HEC - High Efficiency Condensing Heaters. Warming the workplace. 12kw to 1000kw Efficiency of up to 109% Nett High/Low or Fully Modulating Heater

Similar documents
Warming the workplace

CP+ Gas & Oil Cabinet Heater Range

All Heaters Part L2B Compliant. Technical Data External Oil and Gas Cabinet Heaters. For Models. EVD Vertical Ducted EHD Hortizontal Ducted

Cast Iron Boilers. G Series ( kW)

Flue Dilution Fans. Specialists in Air Movement Technology. IMPROVED GBDF MK5 Now includes a Pressure Safety Switch and easier Electrical Connections

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

VPC Gas Cabinet Heater Range Architects of your environment. heating ventilation air conditioning

Technical information. Remeha P200. Pressurized boiler. Heat output: kw

Exhaust Duct Design Page 1 of (C)

VPC Gas Cabinet Heater Range

PREEVA air handling unit

Installation and Operating Manual Drying Cabinet

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw

CI/SfB X. EnviroPak Series GAS FIRED HEATING, VENTILATION AND COOLING UNITS

CAST IRON PREMIX HIGH EFFICIENCY GAS FIRED BOILER kw BRILEY DESIGN MANUAL

Savile Plus. Steam Boiler. Suitable for Pressure Jet burners Oil, gas or dual fuel firing. Outputs kg/h

Pressure Jet Boilers. Pressure Jet Range. Commercial Heating Solutions.

Ca 6s and BCa 6s kw INSTALLATION AND OPERATING INSTRUCTIONS. Page 1 31/07/00

BENSON AMBIRAD. ... EnviroAir Gas Fired Heating, Ventilation & Cooling Units ... HEATI NG AND VENTILATION S OLUTIONS

... LCSA - LCSBD - LCSC Gas Fired Unit Heaters ...

CI/SfB X. DF / IDF Series GAS FIRED COMBINED HEATING AND VENTILATION

pressurejetrange Buccaneer GTE, Falcon GTS, Harrier GTS, Viceroy GTS, Viscount GTS, Vanguard L Pressure jet boilers kW

Design Specifications for Panda 900A Car Spray Booth

TE Powrmaster Heater Range Controlling your working environment. heating ventilation integrity

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW.

PREEVA EC Gas Fired Heating, Ventilation & Cooling Units

BENSON HEATING INSTALLATION OPERATION AND SERVICING MANUAL

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

INSTALLATION & COMMISSIONING INSTRUCTIONS Model: 990 CH

Line Pressure ( w.c.) Gas Supply Min. Max. Pressure ( w.c.) Natural Gas Propane Gas

I n s t r u c t i o n m a n u a l f o r b u i l t - i n h o o d. Model code: BORA600

DOMINATORPLUS ELECTRIC RANGE APPLIANCES INSTALLATION and SERVICING INSTRUCTIONS

This appliance must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

User's Instructions. Alpha CD24C/32C. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

This appliance has been CE-marked on the basis of compliance with the Low Voltage and EMC Directives for the voltages stated on the data plate.

OUH Oil Unit Heater Range Controlling your working environment. heating ventilation integrity

T-CLASS GAS-FIRED UNIT HEATERS Separated Combustion - Direct Vent - Horizontal - 60 HZ. Thermal Efficiency - up to 82% Input - 40,000 to 300,000 Btuh

OPERATING AND MAINTENANCE MANUAL

R e m e h a P Technical Information. Remeha P 300. Pressurized boiler. Heat output: kw

LED (CLASSIC) DECK OVEN

BMM Heaters Limited. Compact HM Range. Installation, Service and User Manual

pressurejetrange Buccaneer GTE, Falcon GTE, Harrier GTE, Viceroy GT, Viscount GTE, Vanguard L Pressure jet boilers kW

AIR CURTAIN GUIDE WHAT IS AN AIR CURTAIN?

