Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

Similar documents
Installation Manual May 9/14 No revision

815 NE 172 nd Avenue Vancouver, WA Installation Manual

Concrete pavers with sand filled joints. Bedding sand 1-1/2 in. (25-40 mm) thick

Construction of Interlocking Concrete Pavements

Tech Spec 10. Application Guide for Interlocking Concrete Pavements. Concrete pavers with sand filled joints. Edge restraint/curb

9 Steps to a Lasting Paver Installation

Concrete pavers can act as a zipper in the pavement.

Technical Bullet Series on Clay Brick Pavers

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

PAVER BLOCK FIXING INSTRUCTIONS VYARA ROTATIONAL INTERLOCK

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

Pavements Built for the Future

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

STANDARD SPECIFICATIONS Book 2 ENGINEERING DRAWINGS INCLUDES ADDENDUMS

RUBBERSIDEWALKS Installation Manual

Paving Systems Using Clay Pavers on a Sand Setting Bed

Permeable Interlocking Pavers

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

AZEK Pavers Install Guide

Pavers Spade, rake (metal prongs), wheelbarrow, wooden stakes, string line, tape measure, pegs and spirit level

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

Appendix G. Detailed Design

TERREWALKS Installation Manual

AZEK Pavers Install Guide

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

AZEK Pavers Install Guide

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

Paving - 8 easy steps for DIY and professional landscapers

Portland, Oregon, (population 551,000) endeavors to maintain

HORSE STABLE USING AZEK PAVERS.

Brick Paver Installation Guide

City of Bonita Springs Driveway Permit Information Packet

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

Tile Tech Warnings. Paving America one step at a time! MANUFACTURER OF DETECTABLE WARNING PAVERS AND TILES

The Raven Radio Foundation, owner of the Cable House at 2 Lincoln Street, invites lump sum bids for the individual items of work described below.

ADVANTAGES OF USING CONCRETE PAVERS IN COMMERCIAL APPLICATIONS

planning, designing and installation guide for interlocking segmental pavers installation guide

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

pavers. effortless style Pavers Tasmania

INFILTRATION TRENCH - LEAKY PIPE

C L AY PAV E R S Naturally best. How to pave. Easy guide to a good professional finish with Claypave

Woodbridge Addition Driveway Separation

I N D U S T R I A L Y A R D S

P A V E R S Are they really the same? The 3-P s and how they relate to storm water management

Town of Essex Small Site Erosion Control Guide

Tech Spec 11. Mechanical Installation of Interlocking Concrete Pavements

A GUIDE FOR DESIGN INTEGRATION OF CONCRETE PAVERS ANTON C. HARFMANN, AIA GARY E. DAY, RA

Masonry. Landscape Product Guide. what can you build with Selkirk?

Installation guidelines

PA01 Concrete Segmental Pavements Detailing Guide

GUIDELINES FOR PERMEABLE SIDEWALK-LANDSCAPING PERMIT

EARTH STABILIZATION GEOSYNTHETIC SOLUTIONS

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

Selkirk. Masonry. Landscape Product Guide. Picture depicts split face blocks. Landscaping Guide. What can. you build. Selkirk?

Tech Spec 11. Mechanical Installation of Interlocking Concrete Pavements

Appendix B DETAILED DESIGN

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

Installation Guide. Expect the Best

PAVING MAINTENANCE AND REPAIR GUIDE

Preparing a Stormwater Control Plan for a Small Land Development Project

Stormwater Control Plan: Small (Tier 1) Land Development Project

STANDARD DETAILS QUICK REFERENCE

CONFORMED AGREEMENT INCORPORATED REVISIONS PER AMENDMENT DATED: APRIL 2, 2013 FOR REFERENCE

Permeable Pavement [STRATEGY] Page 1

CITY OF OZARK STANDARD DRAWING DETAILS FOR PUBLIC IMPROVEMENTS

Paving Systems Using Clay Pavers

There are a few factors critical in the operation of a grease interceptor, which are: Design, Sizing, Proper installation and maintenance.

