McMAHON FP200 OUTAGAMIE COUNTY ADMINISTRATION CENTER S. WALNUT & W. 8TH, APPLETON, WI ALTERATION / ADDITION

Similar documents
Design & Construction Standards, Revised January

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

Western Michigan University Facilities Management Engineering Division

CubeSmart Gulf Breeze Storage AUTOMATIC FIRE SPRINKLER SYSTEM

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors)

CITY OF PASADENA FIRE DEPARTMENT

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

Sprinkler Permit Applications

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

DIVISION 21 FIRE SUPPRESSION

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

FIRE SPRINKLER SHOP DRAWING SUBMITTAL REQUIREMENTS

AUTOMATIC FIRE SPRINKLER SYSTEMS

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

New Construction Fire Inspection Process

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

APPENDIX H (DESIGN SUBMISSION CRITERIA)

Fire Sprinkler Submittal Requirements and Acceptance Testing

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU STANDARD

FIRE SPRINKLER SYSTEMS POLICY

Gas Station & C Store SECTION CWM Job No

RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS

DIVISION 21 FIRE SUPPRESSION

FIRE SPRINKLER SYSTEMS POLICY

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

West District Library Section Campeau Drive, Ottawa SPRINKLER SYSTEMS City of Ottawa Project No. CR Page 1 of 8

2. Welding Materials and Procedures shall conform to the ASME Code.

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

SECTION WET AUTOMATIC FIRE SPRINKLER SYSTEMS

APPLICATION FOR INSTALLATION OF SPRINKLER SYSTEM.,. :" ROCHESTER, NH FIRE DEPARTMENT FIRE PREVENTION DIVISION

Center for Life Safety Education

DIVISION 21 FIRE SUPPRESSION FIRE SUPRESSION

Port of St Helens SIA Aircraft Hanger Scappoose, OR

MONTECITO FIRE PROTECTION DISTRICT

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry Plan Review

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

FIRE SUPPRESSION SPRINKLER SYSTEM

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

1.2 CODES AND REGULATIONS A. Sprinkler system design, equipment, materials, devices, and installation shall conform to the following:

Burnsville Fire Department 100 Civic Center Pky, Burnsville, MN Fire Marshal: FAX:

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST STANDPIPE SYSTEMS

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

Driver Operator Pumps: Sprinkler and Standpipe Operations

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

A GUIDE FOR CONDUCTING FACILITY PRE-FIRE PLANS

ADDENDUM NO. 3 March 19, 2018

Environmental Health & Safety

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

CITY OF MADISON FIRE DEPARTMENT (MFD) FIRE PROTECTION SYSTEM PLANS

OXNARD FIRE DEPARTMENT 360 West Second Street Oxnard, CA (805) Fax (805)

Contren Learning Series Apprenticeship Training Program for Fire Sprinkler Fitters

PLAN REVIEW CHECKLIST

WET AUTOMATIC FIRE SPRINKLER SYSTEMS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION STANDPIPE AND FIRE SPRINKLER STANDARDS

SECTION INSPECTION AND TESTING OF WORK

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

CONSTRUCTION REQUIREMENTS

SECTION WET-PIPE SPRINKLER SYSTEMS

Commercial Remodel/ Add On Rules and Regulations

Commercial Rules and Regulations

SECTION : FIRE PROTECTION SYSTEMS

Fire Sprinkler System Design and Installation Requirements

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

THE BASICS OF BUILDING FIRE PROTECTION DESIGN. RES Symposium April 18, 2017

City of Vista Fire Department

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Winnipeg Fire Department Fire Prevention Branch

SECTION WATER BASED FIRE SUPPRESSION SYSTEMS

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

HYDRAULIC CALCULATIONS. 952 Arapahoe

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Fire Protection Coffee Break Training May 2016

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

Second Revision No. 20-NFPA [ Section No. 1.4 ] Supplemental Information. Submitter Information Verification. Committee Statement

