Grangegorman A New Campus for a New University

Similar documents
Grangegorman Update. College of Engineering & Built Environment 29 November 2013

Developing a New Urban Quarter at Grangegorman, Dublin: The Role of Planning in its Successful Delivery

2bPlanning Scheme. Appendix. Conservation - Removal of Structures. Grangegorman

UPDATE ON ESTATES AND FACILITIES PROJECTS APRIL Projects Completed within last 24 months. 1. Richmond and Workshop Cladding ( 6.

COUNCIL HEALTH, SAFETY AND WELLBEING COMMITTEE. Projects Update

Cranfield University Masterplan

ALTERNATIVE PROPOSAL FOR TRI LOCATED NATIONAL PAEDIATRIC HOSPITAL BY 2016 ON A 20.5 ACRE (8.3 HECTARE) SITE

Submission to Dublin City Council regarding the proposed Poolbeg West SDZ Planning Scheme

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

The 20 Bedford Way Masterplan

Draft proposal for the future of St Brendan's Hospital, Grangegorman (23.5 MB)

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

INTRODUCTION BACKGROUND

Sheffield Victoria Station Development Prospectus January 2014

CAL POLY MASTER PLAN UPDATE, March 2015

11 February CAMPUS MASTER PLAN UPDATE Focus Group - Design Guidelines

Vision & Land Use. Discussion. Historic Preservation Plan. Foggy Bottom Campus Plan:

Cambridge. West Cambridge site. What is a Shared Facilities Hub? Welcome

Proposals for a new college and homes. Thank you for visiting our exhibition.

12 February CAMPUS MASTER PLAN UPDATE Focus Group - Wayfinding & Signage

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

Policy and Resources Committee 10 th October Green Infrastructure Supplementary Planning Document (SPD) Summary. Title

heuston gateway: summary report


ACKNOWLEDGEMENTS PROJECT TEAM

Planning Districts INTRODUCTION

Derry City & Strabane District Council

Public Realm Strategy; Your City Your Space Annual Report 2013

Place Brief. National Collections Facility (NCF site)

Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

Ballymun. Main Street Development Opportunity

NAPA COUNTY HEALTH AND HUMAN SERVICES AGENCY MASTER PLAN UPDATE BOARD OF SUPERVISORS MEETING MARCH 20, 2012

Regeneration of Wigan CECA NW : Supply Chain Conference Emirates Old Trafford, Manchester 21 June 2017

implementation r expression in landscape

Lord Wandsworth College Masterplan

Newcourt Masterplan. November Exeter Local Development Framework

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Decent homes need decent spaces

Cookstown Heritage Conservation District Plan Heritage Workshop Public Open House September 10, 2013

Site Alternatives and Phasing

Welcome to our exhibition

Strategic Environmental Assessment Screening Report. Dublin Port Masterplan Review 2017

POLICY The Trillium Park Master Plan was approved by the Board on April 4, 2012.

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

DESIGN AND ACCESS STATEMENT NEW TALYBONT HALLS, CARDIFF UNIVERSITY JULY 2018

California Environmental Quality Act (CEQA) Environmental Review Process

an inspirational new destination residential commercial retail leisure education CW brochure FINAL version NEW.indd 3-4

DFLC-USFLN Fab Lab Development Discussion Guide

NORTH CIRCULAR ROAD - REGENERATION IN ACTION

CAMPUS MASTER PLAN UPDATE

WELCOME TO THE NEW WILTON PARK

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development:

EDC 016/004 Annex A. Framework Masterplan Stakeholder and public engagement

National Western Center (NWC) Study Area Master Plan adopted March-2015 ~250 Acres Strong commitment to preserving the sites history 2.

NHS DUMFRIES & GALLOWAY - NITHBANK

Summer North West Greenway Network - Information Booklet

Scottish Natural Heritage. Better places for people and nature

REFERENCE: 16/8568/ENQ Received: 25 October 2016 Accepted: 26 October 2016

1 October Dear Citizens of Charlotte and Mecklenburg County,

FOR PUBLICATION CHESTERFIELD TOWN CENTRE MASTERPLAN UPDATE AND REVIEW 2015

Useful Studio 1st Floor, The Clove Building 4 Maguire Street, Butler s Wharf London SE1 2NQ

Welcome to Ashley Road South Masterplan Vision Event!

Darlington Healthy New Town Hilary Hall Project Manager, HNT

This is the East Carolina University Comprehensive Facilities Master Plan Final Draft Plan Review. This workbook reviews the campus draft master plan

COURTHOUSE CAMPUS BARNSLEY Executive Summary March 2010

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Amendments to Illustrative Masterplan. Outline Planning Application RU.14/0099. Royal Holloway University of London

6.1 University Projects

Public Open House. YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m.