DESIGN SCENE SUBJECT INDEX

Mechanical Installation of Interlocking Concrete Pavements

TECHNICAL. Design Guide. Retaining walls made easy with this beautiful solution EARTH RETAINING WALLS

EuroPEK Oil Separator

Technical Assistance Permeable Interlocking Concrete Pavement PICP

Permeable Pavement Systems

George Bialecki, Jr. takes green building seriously. Autumn Trails Pioneers

Polymer solutions Heating mat EM2-CM

County of El Dorado Standard Plans

Subgrade Preparation. Subgrade Preparation. Subgrade 3/27/2016. Tim Crosby: Grading Superintendent Chris DeJulio: Site Manager

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

1. RETAINING WALL SELECTION PROCEDURE

CITY OF LATHROP. Department of Public Works. DESIGN & CONSTRUCTION Standard Details

INSTALLATION GUIDELINES FOR GEOTEXTILES USED IN FILTRATION AND DRAINAGE APPLICATIONS

Tree Pits Construction Guide

THE PATH TO YOUR HOME S BEAUTY STARTS AT YOUR DRIVEWAY.

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

PERMEABLE PAVEMENTS. Have been around for a long time, but are poised for a resurgence

HANOVER ARCHITECTURAL PRODUCTS. Hanover Porcelain Pavers

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL

Civil engineering Fibertex Geotextiles

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

TABLE OF CONTENTS I-1 INTRODUCTION TO STANDARD DESIGNS 03/17/08

Introduction to Compaction

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

FEB 2016 COUNTY MAP NTS

Pavers. New South Wales

TECH. BULLETIN ISSUE TWENTY

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

Silva Cell 2 Installation Guidelines

South Fraser Perimeter Road (SFPR)

Curb Inlet Filter INSTALLATION MANUAL. Bio Clean Environmental Services, Inc. 398 Via El Centro Oceanside, CA 92058

Transcription:

Te c h S p e c 3 Edge Restraints for Interlocking Concrete Pavements Introduction Edge restraints are an essential component of interlocking concrete pavements. Restraints hold the pavers tightly together, enabling consistent interlock of the units across the entire pavement. They prevent spreading of the pavers from horizontal forces from traffic. Edge restraints are designed to remain stationary while receiving impacts during installation, from vehicles and from freeze-thaw cycles. The following is a discussion of methods of restraining concrete pavers placed on bedding sand and installed on a flexible or rigid base. Design Considerations Edge pavers act as restraint Figure 1. Change in laying pattern direction. Figure 1. Change in laying pattern direction Edge pavers act as restraint Figure 2. Change in paver shape. Restraints are required along the perimeter of interlocking concrete pavements or where there is a change in the pavement material. For example, when a laying pattern changes direction, there may be a need for an edge paver to act as a restraint (Figure 1). When a paver shape changes within an area of paver, the edge paver at the end of each pattern can serve as a restraint (Figure 2). Vertical walls of buildings can also provide a suitable restraint. Some edge restraints require spiking to a flexible. The rule of thumb is the base should extend beyond the restraint at least the same dimension as the thickness of the base material. For example, a 6 in. (150 mm) thick base should extend at least 6 in. (150 mm) beyond the spikes in the restraints. This contributes stability to the restraint especially in soils subject to heaving. Soil backfill is never a suitable edge restraint and edge restraints should never be installed on top of the bedding sand. When installing an edge restraint on an existing rigid concrete base there are two methods typically used: direct fastened, or drilled and anchored. In a direct fastened system an explosive charge is used to drive the fastener into the solid concrete base. When using the drill and anchor method, holes must be drilled through the edge restraint (unless pre-drilled) and into the concrete to a sufficient depth. There are several anchor manufacturers and types available: Change in3paver shape Figure 1994 ICPI2.Tech Spec No. Interlocking Concrete Pavement Institute Revised February 2018 All rights reserved.

