SWaM 2017 STORMWATER MANAGEMENT AND DRAINAGE MASTER PLAN (PISMA) PISMA Pelan Induk Saliran Mesra Alam

Similar documents
Curriculum Vitae. Education. Accomplishments. Profile. Mdm. Herlina Ab. Aziz

Creativity Through Inspiration

5. Urban Stormwater Management Manual For Malaysia 2000 Did Malaysia

Development Strategy and Physical Characteristics of New Towns in Malaysia

PLANNING AND DESIGN OF PUTRAJAYA STORMWATER MANAGEMENT SYSTEM

Figure 1 Cypress Street Study Area Location Map

2014 DEPARTMENT OF STANDARDS MALAYSIA

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

INVERTER COMPANY PROFILE

South Bismarck Watershed Model Update and Stormwater Improvement Project

Draft Rhode Island Stormwater Design and Installation Standards Manual

BIO-ECOLOGICAL DRAINAGE SYSTEM(BIOECODS):CONCEPTS, DESIGN AND CONSTRUCTION

SCIENCE & TECHNOLOGY

Green Roofs and Stormwater Management Virginia Stovin

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

POTENTIAL OF STORM WATER CAPACITY USING VEGETATED ROOFS IN MALAYSIA

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

SUDS: Innovation or a Tried and Tested Practice?

CURRICULUM VITAE. Lee Yoke Lai (PhD.)

Post Construction BMPs

NYC Green Infrastructure Program

INITIATIVES AND POLICY DIRECTIONS IN MAKING CITIES RESILIENT

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

VISION OF THE CITY REJUVENATION & REVITALISATION LAB. Objectives of the City Rejuvenation & Revitalisation Lab

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Groundwater Flow Modeling of ROW Bioswales Adjacent to Residential Buildings

The Art and Science of Stormwater Retrofitting

Sustainable Urban Drainage Systems (SuDs)

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Hopwood Motorway Service Area, Worcestershire

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Promoting SuDS & Green Infrastructure

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

Vu Kim Chi Nguyen Thi Thuy Hang

Waterfront regeneration as a sustainable approach to city development in Malaysia

Urban Water Management and Soils (ESRM 311 & SEFS 507)

The use of low head weirs to. perennial streams with their floodplains:

Brigitte A. Berger, Director of Engineering

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

Village of Forest Park. July 27, Sewer Separation Evaluation

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

What is YOUR biggest challenge in stormwater control measure accounting/planning?

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

boundaries solutions

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Bioretention cell schematic key

Appendix 1 Structure plan guidelines

Construction of BIOECODS for a Government Complex: A Case Study

Crop Evapotranspiration and Crop Water Requirement for Oil Palm in Peninsular Malaysia

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Watershed Planning Workshop

Stormwater Solutions for Residential Sites. Section 2 Stormwater Management Approach VERSION 1.0. EcoWater Solutions. Prepared for

Why a new Food & Farm Ordinance?

Appendix A. Planning Processes. Introduction

Total Industrial Hardware Product Supplier & Solutions

MOHD KAMAL BIN ZAINOL Landscape Architect

I602. Birdwood Precinct

4. Contractor (and subcontractors if applicable) certification statement(s)

NAPA COUNTY PUBLIC WORKS Standards & Specifications

4. CONCEPT PLAN DEVELOPMENT

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

When planning stormwater management facilities, the following principles shall be applied where possible.

USF System Campus Master Plan Updates Goals, Objectives and Policies

In 1983, the town evacuated and purchased by government for $36 million

Impervious Cover Project for Climate Resilience in New Jersey

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

Problem Understanding

Green Infrastructure and Adaptive Management

Halimaton Saadiah Hashim, Ph.D Senior Fellow Institute for Environment & Development (LESTARI) Universiti Kebangsaan Malaysia (UKM)

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

4.6. Low Impact and Retentive Grading

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

Article 6 Tree Protection

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Leduc Industrial Outline Plan SE W4

Working Group Meeting

Zakiah Ponrahono CURRICULUM VITAE

Southwest Transitway Extension Baseline Road to Norice Street. Environmental Assessment Minor Modification Report

Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

Adaptation and Resilience at the City of Fort Lauderdale

How You Can Help With Flood Management

Appendix F Construction phase management

Outfall Retrofit Feasibility Study

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

GRACE CHURCH EXPANSION

WASHINGTON COUNTY OREGON

6.5 Lakewood Gulch. Basin Snapshot

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Washington County, Maryland Division of Public Works Policy Manual

Village of New Maryland. Storm Water Management Master Plan

Article 20 Stormwater Management

Soil Erosion and Sediment Control

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

CHECKLIST FOR PHASE II DRAINAGE REPORT

Biodiversity Conservation

Transcription:

SWaM 2017 STORMWATER MANAGEMENT AND DRAINAGE MASTER PLAN (PISMA) PISMA Pelan Induk Saliran Mesra Alam Presented by: Hjh. Zalilah Binti Selamat Bahagian Saliran Mesra Alam Jabatan Pengairan dan Saliran Malaysia

OUTLINE 1 2 3 Introduction PISMA PISMA Output 4 RMK 11 PISMA Status 5 Conclusion

Flood INTRODUCTION Major problem in Malaysia Landuse For Urbanization Forest to agriculture Agriculture to urban areas Increase Flood prone areas 29,800 sq.km (about the size of Selangor + Perak)

TYPES OF FLOOD Major Flooding the main river overtop and cause widespread flooding of long duration Flash Flood a short duration flood that is very localized Flood condition varies from state to state. Flood level varies from 0.2m up to 5m(extreme cases). Size of flood <100 ha. to a few thousand ha.

FLASH FLOOD DEFINITION Usually occur in urban areas Caused by short, intense, localized thunderstorms that occurs < 3 hours Flood water rise almost immediately during the storm and water will recede within 6 hours after the rain 5

Flood Prone Areas Highland town Island town Riverside town Risk based on location Upstream town Coastal town Classification of town based on National Strategic Stormwater Management Plan (2007)

SW RISKS ACCORDING TO LOCATION No. Location Remark 1 Island Towns Affected by tide and shortage of freshwater. Low lying areas are subject to floods from high tide and possible inadequate SWM infrastructure 2 Coastal Towns Affected by tide. Low lying areas are subject to floods from high tide and possible inadequate SWM infrastructure 3 Riverside Towns Low lying areas are subject to flooding from river overflows and possible inadequate SWM infrastructure 4 Upstream Towns Flood likely caused by inadequacies from urban drainage 5 Highland Towns Steep areas may cause slope failure, erosion and mudflows

CLASSIFICATION OF TOWNS BY RIVER BASIN LOCATION Island Towns Coastal Towns Riverside Towns Upstream Towns Penang Langkawi Tioman Pangkor Johor Bahru Pontian Batu Pahat Muar Melaka Port Dickson Klang Lumut Butterworth Kota Bharu K. Terengganu Dungun Kertih Kemaman Kuantan Mersing Kluang Seremban Kuala Lumpur Ipoh Sg. Petani Alor Setar Temerloh Mentakab Pekan Tampin Kuala Kangsar Kajang Putrajaya Gemas Alor Gajah Highland Towns Fraser s Hill Cameron Highlands Genting Highlands Frequent Flash Flood

CAUSES OF FLOODING SHORT, INTENSE LOCALISED THUNDERSTORMS, THE TYPE OF STORM USUALLY EXPERIENCED IN THE EVENING RAPID AND UNCONTROLLED DEVELOPMENT IN CATCHMENT AREAS RESULTING IN HEAVY SILTATION OBSTRUCTIONS IN RIVER FLOW SYSTEM THAT REDUCE IN RIVER FLOW CAPACITY LIMITED AVAILABLE SPACE FOR RIVER IMPROVEMENT WORKS TO HANDLE THE EVER INCREASING FLOOD FLOW DUE TO ESCALATING URBANISATION PROCESS INSUFFICIENT INTERNAL DRAINAGE SYSTEMS WITHIN THE TOWN AREA UNDERCAPACITY

CHANGE IN LANDUSED AND FLOOD

LANDUSE FOR URBANIZATION Jalan Bukit Bintang, circa 1950 Ampang Park, circa 1970 Jalan Bukit Bintang, circa 2017 Ampang Park, circa 2017

