Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

Similar documents
Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Installation, Operation and Maintenance Instructions for PlantPac Steam Plate Heat Exchanger Package

Installation, Operation and Maintenance Instructions Thermaflow E Plate Heat Exchanger Package OM013

Installation, Operation and Maintenance Instructions ThermaFlex Gasketed Plate Heat Exchanger OM010

Rycroft Storage & Non-Storage Calorifiers. Installation, Operation & Maintenance Manual

BOILER HOUSE PRODUCTS GMS

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Installation, operating and servicing instructions

Installation, Operation and Maintenance Instructions for ThermaFlex Brazed Plate Heat Exchangers

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

HYDRAULIC OIL COOLER. Installation, Operation & Maintenance Guide

REG NO FM BS EN ISO HEADER TANK HEAT EXCHANGER. Installation, Operation & Maintenance Guide

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

HYDRAULIC OIL COOLER Installation, Operation & Maintenance Guide

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Powerstock Storage Tank

MAXIMISER Semi-Storage Calorifiers

Instruction Manual. Pharma-line ESE02198-EN Original manual

USER INSTRUCTIONS FOR FLANGE IMMERSION HEATERS USED IN HAZARDOUS LOCATIONS

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

SEALED THERMAL STORE

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

LONGONI ENGINEERING SRL

Powerflow Unvented water heater

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

HEAT TRANSFER STORAGE CALORIFIERS EC SERIES SC SERIES BT SERIES

INFINITY FLUIDS CORPORATION

SERVICE MANUAL. For Service & Parts please call APK THERMAL at or SAFETY INSTRUCTION

Multi-Elec COMPACTE BOILER

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

Installation, Operating and Servicing Instructions

Installation, Operating and Maintenance Manual for F Modul plus Calorifiers

Unvented Electric Water Heater 10/15 litre Undersink

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

Friwa Compact. Operating instructions EN

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER

ENERSTORE. Vented Hot Water Storage System INSTRUCTIONS PLEASE LEAVE WITH HOUSEHOLDER

Hamworthy. Dorchester DR-SA & DR-SE Fully Automatic and Permanent Pilot Direct Gas-Fired Storage Water Heaters. Exceeds Minimum Requirements

Furrows Business Park, Haybridge Road Wellington, Telford, Shropshire TF1 2FE

H o t Wa te r Syste m s. Ultrasteel. Unvented Hot Water Cylinders. Exceeding the Standard

PANDORA HEAT BANKS OXFORD BROOKES, HARCOURT HILL. Operation and Maintenance. THERMAL INTEGRATION LTD. Tel: Internet:

ADVANCE ELECTRIC THERMAL STORE

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

Installation and operating instructions. DK energy storage and DK energy buffer

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 10: Hot Water Supply Phase 2

Inta City Concealed Shower Mixing Valve CT80010CP

Assessment Schedule - TS.6

Installation, operating and. Comfort

Fusion 200, 300 & 500

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

TECHNICAL INSTRUCTIONS

TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE:

INTRODUCTION STORAGE PRIOR TO INSTALLATION. Expansion Vessel Hose. Part No High Flow Rate Inlet Control Set. Part No.

ADVANCE ECB ELECTRIC COMBINATION BOILER

MULTI ELEC. Electric Boilers TECHNICAL MANUAL

USER MANUAL INSTALLATION INSTRUCTIONS WARRANTY REGISTER

Alpha CombiMax 350 and 600

Installation, Operating and Servicing Instructions

Installation and User Instructions HS10U, HS15U.

GEM TRAP FITTING & MAINTENANCE INSTRUCTIONS

Why Vaillant? Because the ecotec delivers day in, day out. Vaillant ecotec boiler range. The TECHNICAL Brochure

Flo~mate Mains Boost Pump Installation & Maintenance Instructions

Unvented Direct & Indirect Hot Water Cylinders (400L L)

Concealed Twin & Triple Thermostatic Shower Valve with Diverter. Installation & Operating Guide

INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS EXHEAT FLR TYPE FLAMEPROOF RADIATORS

Unvented Hot Water Criteria

Installation, Operating and Maintenance Guide

INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS FAW, FAW-C & FAW-C-T TYPE AIR WARMERS FCR & FCR-A TYPE CONVECTORS

