A. INTRODUCTION B. EXISTING CONDITIONS

Similar documents
A. INTRODUCTION B. EXISTING CONDITIONS

B. ROLE OF THE EIS IN THE APPROVALS PROCESS

5.2 LAND USE AND ZONING

A. INTRODUCTION B. PROJECT LOCATION

Land Use, Zoning, and Public Policy A. INTRODUCTION B. DEVELOPMENT HISTORY

Chapter 2, Section C: Urban Design and Visual Resources A. INTRODUCTION

A. INTRODUCTION B. DESCRIPTION OF PROPOSED ACTION

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

Chapter 8: Neighborhood Character A. INTRODUCTION

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

22.1 INTRODUCTION 22.2 HISTORIC RESOURCES ARCHEOLOGICAL RESOURCES HISTORIC RESOURCES

ANCHOR TO ANCHOR. Rescale the street to create an iconic boulevard.

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

B. PROPOSED REFINEMENTS POTENTIALLY AFFECTING URBAN DESIGN AND VISUAL RESOURCES

A. INTRODUCTION B. NO ACTION ALTERNATIVE

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

URBAN DESIGN AND VISUAL RESOURCES

ARLINGTON COUNTY, VIRGINIA

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

The Street Grid. Urban Design Elements

URBAN DESIGN AND VISUAL RESOURCES

burlington mobility hubs study Downtown Burlington Mobility Hub

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Lower Manhattan Development Corporation World Trade Center Memorial and Cultural Program General Project Plan June 2, 2004, As Amended May 19, 2005

I-70/71 Innerbelt Project

Lower Manhattan Development Corporation World Trade Center Memorial and Cultural Program General Project Plan Proposed Amendments December 16, 2004

A Vision for Lower Manhattan. Context and Program for the Innovative Design Study

Lower Manhattan Development Corporation World Trade Center Memorial and Cultural Program General Project Plan proposed amendments November 9, 2006

A. WHAT IS A GENERAL PLAN?

appendix and street interface guidelines

EXISTING COMPREHENSIVE PLAN

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

Bourne Downtown Site Planning

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

13. London Bridge London Bridge Area Vision

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

PORT OF VANCOUVER WATERFRONT DEVELOPMENT. Concept Development Plan City Center Redevelopment Authority April 20, 2017

Our Legacy Projects DOWNTOWN JACKSONVILLE MASTER PLAN

The principal elements of the NTC Strategic Vision plan are as follows.

The Trinity River Corridor, offering Dallas areas of natural

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

Downtown Streetscape Manual & Built Form Standards

17.1 INTRODUCTION CONTEXT CONCLUSIONS

SARANAC LAKE VISION CONCEPTS

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

CITY OF COLWICH COMPREHENSIVE PLAN LAND USE LAND USE 1

PLANNING JUSTIFICATION REPORT

Ivywild On The Creek PRELIMINARY CREEK DISTRICT MASTER PLAN

2. Form and Character. 2.1 Introduction. 2.2 The Downtown Addition Plan. 2.1 Introduction

Carlsbad Village Redevelopment Concept Summary of Features

Policies and Code Intent Sections Related to Town Center

2.0 Strategic Context 4

We are a determined group residents, industry, and government and by working together an incredible future lies ahead for Troy.

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

CITY OF WAUKEGAN MASTER PLAN AND DESIGN GUIDELINES

Town Center. Block 5 Existing multifamily residential units are expected to remain.

Town Center (part of the Comprehensive Plan)

LAND PARK COMMUNITY PLAN

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

Area Plans. September 18, 2012

Today Land & People. Northeast Nampa Gateway District. Employment. Land Use Characteristics. Demographics. Current Zoning

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

Open Space and Recreational Resources

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

TEMPLE MEDICAL & EDUCATION DISTRICT

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

Planning Districts INTRODUCTION

M E M O R A N D U M February 21, 2018

Port Lavaca Future Land Use

17.11 Establishment of Land Use Districts

LAND USE AMENDMENT DOWNTOWN COMMERCIAL CORE (WARD 7) MACLEOD TRAIL SE AND 5 AVENUE SE BYLAW 254D2017

C. Westerly Creek Village & The Montview Corridor

8implementation. strategies

Downtown Dubuque...it s a great time.