User's Instructions. Alpha CB50

Sirius FS. Working towards a cleaner future

Sirius WH. Working towards a cleaner future

JUMBO INDIRECT FIRED DIESEL HEATER OPERATING INSTRUCTIONS

Synergy Grill User & Engineer Installation & Conversion Guide

OUH Suspended Oil Unit Heater

DANESMOOR 12-14, 15-19, 20-25, 26-32, 32-50, FLOOR-STANDING OIL-FIRED PRESSURE-JET BOILERS USER INSTRUCTIONS & CUSTOMER CARE GUIDE

DANESMOOR FRONT SERVICE (FS) 12-18, FLOOR-STANDING OIL-FIRED PRESSURE-JET BOILERS USER INSTRUCTIONS & CUSTOMER CARE GUIDE

These Appliances must be installed and serviced by a competent person as stipulated by the Gas Safety (Installation & Use) Regulations.

AB RANGE GAS FIRED ROOM SEALED AIR CURTAIN INSTALLATION AND OPERATING MANUAL

Hamworthy. Dorchester DR-SA & DR-SE Fully Automatic and Permanent Pilot Direct Gas-Fired Storage Water Heaters. Exceeds Minimum Requirements

ALL THE BENEFITS OF THE ALL COPPER HEAT EXCHANGER

Baxi Maxflow Combi FS

Bx OVEN SET UP AND OPERATION OF OVEN AND CONDENSER UNIT (IF FITTED) CLASSIC

P R O F E S S I O N A L C O O K I N G

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

E1808, E1838, E1848 DEEP FAT FRYER INSTALLATION, SERVICING and USER INSTRUCTIONS

Energy-efficient heat source provides comfort in large rooms

Biomass. Biomass solid fuel boiler range

Xpelair Simply Silent DX150

BENSON.... Variante3 Fired Unit Heaters...

N 700 BOILING PANS ZANUSSI RANGE COMPOSITION FUNCTIONAL AND CONSTRUCTION FEATURES

Series 4. Rotary rack oven. For pastry chefs and bakers, Series 4 rotary rack ovens concentrate a range of technology to ensure real benefits:

User's Instructions. Alpha CD25X/28X. Range of Wall Mounted, Fan Assisted, Room Sealed, Gas Fired, High Efficiency Condensing Combination Boilers

VICTRIX 90 VICTRIX 115 Wall-hung condensing boilers for high power

A. Product Data: Include rated capacities, furnished specialties and accessories.

EVOMAX CONDENSING. PRODUCT & FLUE GUIDE IDEALCOMMERCIALBOILERS.COM

5 YEAR ADVANCE PLUS WARRANTY. High efficiency condensing combi and system boilers

Cooker Hood CHIM60 CHIM70 CHIM90 CHIM101 CHIM110. Installation & User s instructions

OUH Suspended Oil Unit Heater Gas Oil Fired & Optional Kerosene

INSTRUCTION MANUAL FOR OIL BURNER MODELS

OPERATING AND MAINTENANCE MANUAL

1. GENERAL SAFETY RULES

Condensing Units CUS 15-60

... RHeco. High Efficiency Condensing Unit Heaters... Low NO x. ErP. ErP Lot 21 Seasonal Efficiency and NOx compliant

... RHeco. High Efficiency Condensing Unit Heaters... Low NO x. ErP. ErP Lot 21 Seasonal Efficiency and NOx compliant

SKYPAK II Heating & Cooling Self Contained Packages

SKG Advantages. Typical Applications. Typical Installation

INSTRUCTION MANUAL FOR OIL BURNER MODELS

DERV / ERV DEHUMIDIFICATION & ENERGY RECOVERY V E N T I L A T O R U N I T S I N N O V AT I O N W I T H S T Y L E

Installation, start-up use and maintenance manual

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

Baxi Megaflo System HE IE Range. User s Operating Instructions & Important Warranty Information. Gas Fired Wall Mounted Condensing Boiler