Poured Concrete and Walls Precast Concrete and Cut Stone Plastic, Aluminum or Steel Submerged Concrete Sidewalks no vehicular traffic Plazas no vehicular traffic Residential driveways Commercial/Industrial driveways Parking lots Crosswalks in asphalt or concrete streets Streets all types Utility covers Gas stations Industrial flooring Trucking terminals not appropriate for areas with freeze thaw cycles only products designed for heavy duty applications 1 2 Table 1. Application guide for edge restraints 1. Wedge Anchors, 2. Strike Anchors, 3. Drop-in Anchors, 4. Expansion Anchors. steel. Restraints formed onsite are made of poured in place concrete. Regardless of the material the edge restraint is made of, it should have a smooth vertical surface that will allow the side of the pavers to be in full contact with it. When using direct fastened or drill and anchor system, it is important to consider several factors. When selecting materials consider the potential for galvanic corrosion created by using different metals. It may also be necessary to use a washer to prevent the fastener or anchor from pulling through the preformed hole in the edge restraint. Consult the fastener/anchor product information to ensure that you are utilizing the right charge and fastener/anchor for the application. Also consider the loads on the edge restraint when determining the spacing between each fastener/anchor. Also ensure that the proper Personal Protective equipment is utilized. If there is a possibility of sand loss from beneath the pavers or between or under the joints of the edge restraints, geotextile is recommended to prevent its migration. A 12 in. (0.3 m) wide strip can be applied along the base and turned up along the sides of the restraints. Geotextile generally is not required across the entire surface of an, nor should it be placed on top of the bedding sand. Types of Edge Restraints Table 1 shows the types of edge restraints and their application. There are two general types of edge restraints. Those made elsewhere and installed at the site include precast concrete, plastic, cut stone, aluminum and Manufactured Edge Restraints Full depth precast concrete or cut stone edging generally extends the depth of the base material. They can be set on compacted aggregate or concrete backfill (Figure 3). Partial depth precast concrete edge restraints may be used for residential and light duty commercial applications. (Figure 4). These precast units are anchored on a compacted with steel spikes. The spikes are typically 3/8 in. (10 mm) diameter. Depending on the design, the top of the concrete edge can be hidden or exposed. Plastic edging installs quickly and will not rust or rot. Plastic edging should be specifically designed for use with pavers. It can be used with light duty residential and commercial applications, depending on the design. It should be firmly anchored into the compacted course with spikes (See Figure 6). The spikes should penetrate well into the. Spikes do not need to penetrate the bottom of the base. Consult the manufacturer s literature for the recommended spacing of the spikes. Edging for planting beds and flower gardens is not an acceptable restraint for interlocking concrete pavements. Aluminum and steel edging should be selected to provide a smooth vertical surface against the pavers. Lshaped edging provides additional stability. Stakes or spikes ICPI Tech Spec 3 Page 2

Precast concrete or cut stone Concrete aggregate or concrete bedding Concrete backfill Precast concrete or stone Figure 3. Precast concrete/cut stone. Figure 3b. Small precast concrete/cut stone fastened to the edging should be below the pavers or on the outside of the restraints. Steel should be painted or galvanized so that rust does not stain the pavers. Consult manufacturer s literature for recommended spacing of the spikes. Spikes to secure aluminum edging should extend well into the base course (Figure 5) or secured to the rigid base. Like plastic edging, spikes used for aluminum edging should never be placed into the soil. Aluminum and steel edgings are manufactured in different thicknesses. The thickest edging is recommended when pavers are subjected to vehicular traffic. Plastic or aluminum edge restraints can be used for flexible or rigid bases. Steel edge restraints should only be used on rigid bases. Do not use steel on flexible bases. Timber is not recommended for an edge restraint because it warps and eventually rots. Elevations should be set accurately for restraints that rest on the base. For example, 23/8 in. (60 mm) thick pavers with 1 in. (25 mm) of bedding sand would have a base elevation set 3 in. (75 mm) below that of the finish elevation of the pavers. This allows 1/4 in. (6 mm) settlement from compaction and 1/8 in. (3 mm) for minor settling over time. A minimum of 1 in. (25 mm) vertical restraining surface should be in contact with the side of the paver to adequately restrain it. For heavy duty application a greater restraining surface may be warranted. Restraints Formed Onsite Poured in place concrete curbs or combination curb and gutters required by municipalities make suitable restraints for pavers. Exposed concrete edges should have a 1/4 in. to 3/8 (3 to 10 mm) radius edge to reduce the likelihood of chip- ICPI Tech Spec 3 Page 3