Best Practices Appendix: Waterfront Communities

M i s s i o n B a y W a t e r f r o n t

Lynn Waterfront Master Plan

178 Carruthers Properties Inc.

CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS CIVITAS

The transportation system in a community is an

Urban Sustainability Area Designation

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Neighborhood Districts

CHAPTER 4 COMMUNITY DEVELOPMENT AND DESIGN

City Center Neighborhood Plan

ROCKEFELLER UNIVERSITY

City of Heath. Town Center Concept

A. INTRODUCTION. Julie Cowing 5/22/13 11:47 AM Deleted: Considered

Pedestrian and Bike Bridge LOGO

CHAPTER 5: GUIDING PRINCIPLES

THE CIVIC DISTRICT DEVELOPMENT OPPORTUNITIES

Sheridan Boulevard S TAT I O N A R E A P L A N S H E R I D A N B O U L E VA R D S TAT I O N A R E A P L A N

4 C OMMUNITY D ISTRICTS

NATICK COMPREHENSIVE MASTER PLAN. Natick Center Outreach Meeting. After presentations about the Natick Master Plan process, town staff and

Community Design Plan

NEIGHBORHOOD DESIGN ELEMENT

West Ocala Vision & Community Plan City Council Work Session. Presented by West Ocala Community Plan Steering Committee

Chapter 22. Alternatives to the Proposed Project

SECTION ONE: INTRODUCTION. introduction

Transcription:

Chapter 2, Section A Land Use, Zoning, and Public Policy A. INTRODUCTION This section considers existing land use, zoning, and public land use policies for the project site and to the surrounding 400-foot study area. Land use issues associated with the Proposed Project include potential changes in local land uses and neighborhood land use patterns. Zoning and public policy issues include the compatibility of the proposed storefront and façade improvement program, streetscape improvements, and open spaces with existing public policies. As described below, this analysis concludes that the Proposed Project would be in keeping with and supportive of existing land uses in the study area, and that it would be consistent with zoning and public policy for the area. Overall, the Proposed Project would not result in any significant adverse impacts on land use, zoning, or public policy. B. EXISTING CONDITIONS LAND USE PROJECT SITE As described in Chapter 1, Project Description, the project site includes Fulton Street between Broadway to the west and Water Street to the east; Nassau Street between Spruce Street on the north and Maiden Lane on the south; and other streets intersecting Fulton Street up to a three-block area north and south, including John Street from William Street to South Street, and Burling Slip, located one block south of Fulton Street and east of Water Street (see Figure 2A-1). The Fulton Street portion of the project site is characterized primarily by a mix of office and residential uses, most of which include retail storefronts on the ground floor. The types of retail along Fulton Street include clothing and accessories stores, restaurants and fast food outlets, delis, and gift shops. A seven-story commercial building on the north side of Fulton at William Street is undergoing conversion to apartments, and many of the residential buildings in this area have been converted from office use over the past several years. The Southbridge Towers, a large residential complex with apartment towers and a number of retail establishments at ground floor level, are located on the east side of Fulton Street between Gold and Pearl Streets. A portion of the Southbridge Towers site, at Fulton and Gold Streets adjacent to DeLury Square, is part of the project site and would be acquired by the City as part of the Proposed Project. Other uses along Fulton Street include a multi-story parking garage at Cliff Street, an NYU dorm at Water Street, and Saint Vincent Hospital s Medical Practice at Saint Margaret s House between Cliff and Pearl Streets. The Titanic Memorial Park and Pearl Street Playground are located at the southeastern end of the Fulton Street portion of the project site. The Pearl Street Playground, located on the northeast corner of Pearl and Fulton Streets, includes benches and play equipment. To the south across Pearl Street is the Titanic Memorial Park, which features benches, landscaping, and a lighthouse structure. 2A-1