Firebird Enviromax Condensing Range

Burner Comparisons. Typical Competitor s Burner

Simply Silent Contour 4 (100mm) Axial Extraction Fan

BENSON LINEAR RADIANT TUBE

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A

GAS FIRED AIR CURTAIN AB 175, AB 225

WHHR Midi & Midi Lite

EVOMAX CONDENSING BOILER

Transcription:

HEC - High Efficiency Condensing Heaters 12kw to 1000kw Efficiency of up to 109% Nett High/Low or Fully Modulating Heater Air Heater Manufacturers Warming the workplace

BMM Heaters Limited design and manufacture industrial and commercial warm air heating systems. Our heaters are suitable as standard for Natural Gas, LPG, Oil and also Dual Fuel.These heaters are designed to give high efficiency, reliability and manufactured to give good access for ease of maintenance. Condensing heaters are designed to give output from 12kw to 1000kw, larger outputs available on request. These Units are available in all firing orientations, discharge can be horizontal, downward or upward, depending on the application. They can be purchased for very high air pressures and very high gas pressures and their range of uses include make up air, air handling, general heating and high temperature process heating. Major Companies we have experience working with: Alcan AMC Cinemas Automobile Association Asda Stores BBC British Gas B.I.C.C Blackpool Airport British Leyland British Steel Butlins British Bakeries British Rail British Aerospace British Telecom British Army British Waterways British Caledonian Airways Black & Decker Boots Chemists Burger King Burnley Football Club Buxted Chicken Company Cambridge Airport Cannon Co-Operative Superstores Crompton Eternacell Curry s Stores Dept. of the Environment Docklands Arena Dixon s Stores Earls Court Electricity Boards English Industrial Estates French Aerospace Gatwick Airport GKN Glasgow University Government Research Stations (poultry) Heathrow Airport Honda H.M Customs & Excise H.M Prisons ICI Jaguar Cars Jersey Gas KP Food Group Littlewoods Stores Lords Cricket Ground Lucas MFI McDonalds Restaurants Metro Centre Marks & Spencer Mercedes Ministry of Agriculture National Exhibition Centre National Poultry Tests Ltd Nissan NSK Peugeot Talbot Rolls Royce Rover Royal Air Force Royal British Legion Russian Federation Sharps Spillers Foods Texas Home Care Stores TGI Friday Restaurants UCI Cinemas United Biscuits Walkers Crisps Walls Sausages West Mercia Police HQ 2

Condensing Indirect Gas Fired Heaters Efficiency of up to 109% Nett Efficient MODELS 12/HEC to 1000/HEC-12KW to 1000 KW HEC Standard Horizontal, Units suitable for Natural Gas GAS / LPG / OIL INTERNAL/EXTERNAL Can be ordered Horizontal discharge or Downward discharge. HECLPG Standard Horizontal, Unit suitable for LPG HEO Standard Horizontal, Unit suitable for Oil I n t e r n a l E x t e r n a l What is a Heat Unit A Heat Unit is a source of Heat only to a supply of air provided by others. It should not be confused with a complete Heater incorporating its own fan to supply air. Purpose of Heat Unit A source of Heat to existing ventilation supply. An alternative form of heating for use with air handling equipment where electric, steam or hot water coils are not practical. Indirect Fired The term Indirect Fired indicates that the products of combustion are kept isolated from the main supply airstream. The burner fires a flame into a combustion chamber, the heated products of combustion are directed into a heat exchanger and from there into an external flue which is then discharged into the atmosphere. type Gas burners are available for HIGH/LOW or FULLY MODULATING CONTROL. Oil burners are available for ON/OFF or HIGH/LOW Control. Unit type Units are available in a very wide range of heat outputs, designed for high efficiency and built to the latest Regulations and Directives. All Modules are constructed from a pentapost framework and consist of a Stainless Steel Combustion Chamber, Mild Steel Heat Exchanger with Double Skinned and Insulated front panel to protect the burner and ancillary controls from heat. All other external panels are of single skin construction. External Cabinets All have double skin panels. s and Fuel Units are available with forced induced draught gas burners, suitable for propane or natural gas; pressure jet oil burners or dual fuel burners capable of fully automatic operation. 3

