SITE PLAN REVIEW APPLICATION AND CHECKLIST

Similar documents
Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Application for Site Plan Review

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

CRESCENT RESOURCES INC.

City of Mt. Juliet Planning & Zoning Department. Site Plan Checklist. Site plan cklist v1.18

Site Development Plan (SDP) Checklist

PLANNED UNIT DEVELOPMENT APPLICATION

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

APPLICATION FOR MINOR SITE PLAN REVIEW

APPLICATION FOR MINOR SITE PLAN REVIEW

Draft Rhode Island Stormwater Design and Installation Standards Manual

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

Project phasing plan (if applicable) 12 copies of site plan

SUBMITTAL REQUIREMENTS

TENTATIVE MAP CHECKLIST

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

SITE PLAN REVIEW APPLICATION

Florence County Small Commercial Land Disturbance Permit Application

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Town of West Point Plan of Development

ZONING COMPLIANCE PERMIT APPLICATION

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

Huntington Stormwater Utility

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Appendix I. Checklists

4. Contractor (and subcontractors if applicable) certification statement(s)

CONCEPT PLAN APPLICATION

ARTICLE 17 SITE PLAN REVIEW

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Community and Economic Development Department 100 N. Appleton St. PH: Appleton, WI FAX:

Essential Skills: Reading and Interpreting Maps and Plans

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

Preliminary Sediment & Stormwater Management Plan Review Checklist DATE RECEIVED: PROJECT NUMBER: PROJECT NAME:

5. Would the proposed project require modifications to the existing regulations?

STATUS OF REVIEW: ENGINEER WILL COMPLY

CITY OF ZEELAND PLANNING COMMISSION

REZONING APPLICATION MPD SUPPLEMENT

MEDWAY PLANNING BOARD MINOR SITE PLAN PROJECTS Application Guidelines

DEPARTMENT OF PUBLIC WORKS & UTILITIES

Sec Intent and purpose.

SEPA Modification Application

APPLICATION FORM SITE PLAN REVIEW REGULATIONS TOWN OF CONWAY, NH

Erosion & Sediment Control Plan Application Form & Checklist

LND-B LAND USE APPLICATION FOR OFFICE USE ONLY:

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

NAPA COUNTY PUBLIC WORKS Standards & Specifications

City of Waco Stormwater Management Regulations

Landscape and fencing requirements of this Chapter shall apply to all new landscaped areas.

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

Drainage Control Plans

Article 20 Stormwater Management

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

GENERAL LANDSCAPE PROVISIONS. The following landscape provisions shall be adhered to by all land uses unless otherwise noted:

ENGINEERS AND SURVEYORS INSTITUTE A public/private partnership CITY OF ALEXANDRIA, VIRGINIA MINIMUM SUBMISSION REQUIREMENTS SITE PLAN

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

City of Richmond. Engineering Design Specifications

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

THE CITY OF MOBILE, ALABAMA

Gloucester County PLAN SUBMITTER'S CHECKLIST

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

APPLICATION FOR SITE PLAN REVIEW

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

GRACE CHURCH EXPANSION

Major Subdivision Sketch Plan Checklist

PLANNED DEVELOPMENT (MASTER PLAN & UNIT PLAN)

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Preliminary Development Plan 07/ /2

PLAN SUBMITTER'S CHECKLIST

Appendix A - Submittal Checklists

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

Planning the BMP. Region 2000 Planning District Commission Lynchburg, VA December 13, 20013

COLUMBIA COUNTY LAND DEVELOPMENT SERVICES COURTHOUSE 230 STRAND ST. HELENS, OREGON (503) General Application

Rule D Wetland and Creek Buffers

Bylaw A Bylaw to amend Bylaw 12800, as amended, The Edmonton Zoning Bylaw Amendment No. 2239

CHECKLIST FOR PHASE II DRAINAGE REPORT

CONCURRENT SUBDIVISION/SITE PLAN REVIEW APPLICATION TOWN OF CONWAY, NH

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

A/E REVIEW CHECKLIST SITE & LANDSCAPE

LANDSCAPE ORDINANCE PASADENA PLANNING DEPARTMENT (713) FAX (713)

4. CONCEPT PLAN DEVELOPMENT

ARTICLE 9: Landscaping

Zoning Ordinance Section 1.100

Zoning Ordinance Chapter 10

Chapter 4 - Preparation of Stormwater Site Plans

CITY OF SCANDIA ORDINANCE NO. 174

Please highlight flow chart where applicable and return with Form 2 and Form 3 (tab 1) to the City of St. Charles Engineering Department.

