Are you ready for EN 54-23? New requirements for fire alarm systems from 1 January 2014

Similar documents
A perfect fire alarm system needs perfect planning.

Evacuate everyone Sonos Pulse & Nexus Pulse

EN54 Part 23 Made Easy CPD PRESENTED BY SIMON ADAMS GENT BY HONEYWELL

Thermal management of electrical enclosures. Stronger than the elements. Pfannenberg units for outdoor thermal management.

Notifier by Honeywell: Non-Addressable Audible & Visual Alarm Devices. Approved to EN54-3/EN54-23

Opal TM AV Devices. Data Sheet. Benefits

CONVENTIONAL AUDIBLE VISUAL

Visual Alarm Devices. Presented prepared by Chris Orr

THE COMPLETE SPECTRUM OF SIGNALING TECHNOLOGY

Top-mounted cooling units for the highest demands.

CASE STUDY. It s all about the cut-out

Thermal Management and Signaling Technology

Addressable Loop Powered Visual Alarm Devices

ErP 2009/125/CE. Directives Eco design Energy labelling

INNOVATION GATEWAY. Challenge Selection Round 2, Innovator Briefs Building heating systems

Addressable Fire Alarm Devices Superior Technology for the Highest Protection

Visual Alarm Devices - VADs. A pocket guide to planning, design, installation, commissioning and maintenance of VADs for Fire Warning.

Quality makes the Difference. AquaTREND uni. User s Manual Humidifi er for Therapeutic Air Flow

CASE STUDY. Safety and system uptime in the St. Gotthard Base Tunnel

Record of Amendments. Version Date Amendment Section/page affected

The new Gas Appliances Regulation (EU) 2016/426

Opal TM AV Devices. Data Sheet. Benefits

Fire Systems Design Pocket Guide BS 5839 Part 1:2017 and CoP 0001 for Visual Alarm Devices. Fire Installers Mate. A guide to fire system design

Procedure for the Approval of New Fire Detection and Alarm Technologies

Display coolers Special 2016 / 2017

Instruction Manual. CAT 100 & CAT 200 Continuous Analyzer Transmitter Addendum for Hazardous Area Applications. 3 rd Edition 05/2007

EN54-23 Beacons & Sounder Beacons

Interbases. Sinteso FDSB221, FDSB228, FDSB229

Extended Coverage Sidewall Sprinklers

Installation Instructions

13 tones to choose from, 2 programmable alarm levels Adjustable sound levels up to 93 dba

CE marking of noise barriers and foundations

The PPE Directive and the PPE Regulation

Fire Signalling. Signalling Solutions

SCS motion sensors Surface/wall mounting - PIR

SWIMMING POOL SWIMMING POOL DEHUMIDIFICATION

Detector switch - Dual Tech SCS

Sensero-868/915 AC, Sensero-868/915 AC Plus Nr , , ,

COMMISSION DELEGATED REGULATION (EU)

TAH / TBH / TCH Series

BUSINESS PLAN CEN/TC 124 TIMBER STRUCTURES EXECUTIVE SUMMARY

Operating Instructions!

DID YOU GET USED TO THE NEW CPR? HERE S A QUICK REVIEW!

VIMPEX BS Evacuation. Fire Alarms EN Banshee. Beacons. FlashDome. Electronic Sounders. Audible Alarm

6100 SINGLE LOOP DIGITAL ADDRESSABLE FIRE ALARM CONTROL PANEL

YOUR GUIDE TO UNDERSTANDING CPR

ORIGA-SENSOFLEX Displacement Measuring System for Cylinder Series OSP-P

OPERATING MANUAL ORWAK March 2005 PUBL. NO Edition 4

Dry Bath Heating Systems

Circuit Breakers JANUARY The electronic pdf version of this document found through is the officially binding version

Technologies Gas extinguishing systems. MX 200 Fire Extinguishing Systems Fighting Fire using HFC-227ea

Achieve Success with European Medical Device Commercialization. By Russ King

Heating with log wood

Role of CE Marking in the Placing on the Market of Electronic Components

The Danish Energy Authority to carry out inspections in June and July 2012

The effects on the UK Fire Industry. Paul Pope Eng.Tech AIFireE

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

InfraTec Premium. Assembly and operating instruction. 20 min. Made in Germany. Druck Nr en/ :00 20 C