Installation and User Instructions Aquaheat Unvented Water Heaters Models: AH30H

Broag Pressurisation equipment

Instructions for use Installation and Servicing. Unvented Hot Water Cylinders/ Hydracyl

Extreme Domestic Hot Water Loading System TECHNICAL DOCUMENTATION. Issue 11/09

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

LP30 High Integrity Low Level Alarm Probe Installation and Maintenance Instructions

Combined electric boiler and domestic hot water store

Method Statement. General Site preparation by others: Preparation for screed system by others: Preparation for plate system by others:

/99 USA. Installation Manual SU Save These Instructions!

Cylinder/Pipe Thermostat Cat. No. TRT044. Operating & Installation Instructions

OPERATING & MAINTENANCE INSTRUCTIONS FOR EXHEAT RFA-OS TYPE FLAMEPROOF OVERSINK WATER HEATER

Advance Stainless Steel Unvented Hot Water Cylinders for Heat Pump Systems. Installation and Commissioning Manual

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL

MEGAFLO HE Iss 1

smart line E SLE

HEATRAE SADIA. Installation and User Instructions for the UTC Undersink Vented Water Heater

Hamworthy. Powerstock. Calorifiers and Storage Tanks Single and Twin Coils Capacities 160 litres to 995 litres

Inverted Bucket Steam Traps

InterSeptor Centrifugal Separators Operating & Maintenance Manual

Precision Storage Vessels ELECTRIC WATER HEATERS

Link-Up. Solid Fuel Association Guide to Central Heating.

STORAGE TANK INSTALLATION and OPERATION MANUAL

ADVANCE STAINLESS STEEL UNVENTED HOT WATER SYSTEMS

MK 45-1 MK 45-2 MK 45 A-1 MK 45 A-2

INSTALLATION INSTRUCTIONS OWNERS GUIDE & WARRANTY STATEMENT

Operating Guide. Termix Solar A+/B+ 1.0 Table of Contents. 1.0 Table of Contents

Transcription:

OM004 Installation, Operation and Maintenance Instructions for Electric Storage Calorifier The operating and maintenance instructions contained within this package are for standard electric storage calorifiers (vessels fitted with an electric immersion heater). Please refer to separate instructions for standard calorifiers, indirect cylinders and direct cylinders. Please note that an electronic version of these instructions is available from our website and also on a CD. Please contact our sales office for further information. Rev Date By Details Revision Details

Contents 1.0 Standard Unit Information and Description 3 2.0 PED Information. 4 3.0 Installation 5-6 4.0 Commissioning and Operation. 7 5.0 Maintenance 8 6.0 Recommended Spares.. 9 [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 2

1.0 Standard Unit Information & Description The standard range of electric storage calorifiers range from 230 litres to 9000 litres. These are mostly used in systems to heat domestic hot water. The water is heated by an electric immersion heater. Other applications may also arise with different water temperatures and materials of construction. This manual covers types EC, EL, ES, EG & EP calorifiers. Standard Material Options Schedule Copper (ES) Copper-Lined Steel (EL) Shell Galvanised Steel (EG) Stainless Steel (ES) Glass-Lined Steel (EP) (Other materials on request) Design Data Maximum Working Pressure Hydraulic Test Pressure Design Code Shell Side Refer to Vessel Nameplate Refer to Vessel Nameplate Refer to Vessel Nameplate Please refer to our brochure for standard connection and dimensional data. [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 3

2.0 PED Information The standard range of electric storage calorifiers are designed in accordance with the requirements of the Pressure Equipment Directive 97/23/EC. Units classed as SEP in the PED category are not supplied with a CE mark. Units in category I & II are CE marked and appropriate markings and certification is supplied with each unit. It is the responsibility of the user and/or installer to ensure that the unit is installed and operated safely, and in accordance with the instructions supplied within this manual. [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 4