Spike Partial depth precast concrete (hidden) Figure 4a Partial Depth precast concrete edge Spike Partial depth precast concrete (exposed) Figure 4. Partial depth precast concrete edge. Figure 4b. Partial Depth Precast Concrete Edge ping. As with precast, the side of the curbs should extend well below the sand bedding course (Figure 7). Complete compaction of the soil and base next to these curbs is essential to preventing settlement of the pavers. A concrete curb or edge that is submerged or hidden can be used to restrain concrete pavers. See Figure 8. The top surface of the concrete edge has pavers mortared to it. Acrylic fortified mortar is recommended and pavers exposed to freeze-thaw and deicing salts should be applied with high-strength epoxy mortar materials. The minimum cross section dimensions of the curb should be 8 in. x 8 in. (200 mm x 200 mm). These dimensions apply to residential driveways and low volume streets. Larger sized curbs will be required in higher traffic areas or for support over weak soil. The concrete edge may require a layer of compacted as a foundation. The width of concrete will need to be equal to the width of whole pavers mortared to it. This detail should not be used in heavy traffic areas such as major urban streets with regular truck or bus traffic. Other Design Considerations Paver sidewalks against curbs Joints throughout poured in place or precast concrete curbs should allow excess water to drain through joints in them without loss of bedding sand. If there are no joints, weep holes placed at regular intervals will prevent the sand from migrating. A 1 in. (25 mm) diameter hole every 15 ft. (5m) is a recommended spacing. The bottom of the holes should be at the same elevation as the top of the base. They should be covered with filter cloth to prevent loss of bedding sand. Joints in curbs often have expansion material in them. This material tends to shrink and decompose. Filter cloth placed over these joints will prevent the sand from migrating. Expansion joint materials are not required between the pavers and the curb. Utility covers in streets and walks (e.g., sewers, water and gas valves, telephone, electrical,) should have concrete collars around them. Consistent compaction of aggregate base against cast iron collars is difficult, so a concrete collar ICPI Tech Spec 3 Page 4

Spike Edge restraint Figure 5. Aluminum and steel edging Figure 5. Aluminum edging. Spike Plastic edge restraint Figure 6. Plastic edge restraint. Figure 6. Plastic edge restraint placed around them after base compaction reduces the potential for settlement. Concrete collars should be 1/4 in. (6 mm) below the pavers to prevent catching snowplow blades (Figure 10). Drain and catch basin inlets should have a concrete collar around them if they are not encased in concrete. When overlaying existing asphalt or concrete streets with pavers and bedding sand, utility covers are raised and new concrete collars poured around them. When raised, the covers and frames should be inspected for cracks that might allow migration of sand. Cracks should be repaired. Filter cloth should be applied on the base around the concrete collar, turned up against the collar to prevent sand loss. Catch basins During the early life of interlocking concrete pavement, there may be a need to drain excess water from the bedding sand. Drain holes may be drilled or cast into the sides of catch basins to facilitate this. The bottom of the holes are at the same elevation as the bottom of the base. Space holes at least 12 in. (0.3 m) apart, and make 1 in. (25 mm) in diameter. The holes should be covered with filter cloth to prevent loss of bedding sand. This drainage detail can prevent pumping and loss of bedding sand around the catch basin. Crosswalks Pavers in a crosswalk or abutting another pavement can be placed against a concrete beam (Figure 10), ICPI Tech Spec 3 Page 5

