Public Information Meeting

Similar documents
North Carolina Department of Transportation Project Development and Environmental Analysis Branch

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

ALIGNMENT SEGMENTS & OPERATIONALLY INDEPENDENT SECTIONS

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

BeltLine Corridor Environmental Study

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

Pennsy Greenway Trail

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY)

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

Technical Memorandum 5

Northern Branch Corridor SDEIS March Table of Contents

LITTLE ITALY UNIVERSITY CIRCLE (MAYFIELD STATION) COMMUNITY MEETING FEBRUARY 21, 2013

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Northern Branch Corridor DEIS December 2011

Asbury Chapel Subdivision Sketch Plan

AGENCIES and OFFICIALS CONTACTED FEDERAL Federal Aviation Administration Federal Emergency Management Agency Natural Resources Conservation Service U.

PennDOT. single spann lanes and 3- mayy need to be to accommodate. any bridge. addition to III. Date: CRP 07/27/2015 CRP.

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

BeltLine Corridor Environmental Study

APPENDIX I PUBLIC MEETING AT PROJECT INCEPTION

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Environmental Assessment

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

FDOT D4 Complete Streets

Welcome to the. Citizen Information Meeting for the Martinsville Southern Connector Study. The purpose of this meeting is to:

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Green Infrastructure The Indianapolis Greenways Connection

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Purpose of Tonight s Meeting

Illiana Corridor CPG/TTF Meeting #1

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

Northwest Corridor LRT Line to Irving/DFW Public Meeting No. 1 Project Overview

City of Meriden Harbor Brook Flood Control Project Overview

Kick-off Meeting. FM No: ETDM No: 14050

New Stanton Project Update July 3, 2012

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

Planning & Zoning Board Meeting. DRAFT Comprehensive Transportation Plan Update, February 23, 2018 version

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

APPENDIX A 6 CONCEPTUAL PRELIMINARY PLAN GUIDE AND CHECKLIST FOR MAJOR SUBDIVISIONS CARRBORO DEVELOPMENT GUIDE APPENDIX A

Rapid Transit Implementation Working Group

INTRODUCTION PLANNING HISTORY

Existing Conditions and Environmental Consequences Floodplains

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

South Dakota 100 Corridor Preservation

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Beatties Ford Road & Mt. Holly-Huntersville Road Small Area Plan

Parks, Trails, and Open space Element

Parks, Trails, and Open Space Element

Project Purpose. Project Need

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 8B5

PROJECT COMMITMENTS. Research Parkway -- Winston-Salem. From Stadium Drive to Third Street. Forsyth County. WBS Element TIP Project U-4918

Commissioners Road West Realignment Environmental Assessment

ELIGIBILITY CRITERIA CHECKLIST OPEN SPACE CLASSIFICATION

CENTERTON ROAD BRIDGE REPLACEMENT

Reevaluation of Categorical Exclusion

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

SECTION 4(f) DE MINIMIS DOCUMENTATION

FEASIBILITY / PROJECT DEVELOPMENT & ENVIRONMENT STUDY LAKE / ORANGE COUNTY CONNECTOR (US 27 TO SR 429) ENVIRONMENTAL ADVISORY GROUP MEETING NO.

DRAFT MAP AMENDMENT FLU 04-4

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

2017 General Obligation Bond

Master Plan for Preservation and Scenic Conservation (1995)

UCONN Athletic District Improvements Scoping Meeting

B. DESCRIPTION OF THE PROPOSED ACTION

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

RCS: Prepared for: DEPARTMENT OF THE AIR FORCE Eglin Air Force Base. Okaloosa County, Florida. July Prepared by:

Capital Improvement Program. Development Services Staff Recommended Projects

Warren County/Bowling Green Focus 2030 Comprehensive Plan VOLUME 1 INDEX

Appendix E Section 4(f) Evaluation

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Northern Branch Corridor SDEIS March 2017

State Avenue Corridor Transit Improvement Project, Scope Overview

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Albert Lea. Redevelopment Plan. 701 Xenia Avenue South, Suite 300 Minneapolis, MN Tel: (763) Fax: (763) wsbeng.