3.0 Installation Lifting & Handling: Use lifting eyes where fitted. Do not lift a calorifier using the insulation (if fitted). Straps may crush the insulation. The shell of the calorifier may be made of relatively light gauge metal and care should be exercised when handling and moving the unit not to damage the shell. Do not lift the calorifier using chains directly in contact with the shell. Do not allow operatives to stand on the calorifier Siting: Unless specifically ordered for outside siting the calorifier must be sited indoors. Foundations must be firm and level to prevent settling, pipe strain or distortion of the calorifier. Unless specifically ordered differently, the calorifier should be installed in a level position. For calorifiers with removable tube bundles, ensure enough room exists to withdraw the bundle from the shell. For calorifiers with inspection openings ensure enough room exists to gain access to the opening. Protective covers/plugs may be fitted to connections to protect them in transit. These must be removed prior to use. If a connection is not required seal it appropriately. Check for and remove any foreign material which may have got into the vessel. Pipe-work connected to the calorifier should be supported to prevent loads being transmitted to the calorifier. Provide for thermal expansion with bends and expansion joints. To avoid corrosion do not use copper pipework with galvanised steel calorifiers or vice-versa. Fit isolation valves prior to calorifier connections to facilitate servicing (NOT TO THE VENT). For flanged connections tighten bolts in a diametrically opposite sequence to load the flanges evenly onto the gasket. For screwed connections use a thread sealant approved for use with potable water by the local water authority. Ensure that the tube bundle can be isolated and easily disconnected for removal during maintenance. The vent must not be blocked so, if the unit may need to be isolated from the vent, fit a 3-way vent valve. Ensure adequate venting for air removal during filling and operation ("sealed" systems should have an auto-air-vent and a manual air vent valve for this). Pressure and temperature relief valves (and bursting discs if fitted) should have their outlets piped away to a safe disposal point, preferably via an air-break and tundish so that discharge is unrestricted and easily visible. Water expansion must be accommodated by separate expansion vessel on the cold feed side (on sealed systems) or via the vent pipe on vented systems. Allowing expanded water back into the cold feed tank on vented systems is not recommended as the resultant warm water will encourage bacterial growth. Destratification Pumpset To avoid damage in transit the pipe-work and pump of a de-stratification set (if included) may be supplied loose for fitting on site. The pump should be installed to circulate water from the top of the cylinder to the bottom. To ensure that the anti-stratification pump does not adversely affect performance of the calorifier during peak demand periods the power supply to the pump should be timed to come on during periods of low demand if possible, but often enough to guarantee heating the calorifier contents fully for a period of at least 1 hour per day. The unit should be flushed thoroughly with clean water prior to operation. Immersion Heaters The immersion heaters are tested before leaving the factory and are ready for installation. The immersion heaters are thoroughly dried prior to despatch but moisture may collect in the heater during transit or site storage. It is important that prior to connecting the heaters to the mains, an insulation test must be made across each element to earth. If the insulation resistance is less than 50,000 Ohms, the heaters must be dried out prior to connection. This [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 5

can be done by placing the heaters in a low temperature oven or by passing a low voltage (maximum of 25% of the working voltage) through the elements in open air to a maximum temperature of 60 C. The heaters should be switched off at regular intervals to prevent overheating. For further instructions on the immersion heater, refer to separate literature Control Panel Prior to commissioning and wiring to the immersion heaters, check all the control circuitry and main circuit connections are tight using the appropriate tools. Remove all loose items from inside the panel and other items that may be fastened to the cables. The equipment must be connected to a suitable power supply in accordance with local regulations and the wiring diagram supplied. For units supplied without a factory fitted control panel the installer must ensure that thermostat maximum current is not exceeded. In most cases this will mean using suitable contactors to send power to the electric immersion heater elements. To avoid damage to the electric immersion heater elements do not allow electric immersion heaters to be run dry. [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 6