SECTION WET-PIPE FIRE SUPPRESSION SPRINKLERS

DIVISION 21 - FIRE SUPPRESSION

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

RESIDENTIAL FIRE SPRINKLER SYSTEMS POLICY

THE JAMES RUSHTON EARLY LEARNING AND FAMILY SUCCESS CENTER #2616 ISSUE FOR CONSTRUCTION

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

SECTION WET FIRE SPRINKLER SYSTEMS

SUMMARY. Building receiving sprinkler credit: SPRINKLERED. Grade: 68. Percent of Building Sprinklered: 100% Sprinkler Demand Met: 91%

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

DIVISION 21 FIRE SUPPRESSION FIRE SUPPRESSION GENERAL PROVISIONS .1 PREPARATION OF CONTRACT DOCUMENTS

TECHNICAL DATA 1. SYSTEM DESCRIPTION 2. SYSTEM OPERATION 3. INSTALLATION. Page 1 of 5

Transcription:

4/5/017 1:58:50 PM C. 1445 DRIVE NEENAH, WI 54956 EXISTING JUSTICE CENTER IS FULLY SPRINKLED C. EXISTING FIRE PUMP BASEMENT LEVEL EXISTING FDC FOR DRY STANDPIPE IN STAIRWELL SHALL BE DEMOLISHED, SEE FP FOR ROUTING TO NEW FDC 4/4/17 ADDENDUM AREA OF FLOOR REMOVAL 11 DISCONNECT AND REROUTE DRY STANDPIPE SPLY EXISTING HHS NORTH - NOT SPRINKLED n 1 LEVEL 1 OVERALL FIRE PROTECTION PLAN 1" = 0'-0" FP00 EXISTING DRY STANDPIPE IN STAIRWELL EXISTING HHS SOUTH - NOT SPRINKLED s O000-61600160 MARCH 3, 017 FP00 LEVEL 780.00 - COMPOSITE EXISTING FIRE PROTECTION PLAN

4/5/017 1:58:5 PM 1445 DRIVE NEENAH, WI 54956 LOCATION OF EXISTING FIRE DEPARTMENT CONNECTION TO BE RELOCATED C. EXISTING JUSTICE CENTER IS FULLY SPRINKLED 4/4/17 ADDENDUM EXISTING HHS NORTH - NOT SPRINKLED n 1 LEVEL 1 OVERALL FIRE PROTECTION PLAN 1" = 0'-0" FP01 EXISTING HHS SOUTH - NOT SPRINKLED s O000-61600160 MARCH 3, 017 FP01 LEVEL 790.00 - COMPOSITE EXISTING FIRE PROTECTION PLAN

4/5/017 1:58:54 PM C. C. 1445 DRIVE NEENAH, WI 54956 EXISTING JUSTICE CENTER FULLY SPRINKLED C. C. C. C. 4/4/17 ADDENDUM EXISTING HHS NORTH - NOT SPRINKLED n C. C. C. C. LEVEL 805.00 - COMPOSITE EXISTING FIRE PROTECTION PLAN 1 LEVEL OVERALL FIRE PROTECTION PLAN 1" = 0'-0" FP0 EXISTING HHS SOUTH - NOT SPRINKLED s O000-61600160 MARCH 3, 017 FP0

4/5/017 1:58:56 PM ' - 8 5/8" ' - 7 3/4" 1445 DRIVE NEENAH, WI 54956 EXISTING JUSTICE CENTER FULLY SPRINKLED C. C. ' - 7 3/4" 4/4/17 ADDENDUM EXISTING HHS NORTH - NOT SPRINKLED C. n REF. REF. REF. C. C. LEVEL 80.00 - COMPOSITE EXISTING FIRE PROTECTION PLAN 1 LEVEL 3 OVERALL FIRE PROTECTION PLAN 1" = 0'-0" FP03 s O000-61600160 MARCH 3, 017 FP03