Local Development Plan for Glasgow

Biodiversity Standard

Croxley Rail Link Watford Vicarage Road Station Reference Number :

District Facilities Master Plan

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44

01 Welcome! About Ontario Shores

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

COMMUNITY OPEN HOUSE. March 28, 2012

Developing a Master Plan. By LH-PA, City of Sunnyvale, & Anderson Brulé Architects

Enclosures Appendix 1: Draft Golders Green Station Planning Brief. Summary

4.00 STAKEHOLDERS. urbanprojects

2019 Hillcrest Campus LRDP EIR Scoping Meeting

Welcome to the Queen s Square, Croydon Consultation

Green Square Town Centre

Chapter 1.0 Introduction

Vision 2020 Economic Redevelopment Team Final Report

AT A GLANCE... Our People, Culture & Place. A plan to sustain Ballarat s heritage (final draft)

Greening the Thameslink Route

Draft Resolution XII.10


Introduction to MP3. MP3 H4 Park Central (North)

Universal Design Policies, Strategies & Good Practice

Inspiring Technovation

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

Welcome! UBC Community Conversations. Proposed new community garden space in Chancellor Place and Wesbrook Place. Traffic flow on Iona Drive

Dublin Mountains Visitor Centre

Transcription:

Grangegorman A New Campus for a New University Dr Louis Gunnigan Campus Planning Team Dublin Institute of Technology

Grangegorman A Project that is Changing a City Background Grangegorman 200 year+ history of psychiatric care In 2009 was hospital for treatment of mental illness Outdated facilities 30 hectares of walled brownfield site

Grangegorman c.1950

Grangegorman 2010

Proximity to City Centre Bolton St

Grangegorman 2011 A disadvantaged area High Unemployment Lower Income Lower educational attainment levels Limited local open space Limited public recreation facilities

Grangegorman The Vision The creation of a Living, Learning, Sustainable City Quarter

Facts and Figures Planned final Campus Population of 25,000 30 Building Plots 380,000m 2 of floor space overall 140,000m 2 is academic space for Dublin Institute of Technology (DIT) o Timeframe o Remainder student residences, sports facilities, industry innovation park, community and residential health facilities, primary school other associated structures to support the servicing of the campus. Completion planned for 2025/30 (dependent on availability of finance) Estimated overall cost o c. 1.5 billion

Benefits

The Stages Create a Park Develop as a Sustainable, Health Park Further develop as a Learning, Sustainable, Health Park Complete as a Living, Learning, Sustainable, Health Park

Detail

The Masterplan (http://ggda.ie/the-masterplan)

Grangegorman as a City Quarter

Creating the Park

Services Infrastructure

Creating the Park

Creating the Sustainable Health Park The Phoenix Centre The Primary Care Centre

Health & Fitness Facilities

What is Sustainable for DIT? Walk the Walk Sustainability is core to what we teach and research 40%+ of activities directly related Dublin Energy lab Offer examples of best practice to wider community Statutory obligations Increasing minimum standards Government s 2020 commitments Social obligations Aim to reduce our overall carbon footprint Make best use of scare resources Local regeneration Economic arguments Increasing costs of utilities power, water, waste

Grangegorman Sustainability Strategy Aims The Grangegorman Urban Quarter will: be Zero Carbon by 2050 use 60% less mains Water by 2050 good practice in Biodiversity best practice in Waste best practice in Transport best practice in Construction best practice in Health & Wellbeing best practice in Sustainable Governance best practice in Community Relations best practice in Sustainability Education

The Energy Centre District heating Power generation Energy engineering education

Energy Distribution EXISTING ESBN SUBSTATION (HSE) INCOMING CABLE CHAMBER PROPOSED ESBN SUBSTATION (WEST) NATURAL GAS TIE-IN POINT COMMUNICATIONS ROOM A (North House) P FUTURE ENERGY CENTRE T COMMUNICATIONS ROOM B (Orchard House) TEMPORARY EXISTING ESBN SUBSTATION (Orchard House) P PROPOSED ESBN SUBSTATION (EAST) Primary Underground Services Utilities Route

Greenway Hub Research & Business Incubation First New Build on DIT Campus 4,500m2 Houses Environment, Sustainability & Health Institute (ESHI), DIT Technology Transfer, DIT Incubation Hothouse

Transport new light rail line

Transport Dublin Bikes

The Learning Sustainable Health Park Campus for a New University DIT across the city DIT before Grangegorman Bolton St. Mountjoy Sq. Cathal Brugha St. Kevin St. Aungier St. Rathmines Chatham Row

Programme 1

Before Programme 1

After Programme 1

Before Programme 1

After Programme 1

Programme 2 - PPP Central & East Quads Cathal Brugha St. Chatham Row Media, Aungier St. Kevin St. Rathmines