Examples shown for design of flue installation Examples shown for installation design for minimum working distances Width of Unit Width of Unit Plan Wall Ideally minimum clearance required is width of unit as per data sheets for servicing front and rear of module Width of Unit A C Min. Height 1000mm Ceiling Optional flanged flue system section flanged to provide easy removal for servicing B Floor Access doors both upstream and downstream of module to be provided for service personnel. A Top flue configuration utilising 45 o condensation trap to transpose to vertical flue. B Extra support required for stack in excess of 23Kg ( lbs) C 90 o condensation trap to horizontal flue spigot. Consideration for Design When designing a System, allowance must be made so equipment can be serviced after installation and for the fitting of any spares which may be needed. Also consideration for the flue arrangement so that they can be dismantled for servicing to take place (examples only). The Standard Unit The Standard Unit as described above is designed to be installed within an air handling unit or ductwork. Units with all external panels double skinned and insulated are available for self contained internal use with optional single skinned burner extension housing and weatherproofed for external installation. All external units are supplied with combustion air intake grille, hinged access door with lock and support stays and internal inspection lamp. All units are supplied with a fully automatic start burner with sequence controls in accordance with CE approval and to the latest British Standards and Directives etc. When a unit is required to be installed within a larger cabinet, perhaps to accommodate a higher volume air supply, adjustable air balancing plates can be installed to correct the balance of air between the unit and the by-pass area of the cabinet. Units are available for horizontal, upwards or downwards discharge. The Standard finish is in galvanised mild steel but can be supplied in an oven baked epoxy paint finish if required. Process Heat Units Process Heat Units are also available for normal space heating, low temperature air handling, or high temperature process heating. As high temperature process units are very specialised we would suggest contacting our Technical Sales Department before designing your system. Overheat Protection An overheat lockout manual reset thermostat will provide overheat safety protection against supply air fan failure or drastic reduction in air flow, resulting in the burner going to a hold-off condition and will not function again until the manual reset button has been pressed. The combined overheat and fan control thermostat has the ability to allow the burner to give pre warm up to prevent cold air being dispersed when the unit is first started. After a preset temperature has been reached it operates the supply air fan, thus discharging the warm air produced. When the heat is no longer required the burner is switched off but the supply air fan is allowed to continue to dissipate heat from the combustion chamber until the residual heat is removed. If this overheat facility is not required provision must be made to install a fan over-run timer to provide the same function. Overheat protection must be fitted. Pipe All indirect fired heat units must have a flue. It is important to have a well designed flue system which should be a minimum of two metres in height and clear the apex of a roof by at least one metre. Whenever possible, horizontal runs of flue should be avoided. Supports should be provided for the flue and not rely on the unit for support. If the flue is more than fifty pounds in weight it should be self supporting. A condensation trap with a clean-out door should always be fitted at the base of the flue. Down Draught On external units it may be preferred for aesthetic reasons to fit a flue system which is as short as possible, however a minimum of one metre length should be fitted above the cabinet to reduce down draught problems. If a down draught problem is anticipated, possibly due to the location of the flue terminal in relation to adjacent buildings or to prevelant site and landscape turbulence, an anti down draught cowl is recommended or in extreme cases the fitting of an l.d. Fan dilution system. The fitting of a burner fan over-run timer is particularly recommended to prevent heat damage to the burner internals after shut-down. Combustion Chamber / Heat Exchanger The standard combustion chamber/heat exchanger consists of a stainless steel combustion chamber with a mild steel heat exchanger of multi-tube construction with a condensation trap and clean out door at either end. If by location the heat unit is to utilise part or full fresh air and is situated near the coast, in salt air, high humidity or areas of chemical process, corrosion could affect the heat exchanger and internals of the unit when shut down. To avoid this, consideration should be made to install an inlet damper to prevent air being introduced into the module when shut down or fit a stainless heat exchanger at an extra cost. 4