4/5/017 1:58:56 PM 1445 DRIVE NEENAH, WI 54956 EXISTING JUSTICE CENTER FULLY SPRINKLED C. 4/4/17 ADDENDUM EXISTING ROOF TOP FDC n LEVEL 835.00 - COMPOSITE EXISTING FIRE PROTECTION PLAN 1 LEVEL 4 OVERALL FIRE PROTECTION PLAN 1" = 0'-0" FP04 s O000-61600160 MARCH 3, 017 FP04

C. 4/5/017 :7:36 PM A B C D E F G H J K C. C. C. 1445 DRIVE NEENAH, WI 54956 1 C. C. 3 4 5 C. 6 7 PROPOSED ADDITION 8 9 4" PIPE CORE DRILLED AND LINK SEAL THROUGH NEW FOUNDATION WALL REROUTED DRY PIPE SYSTEM UNDERFLOOR OF ADDITION TO NEW FDC LOCATED IN EXTERIOR LANDSCAPE L 6" FP-W FROM JUSTICE CENTER EXISTING FIRE PUMP AREA OF NEW 8" COMBINATION DOMESTIC AND FIRE PROTECTION WATER SERVICE 4/4/17 ADDENDUM 11 11 EXISTING AND /OR EXISTING AND /OR NEW PIPING IN BASEMENT n 1 LEVEL 1 OVERALL FIRE PROTECTION PLAN 1" = 0'-0" FP EXISTING AND /OR s FIRE PROTECTION GENERAL NOTES * EXISTING 1 PROVIDE ALTERATIONS TO THE EXISTING FIRE PROTECTION SYSTEM AS REQUIRED TO ACCOMMO THE NEW FLOOR PLAN AND NEW CEILING TYPES. PROVIDE A COMPLETE WET TYPE SYSTEM INCLUDING NEW MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED. REUSE EXISTING SYSTEM EQUIPMENT WHERE APPLICABLE. THE SYSTEM SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS AND AS PER REQUIREMENTS OF THE STATE BUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE, AND LOCAL AUTHORITIES, NFPA, AND OWNERS INSURANCE CARRIER. * EXISTING THE BUILDINGS COMPLETE OPERATIONAL FIRE PROTECTION SYSTEMS SHALL REMAIN IN PLACE. THIS CONTRACTOR SHALL REPAIR ANY DAMAGE TO THIS SYSTEM CREATED BY THE REMOVAL OF ANY OTHER MECHANICAL SYSTEMS OR COMPONENTS. * EXISTING 3 THIS CONTRACTOR SHALL COORDINATE PHASING OF SPRINKLER WORK WITH THE GENERAL CONTRACTOR PRIOR TO STARTING WORK. * NEW 1 PROVIDE A COMPLETE WET TYPE FIRE PROTECTION SYSTEM AS REQUIRED TO ACCOMMO THE FLOOR PLAN AND CEILING TYPES INCLUDING MAINS, BRANCHES, HEADS, VALVES, AND ACCESSORIES AS REQUIRED. THE SYSTEM SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS OF THE STATE BUILDING CODE, LOCAL FIRE DEPARTMENT, AND ALL FEDERAL, STATE, AND LOCAL AUTHORITIES, NFPA, AND OWNERS INSURANCE CARRIER. * NEW THE SPRINKLER SYSTEM SHALL BE BASED ON ACTUAL WATER FLOW TEST DATA OBTAINED AT OR NEAR THE JOB SITE. * NEW 3 IT IS THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR TO COORDINATE THE LOCATION OF SPRINKLER PIPING AND HEADS WITH THE PROJECT DESIGN AS REPRESENTED IN THE CONSTRUCTION DOCUMENTS, AND COORDINATE WITH ALL OTHER TRADES ON SITE AS NEEDED TO ADDRESS EXISTING CONDITIONS. * NEW 4 DIVISION 1 CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR PROPER INSTALLATION OF THE FIRE PROTECTION SYSTEMS ALARM DEVICES INVOLVED WITH FIRE SPRINKLER SYSTEM. * NEW 5 ALL SPRINKLER