Central Quad Science & Health, Tourism & Food, Electrical/Electronic Engineering 6,000 students 35,000m 2 floor area

East Quad Creative arts and digital media, music & drama, social sciences 3,500 students 16,000m2

Timeline Milestones Central Quad East Quad Planned Projected Planned Projected Complete GF Floor Slab 23/11/2018 23/11/2018 02/10/2018 Completed Structural Frame Complete 05/06/2018 05/06/2018 20/02/2019 20/02/2019 Commence Commissioning 02/12/2019 02/12/2019 19/11/2019 19/11/2019 Service Commencement 25/05/2020 25/05/2020 10/04/2020 10/04/2020

Central Quad Progress

Virtual meets Reality

East Quad progress

Programme 3 North House West Academic Hub / Library Bolton St West Quad / Business CQ EQ Lower House Park House Energy Centre

Academic Hub/Library Phased development of ~19,000m 2 Incorporating protected structure Strong focus on natural light, natural vent.

Exterior Design

Reception

Atrium Academic Hub - Phase 1 O Donnell Tuomey (ODT) Phase 1 design advanced to planning Lodge planning Nov/Dec 2018

Programme 3 West Quad College of Business, languages, exam/conferring hall Heneghan Peng Architects appointed Initial brief established Stakeholder team very active Site visits, scoping etc Energy centre for district heating Long term strategy established OCSC Building design complete, Planning granted July 2018 Financial constraints interim options being explored.

Park House Workspace Decant of Rathmines House => 5 th Floor April 2018 Work with existing tenants. (2019) Renovate 6 th Floor (2020) Library in Park House Gnd/1 st /2 nd + Academic Hub design team O Donnell Tuomey Recruited to do stage 1 design Brief to replace existing provision 4 libraries + media => 1 library Initial proposals tabled Constraints of pillars/loading etc. Options being explored. Aiming to lodge planning Nov (not SDZ) 52

Lower House Lower House Design team led by Fitzgerald Kavanagh started. Initial brief established and being examined by design team Initial focus on building fabric and structure Tight schedule proposed submit planning by December 2018

In planning Minor renovate Rathdown Hse Library moved to park House summer 2020 Focus of Student Services Expand food offering Minor renovate North House West Provide services (power, data, water..) Retain print workshop Additional workspace academic staff/research/admin Relocate sports changing North house annex and adjacent to be demolished summer 2020 Minor renovate D7ET School when vacated Not likely to be available until Dec 2020

Broadstone - Bolton St link Nov 2018 - Via bridge Nov 2019 - Via Plaza

Student accommodation Distinctive blocks Range of settings Active along St Brendan's way Quieter options around Lower House Integrated with the overall provision Part of an integrated urban fabric Opportunities for active use at ground floor

Student Accommodation I Phase 1 / c1100 beds Procurement commencing Project completion 2022 primarily single en-suite rooms in cluster flats of 6-8 beds with shared kitchen/lounge Underpin student recruitment Dining, sport and student centre uses at ground floor

PRIMARY SCHOOL D7ETNS Project: Permanent home for Dublin 7 Educate Together Design Team: Grafton Architects Site Location: Adjacent to the HSE Primary Care Centre Operation from September 2020

Other Local Works Prussia Street Shopping Centre Redevelopment http://www.3ddesignbureau.com/news/prussia-street-to-receive-much-awaited-student-scheme/ Mixed development Retail/Student Accommodation 541 beds 3-7 storey

Student Accommodation Private Sector Completed: Lower Grangegorman (690 beds) Dorset Street (440 beds) Church Street (400 beds) In Construction: Adjacent to Grangegorman Luas Stop (440 beds) Arbour Hill (320 beds) Planned: Adjacent to Grangegorman Luas Stop (320 beds) Prussia Street (440 beds) Phibsborough (330 beds) Total: c3380 beds

Current Live Projects Sept 2020 Central & East Quad Park House Temp Library Park House Student Services - Rathdown Cluster Energy Cent Wes t Qua d Aca d Hub Stu accomm Central Quad Greenway Rathdown Grangegorman Broadstone DIT Student Hub- Lower House & School Energy Centre Sept 2021/22 West Quad College of Business Sept 2022 Academic Hub Library (Phase 1) Student accommodation (Phase 1) East Quad Lower hse School Bolton St 1000m

Summary Public park open 50% of Health facilities delivered Initial DIT learning buildings delivered Transport options well advanced Construction of DIT learning facilities proceeding Living facilities about to go into procurement Design and procurement of further projects ongoing watch this space!

Contact Louis Gunnigan Programme Leader for Campus Development Campus Planning Office Dublin Institute of Technology Grangegorman Lower Dublin 7 D07 H6K8 Ireland T: +353(0)87 6153066 E: louis.gunnigan@dit.ie W: http://goo.gl/ncvbmb