Summary of all SHLAA sites in Pershore

Similar documents
9 Pershore. Introduction. Pershore Abbey

Ashtead Neighbourhood Forum Site Assessment AS07 Old Chalk Pit, Pleasure Pit Road. Site ref: AS07 Site address: Old Chalk Pit, Pleasure Pit Road

Evesham 7. Reasoned Justification

Bradleys Both Parish Council

Test Valley Borough Council. Strategic Housing Land Availability Assessment (SHLAA)

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Story Homes. Land at Thirsk Road, Kirklevington. An Introduction to Story Homes. Our Foundations. Commitment to Consultation.

Droitwich Spa 6. Reasoned Justification

Public Consultation. Land at Monks Farm, North Grove. Welcome

Longhorsley Neighbourhood Plan

Local Plan Committee

Neighbourhood Planning Site Assessment Pro-forma and Guide Version 2

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

Ashtead Neighbourhood Forum Site Assessment AS14 Land at The Pines, Farm Lane. Site ref: AS14 Site address: Land at The Pines, Farm Lane

What do you like about South Marston?

Built Up Area Boundary (BUAB)

Draft for Consultation Site Assessments and Opportunities

Ashtead Neighbourhood Forum Site Assessment AS03 Lime Tree Lodge, Farm Lane. Site address: Lime Tree Lodge, Farm Lane. Proposed Land Use:

Welcome. Land adjacent Sandy Lane WALTHAM CHASE THE PROPOSED SITE

Site ref: AS05 Site address: Ashtead Park Garden Centre, Pleasure Pit Road

Plumpton Neighbourhood Plan Site Assessment Report

CAERNARFON DEPENDENCY CATCHMENT AREA

SOUTH EAST LINCOLNSHIRE LOCAL PLAN: HOUSING PAPER DONINGTON (JUNE 2016)

About 10% of the Borough's population lives in the seven rural parishes. Population figures from the 1991 census are given below:-

HURSTPIERPOINT SAYERS COMMON PARISH COUNCIL

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

PHASE III: Reserved Matters Submission

Tarrington Neighbourhood Development Plan Housing site assessment

Proposed Modifications to Housing Allocations in South Worcestershire. Site Assessment Forms (Additional New Sites and Amended Sites Only)

Core Strategy Settlement Classification. 0.61ha. For sale

Report on Site Selection SR-0188 SR-0176 SR-0319 SR-0819 SR-0818 SR-0817 SR-0816 SR-0576 SR-0813 SR-0225 SR-0293 SR-0811 SR-0810 SR-0865

8.0 Design and Form of Development 43/

INTRODUCTION CURRENT APPLICATION

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

WELCOME. Welcome and thank you for visiting today.

Appendix I: Addendum to Development Frameworks Evidence Paper

Welcome to our public exhibition

Neighbourhood Plan Representation

an Inspector appointed by the Secretary of State for Communities and Local Government

Wallingford Neighbourhood Plan

Land off Arbour Close and Cotswold Edge Mickleton, Gloucestershire. Design and Access Statement Mickleton, Gloucestershire

SITE ASSESSMENT CHECKLIST

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

WEST DORSET, WEYMOUTH AND PORTLAND STRATEGIC HOUSING LAND AVAILABILITY ASSESSMENT

Briefing Document of CNP. June 2017

WELCOME LAND EAST OF TYE LANE, WALBERTON. Above all, it s about people

PDP DESIGN & ACCESS STATEMENT

Application Recommended for Approval Hapton with Park Ward

New House Farm, Risbury, Nr Leominster, Herefordshire

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Joint Core Strategy Rushden Sustainable Urban Extension

Welcome to our Public Consultation

an Inspector appointed by the Secretary of State for Communities and Local Government