5 MODEL KW Output 12 15 18 23 30 12 15 18 23 30 I n t e r n a l U n i t s Standard sizes shown in mm 890 Mains input and overheat thermostat, with plug in burner lead. 8 0 Standard E x t e r n a l U n i t s 890 1195 0 6 8 125 2 1 Removable front and rear access panels Front Option 345 125 1195 1 1 Combustion Air Intake Grille External Standard units will have burner and flue positioned as shown above. can be positioned on opposite side providing we are notified. can be catered for on the same side as burner at extra cost. The installer should familiarise himself with any Planning Regulations, Building Regulations, Fire Regulations or Insurance Requirements and undertake whatever is necessary to satisfy these regulations. Whichever fuel is used great care should be taken to ensure that the Installation is safe and complies with all the above Regulations. Model 12 15 18 23 30 Heat Output BTU x 1000 40 60 80 100 Heat Output K w 12 15 18 23 30 Gas flow rate M3/hr 1.1 1.4 1.7 2.2 2.9 Electrical Requirements 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz Running Current 1.3A 1.3A 1.3A 1.3A 1.3A Gas Inlet Size Weight (Internal) Kg 110 110 110 110 110 Weight (External) Kg 130 130 130 130 130 Min. Air Volume M3/Sec 0.47 0.47 0.47 0.47 0.47 Pressure Drop at Minimum Air Volume accross Standard Chamber at Ambient Temperature (Nominal) 125Pa 125Pa 125Pa 1Pa 1Pa 5

900 800 400 Standard sizes shown in mm I n t e r n a l U n i t s MODEL KW Output 44 60 90 44 60 90 1290 Mains input and overheat thermostat, with plug in burner lead. 44,60 HEC-980 90 HEC-1260 Standard 700 44-125 66,90-1 90 HEC-1260 44,60 HEC-980 Removable front and rear access panels E x t e r n a l U n i t s Front Option 400 1290 90 HEC-1690 44,60 HEC-1380 1 700 44 HEC-125 66,90 HEC-1 90 HEC-11690 44,60 HEC-1380 Combustion Air Intake Grille 100 External Standard units will have burner and flue positioned as shown above. can be positioned on opposite side providing we are notified. can be catered for on the same side as burner at extra cost. The installer should familiarise himself with any Planning Regulations, Building Regulations, Fire Regulations or Insurance Requirements and undertake whatever is necessary to satisfy these regulations. Whichever fuel is used great care should be taken to ensure that the Installation is safe and complies with all the above Regulations. Model 44 60 90 Heat Output K w 44 60 90 Gas flow rate M3/hr 4.25 6.17 9.25 Electrical Requirements 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz Running Current Gas Inlet Size Weight (Internal) Kg Weight (External) Kg Min. Air Volume M3/Sec 1.3A 290 295 0.91 1.7A 292 317 1.24 1.7A 3/4 B.S.P. 305 3 1.86 Specialised Models Manufactured to customers individual requirements. Sizes, outputs etc. can be catered for on application. Pressure Drop at Minimum Air Volume accross Standard Chamber at Ambient Temperature (Nominal) 125Pa 1Pa 1Pa 6