4.0 Commissioning and Operation Do not operate the equipment at pressures or temperatures in excess of those specified on the nameplate of the vessel marking. Do not subject the equipment to conditions of vacuum or partial vacuum. This is particularly vital for copper-lined steel calorifiers, which are supplied complete with anti-vacuum valve - which must not be removed. For example partial vacuum can be caused if the cold feed or the vent are restricted during draw off or drain down. It is assumed here that the secondary pipework is already full of water. For sealed systems it is assumed here that any cold water booster set and/or pressure reducing valve is already commissioned and set to the correct pressure. Start with primary, secondary flow, return and cold feed valves closed, anti-stratification and secondary re-circulation pumps off. Close the drain valve. For sealed systems ensure auto-air vent is operational For sealed systems open manual vent valves For sealed systems open expansion vessel isolation valve Open the cold feed valve and slowly fill the calorifier with cold water. For sealed systems when water reaches the manual vent valve, close it. When the calorifier is full slowly introduce the hot fluid to the tube bundle. Allow the unit to heat up. Adjust the temperature control gradually and ensure that the correct operating temperature is maintained by it. If the calorifier is open vented and shares a vent with other calorifiers, connect it to the common vent using the 3-way valve Carefully open the secondary flow and return valves Open anti-stratification pump isolation valves Switch anti-stratification and secondary re-circulation pumps power on Check that all gaskets are effective when the unit is operating - some bolt tightening may be necessary after the unit has been first heated and subsequently from time to time. Following installation and commissioning it is advisable to remove, clean and re-assemble any strainers. All fluids must be drained when the unit is out of operation to prevent freezing or possible corrosion. [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 7

5.0 Maintenance Annual maintenance should include cleaning debris from the base of the calorifier to comply with guidelines on prevention of legionella bacteria proliferation. Also the site insurers may require annual inspection of tube bundle and shell condition. If a loss of performance or increase in primary pressure drop has been observed the following are possible causes:- a) Primary fluid restriction (blocked strainer, faulty control valve etc.) b) Air lock on primary side. c) Scale deposits on the heater battery tube surfaces (primary or secondary side). This can severely affect heat transfer rates. To drain the calorifier down (secondary side) Obtain a complete set of replacement gaskets from GMS Thermal Products Ltd. It is assumed here that all isolation valves (except drain) are open at the start. Isolate the primary fluid inlet and outlet - switch off primary pump and boilers if necessary. Switch off the secondary system return pump and isolate secondary return to calorifier. Switch off anti-stratification pump power. Isolate the secondary flow Isolate the cold feed For sealed systems reduce the residual calorifier pressure by manually operating the safety valve - some hot water will come out For sealed systems open the manual vent valve to allow air in during drain-down For copper-lined steel calorifiers ensure that the anti-vacuum valve is not stuck shut - also ensure that a vent is available at the top of the calorifier of flow area at least one half the flow area of the drain connection. Remove one of the fittings on the top of the calorifier if necessary to achieve this. Partial vacuum, caused by inadequate venting of copper-lined calorifiers during drain-down, will cause damage to the thin copper lining. If the calorifier is open vented and shares a vent with other calorifiers, isolate it from the common vent using the 3-way valve (it will now vent to atmosphere). Pipe the drain to a drain point and open the drain valve. The calorifier shell internal condition can be inspected by removing the inspection cover or the tube-bundle (see below) to allow visual examination Re-fit new gaskets and re-fill the calorifier according to the commissioning instructions above. Check the thermostats every 12 months by removing and testing the contact resistance and comparing the switch point by immersion in hot water using a separate thermostat. [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 8

6.0 Recommended Spares Please contact our sales department for recommended spares prices and availability. The recommended quantities given are per unit supplied. Description Part Ref. 230-550 Litres 600-2000 Litres 2000-9000 Litres All Copper Lined Inspection Gasket RG250-P 1 Inspection Gasket RG380-P 1 Inspection Gasket RG450-P 1 1 Please refer to the issued manufacturing drawing for the following sizes for the immersion heater. The quantities shown are per heater, not Calorifier as some calorifiers can be supplied with more than one heater. Please contact our sales office with regards to heater spares as each type of heater has it s own recommended spares. Nominal Heater Size Description Part Ref. 80NB 125NB 150NB 200NB 250NB 300NB Heater Gasket NG075-P 1 Heater Gasket NG125-P 1 Heater Gasket NG150-P 1 Heater Gasket NG200-P 1 Heater Gasket NG250-P 1 Heater Gasket NG300-P 1 [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 9

OM004 Calorifiers Heat Exchangers Pressurisation Units Sales Tel: 01457 835700 Sales Fax: 01457 832700 E-mail: sales@gmsthermal.co.uk Riverside Works, Egmont Street, Mossley [T:\gms\Word\GMSO&M\Word Format\OM004.doc] Page 10 Ashton-Under-Lyne, OL5 9NE