EXHIBIT 5-1 VILLAGE OF WILD ROSE FUNCTIONAL CLASS AND AVERAGE DAILY TRAFFIC VOLUMES 2000 & 2003 DATA

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Welcome to our exhibition

1. Local Plan Context

SITE ASSESSMENTS. September 2018 SOUTHWATER PARISH COUNCIL BEESON HOUSE, 26 LINTOT SQUARE, SOUTHWATER, RH13 9LA

Cranbrook EXPANSION ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY PRODUCED BY DAVID LOCK ASSOCIATES

Character Area Summary 6: Canal Zone Stonehouse Town Character Assessment, Bridgend Works from Downton Road

DHT 750_EDR_00 Ecological Deliverability Appraisal DHT Access Appraisal C DHT Heritage Overview

Mortimer NDP, Principles, Vision and Policies

Table of Allocated Housing Sites

Little Hadham Neighbourhood Plan

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

Great Easton Sustainable Housing Development Sites - Site Seven, Broadgate extension site SHLAA Ref HSG/03)

Hodgson s Gate. Welcome. Who we are. Hodgson s Gate Developments. Thank you for taking time to attend today s event.

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Blandford Forum Town Council, Blandford St Mary Parish Council and Bryanston Parish Council

Land East of Cromwell Lane

There are two assessment methods used. The first is according to the criteria set out in the Neighbourhood Plan which are set out below.

Dunsfold Neighbourhood Plan. Site Assessment Report

Dartington. Webbers Yard, Higher Tweed Mill and Sawmills Field. Masterplan and Development Brief. Revision E. September 2012.

Alder View. Introduction. Alder View. Harwell. The Vision. The Team. Taylor Wimpey

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

PROPOSAL FOR NEW HOMES ON LAND OFF WALTON ROAD

Site ref: AS11 Site Name or Address: Land South of Ermyn Way

A Response Objecting to Outline Planning Application by Hallam Land Ltd.

Cookham Parish Council s Response to The Draft Local Borough Plan

Doncaster Employment Land Review Site Assessment. UDP Policy: Employment Policy Area

SITE ASSESSMENT CHECKLIST

Wiltshire Council s Core Strategy

Form to Submit Land for Residential Evidence Gathering Shepway Strategic Housing Land Availability Assessment (SHLAA) Partial Review

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

GUILDFORD BOROUGH GREEN BELT AND COUNTRYSIDE STUDY

Hampton Park North Littlehampton West Sussex

East Harptree Site EH3 Parker s Mead, Church Lane

Shenley Neighbourhood Development Plan Pre-Submission Plan, Regulation 14 Consultation

Exhibit A Comprehensive Plan Amendments

ASSESSMENT OF LOCAL GAPS IN BREDON PARISH

MAYFIELD WEST SECONDARY PLAN PHASE 2

Chichester District Council. Planning Committee 3 February Masterplan for the Westhampnett/NE Chichester Strategic Development Location (SDL)

University Park, Worcester Non Technical Summary December 2011

Application and Proposals. Part 211

Warwickshire County Council. Upper and Lower Brailes. Landscape Study

INTRODUCTION. Land south of Bishopswood Lane, Tadley

Environmental and Landscape Mapping

APP/G1630/W/15/

Settlement Boundaries Methodology North Northumberland Coast Neighbourhood Plan (August 2016)

Transcription:

Summary of all SHLAA sites in Village Site area Site Ref Location Town/ (ha) 71-38 Land adjacent to Abbey Springs Wychavon 1.23 71-01 Health Centre, er Priest Lane Wychavon 0.17 ALLOCATED 71-02 Garage Court, St Andrews Road, R/O Wychavon 0.19 ALLOCATED 71-03 Garage Court, Abbots Road, R/O Wychavon 0.25 ALLOCATED 71-04 Garage Court, Off Mill Lane Wychavon 0.18 PP 71-05 Lane R/O Street, R/O 1-33 Wychavon 0.49 AVLBT UKOW 71-06 Garage Main Street (Texaco) R/O Cherry Orchard Wychavon 0.47 ALLOCATED 71-07 Cherry Orchard House, Cherry Orchard Wychavon 0.29 DUPLICATED 71-07a Cherry Orchard House & 44, 46, 48 & 50 Cherry Orchard Wychavon 0.61 PP 71-08 Manor House Hotel, Bridge Street, Wychavon 0.28 FLOOD 71-09 Garage Court, R/O Mayfield Road South/Apple Tree Road Wychavon 0.19 BUILT OUT 71-10 Former Central Gardens, R/O Street, Head Street Wychavon 0.19 BUILT OUT 71-12 Land adjacent to Hurst Road Cottages, Wyre Road Wychavon 3.36 71-13 Land South of Holloway Wychavon 1.02 Land off Three Spring Lane, Adjacent o 62 Three Spring 71-14 Road Wychavon 0.4 DUP/ AV UKOW 71-15 Land R/O 31 & 33 Street Wychavon 0.29 DUPLICATED 71-16 Land at the Croft, Off the B4082 Wychavon 3.62 DUPLICATED 71-17 Land at Allesborough Hill, orth of Holloway Wychavon 2.07 PP 71-18 Land off Three Springs Road & R/O Conningsby Drive Wychavon 4.96 71-19 Land orth of Worcester Road Wychavon 12.52 DUPLICATED 71-20 Land orth of Wyre Road Wychavon 2.68 DUPLICATED 71-21 Land East of Keytel 7 Business Park Wychavon 9.4 ELR 71-22 Land South of Burlingham Close Wychavon 29.02 FLOOD 71-23 Land at Allesborough Hill Wychavon 26.93 71-24 Land at 62 Three Springs Road, & adjoining land Wychavon 5.33 PP 71-25 Land South of Holloway - Extend to include farm Wychavon 1.366 AV UKOW 71-26 Land orth of Wyre Road, South of Keytec 7 Business Park Wychavon 9.42 ELR Reason

71-27 Land South of Wyre Road Wychavon 6.78 71-28 Land West of Station Road, orth of Junction with Wyre Piddle Wychavon 9.31 DUPLICATED 71-29 Land west of Allesborough Farm, South of Worcester Road, Allesborough Hill Wychavon 4.98 AV UKOW 71-30 Land South of Holloway, West of Three Springs Road/Defford Road Wychavon 15.29 AV UKOW 71-31 Land west of Defford Road Wychavon 1.68 PPG17 71-32 Land South of Junction of Defford Road/Three Springs Wychavon 1.22 71-34 Land adjacent to Orchardene Wychavon 1.2 DUPLICATED 71-35 Land adjacent to the Ford House (west of Station Road) Wychavon 9 LOCATIO 71-36 Land off Station Road Wychavon 27.31 DUP/ AV UKOW 71-37 Land adjacent Station Road Wychavon 10.42 FLOOD

Site Ref 71-09 Location Garage Court, R/O Mayfield Road South/Apple Tree Road Site Ref 71-12 Location Land adjacent to Hurst Road Cottages, Wyre Road Panel date 02/10/2007 Panel ame Evesham / Multiple Land Owners Attitude Panel date 02/10/2007 Panel ame Evesham / Unknown Greenfield (/) Greenfield (/) Assumed Dwelling Dwelling info Obligation Obligation constraint Appropriate Density (dws/ha) 0 Size of site Total potential Dwellings 0 Financial Viability for housing Availability constraint Appropriate Density (dws/ha) 40 Size of site 3.36 Total potential Dwellings 120 Financial Viability for housing Availability Within 5 years Remove. Part of site being developed so reduced size would be too small. 40dph less 10% for landscaping. BUILT OUT

Site Ref 71-13 Location Land South of Holloway Site Ref 71-16 Location Land at the Croft, Off the B4082 Panel date 02/10/2007 Panel ame Evesham / Panel date 02/10/2007 Panel ame Evesham / Unknown Land Owners Attitude Poor Greenfield (/) Greenfield (/) Obligation Junction at Three Springs Rd Obligation ew road, new junction required constraint orchard and woods on site es Appropriate Density (dws/ha) 30 Size of site 1.02 Total potential Dwellings 24 Financial Viability for housing Availability 5-10 years constraint Steep slopes - earthworks o Possible drainage and run off problems Appropriate Density (dws/ha) 40 Size of site 3.62 Total potential Dwellings 115 Financial Viability for housing Availability Within 5 years Access with Wadborough Rd difficult and junction with Three Springs Road difficult. Visual impact Currently wood and orchard, not a good site. Financial viability dependent on amount of earthworks required. All very visible from east.