10.29.07 CHURCH ST. BARCLAY ST. CENTER ST. N VESEY ST. PARK ROW SPRUCE ST. MADISON ST. BEEKMAN ST. DEY ST. BK BR ARCH BROADWAY FULTON ST. ANN ST. JOHN ST. FRANKFORT ST. NASSAU ST. DUTCH ST. GOLD ST. CEDAR ST. LIBERTY ST. MAIDEN LA. CLIFF ST. PEARL ST. PECK SLIP PLATT ST. WATER ST. PINE ST. CEDAR ST. SEAPORT PLZ. BEEKMAN ST. FRONT ST. FLETCHER ST. BURLING SLIP EXCHANGE PL. WALL ST. FDR DR. HANOVER PLZ. BEAVER ST. SOUTH ST. S WILLIAM ST. WATER ST. FRONT ST. Project Site Boundary Study Area Boundary (400-Foot Perimeter) Residential Residential with Commercial Below Hotels Commercial and Office FULTON CORRIDOR REVITALIZATION PROGRAM Industrial and Manufacturing Transportation and Utility Public Facilities and Institutions Open Space and Outdoor Recreation Parking Facilities Vacant Land Vacant Building Under Construction 0 400 FEET SCALE Land Use Figure 2A-1

Fulton Corridor Revitalization Program Like Fulton Street, Nassau Street is lined with a mix of office and residential buildings, nearly all of which have retail uses on the ground floor. The types of retail along Nassau Street are similar to those on Fulton Street. Several storefronts along Nassau Street are vacant and undergoing renovation. John, William, Gold, Cliff, and Pearl Streets are characterized by a similar mix of office, residential, and retail uses as Fulton and Nassau Streets, though retail use along these streets is less continuous. Burling Slip, located at the southeastern end of John Street, is a City-owned paved area currently used for parking for vehicles owned by the New York City Economic Development Corporation (EDC) and the New York City Department of Small Business Services (DSBS). STUDY AREA The study area includes a mix of office, retail, residential, institutional, and open space uses. Several large residential and institutional uses are located to the north and east of Fulton Street. These include the Southbridge Towers, Pace University, and the New York Downtown Hospital, which is currently undergoing expansion between Beekman and Spruce Streets. The South Street Seaport and the East River waterfront are located in the southeastern portion of the study area. The South Street Seaport is centered around Fulton Street, where Schermerhorn Row and the Fulton Market building house retail and gallery space. An esplanade runs along the waterfront beneath the elevated FDR Drive. Piers 16 and 17 house the South Street Seaport Museum and retail complex. The study area to the south and west of Fulton and John Streets is characterized by large office buildings and commercial buildings that have been converted to residential use. ZONING PROJECT SITE The project site falls entirely within the Special Lower Manhattan District. Established in 1998, the Special Lower Manhattan District covers all of Lower Manhattan generally south of Murray Street and the Brooklyn Bridge. It was created to simplify and consolidate the overlapping complex regulations previously governing Lower Manhattan, to allow the area to grow while reinforcing its historic character and built fabric, and to facilitate the area s change to a mixeduse community. The zoning change relaxed strict use controls that had inhibited the retail, entertainment, and service establishments generally needed to support a 24-hour community. The special district s height and setback controls are intended to encourage new development that would be consistent with the historic character of Lower Manhattan while allowing design flexibility. The project site falls within C5-3, C5-5, C6-4, C6-2A, and R8 zoning districts (see Figure 2A-2 and Table 2A-1). However, the portions of the project sites that would be subject only to streetscape improvements are within the existing street bed and therefore no zoning designation applies. The commercial districts that encompass the project site are central commercial districts that allow for a range of retail and office uses as well as residential uses, community facilities, and public open space. DeLury Square is zoned R8, a residential district that typically includes mid- to high-rise apartment buildings and permits public open space. 2A-2