1. Project Description

Transcription:

Public Information Meeting Corridor Study / Environmental Analysis for County Road 600 West from County Road 300 North to County Road 1000 North (96 th Street)

Study Limits it County Road 600 West from County Road 300 North to County Road 1000 North Total Length = Approximately Total Length = Approximately 7 miles

Study Scope/Focus Scope Add capacity to County Road 600 West while focusing on improvements within the corporate limits of the Town of McCordsville Identify preferred alignment alternative

Stakeholder Involvement Stakeholder committee was organized Indianapolis MPO Hancock County Public Officials McCordsville Public Officials Periodic stakeholder meetings were held to discuss the evolution of thestudy

Study Scope Components Environmental Engineering

Environmental Scope Components Federal, State and Local Agency Coordination Used to identify federal and state Endangered or Threatened species, federally protected lands, well head protection areas, and other environmentally sensitive areas. CulturalResources Investigations Archaeological Prehistoric and historic below ground resources (burial grounds and artifacts) Historical Above ground resources (National Register of Historic Places listed or eligible structures) Hazardous Materials and Regulated Substances Sites with the potential for contaminated soils/groundwater (i.e. gas stations, dry cleaners, factories, etc.) Wetlands and Other Aquatic Resources Identified wetlands and streams Floodplain Impacts Defined by Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps

Environmental ls Scope Components Continued Farmland Impacts Pi Prime farmland of State t or Local significance ifi Environmental Justice Is required for any project that may result in disproportionately high adverse impacts on a minority and low income population in or near the project area

Engineering Scope Components Indiana Design Manual Basis for Engineering Evaluation 45 mph thoroughfare Grade separation with CSX Railroad Cost Major utilities Relocations and land acquisition Land access (land locking)

Engineering Scope Roadway Section General Section 2 12 travel lanes each direction 1 14 bi directional center turn lane or raised median Mill and resurface existing lanes

Engineering Scope Structures Bridges and Small Structures from south to north County Road 600 West over Indian Creek County Road 600 West over Broadway (US 36 / SR 67) and the CSX Railroad (New Structure) County Road 600 West over Dry Branch County Road 600 West over North Fork

Study Analysis Preferred Alignment Alternative Development Existing alignment was analyzedbased ontheenvironmental environmental and engineering components. Existing alternate was carried forward for further analysis from County Road 300 North to County Road 700 North alignment and from County Road 800 North to County Road d1000 North h(96 th Street). The existing alignment alternate did not meet study scope objectives between County Road 700 North and County Road 800 North. Adherence to Environmental and Engineering Study Scope Components Existing Alignment Environmental Engineering County Road 300 North to County Road 700 North County Road 700 North to County Road 800 North County Road 800 North to County Road 1000 North X X

Study Analysis Preferred dalignment Alternative ti Development Continued Western Alternative Alignments of McCordsville Disproportionate relocation impacts due to existing developments Economic and social impacts within McCordsville Eliminated from further evaluation

Study Analysis Preferred ee edalignment Alternative edevelopment eeop e Continued Eastern Alternative Alignments of McCordsville Development

Study Analysis Preferred Alignment Alternative Development Continued Eastern alternative alignment of McCordsville selected for comparison versus the existing alignment

Study Analysis Preferred dalignment Alternative ti Development Continued Environmental Impacts Existing Alignment vs. Eastern Alternate Alignment of McCordsville Environmental Resource Existing Alignment Eastern Alternate Alignment of McCordsville Wetlands 0 0 Stream Crossings 3 1 Natural Areas and Nature Preserves 0 0 Relocations 10 1 Wellhead Protection Areas 0 0 Natural Habitat 0.35 acres 0.91 acres Floodplain Impacts 2 2 Archaeological Impacts 0 0 Cemetery Impacts 2 0 Hazardous Material Sites 4 2 Section 4 (f) Impacts (Parks) 1 0 Section 6 (f) Impacts 0 0 Environmental Justice Impacts 0 0

Study Analysis Existing Alignment vs. Eastern Alternate Alignment of McCordsville Engineering Consideration Existing Alignment Eastern Alternate Alignment of McCordsville Yes No Yes No 45 mph thoroughfare X X Grade separation with CSX Ril Railroad Cost X X Major Utilitiest X X X X Relocations and land acquisition X X Land access (land locking) X X

Recommended Preferred Alternative

What s Next? Approval of preferred alignment Followed by: Design Environmental Documentation Public Hearing Seek out funding sources Place projects in the MPO s Transportation ti Improvement Program (TIP) Construction

Thank you for attending!