Review Zone Application for D&R Canal Commission Decision

4.500 Preston Road Overlay District

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Landscaping Standards

Washington County, Maryland Division of Public Works Policy Manual

Design Guidelines for Residential Subdivisions

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Transcription:

SITE PLAN REVIEW APPLICATION AND CHECKLIST PROJECT SUMMARY: Project Name: City/ETA Location: City ETA (Application fee & number of copies needed are based on location) Property Location (Legal Description Lot, Block, Addition): Property Address: New Construction or Addition to Existing: New Construction Addition to Building New Parking Lot Addition to Parking Lot Parcel Size (sf): Number of Stories: Proposed Use of Property/Building (with square footages of each use if multiple uses): Existing Use of Property: Building Footprint (sf): Total Square Footage of Building: Number of Off-street Parking Spaces Required: Number of Off-street Parking Spaces Provided: Total Number of Apartment Units: Total Number of Bedroom Units: Fire Protection Systems (specify type): Existing Parking Lot (SF) Total SF of Parking: PROPERTY OWNER: Name: Number of Existing Off-Street Parking Spaces: Number of Additional Off-Street Parking Spaces: Daytime Telephone Number: Mailing Address: DEVELOPER (IF DIFFERENT THAN OWNER): Name: Daytime Telephone Number: Mailing Address : CONTACT PERSON (FOR PURPOSES OF PROCESSING THIS APPLICATION): Name of Contact Person: Name of Firm, if Applicable: Mailing Address: Daytime Phone Number: Fax Number: E-mail Address: 05/12 Page 1

Zoning District: RR-1 R-1 R-2 R-5 R-7 R-9 MU PUD C-1 I-1 I-2 P A Occupancy Classification: A-1 A-2 A-2.1 A-3 A-4 B E-1 E-2 E-3 F-1 F-2 H-1 H-2 H-3 H-4 H-5 H-6 H-7 I-1.1 I-1.2 I-2 I-3 M R-1 R-3 R-4 S-1 S-2 S-3 S-4 S-5 U-1 U-2 Type of Construction: I F.R. II F.R, One-hour, N III One-hour, N IV H.T. V One-hour, N The following information is required on all site plans submitted for City approval. Please allow for a minimum of 7 days for City review time and a maximum of 30 days per each submittal. I. GENERAL INFORMATION A. Set(s) - six (6) for City and eight (8) for ETA of non-reduced sheets of both the site plan and the building plans (minimum scale of 1 =50 ). If more than one sheet is submitted, all sheets must be numbered, be of the same size and include matchlines along with an index. Also submit a PDF of each set of plans. B. Project summary information (must be the same as application form): Name, address and telephone number of owner/developer Name of proposed development Legal description of property lot, block, and addition Address of property C. Name, address and telephone number of engineer, surveyor and architect. D. North direction indicator. E. Scale including both a graphic and a numeric scale (engineer s scale preferred) F. Date (original and all revisions) shown on all sheets. G. All dimensions, both linear and angular. Linear measurements should be expressed in feet and decimals of a foot. Angular land measurements should be expressed by bearings. Curved land measurements should be defined by radius, central angle, and arc distances. H. All sheets with topographic information and/or specific elevations must include an indication of the vertical datum used (NGVD29 or NAVD88). Two bench marks for the site must be indicated on the plans. I. Include Site Plan review fee - $300 II. EXISTING CONDITIONS A. Parcel boundary lines of the property with dimensions and area (platted dimensions). B. Location of any non-access control lines, with dimensions. C. Location, width and identification of existing easements (both public and private). D. Building setback dimensions. E. Existing topographical features, contour lines, and existing drainage patterns. F. Existing buildings, structures, driveways (on-site with elevations and across adjacent public rights-of-way), parking and loading areas, outdoor storage areas, fire lanes, private sewage disposal systems and any other manmade features, dimensioned and clearly distinguished from proposed improvements. G. All adjacent and on-site streets, including dedicated right-of-way width, pavement widths, curb and gutter locations, curb elevations (or street elevations where no curb is in place), sidewalks and curb ramps. H. Within and/or adjacent to property: existing municipal utilities including light poles, water and sewer mains, service lines, connections, curb stops and valves, manholes, hydrants, inlets, and any other stormwater facilities (location, size, elevations, etc.). I. The boundaries of any floodway, floodway fringe, 100-year floodplain, streams and/or wetlands. 05/12 Page 2