SYSTEM PIPING SHALL BE CONCEALED ABOVE THE SUSPENDED CEILING SYSTEM, UNLESS NOTED OTHERWISE. WRITTEN AUTHORIZATION SHALL BE OBTAINED FROM THE ARCHITECT PRIOR TO EXPOSING ANY PIPING IN ANY ROOM WHICH HAS A SUSPENDED CEILING. * NEW 6 THIS CONTRACTOR SHALL PROVIDE ALL ADDITIONAL SPRINKLER HEADS AS REQUIRED TO ENSURE AN APPROVED FIRE PROTECTION SYSTEM AT NO ADDITIONAL COST TO THE OWNER. * NEW 7 AUXILIARY DRAINS SHALL BE EXPOSED WITH 1" DRAIN VALVES. WHEN 5 OR MORE GALLONS ARE TRAPPED, THIS CONTRACTOR SHALL PROVIDE FIXED PIPING TO AN ADEQUATELY SIZED RECEPTOR WHICH IS CAPABLE OF ACCEPTING THE FULL FLOW OF THE DRAIN. WHEN LESS THAN 5 GALLONS ARE TRAPPED, A HOSE BIB SHALL BE PROVIDED AT THE DRAIN VALVE. * NEW 8 AUXILIARY DRAINS SHALL NOT BE LOCATED ABOVE PLASTER OR GYPSUM BOARD CEILING SYSTEMS. ONLY BY A SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER WILL A VARIANCE BE PROVIDED. * NEW 9 AN INSPECTOR'S TEST CONNECTION SHALL BE PROVIDED FOR EACH FIRE SPRINKLER ZONE. THIS CONTRACTOR SHALL PROVIDE FIXED PIPING FROM THE TEST CONNECTION TO AN ADEQUATELY SIZED RECEPTOR WHICH IS CAPABLE OF ACCEPTING THE FULL FLOW OF THE TEST. EXTERIOR DISCHARGE OF THE TEST CONNECTION SHALL BE PERMITTED ONLY BY SPECIFIC WRITTEN INSTRUCTION FROM THE ENGINEER. * NEW SHOW ALL ROOM NUMBERS ON SHOP DRAWING PLANS. IT ROOMS SHALL BE FIRE RATED AND NOT SPRINKLED. * NEW 11 FLOW TEST DATA FROM THE CITY OF APPLETON INDICATES THE FOLLOWING: (HYD #891) STATIC PRESSURE 58 PSI. RESIDUAL PRESSURE: 46 PSI AT 1,088 GPM. SEE CIVIL PLANS FOR HYDRANT LOCATION. THE CONTRACTOR SHALL PERFORM A FIRE FLOW TEST IN ACCORDANCE WITH NFPA 91 TO VERIFY THE FLOW TEST DATA GIVEN ABOVE. THE DATA GIVEN ABOVE SHALL BE THE BASIS OF DESIGN UNLESS THE AVAILABLE PRESSURE OR FLOW HAS DECREASED. NOTIFY OWNERS REPRESENTATIVE IF FLOW TEST DATA DIFFERS FROM THE DATA ABOVE. A FIRE PROTECTION ENGINEER OR AN ENGINEER EXPERIENCED IN WATER FLOW TESTING SHALL PERFORM OR WITNESS THE REQUIRED FLOW TESTING AND SIGN THE REPORT PRIOR TO THE FIRST SPRINKLER SYSTEM SUBMITTAL. * NEW 1 ROUTE SPRINKLER PIPING SUCH THAT IT DOES NOT RUN ABOVE ELECTRICAL PANELS, SWITCHGEAR, OR SIMILAR EQUIPMENT. SPRINKLER MAINS SHALL NOT RUN THROUGH ELECTRICAL OR COMMUNICATION ROOMS. SPRINKLER HEADS IN THESE ROOMS SHALL BE SERVED BY A DEDICATED BRANCH LINE FOR EACH ROOM. * NEW 13 THIS CONTRACTOR SHALL PREPARE HYDRAULIC CALCULATIONS BASED ON THE CONFIGURATION OF THE ACTUAL SYSTEM DESIGN AS SHOWN ON THIS CONTRACTOR'S SHOP DRAWINGS. * NEW 14 COORDINATE ALL SPRINKLER MAINS, BRANCHES, AND HEAD LOCATIONS WITH MECHANICAL, ELECTRICAL AND PLUMBING. REISSUE SHEET O000-61600160 MARCH 3, 017 FP LEVEL 780.00 - NEW AREA OF COVERAGE FIRE PROTECTION PLAN