1000 900 Standard sizes shown in mm I n t e r n a l U n i t s MODEL KW Output 120 1 120 1 13 Mains input and overheat thermostat, with plug in burner lead. Standard 1 13 800 180 1 Removable front and rear access panels E x t e r n a l U n i t s Front Option 120 HEC-400 1 HEC-610 13 120 HEC-18 1 HEC-2060 1160 800 180 120 HEC-18 1 HEC-2060 Combustion Air Intake Grille External Standard units will have burner and flue positioned as shown above. can be positioned on opposite side providing we are notified. can be catered for on the same side as burner at extra cost. The installer should familiarise himself with any Planning Regulations, Building Regulations, Fire Regulations or Insurance Requirements and undertake whatever is necessary to satisfy these regulations. Whichever fuel is used great care should be taken to ensure that the Installation is safe and complies with all the above Regulations. Model 120 1 Heat Output K w Gas flow rate M3/hr Electrical Requirements Running Current Gas Inlet Size Weight (Internal) Kg Weight (External) Kg Min. Air Volume M3/Sec 120 13.33 240V/1ph/Hz 2.7A 1 B.S.P. 260 290 2.48 1 15.42 240V/1ph/Hz 3.8A 1 B.S.P. 300 345 3.10 Specialised Models Manufactured to customers individual requirements. Sizes, outputs etc. can be catered for on application. Your Choice We can supply the Heat Units for you to install in your cabinets or alternatively you supply your cabinet to us and we will install. Pressure Drop at Minimum Air Volume accross Standard Chamber at Ambient Temperature (Nominal) 125Pa 1Pa 7

1110 1100 Standard sizes shown in mm I n t e r n a l U n i t s MODEL KW Output 180 2 300 180 2 300 1610 Mains input and overheat thermostat, with plug in burner lead. 180,2 HEC-1690 300 HEC-2000 5 1000 180,2 HEC-230 300 HEC-2 180,2 HEC -1690 300 HEC-2000 Removable front and rear access panels 600 E x t e r n a l U n i t s 1610 180,2-2240 300-2600 1000 180,2 HEC-230 300 HEC-2 180,2 HEC-2290 300 HEC-2600 Combustion Air Intake Grille 100 External Standard units will have burner and flue positioned as shown above. can be positioned on opposite side providing we are notified. can be catered for on the same side as burner at extra cost. The installer should familiarise himself with any Planning Regulations, Building Regulations, Fire Regulations or Insurance Requirements and undertake whatever is necessary to satisfy these regulations. Whichever fuel is used great care should be taken to ensure that the Installation is safe and complies with all the above Regulations. Model 180 2 300 Heat Output K w 180 2 300 Gas flow rate M3/hr 17.2 23.8 28.6 Electrical Requirements 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz Running Current 3.8A 3.8A 3.8A Gas Inlet Size 1 1 1 Weight (Internal) Kg Weight (External) Kg 5 5 5 Min. Air Volume M3/Sec 3.73 5.17 6.21 Pressure Drop at Minimum Air Volume accross Standard Chamber at Ambient Temperature (Nominal) 1Pa 1Pa 185Pa 8

1400 700 MODEL KW Output 352 513 600 352 513 600 Standard sizes shown in mm. Model 352 measurements in (brackets). I n t e r n a l U n i t s 2290 Mains input and overheat thermostat, with plug in burner lead. 2655 Standard 1300 352, HEC-300 513,600 HEC-3 2655 Removable front and rear access panels Front Option 790 E x t e r n a l U n i t s 2290 3445 10 1300 352, HEC-300 513,600 HEC-3 3445 Combustion Air Intake Grille 100 External Standard Units will have burner and flue positioned as shown above. can be positioned on opposite side providing we are notified. can be catered for on the same side as burner at extra cost. The installer should familiarise himself with any Planning Regulations, Building Regulations, Fire Regulations or Insurance Requirements and undertake whatever is necessary to satisfy these regulations. Whichever fuel is used great care should be taken to ensure that the Installation is safe and complies with all the above Regulations. Model 352 513 600 Heat Output K w 352 513 600 Gas flow rate M3/hr 33.6 42.9 48.9 57.2 Electrical Requirements 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz 240V/1ph/Hz Running Current 5.3A 5.3A 5.9A 5.9A Gas Inlet Size Weight (Internal) Kg 1200 1300 1320 1400 Weight (External) Kg 10 1600 1620 1800 Min. Air Volume M3/Sec 7.24 9.31 10.5 12.42 Pressure Drop at Minimum Air Volume accross Standard Chamber at Ambient Temperature (Nominal) 1Pa 165Pa 1Pa 185Pa 9

