GIS inventory of watershed / landscape-scale factors that act as agents of change within SECN parks

Similar documents
Natural Resources Research Summaries for National Park Service Units within the Southeast Coast Network

The City shall enhance and improve the accessibility of parks and recreational facilities while protecting their quality. by:

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

TOWN OF BEDFORD CONSERVATION COMMISSION

SECTION FOUR: MISSION STATEMENT, GOALS & OBJECTIVES

Arlington, Virginia is a worldclass

GIS to Estimate Archaeological Site Loss and Develop Conservation Strategies

Texas AgriLife Extension Service

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

Draft Rhode Island Stormwater Design and Installation Standards Manual

Landscape Act. (Act No. 110 of June 18, 2004)

Master Plan for Preservation and Scenic Conservation (1995)

COMMISSION ACTION FORM

FORT MYERS BEACH FIRE DEPARTMENT JOB DESCRIPTION

Rocky Areas Project Guidance HABITAT

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

2014 South Atlantic LCC

FAQ S about Restoration Planning FROM THE Department of Ecology WEBSITE:

Environmental Hazards and Risk Management

Collaborative Conservation across Landscapes: Experiences from the Upper Midwest and Great Lakes LCC 2/29/2016. GreatLakesLCC.org

Waco Mammoth Site Special Resource Study

13 Extending the Esri Enterprise Licence Agreement

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

An Update on the Air Force Pilot Project: Developing the Florida Strategic Plan for Sustaining Military Readiness through Conservation Partnerships

6. RECREATION AND OPEN SPACE ELEMENT

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

Cumberland Comprehensive Plan Town Council adopted August 2003, State adopted June 2004 TABLE OF CONTENTS

2.6 Pawtucket. Pawtucket Impervious Cover Map (61.4% Impervious)

Project Summary. Rationale

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects

Historic Asset Management A Decision Support Process for Balanced Consideration of Mission Utility, Historic Value, and Facility Condition

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

THE PROTECTION OF CHATHAM COUNTY S NATURAL RESOURCES - THE POLICY SIDE

STAFF RECOMMENDATION: Adopt the Parks and Recreation Master Plan 2013, or take other action as deemed appropriate.

TOWN OF NEW CASTLE - Master Plan Update

Chapter 4 - Preparation of Stormwater Site Plans

Pinellas County Greenways

ROLE OF LANDSCAPE CONSERVATION COOPERATIVES IN EVERGLADES RESTORATION

20 International Conference of The Coastal Society THE ROLE OF PLANNED UNIT DEVELOPMENTS IN ENVIRONMENTAL MANAGEMENT IN THE COASTAL ZONE

Albion Hills Conservation Area Master Plan. Public Information Session

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Infrastructure, Development and Enterprise Services. Natural Heritage Action Plan (NHAP) Project Initiation

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

VILLAGE OF BOLTON HERITAGE CONSERVATION DISTRICT PLAN

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

systems is available on the Colorado Wetland Information Center (CWIC) website.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

I. INTRODUCTION SITE DESCRIPTION

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

This chapter describes the purpose of the Plan, introduces how the Plan is organized and provides contextual background for the Plan.

Draft Resolution XII.10

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Master Plan Objectives and Policies

RESOLUTION RAlCRA

What Planners Do. Heather Wade, Coastal Planning Specialist Texas Sea Grant

The River Future. San Gabriel River Confluence with Cattle Canyon Creek Improvements Project (the Cattle Canyon Project)

TOWN OF BETHLEHEM OPEN SPACE CONSERVATION PLAN PUBLIC MEETING: OCTOBER 12, 2017

Ashbridges Bay Erosion and Sediment Control Project

Green Infrastructure Recommendations For Parks and Public Spaces

REQUEST FOR PROPOSALS. Preparation of National Register of Historic Places. Nominations for the following:

Special Joint Meeting. Emerald Isle Planning Board. Emerald Isle Board of Commissioners. January 18, 2017

Stock-Taking on Integrated Coastal Zone Management (ICZM) in the Black Sea IMPLEMENTATION AUDIT QUESTIONNAIRE 2010

Canyon Lake Master Plan Revision Public Information Meeting March 18, 2016

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

A global view of integrated closure and legacy planning

REQUIREMENTS. For FIRE DEPARTMENTS. State of West Virginia. Bob Wise Governor THE DEPARTMENT OF MILITARY AFFAIRS AND PUBLIC SAFETY

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

Building Innovation Celebrating Park Architecture and Beyond: Building for Resilience and Stewardship

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Project: Mooney Lake Preserve Received: Location: 300 Sixth Ave. N., Orono Complete: Noticed:

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Shared History, Shared Future

ESSENTIAL PUBLIC FACILITIES

master plan of highways

Figure 1. Proposed Strategic Habitat Conservation Areas for Florida

Landscape Conservation Design:

INTRODUCTION. 1.1 What is a General Plan? 1.2 Requirements for a General Plan. 1.3 Introduction to Monterey County