10.29.07 N Project Site Study Area Boundary (400-Foot Perimeter) 0 500 FEET SCALE Zoning District Boundary Special Purpose District FULTON CORRIDOR REVITALIZATION PROGRAM Zoning Figure 2A-2

Chapter 2, Section A: Land Use, Zoning, and Public Policy Table 2A-1 Existing Zoning Districts District Type Use Groups Maximum FAR Notes: Sources: Project Site C5-3 Central Commercial 1-6, 9-11 15.0 (C, CF); 10.0 (R) C5-5 Central Commercial 1-6, 9-11 15.0 (C, CF); 10.0 (R) C6-2A Central Commercial 1-12 6.0 (C), 6.02 (R), 6.5 (CF) C6-4 Central Commercial 1-12 10.0 (R, C, CF) R8 Residential 1-4 6.02 (R), 6.5 (CF) Study Area C2-8 Local Service 1-9, 14 2.0 (C); 10.0 (R, CF) C6-9 Central Commercial 1-12 15.0 (C, CF), 10.0 (R) C = Commercial Use; M = Manufacturing; CF = Community Facility; R = Residential New York City Zoning Resolution. STUDY AREA In addition to the zoning districts described above for the project site, the study area includes C2-8 and C6-9 zoning districts. C2-8 is a local service district that permits residential and community facility uses as well as a wide range of commercial uses, including local retail and service establishments, small amusement establishments, and services for boating and related activities. The maximum permitted floor area ratio (FAR) is 2.0 for commercial uses and 10.0 for residential and community facility uses. C6-9 is a central commercial district that allows the same uses as the C6-4 on the project site but permits a greater density for commercial and community facility uses. PUBLIC POLICY Public policy at multiple levels of government supports the expedited redevelopment of Lower Manhattan. Public policies that affect the project site and study area by encouraging development and revitalization are outlined below. LOWER MANHATTAN DEVELOPMENT CORPORATION The Lower Manhattan Development Corporation (LMDC) was created in November 2001 as a subsidiary of the New York State Urban Development Corporation, doing business as Empire State Development Corporation (ESDC) to help plan and coordinate the rebuilding of Lower Manhattan south of Houston Street. LMDC is charged with assisting New York City in recovering from the terrorist attacks on the World Trade Center (WTC), and ensuring that Lower Manhattan emerges as a strong and vibrant 24-hour community. The centerpiece of LMDC s efforts is the creation of a permanent Memorial for the WTC site. In addition, several advisory councils provide input on such issues as transportation and infrastructure, residential and commuter concerns, economic development, and tourism and the arts. NEW YORK CITY S VISION FOR LOWER MANHATTAN On December 12, 2002, Mayor Michael Bloomberg released New York City s Vision for Lower Manhattan with the stated purpose of connecting Lower Manhattan to the world around it, building new neighborhoods, and creating public places that make Lower Manhattan one of the 2A-3