Annex A to joint CELMA / ELC Guide on LED related standards: Photobiological safety of LED lamps and lamp systems

Sonos-SB Siren/Beacon

URBAN DESIGN BRIEF New Street Burlington, ON

BLUE ANGEL The German Ecolabel Electric Hand Dryers DE-UZ 87 Basic Award Criteria Edition May 2014 Version 3

Valve Manufacturers Association of America

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems


Heaters, Thermostats and Hygrostats

ENGLISH USER S MANUAL PRE SOAKER 3600

ENABLING MARKET ACCESS RADIO EQUIPMENT DIRECTIVE (RED) 2014/53/EU. The new radio equipment directive in detail

Detector switch - Dual Tech

SD119 Range of Conventional Smoke and Smoke/Heat Detectors (refer to attached appendix for details and conditions)

CEN TC 10 (Lifts, escalators and moving walks) Introduction to EN 81-20/50 (revision of EN 81-1/2)

HEALTH & SAFETY AND INSTALLATION GUIDE

TECHNICAL REPORT. Household high-fidelity audio equipment and systems Methods of measuring and specifying the performance

Convener, CEN/TC226/WG6/TG1

Request for tender regarding the validation of ammonia testing methods as supplement to pren 16516

COMMISSION DELEGATED REGULATION (EU) /... of

LED Product Catalogue

NON ELECTRICAL EQUIPMENT IN HAZARDOUS AREAS

EQUIPMENT INTENDED FOR USE IN POTENTIALLY EXPLOSIVE ATMOSPHERES (ATEX)

TAH / TBH / TCH Series

Remote alarm case VENTIremote alarm 10 m WM VENTIremote alarm 30 m WM Device description and instructions for use

Dräger Bodyguard 1000 Warning Device

The ATEX Directive 94/9/EC

Technical Bulletin CE marking: from 1st July 2013

Regulation 574_2014: Annex III CPR. and. Regulation 568_2014: Annex V CPR

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Pocket guide to. Fire Alarm Systems Design BS Standard

AD.3.XG... DIRECTIONAL CONTROLE CETOP 3

Signaling Solutions for Alarm, Warning, and Indication

The transition requirements of the new Regulation (EU) 2016/425 of the European Parliament and of the Council on personal protective equipment

SECTION 4. Parts Management

NEVER ACTIVATE THE STROBE WITH THE PCB OUT OF ITS PROTECTIVE CASE. EXTREME CARE IS ADVISED TO REMOVE THE RISK OF ELECTRIC SHOCK.

EUROPUMP ATEX Guideline Part II

COMMISSION DELEGATED REGULATION (EU) /... of

Type 5 Certifications:

Premium Efficiency Heat Recovery Unit. D-AHU Modular L. Air Handling Units

The Danish Energy Agency will carry out inspections in June 2013

Council of the European Union Brussels, 28 June 2017 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

Standards in Security Shutters & Fire Shutters (UK & USA)

AZSG10000/AZSG10005/AZSG10010 ABUS Wired Outdoor Siren

Shipboard incinerators with capacities up to 4000 kw

Transcription:

Are you ready for EN 54-23? New requirements for fire alarm systems from 1 January 2014

At a glance: What you should know about EN 54-23 What has to be done now How Pfannenberg supports you From 1 January 2014 onwards, fi re alarm systems must have, according to EN 54, visual and/or visual-audible signaling devices which comply with EN 54-23 requirements. That means that all visual alarm devices (VADs) which do not have the necessary certification will also lose their national approval (e.g. VdS) and may no longer be used for new installations. There is therefore an acute need for action for the following groups of companies and professionals: planners/specifi ers, fi re detection technology experts, system integrators and manufacturers of fi re alarm systems, electrical installers and specialist companies as well as building operators in all countries in the EU. Pfannenberg is the fi rst manufacturer to now offer you fl ashing lights that are EN 54-23 and VdS certifi ed. That ensures you planning security for all building projects.