HOUSING ELEMENT GOALS, OBJECTIVES, AND POLICIES

Intergovermental Coordination

Protected Areas: Context for Planning and Management Parks Canada Perspective

Exhibit A Comprehensive Plan Amendments

UNIVERSITY OF WASHINGTON BOTANIC GARDENS FINAL DRAFT - 2/2/04 VOLUNTEER HANDBOOK

Guiding Principles, Objectives, Strategies and Policies

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Ottawa County Parks, Recreation & Open Space Plan. February, 2006

Appendix F PENNSYLVANIA LOCAL PARKS AND THE COMMUNITIES THEY SERVE

Mississippi Skyway Preliminary Engineering Report

Planning Commission Retreat March 23 rd Comprehensive Plan Update Discussion

Master Environmental Servicing Plan & Secondary Plan

PRESENTATION TO THE CITY COUNCIL, CITY OF GLEN COVE

IFLA Regional Office for Latin America and the Caribbean: Call for Applications to host the Regional Office

Lewisville Lake Master Plan Revision Public Information Meeting May 2 & 4, 2017

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 LOS ANGELES GREEN VISION PLAN. File No.: Project Manager: Marc Beyeler

Transcription:

National Park Service U.S. Department of the Interior Southeast Coast Network Atlanta, Georgia GIS inventory of watershed / landscape-scale factors that act as agents of change within SECN parks Request for Pre-Proposals and Statement of Work

Summary and Request for Pre-Proposals This project seeks to develop an inventory of landscape-scale factors acting as agents of change, applicable to the parks within the Southeast Coast Network: Canaveral National Seashore (CANA), Cape Hatteras National Seashore (CAHA), Cape Lookout National Seashore (CALO), Castillo de San Marcos National Monument (CASA), Charles Pinckney National Historic Site (CHPI), Chattahoochee River National Recreation Area (CHAT), Congaree Swamp National Monument (COSW), Cumberland Island National Seashore (CUIS), Fort Caroline National Memorial (FOCA), Fort Frederica National Monument (FOFR), Fort Matanzas National Monument (FOMA), Fort Pulaski National Monument (FOPU), Fort Raleigh National Historic Site (FORA), Fort Sumter National Monument (FOSU), Horseshoe Bend National Military Park (HOBE), Kennesaw Mountain National Military Park (KEMO), Moores Creek National Battlefield (MOCR), Ocmulgee National Monument (OCMU), Timucuan Ecological and Historic Preserve (TIMU), and Wright Brothers National Memorial (WRBR). To accomplish this, the Southeast Coast Network desires to achieve the following objectives: Primary Objectives: 1. To use GIS, remotely-sensed data, and appropriate ancillary data to describe the current regional environmental setting surrounding the parks within the Southeast Coast Network and conduct a historical land use analysis of the region. 2. Develop landscape-scale indicators and the corresponding analytical techniques to assess the relative condition of park ecosystems and identify park lands and resources vulnerable to degradation. Potential agents of change include: land use and land use change, increasing quantity of impervious surfaces, proximity to point and non-point source pollution sources, regional air quality, and human demographics (see Table 1). 3. Provide basic protocols to allow the SECN to perform these analyses in the future as environmental conditions change within the region. The Southeast Coast Network hopes to develop one or more cooperative agreements to carry out the above objectives. Interested cooperators should submit a Pre-Proposal by Friday, November 14, 2003 that includes the following: 1. A concise description of research methods and proposed work schedule for completing objectives as outlined above. 2. Estimated budget itemized by line item and Park Unit. Potential applicants need not submit a proposal for work on all parks. It is possible that investigators will find it more cost effective and feasible to work on a subset of parks within a smaller geographic area (to reduce travel costs, time, ease logistics, etc.). However, selection of final project(s) will be based partly on the cost to accomplish primary objectives at ALL parks. Funding decisions will be made in early December to allow cooperators to begin work before the new Calendar Year. Funding of this project is contingent upon receiving expected levels of funding in FY 2004. All Pre-Proposals should be directed by email to Joe DeVivo at joe_devivo@nps.gov. 2