Site Ref 71-17 Location Land at Allesborough Hill, orth of Holloway Site Ref 71-18 Location Land off Three Springs Road & R/O Conningsby Drive Panel date 02/10/2007 Panel ame Evesham / Unknown Land Owners Attitude Panel date 02/10/2007 Panel ame Evesham / Greenfield (/) Greenfield (/) Obligation way issues: road layout Obligation Traffic lights at Worcester Road and Three Springs constraint Appropriate Density (dws/ha) 30 Size of site 2.07 Total potential Dwellings 50 Financial Viability for housing Availability Within 5 years constraint Gently sloping Appropriate Density (dws/ha) 30 Size of site 0.99 Total potential Dwellings 30 Financial Viability for housing Availability Within 5 years Difficult shaped site - insufficient depth in some places this would reduce density. Hence 30 dph less 20% for landscape and layout issues.

Site Ref 71-20 Location Land orth of Wyre Road Site Ref 71-21 Location Land East of Keytel 7 Business Park Panel date 02/10/2007 Panel ame Evesham / Panel date 02/10/2007 Panel ame Evesham / Unknown Land Owners Attitude Greenfield (/) Greenfield (/) density Obligation Obligation constraint Footpath through site o Appropriate Density (dws/ha) 30 Size of site 2.68 Total potential Dwellings 80 Financial Viability for housing Availability Within 5 years constraint Appropriate Density (dws/ha) 25 Size of site 9.4 Total potential Dwellings 176 Financial Viability for housing Availability Within 5 years ot good site for residential - preferred for employment use, as too remote. ELR

Site Ref 71-23 Location Land at Allesborough Hill Site Ref 71-24 Location Land at 62 Three Springs Road, & adjoining land Panel date 02/10/2007 Panel ame Evesham / Unknown Land Owners Attitude Panel date 02/10/2007 Panel ame Evesham / Land Owners Attitude Greenfield (/) Greenfield (/) Obligation ew road would be required and new junction Obligation traffic lights at Worcester Road and Three Springs constraint Steep slopes earth works o possible drainage and run off issues Appropriate Density (dws/ha) 40 Size of site 26.93 Total potential Dwellings 808 Financial Viability for housing Availability Within 5 years constraint Gently sloping Appropriate Density (dws/ha) 30 Size of site 5.21 Total potential Dwellings 140 Financial Viability for housing Availability Within 5 years All very visible from east. Would need new road and junction. Due to slope and visual impact 40dph less 25% for landscaping and infrastructure. 30 dph less 10%

Site Ref 71-25 Location Land South of Holloway - Extend to include farm Site Ref 71-26 Location Land orth of Wyre Road, South of Keytec 7 Business Park Panel date 02/10/2007 Panel ame Evesham / Land Owners Attitude 3 Panel date 02/10/2007 Panel ame Evesham / Multiple Greenfield (/) Greenfield (/) Obligation highway Obligation constraint Slope and access es drainage Appropriate Density (dws/ha) 30 Size of site 1.36 Total potential Dwellings 36 Financial Viability for housing Availability 5-10 years constraint Woodland o Appropriate Density (dws/ha) 30 Size of site 9.42 Total potential Dwellings 170 Financial Viability for housing Availability Unknown Depends on whether site in Three Springs Rd comes forward. 30 dph less 10% for landscaping. Concern over landscape impact - requires mitigating landscape. Site more suitable for employment. 30dph less 40% due to woodland and school playing field. ELR