Background information: EN 54-23 a directive becomes a regulation Up until May 2010 there was no unified European standard to define the performance of visual alarms. The introduction of the European standard EN 54-23 now allows standardisation of the requirements for visual alarms, the test methods and the performance criteria. With the EN 54-23 taking effect, demands are also being made regarding the light output and light distribution for all visual signaling devices. Furthermore, in many cases of alarms in which up to now solely an audible signal has been installed, an additional visual signal must be used in the future. So, ambient noise, so-called acoustic smog, the use of ear protection or headphones and deafness hinder the perceptibility of audible danger signals and make additional visual alarm devices in fire alarm systems urgently necessary.

For this reason, certifi ed visual and/or visual/audible signaling devices are mandatory in accordance with EN 54-23 as of 1 January 2014, as the transitional period expires on this date. In countries, such as Great Britain, Portugal, Ireland and Sweden, which have currently not implemented European Directive 89/106/EEC (Construction Products Directive) for the CE conformity declaration of visual and audible alarms, the deadline is 1 July 2013. Thereafter, European legislation allows no choice. The Construction Products Directive will be superceded by the Construction Products Regulation and becomes EU-wide law. Because of the EN 54-23 all visual signaling devices will lose their certifications as of 1 January 2014 and may no longer be used for new installations.

The Details: What requirements does EN 54-23 stipulate? The EN 54-23 European product standard stipulates the device requirements for visual signaling devices used as components of fi re alarm systems. Many of the visual signaling devices previously used in fi re protection do not meet the EN 54-23 requirements. Besides the signaling devices all other components of a fi re alarm system have to comply with the EN 54 series of standards. Furthermore, according to EN 54-13 an evaluation of the compatibility of system components has to be performed in which the visual signaling devices are also considered. Requirements for visual signaling devices Illumination: An illumination of min. 0.4 lux (lm/m²) is required over the entire coverage volume, i.e. the space in which the alarm signal is to be effective (e.g. hotel room). Light color: The visual signaling device must emit white or red fl ashing light. Flash rate: The fl ash rate must be between 0.5 Hz and 2 Hz.

The Details: What requirements does EN 54-23 stipulate? Coverage Volume Visual alarm devices must meet the requirements for the coverage volume in at least one of the following three categories: ceiling mounted signaling device C; wall mounted signaling device W; or O for signaling devices for which the mounting position is freely selectable. Ceiling mounted (C) Devices from category C are described with the specifi cation C-x-y. x stands for the measured maximum installation height in meters (m) at which the signaling device may be placed. Whereas y specifi es the diameter of the cylindrical coverage volume. Besides the specification of the cylindrical signaling space x the devices are only classified for heights up to 3 to 6 or up to 9 m. y Wall mounted (W) Category W devices are described with W-x-y. x stands for the maximum height of the signaling device on the wall specifi ed in meters (m) with a minimum installation height of 2.4 m. y describes the square base area of the cuboid coverage volume. y x Open mounting position (O) For category O devices the shape of the coverage volume and the mounting position of the signaling device is open. This means there are no restrictions on the formation of the coverage volume. y

Conclusion: Category O devices are the most flexible solution The signaling device can be optionally mounted on the ceiling, wall or another position, whereas category C and W devices are only allowed to be mounted according to their classifi cation. Category O devices are the most economical solution Only one signaling device is required for all mounting positions. This avoids having to keep double stock. No restriction with the mounting height - devices with the identifi er C-3-y are not approved for ceiling heights of 3.2 m for example and a device of category C-6-y has to be taken, which would be far too oversized for this application. The shape of a cylinder is generally not compatible with the shape of rooms. The actual coverage volume of the device is fi rstly reduced to a cylinder shape. In order to then be in a position to use the shape of the cylinder and to make planning possible, it is necessary to further reduce the coverage volume to the largest possible quadratic area. This automatically requires the use of a larger number of signaling devices in order to ensure alarming of the room. The shape requirement with quadratic base area for category W devices means that the actual coverage volume that the device could cover is reduces in certain places. As a result of the artificially reduced coverage volume, an increased number of devices is necessary. Category O devices are subject to no restrictions, so the formation of the largest possible coverage volume in the form of a freely selectable cuboid is possible. y F F = y2 2