2630 MODEL KW Output 700 8 1000 700 8 1000 I n t e r n a l U n i t s Standard sizes shown in mm 2022 Mains input and overheat thermostat, with plug in burner lead. 3100 2480 3100 E x t e r n a l U n i t s 2022 3965 1840 865 Removable front and rear access panels 406 2730 2480 3965 Combustion Air Intake Grille 100 External Standard units will have burner and flue positioned as shown above. can be positioned on opposite side providing we are notified. can be catered for on the same side as burner at extra cost. The installer should familiarise himself with any Planning Regulations, Building Regulations, Fire Regulations or Insurance Requirements and undertake whatever is necessary to satisfy these regulations. Whichever fuel is used great care should be taken to ensure that the Installation is safe and complies with all the above Regulations. Model 700 8 1000 Heat Output K w 700 8 1000 Gas flow rate M3/hr 66.7 81.0 95.3 Electrical Requirements 415V/3ph/Hz 415V/3ph/Hz 415V/3ph/Hz Running Current 6A 6A 6A Gas Inlet Size Weight (Internal) Kg 2260 2360 2460 Weight (External) Kg 20 2600 2700 Min. Air Volume M3/Sec 15 18 21 Pressure Drop at Minimum Air Volume accross Standard Chamber at Ambient Temperature (Nominal) 1Pa 1Pa 1Pa 10

Showing example of Internal / External Heat Units being fitted into larger cabinets Showing Units installed in alternatively sized cabinets,where the optional by-pass Damper Facility is required and optional flue configuration available. Unit fitted in oversize cabinet showing optional position of air balancing plates FLUE LAYOUTS A External Unit showing optional short flue set with standard or anti-downdraught cowl A. Short horizontal offset to higher vertical flue rise acceptable Avoid long horizontal runs of flue pipe. As we have explained a Heat Unit is only part of another Manufacturers Unit (Air Supply, Filters, Electric Supply, etc., are all part of your system). BMM test all their appliances before they leave the factory. One should realise that our Equipment is not made in large production batches. Every system is individual and we recommend that you build and assemble all your equipment with the Ancillary (Our Heater) to make your unit complete and undertake a Simulated Test to iron out any problems and ensure that everything is to your satisfaction before delivery to site. Servicing Adequate room must be available for a service engineer to gain access to all sides of the module. Particular consideration should be given by the installer to provide sufficient space for the removal of the combustion chamber and burner for maintenance and servicing. Access doors for personnel both up and down stream of the module should be made available in adjacent cabinet chambers or ductwork. Design If you are unsure about any aspect of the heat module design please do not hesitate to contact our Technical Sales Department. Commissioning On site commissioning of Units is available on request. Commissioning by a BMM Engineer is recommended, not only for correct settings of burner combustion but also to advise on items such as correct air volume, by-pass settings, the linking up of external controls and supply air fan motor control equipment. The use of this service could prevent the possibility of unnecessary post commissioning down time of expensive air handling equipment. Controls Our Technical Sales Department can give advice on linking into other manufacturers control systems. Air Required The minimum amount of air required should be of even distribution when entering the Unit. All pressure calculations/ resistances for air are at ambient with the Heater in the Off position. Specialised Units manufactured to customers individual requirements, sizes, outputs etc. can be catered for on application. Your Choice We can supply the Heat Units for you to install in your cabinets or alternatively you supply your cabinet to us and we will install. Due to our policy of innovation and development we reserve the right to alter the specification without prior notice.

3 Whorlton Road, Riverside Park Industrial Estate, Middlesbrough, TS2 1QJ. Tel: 01642 240700 Fax: 01642 240708 Email: sales@bmmheaters.co.uk www.bmm heaters.co.uk