Inventory and Monitoring Program Background The National Park Service mission to preserve, protect, and maintain the health of park ecosystems for the enjoyment of future generations, relies on scientific information about the status and trends of ecosystem health. Parks have a critical need to know the condition of natural resources to meet the basic goal of preservation. To address this need, the NPS created a Servicewide Inventory and Monitoring program to complete baseline resource inventories and monitor critical parameters (vital signs) on each park. To accomplish this, the National Park Service grouped parks into 32 networks, each of which is comprised of parks having similar resources and management issues. The network approach provides an opportunity to reduce costs, ensure consistent products, and increase information exchange. The Southeast Coast Network is currently designing an integrated monitoring program to meet the five following goals: Conduct baseline inventories of natural resources, including geology, biology, water quality, and air quality. Develop a coordinated long-term monitoring program at the seventeen SECN parks to efficiently and effectively monitor ecosystem status and trends over time at various spatial scales; Develop Decision Support Systems (including GIS and other tools) to aid park managers in identifying, evaluating, and implementing management options. Integrate inventory and monitoring programs with park planning, operation and maintenance, visitor protection, and interpretation activities to establish natural resource preservation and protection as an integral part of park management. Cooperate with other federal and state agencies to share resources, achieve common goals, and avoid unnecessary duplication of effort and expense. This project seeks to conduct an inventory of landscape-scale conditions that potentially act as ecosystem drivers within SECN parks (Table 1). All parks in the Southeast Coast Network are affected by landscape-level drivers of ecosystem structure and function, including: land-use, land-use change, watershed hydrology, proximity to point and non-point source pollution, development, disturbance events, and more (Table 1). Given the scales at which these drivers function, an appropriate tool of study is geographic information systems (GIS), which can be used to analyze remotely-sensed data and other geospatial data sets to develop landscape-scale indicators of overall ecosystem health. Developing such ecological indicators will provide baseline information regarding landscape-scale conditions that affect park ecosystems and may be used as part of a long-term monitoring program to predict changes in ecosystem health. The Southeast Coast Network The Southeast Coast Network (SECN) contains twenty parks, seventeen of which contain significant and diverse natural resources. In total, SECN parks encompass more than 178,000 acres of federally-managed land across North Carolina, South Carolina, Georgia, Alabama, and Florida. The parks span a wide diversity of cultural missions also, including four National Seashores, two National Historic Sites, two National Memorials, seven National Monuments, two national Military Parks, as well as a National Recreation Area, National Battlefield, and Ecological and Historic Preserve. The parks range in size from slightly more than 20 to nearly 60,000 acres, and when considered with non-federal lands jointly managed with SECN parks the Network encompasses more than 242,000 acres. For information on the Southeast Coast Network of Parks, please see: http://www.nature.nps.gov/im/units/nw14/ 3

Project Objectives 1. To use GIS, remotely-sensed data, and appropriate ancillary data to describe the current regional environmental setting surrounding the parks within the Southeast Coast Network and conduct a historical land use analysis of the region. 2. Develop landscape-scale indicators and the corresponding analytical techniques to assess the relative condition of park ecosystems and identify park lands and resources vulnerable to degradation. Potential agents of change include: land use and land use change, increasing quantity of impervious surfaces, proximity to point and non-point source pollution sources, regional air quality, and human demographics (see Table 1). 3. Provide basic protocols to allow the SECN to perform these analyses in the future as environmental conditions change within the region. Table 1. Examples of Landscape-scale drivers of ecosystem structure and function and parks within the Southeast Coast Network where inventories of those drivers have been completed. Vital Sign Land Use Agriculture Silviculture Residential (low density) Residential (high density) Commercial / Industrial Impervious Surface Road Density Hydrology Impoundments NPDES discharge locations Wastewater Treatment Plants Septic tanks Permitted Water withdrawals Cultural / Miscellaneous Census data High-density animal production facilities Disturbance Erosion Zones / Rate Air Resources Air Discharge Locations CANA OBXG CALO CASA / FOMA CHAT COSW CUIS FOFR FOPU FOSU / CHPI MOCR HOBE KEMO OCMU TIMU / FOCA Responsibilities of Cooperating Parties 1. NPS contribution to work plan (justification of cooperative agreement): a. Provide available GIS data for each of the park units included in the study 4

b. Provide substantive input into the development of the study methodology, recognizing that mutual participation is essential to the future success of management recommendations developed pursuant to this research. c. Assist with data collection using park employees, student interns, or other appropriate resources when available. d. Assist with data management to facilitate reporting and completion of deliverables. e. Provide students with the opportunity to conduct research in a natural setting while developing their knowledge of GIS and landscape ecology. f. Meet with cooperator to review project scope of work, sampling locations, park policies, etc. prior to the commencement of field work. g. Review, in a timely manner, drafts of ecological indicators and analytical methods at jointly-agreed upon milestones during the period of performance (such as prior to beginning regional vulnerability assessment). 2. Cooperator (to be named) agrees to: a. Accomplish all primary objectives listed in the statement of work and to provide mutually-agreed upon deliverables to National Park Service specifications. b. Ensure that all data (spatial and non-spatial) used and/or produced conforms to NPS Inventory and Monitoring program standards for collection methods, formats, documentation, scale and spatial resolution, quality control and assurance, and metadata. For information on NPS GIS data specifications, please see: http://science.nature.nps.gov/im/datamgmt/docs.htm. c. Acquire all necessary State, Federal, and NPS permits. NPS permits can be applied for online at http://science.nature.nps.gov/servlet/prmt_pubindex. d. Meet with park Technical Steering Committee representatives (see attached list of key contacts) and the Network Coordinator to review project scope of work, sampling locations, and park policies prior to the commencement of field work. e. Enter all species data into the National Park Service NPSpecies or NPSpecies-compatible database format provided by the Southeast Coastal Network (See Attachment NPS Inventory and Monitoring Product Specification Natural Research Database Template for specifications). f. Others as mutually agreed upon by the Southeast Coast Network and the cooperator. Questions should be directed to Joe DeVivo at: Joe_DeVivo@nps.gov 404-562-3113 x739 5