Application example As an example, a room of 20 m length, 8 m width and 3 m height is to be signalled. Planning with the following three devices is compared: The Pfannenberg PYRA fl ashing light (category O) with the following coverage volume 11.1 m x 8.4 m x 6.3 m The same device, however if it were only approved for ceiling-mounting. Coverage volume C-6-10.6. A comparable device of category C-3-7.5 On account of the specifi ed coverage volumes, the following quantities for visual signaling devices arise: 8.4 m max. 6.3 m 10.6 7.5 6 3 11.1 m 11.1 m PYRA (Cat. O) 11.1 x 8.4 m PYRA (Cat. C) C-6-10.6 VADs for ceiling mounted position (Cat. C) C-3-7.5 The following calculation applies for this example: Calculation * of open mounted in comparison to ceiling mounted position PYRA (Cat. O) PYRA (Cat. C) If the ceiling height of the room were just 1 cm higher, the 3rd version could not be used for this room. C-3-7,5 (Cat. C) Quantity unit 2 6 8 Costs per unit EUR 60.00 60.00 60.00 Total cost of devices EUR 120.00 360.00 480.00 Costs of cabling per unit EUR 9.00 9.00 9.00 Total costs of cabling EUR 18.00 54.00 72.00 Costs of installation per unit EUR 1.50 1.50 3.00 Total costs of installation EUR 3.00 9.00 24.00 Total costs EUR 141.00 423.00 576.00 Cost saving compared to C-3-7,5 EUR 435.00 153.00 * exemplary calculations costs; costs for a room 20 m of length, 8 m of width, 3 m of height

Need for action: What does EN 54-23 mean for you in particular? The Europe-wide introduction of the unified product standard for visual alarms affects a whole range of companies and professional groups and has to be considered in all current and future projects: Planners and specifiers Modification of the contractual basis Modification of the tendering text / items Information for the ordering customer Testing and acceptance of the visual signaling device Fire detection technology experts Define the basis for testing/demand for certificates Testing the function of the visual signaling device and comparison with the standards requirements System integrators / Manufacturers of fire alarm systems Implementation of EN 54-23 approved visual signaling devices in the system Assessment of compatibility in consideration to EN 54-13 of the entire system Installers and specialist companies Information for the ordering customer Modification of the offers Possibly inform on erroneous items in the tender, possibly revision Building operators Review of the contractual documents Information to the planning company

Certified Pfannenberg products for building and industrial solutions EN 54-23 certified solutions from the innovative PATROL and PYRA series PY X-S-05 PA X 1-05 PY X-S-05 and PA X 1-05 Flashing sounders PAX from the PATROL series had been honoured with the red dot award: product design 2013. Safely to the right solution: Pfannenberg Sizing Software (PSS) With the Pfannenberg Sizing Software you can determine standard-compliant signal technology solutions. Calculate correctly and avoid expensive and hazardous oversizing and undersizing. With PSS and innovative products from Pfannenberg you will always fi nd the best and most effi cient solution for your applications. Please fi nd more information on our website: www.pfannenberg.com/en/support/pss-sizing-software/

The recommendation: Take advantage of certified VADs now! What are the advantages of EN 54-23 certified VADs? Planning reliability in project management Ensuring compliant fire alarm systems Minimisation of liability risks Cost reductions thanks to shorter installation times For system integrators and manufacturers of fire alarm systems: Reliability concerning system requirements and compatibility For building operators: possibly a reduction in insurance premium Certified flashing lights from Pfannenberg Pfannenberg offers you flashing lights certified according to EN 54-23 and national approval (e.g. VdS). The flashing light PY X-S-05 and the combined visual-audible device PA X 1-05 are available in the standardized lens colors red and clear and ensure an immediate planning security for all building projects.

Get fit for EN 54-23 contact us now Please fi nd more information on: www.en54-23.eu Pfannenberg GmbH Werner-Witt-Straße 1 D-21035 Hamburg P.O. Box 80 07 47 D-21007 Hamburg Phone + 49 (0)40 734 12-156 Fax + 49 (0)40 734 12-101 customercare@pfannenberg.com www.pfannenberg.com Deliveries are made on the basis of the General Terms and Services of the ZVEI. Subject to technical amendments and misprints. This paper has been manufactured from chlorine-free bleached cellulose.