Fulton Corridor Revitalization Program most appealing places in the world. The Vision discusses various recommendations to help revitalize and improve Lower Manhattan as a global center of business by creating new regional transportation links. Other goals include improvements to streetscapes, the expansion and creation of public plazas and parks, and the continued revitalization of the waterfront. The Vision aims to spark private market reactions from these public investments. THE ALLIANCE FOR DOWNTOWN NEW YORK The Alliance for Downtown New York (ADNY), the City s largest Business Improvement District (BID), was established in 1995. Prior to September 11, 2001, ADNY s mission was to transform downtown into a 24-hour neighborhood and to create a safe, clean, live-work, wired community for the 21st century. The BID covers the area from City Hall to the Battery, and from South Street to West Street (Route 9A). After September 11, 2001, ADNY is continuing its efforts to aid downtown redevelopment and has partnered with Seedco and Asian Americans for Equality to offer combination grants/loans and workforce subsidies to small retailers south of Canal Street. NEW YORK CITY WATERFRONT REVITALIZATION PROGRAM Because the Proposed Project would fund an action within the City s Coastal Zone, it is subject to the policies of the New York City Waterfront Revitalization Program (WRP). The WRP was originally adopted in 1982 and approved by New York State Department of State (NYSDOS) for inclusion in the New York State Coastal Management Program. The WRP establishes the City s policies for development and use of the waterfront and provides a framework for evaluating activities proposed in the Coastal Zone. The City s WRP was revised to include 10 consolidated policies and adopted by the City Council in October 1999. In May 2002, NYSDOS approved the City s new WRP, and the U.S. Department of Commerce concurred in August 2002. An assessment of the Proposed Project s consistency with these policies is presented in Appendix A, Waterfront Revitalization Program. C. FUTURE WITHOUT THE PROPOSED PROJECT LAND USE Within the 400-foot study area, a number of development projects are under way or planned in the future without the Proposed Project by the 2009 analysis year (see Table 2A-2 and Figure 2A-3). The emergency reconstruction of Fulton Street between Church and Water Streets, and Nassau Street between Fulton and Spruce Streets is under way, having commenced in August 2007. Several residential developments, most of which involve the conversion of commercial buildings to apartments, are under way along Fulton and John Streets, and Maiden Lane. Bordering the project site to the west, the new Fulton Transit Center is under construction at Fulton Street and Broadway. Along Beekman Street between Nassau and Gold Streets, a new 74-story building with apartments, an ambulatory care facility, and an elementary school is under construction on the site of the New York Downtown Hospital parking lot on Beekman Street. The East River Waterfront Esplanade and Piers project will result in the improvement of the esplanade that runs through the study area beneath the FDR Drive. 2A-4

10.29.07 CHAMBERS ST. MADISON ST. N WARREN ST. CITY HALL PEARL ST. MURRAY ST. PARK BROOKLYN BRIDGE APPROACH ROBERT F. WAGNER SR. PL. FRANKFORT ST. PARK PL. BARCLAY ST. PARK ROW 13 THEATRE ALLEY NASSAU ST. SPRUCE ST. 7 BEEKMAN ST. PEARL ST. PECK SLIP VESEY ST. ANN ST. FULTON ST. DEY ST. 2 JOHN ST. 1 3 12 DUTCH ST. 4 5 6 WATER ST. BEEKMAN ST. FRONT ST. FDR DRIVE CORTLANDT ST. CHURCH ST. FULTON ST. LIBERTY ST. MAIDEN LA. PLATT ST. 8 9 GOLD ST. CLIFF ST. CEDAR ST. THAMES ST. 10 FLETCHER ST. MAIDEN LA. 11 TRINITY PL. BROADWAY PINE ST. NASSAU ST. BROAD ST. WALL ST. WILLIAM ST. CEDAR ST. PEARL ST. WATER ST. FRONT ST. SOUTH ST. Project Site Fulton/Nassau Street Reconstruction Area 0 400 FEET SCALE Study Area Boundary (400-Foot Perimeter) 1 Background Project (see Table 2A-2 for reference) FULTON CORRIDOR REVITALIZATION PROGRAM Background Projects Figure 2A-3

