuting. 4.3 Car Residents of Seghill currently driving to Northumberland Park Metro station would be able to continue to do so. But in this scenario the re-opening of the Ashington Blyth & Tyne line would only divert some passengers from Metro at Northumberland Park to the heavy rail route. It would not generate more passengers or revenue or achieve any economic benefits. 5. TECHNICAL CONSIDERATIONS The railway line at Seghill is currently subject to a 30 mph speed limit. Opportunities to upgrade the line speed are limited due to the level crossing with the public highway which is the main road through Seghill, and the bend in the railway line immediately to the north of the crossing, limiting the forward view of drivers of southbound trains. Additionally, as mentioned in the introduction, it is likely that to achieve the required service levels on the line, a passing loop must be created somewhere near Seghill. This needs to be a dynamic loop, which means a long loop (typically quarter to half a mile) allowing trains to pass at full line speed without slowing down. However, if the station were located on the loop, the length of loop required would be much shorter. The savings in having a shorter loop could defray the cost of building the station. 6. CONCLUSION SENRUG s conclusion is that residents of Seghill would not be served by and would not use the Seaton Delaval station. The Seghill community requires a station in its own right if Seghill residents are to use the line. 7. ADDENDUM As argued in this paper, SENRUG believes there is a strong case for building a station at both Seaton Delaval and Seghill. If however, the decision of the County Council, notwithstanding the Authors: Dan Nesbitt / Dennis Fancett. SENRUG Page 4 of 5

strength of this argument, is to proceed with a station at Seaton Delaval only, SENRUG strongly requests that passive provision is made for a station at Seghill to be built at a later date. Ideally, the required passing loop at Seghill should be located either side of the highway with space left to insert platforms with access from the highway later. Notes 1 GRIP is an internal Network Rail acronym for Governance in Rail Investment Projects. See http://www.networkrail.co.uk/aspx/4171.aspx 2. http://www.citypopulation.de/php/uk-england-northeastengland.php (June 2014 estimates) 3. https://goo.gl/maps/hzmdppmb68f2 Google Map 4. https://goo.gl/maps/fanc3xfjsgo Google Map 5. https://goo.gl/maps/hd7ccbsggtd2 Google Map 6. Chartered Institute of Highways and Transportation: Planning For Walking April 2015 page 30. See www.ciht.org.uk/download.cfm/docid/082bef1b-0fd2-44f4-90a0b31eb937899a ANNEX 1: WALING AND BUS DISTANCES: SEGHILL TO OTHER RAIL HEADS Seghill Population: 2,965 2 Nearest Point to Seaton Delaval stn (Point A) Furthest Point to Seaton Delaval stn (Point B) Location (longitude, latitude) 55.064626,-1.538367 55.060233,-1.56123 Nearest bus stop Seghill Deneside Seghill Reid s Lane Travel to Seaton Delaval Station Walking distance (via road) 1.1 miles 2.1 miles Walking (via unlit footpath) 1.3 miles 1.9 miles Bus route X7 X7 Bus journey time 11 mins 15 mins Bus frequency (Mon Fri peaks) 30 mins 30 mins Bus fare (return) 4.20 4.20 Travel to West Monkseaton Metro Walking distance (via road) 3.8 miles 4.9 miles Bus route 57A 57A Bus journey time 16 mins 21 mins Bus frequency (Mon Fri peaks) 60 mins 60 mins Bus fare (return) 5.90 5.90 Travel to Northumberland Pk Stn Walking distance (via road) 4.3 miles 5.4 miles Walking distance (unlit footpath) 3.0 miles 3.0 miles Bus route 57A to Holywell then 19 57A to Holywell then 19 Bus journey time 25 mins 25 mins Bus frequency (Mon Fri peaks) Hourly (routes 19 and 57A) Hourly (routes 19 and 57A) Bus fare (return) 10.60 10.60 Authors: Dan Nesbitt / Dennis Fancett. SENRUG Page 5 of 5