CHANGES IN HYDROLOGY AND RUNOFF DUE TO DEVELOPMENT

IMPACT OF UNCONTROLLED DEVELOPMENT 13

Flow Flow Characteristics Rural and Urbanised Catchment Urbanised Developed Rural Undeveloped Time

LATEST FLASH FLOOD OCCURANCE

LATEST FLASH FLOOD OCCURANCE pada 15 September 2017

STORMWATER MANAGEMENT AND DRAINAGE MASTER PLAN

INTRODUCTION TO PISMA PISMA PISMA = MSMA Concept + Master Plan A master plan that will give comprehensive guidance and instruction, A comprehensive long-term strategy, Compliance with MSMA 2 nd Edition

INTRODUCTION TO PISMA The development of PISMA is to help solve the problem on flash floods and develop a master plan on how to effectively handle and overcome the occurence of flash floods. The output of this master plan are to: 1)Create a master plan for drainage 2)Create a master plan for water quality 3)Create an infrastructure inventory system based on GIS

PISMA TARGET GROUP 1 2 3 Developers Local Governments DID States & Districts New Development Local Plans Approval & Retrofitting

SCOPE OF WORK OF PISMA 1 Data and Information Collection 2 Topographical and Engineering Surveys and Geotechnical Investigations 3 Site Investigation and Field Inspection 4 Analyse Existing Conditions 5 Identify Stormwater Issues and Problem

SCOPE OF WORK OF PISMA 6 Formulate Alternatives 7 Compare Alternatives and Select Recommended Plan 8 Development of Stormwater Management Master Plan 9 Cost Estimates and Benefits 10 Prepare Plan Implementation Program

PISMA OUTPUT

PISMA STUDY OUTPUT 1 2 3 DRAINAGE MASTER PLAN Quantity Control WATER QUALITY MASTER PLAN Quality Control ASSET INVENTORY SYSTEM GIS Database

EXAMPLE OF PISMA STUDY (OUTPUT) EXISTING DRAINAGE Thoroughly studied by the consultant to identify the most comprehensive solution for the flash flood. PISMA STUDY PROPOSED SOLUTION The proposed option can be in: Structural approach (Channelisation, retention pond, pump drainage and etc.) Non-structural approach (Landuse management & zoning, Public Outreach Program, Enforcement (ESCP) and etc.)

MSMA CONCEPT IN PISMA (OUTPUT) MUDFLOWS SMELLY DRAIN FLASH FLOOD ESCP- CONSTRUCTION QUALITY CONTROL QUANTITY CONTROL

On Site Detention Pond (Dry Pond) On Site Retention Pond Wetland

Outfall Structure Filtration Structure Silt Fence Silt Trap

11 th MALAYSIA PLAN

17 STORMWATER MANAGEMENT AND DRAINAGE MASTERPLAN (PISMA) STUDY HAD COMPLETED UNTIL 2010 No. State Study Area 1. Perlis 2. Perak 3. Selangor 4. Sabah 5. Sarawak 6. Johor Pasir Gudang 7. Kelantan 8. Terengganu Dungun Kangar, Arau dan Padang Besar 1. Parit Buntar dan Bagan Serai 2. Ipoh 3. Manjung, Lumut dan Sitiawan 1. Klang 2. Sungai Besi dan Seri Kembangan 3. Bandar Sungai Buloh 4. Kajang 1. Tuaran, Mengatal dan Talipok 2. Tawau 1. Kuching dan Kota Samarahan 2. Miri 1. Tanah Merah 2. Pasir Mas 9. Pahang Kuantan Bagan Datuk 1. Semenyih, 2. Selayang, Rawang dan Kuang 1. Sandakan, 2. Lahad Datu, 3. Putatan dan Kinarut In Progress Not yet started Kota Bharu Kuala Terengganu Cameron Highlands Tebrau dan Plentong 1. Sri Aman, 2. Betong, Saratok, Spaoh & Debak 3. Limbang, 4. Serian 5. Lawas 6. Sarikei dan Bintangor

CONCLUSION Reference for state governments and local authorities

Prepared By: BAHAGIAN SALIRAN MESRA ALAM JPS MALAYSIA