Site Ref 71-27 Location Land South of Wyre Road Site Ref 71-28 Location Land West of Station Road, orth of Junction with Wyre Piddle Panel date 02/10/2007 Panel ame Evesham / Unknown Panel date 02/10/2007 Panel ame Evesham / Unknown Greenfield (/) Greenfield (/) Obligation Obligation constraint Appropriate Density (dws/ha) 40 Size of site 8.03 Total potential Dwellings 273 Financial Viability for housing Availability Within 5 years constraint o Appropriate Density (dws/ha) 40 Size of site 9.18 Total potential Dwellings 293 Financial Viability for housing Availability Within 5 years Illogical extension to. 40 dph less 20% for landscaping

Site Ref 71-29 Location Land west of Allesborough Farm, South of Worcester Road, Allesborough Hill Site Ref 71-30 Location Land South of Holloway, West of Three Springs Road/Defford Road Panel date 02/10/2007 Panel ame Evesham / Land Owners Attitude 3 Panel date 02/10/2007 Panel ame Evesham / Unknown Land Owners Attitude 3 Greenfield (/) Greenfield (/) Obligation Access issue on Lane Obligation constraint o Appropriate Density (dws/ha) 30 Size of site 4.98 Total potential Dwellings 135 Financial Viability for housing Availability Within 5 years constraint Slope and access issues drainage issues Appropriate Density (dws/ha) 30 Size of site 19.95 Total potential Dwellings 448 Financial Viability for housing Availability 5-10 years Disconnected from settlement, too remote. Intrusive - listed buildings adjacent (x 2) Farm would be enclosed by development. 30 dph less 10% for landscape. 30 dph less 25% for landscape mitigation. visual impact - unlikely to be sympathetic backdrop to Abbey from Wick

Site Ref 71-31 Location Land west of Defford Road Site Ref 71-32 Location Land South of Junction of Defford Road/Three Springs Panel date 02/10/2007 Panel ame Evesham / Panel date 02/10/2007 Panel ame Evesham / Unknown Greenfield (/) Greenfield (/) low density Obligation Traffic lights at three Springs Rd/ Worcester Rd Obligation constraint Gently sloping Appropriate Density (dws/ha) 30 Size of site 1.68 Total potential Dwellings 45 Financial Viability for housing Availability Within 5 years constraint Established trees and hedges o Appropriate Density (dws/ha) 30 Size of site 1.22 Total potential Dwellings 33 Financial Viability for housing Availability Within 5 years Quite remote and removed from settlement. 30 dph less 10% landscape. Proposed extension to cemetery. Owned by town Council. Too rural, unsuitable for residential, beyond natural boundary. 30 dph less 10% for landscape PPG17

Site Ref 71-35 Location Land adjacent to the Ford House (west of Station Road) Site Ref 71-37 Location Land adjacent Station Road Panel date 20/10/2009 Panel ame Wychavon Panel date 02/11/2010 Panel ame Wychavon Poor Poor Greenfield (/) Greenfield (/) Assumed Dwelling Mixed Dwelling info one Obligation Obligation constraint es Appropriate Density (dws/ha) 30 Size of site 9 Total potential Dwellings 270 Financial Viability for housing Availability Available ow constraint Sloping, flooding issues with ford es Appropriate Density (dws/ha) 30 Size of site 10.42 Total potential Dwellings 312 Financial Viability for housing Availability Within 5 years Fairly isolated site- would need to be considered as an extension to the Preferred Option site. Large part of site in floodplain, therefore could only realistically use eastern section of site and road frontage. Would be happy to see smaller section of site exclusing the floodplain resubmitted. LOCATIO FLOOD

Site Ref 71-38 Location Land adjacent to Abbey Springs Panel date 18/04/2012 Panel ame Wychavon Poor Greenfield (/) one Obligation constraint Appropriate Density (dws/ha) 30 Size of site 1.23 Total potential Dwellings 36 Financial Viability for housing Availability Available ow site as extension to Bloor Homes/Bellway Homes site. Will need to demonstrate adequate access.