Curb Comapcted Curb Figure 7a. Poured in place concrete curbs Figure 7b. Poured in place concrete curb Figure 7. Poured in place concrete curbs. or a beam and slab base combination for pavements subject to heavy vehicular traffic (Figure 11). The beam prevents horizontal creep of the pavers due to braking and turning tires. Figure 12 shows a light duty crosswalk appropriate for residential streets with minimal truck traffic. Refer to Tech Spec 19 Crosswalk Construction Using Interlocking Concrete Pavers for further details. Gutters and drainage channels made with pavers should be embedded in fortified mortar, a bitumen-neoprene bed, or polymer adhesive. The mortar mix should resist degradation from freeze-thaw and salt. Care must be taken in applying the mortar as it can stain the pavers. Sand is not recommended in joints subject to channelized water flow. The sand will eventually wash out of the paver joints and weaken the pavement. Cement can be dry mixed with joint sand (3% to 4% by weight) to reduce washout in areas subject to channelized drainage or from water draining from roof eaves without gutters. Care must be taken to not let the cement stain the pavers when placing the sand and cement into the joints. A more effective method is use of joint sand stabilization materials. Stabilizers are recommended to reduce risk of wash out on steep slopes. See ICPI Tech Spec 5 Cleaning, Sealing and Joint Sand Stabilization of Interlocking Concrete Pavement for more information. Elevations When edge restraints are installed before placing the bedding sand and pavers, the restraints are sometimes used to control thickness when screeding the bedding sand. Elevations for screeding should be set from the restraints after their elevations have been verified. Attention should be given to the elevation of the pavers next to the restraints. Sand-set pavers may require a finish elevation of 1/4 in. (6 mm) above the top of the restraint. This allows for minor settlement of the pavers and surface drainage. Bitumen-set, mortared or adhesive-set pavers should be at least 1/8 in. (3 mm) above adjacent curbs or other edge restraints. ICPI Tech Spec 3 Page 6

edge location. The pavers are marked with a chalk line, or by using the edge Paver mortared to material itself as large ruler for marking concrete edge (Figure 14). The marked pavers are then cut with a powered saw or mechanical splitter. The unused ends and excess bedding sand are removed up to the cut pavers, and the edge restraints installed. This technique is particularly useful for creating curved edges. When the gap between the pavers and the restraint exceeds 3/8 in. (10 mm), the space should be filled with cut pavers. Cut pavers exposed to vehicular traffic should be no smaller than onefigure 8. Submerged concrete edge. third of the whole paver. The paving Figure 9. Submerged concrete edge pattern may require shifting to accommodate cut pavers. Stability of cut edge pavers exposed to tire traffic is increased when a running Construction tips Some restraints allow the pavers course (string or sailor) of whole pavers is placed between and bedding sand to be installed prior to placing the edge the edge restraint or concrete collar and the cut edge materials. The field of pavers is extended past the planned Cover String course around collar Cover Concrete collar min. 6 in. (150 mm) wide, 1/4 in. (6 mm) below pavers Geotextile aggregate base Geotextile Figure 9. Utility cover. ICPI Tech Spec 3 Page 7

pavers. Pavers are cut to fit against this edge course (see Figures 9 and 10). Other shapes include edge pavers that make a straight, flush edge. This detail can reduce incidental chipping of the cut pavers. In some situations, site fixtures can be installed after the pavers are placed and vibrated and the joints filled with sand. Openings can be saw cut, the edge restraints placed, and the tree grates, bollards, or other fixtures installed. Curb Concrete beam min. 8 in. (200 mm) wide Adjacent street Street in pavers Figure 10. Concrete beam. Figure 11. Concrete beam Exisitng pavement saw cut Concrete beam min. width 8 in. (200 mm) Geotextile over drain hole Exisitng pavement saw cut Concrete beam min. width 8 in. (200 mm) Geotextile Concrete base 2 in. (50 mm) diameter drain hole filled with open graded aggregate Figure 12. Crosswalk in existing asphalt pavement. Figure 11. Crosswalk with concrete base. 14801 Murdock Street Tel: 703.657.6900 Suite 230 Fax: 703.657.6901 Chantilly, VA 20151 E-mail: icpi@icpi.org In Canada: www.icpi.org P.O. Box 1150 Uxbridge, ON L9P 1N4 Canada Figure 13. Marking pavers for saw cutting. The cut pavers are carefully removed and edging is placed against the pavers. The content of ICPI Tech Spec technical bulletins is intended for use only as a guideline. It is not intended for use or reliance upon as an industry standard, certification or as a specification. ICPI makes no promises, representations or warranties of any kind, expressed or implied, as to the content of the Tech Spec Technical Bulletins and disclaims any liability for damages resulting from the use of Tech Spec Technical Bulletins. Professional assistance should be sought with respect to the design, specifications and construction of each project. BOD Approved: February 2018 ICPI Tech Spec 3 Page 8