4/5/017 1:58:59 PM NEW LOCATION OF FIRE DEPARTMENT CONNECTION A B C D E F G H J K C. C. NOTE: IT ROOMS IN THE ADDITION SHALL BE FIRE RATED AND NOT SPRINKLED. 1445 DRIVE NEENAH, WI 54956 1 C. C. C. 3 4 C. C. C. C. 5 C. 6 7 C. C. C. 8 C. C. 9 LOCATION OF NEW FDC C. 11 11 L 6" FP-W FROM JUSTICE CENTER EXISTING FIRE PUMP NEW FDC 6" DCDA 6" FP-W FIRST FLOOR TAMPER AND FLOW SWITCH LOCATION 4/4/17 ADDENDUM C. C. IN EXISTING AND /OR IN EXISTING AND /OR 1 COMPOSITE PLAN - EL. 790.00 1" = 0'-0" FP11 C. C. IN EXISTING AND /OR C. n s REISSUE SHEET O000-61600160 MARCH 3, 017 FP11 LEVEL 790.00 - NEW AREA OF COVERAGE FIRE PROTECTION PLAN

4/5/017 1:59:01 PM A B C D E F G H J K C. C. NOTE: IT ROOMS IN THE ADDITION SHALL BE FIRE RATED AND NOT SPRINKLED. 1445 DRIVE NEENAH, WI 54956 1 AREA OF COVERAGE FOR NEW ADDITION 3 C. C. 4 C. C. 5 6 7 C. C. 8 C. C. C. 9 C. C. C. C. L 6" FP RISER SPRINKLER RISER LOCATION OF FLOW AND TAMPER SWITCHES FOR SECOND FLOOR 4/4/17 ADDENDUM 11 11 IN EXISTING AND /OR C. EXISTING AND /OR C. n 1 COMPOSITE PLAN - EL. 805.00 1" = 0'-0" FP1 C. IN EXISTING AND /OR C. s REISSUE SHEET O000-61600160 MARCH 3, 017 FP1 LEVEL 805.00 - NEW AREA OF COVERAGE FIRE PROTECTION PLAN

4/5/017 1:59:03 PM A B C D E F G H J K NOTE: IT ROOMS IN THE ADDITION SHALL BE FIRE RATED AND NOT SPRINKLED. 1445 DRIVE NEENAH, WI 54956 1 3 4 C. C. C. 5 6 C. 7 C. 8 C. C. 9 C. C. C. L FIRE PROTECTION RISER LOCATION OF FLOW AND TAMPER SWITCH FOR THE THIRD FLOOR 4/4/17 ADDENDUM 11 11 C. EXISTING AND/OR EXISTING AND/OR C. n 1 COMPOSITE PLAN - EL. 80.00 1" = 0'-0" FP13 C. C. EXISTING AND/OR C. s REISSUE SHEET O000-61600160 MARCH 3, 017 FP13 LEVEL 80.00 - NEW AREA OF COVERAGE FIRE PROTECTION PLAN