Chapter 2, Section A: Land Use, Zoning, and Public Policy Table 2A-2 Background Development Projects in the Study Area to be Completed by 2009 Map No.* Project Name/Address Type of Development 1 Reconstruction of Fulton Street between Church and Water Streets and Nassau Street between Fulton and Spruce Streets Street reconstruction 2 Fulton Transit Center Transportation 3 119 Fulton Street 19 DU (conversion of existing building and addition of 7 new floors) 4 127 Fulton Street Residential conversion with 9 DU and ground floor retail 5 151 William Street (DistrictNY) 163 DU conversion 6 59 John Street (recently completed) 74 DU conversion 7 New York Downtown Hospital between Spruce and Beekman Streets 720 DU, 24,000 ambulatory care facility, 2,400 sf retail, 630-Seat K-8 School 8 90 William 128 DU 9 79 Maiden Lane 400 DU 10 201 Pearl Street 315 DU, 30,000 sf retail 11 East River Esplanade and Piers Project Open space with retail/community facility pavilions 12 45 John Street 84 DU (conversion of existing commercial building and addition of two floors) 13 113 Nassau Street 28-story residential building Notes: *See Figure 2A-3. DU = Dwelling units Additionally, it is expected that Pier 17 of the South Street Seaport may be redeveloped in the future, though it would be completed beyond the Proposed Project s 2009 Build year. ZONING No changes to zoning are expected on the project site or in the study area by the Proposed Project s Build year. PUBLIC POLICY No changes to public policies that apply to the project site or study area are expected by the Proposed Project s Build year. D. PROBABLE IMPACTS OF THE PROPOSED PROJECT LAND USE The Proposed Project includes enhancements to the streetscape, incentives for the improvement of storefronts and façades of buildings that contribute to the heritage and experience of the Fulton and Nassau Street corridors, and the creation, expansion, or improvement of open spaces within the project site. The retail character of Fulton and Nassau Streets would be reinforced under the Proposed Project by providing grants to property and business owners to restore building façades and improve commercial storefronts and interior space. 2A-5

Fulton Corridor Revitalization Program The Proposed Project would create a new playground a block south of Fulton Street between Front and South Street at Burling Slip in an area currently used for parking City vehicles. This new 22,000-square-foot open space would provide a link to the East River waterfront and the enhanced esplanade planned for that area. A playground would be developed as well as some accompanying gathering space. The playground would consist of a wooden structure with a sand play area at the western end and a water feature and sitting area at the eastern end. Wooden benches would be arranged along the southern edge of the playground and at each of the site s four corners. DeLury Square would be improved and expanded with the Proposed Project. The total open space area would be expanded to 10,900 square feet, including the small planting and seating area at the northeast corner of the intersection. The concept for DeLury Square could include a lawn, planted areas, a pond, and a fountain. This water feature could be designed to provide visual interest while helping to mask traffic noise and to define the site. The open space could be surrounded by a fence with gates at the three pathway entrances. The Proposed Project includes the renovation and expansion of the existing triangular-shaped, 5,200-square-foot Pearl Street Playground, bounded by Fulton, Pearl, and Water Streets. The Proposed Project would upgrade the existing facility and provide an enhanced play environment for local children and their caregivers. Among the improvements that may be incorporated are new play equipment and play surfaces, enhanced seating, new plantings, lower fencing, and possibly a water feature. This effort will also seek to expand the amount of area used for the playground. The existing 3,500-square-foot Titanic Memorial Park at Fulton and Water Streets would be refurbished to become an improved gateway to the South Street Seaport. Proposed improvements to seating and landscaping are intended to create a more attractive community gathering space. Overall, the Proposed Project would have a positive effect on land use by creating and enhancing open spaces and by strengthening and improving the retail presence on Fulton and Nassau Streets. There would be no significant adverse impacts on land use. ZONING AND CITY MAP The Proposed Project would not involve any changes to zoning. Public open space is a permitted use in the zoning districts where open space enhancements would take place at DeLury Square and the Pearl Street Playground, and where new open space would be created at Burling Slip. A City map change would be made at DeLury Square in order to map this public open space as a park. The City map change would facilitate the expansion and redesign of this open space. The Proposed Project, therefore, would not result in any significant adverse impacts on zoning or the City map. PUBLIC POLICY The Proposed Project would support public policy efforts to revitalize Lower Manhattan and improve the quality of life of its residents, workers, and visitors. In particular, the commercially revitalized of Fulton Street would strengthen the link between the WTC site and an improved East River waterfront. As such, the Proposed Project would not result in any significant adverse impacts on public policy. 2A-6