III. PROPOSED CONDITIONS A. Limits of any proposed demolition. B. Location and dimension of proposed street cuts and any street land and/or sidewalk closures. C. Proposed new and/or relocated municipal utilities including mains and service lines (location and size), connections, disconnections, curb stops and valves, manholes, hydrants (with distance to building), inlets and any other stormwater facilities (location, size, elevation, etc.), including sidewalk trench drains.* D. Location of any relocated street lights.* E. Proposed buildings and structures, with locations, footprints, entrances, area by floor, finished floor elevation, building construction type, height, number of stories, and distance of buildings from other buildings and/or property lines. The use of automatic fire suppression system should be clearly indicated.* F. Proposed driveways, including distance from lot lines, width at top, relationship to non-access control lines. Any proposed driveway closures. For rural roadway approaches, add the location, diameter, inverts, slopes, and lengths of culverts.* G. Proposed off-street parking areas, including dimensions, elevations, setbacks and number of spaces. List number of parking spaces provided and how calculated.* H. Proposed sidewalks and/or trails, both on-site and within adjacent right-of-way, with locations and dimensions. Proposed crosswalk ramps at corner lots may be required.* I. Proposed fencing, especially if located across a drainage easement, and all proposed retaining walls (location and height).* J. Dumpster (or any other solid waste handling facilities) location, size of dumpster (verify need with Public Works), dimensions of concrete pad (must be level and a minimum of 4 concrete), and any proposed screening labeled with height and material (there must be a 24 clear zone on all sides of pad and no overhanging structures, vegetation or utilities). If access to dumpster is not directly accessible from public right-of-way, a damage claim waiver may be required before service can be started.* K. Proposed fire access features, including location of hydrants, location and dimension of fire lanes (minimum width of 26 required when any portion of an exterior wall of the first story of the building is located more than 150 from fire department access road), and height of any overhead obstructions. If the building is greater than 30 feet in height, a fire lane minimum width of 26 feet is required. Dead-ends greater than 150 feet in length need an approved turn-around. A 48-foot turning radius is needed for adequate clearance for turns. A minimum vertical clearance of 13 6 is needed to accommodate vehicles. Detailed design information is available on line at www.bismarck.org/fire. The documents area of the Fire Prevention division contains the common International Fire Code requirements governing site designs. The direct link to the document is http://www.bismarck.org/documentview.aspx?did=246. * L. Proposed contours lines. M. Items C-L above, marked with an asterisk (*), are to be shown on one sheet for scanning or provided in a digital format for use in the City s GIS system. In addition to this comprehensive sheet, additional sheets may also be provided if needed to provide details not legible in the comprehensive sheet. Notes and removals may also be on separate sheets. N. Copy of recorded common use agreement if multiple-family, commercial, or industrial with separate ownership (common water, sanitary or drainage facilities; common access drives, lanes, and lots; access easement to backyard area). 05/12 Page 3

A landscape plan is required for the construction of any principal commercial, industrial, institutional, or multi-family building with more than two units; for the installation of any parking area or any existing parking area by five or more required off-street parking spaces; and for a change in the use of the property that requires rezoning to a more intensive zoning classification or a special use permit. Copies of the City s landscaping and screening ordinance can be obtained from the City of Lincoln website located at http://www.cityoflincolnnd.com/index.htm. IV. LANDSCAPE PLAN A. North point & scale B. The boundary lines of the property with dimensions and area C. The location of all driveways, parking areas, sidewalks, structures, utilities, or other features, both existing and proposed, affecting the landscaping of the site. D. The location, common name, scientific name to the species level, size and quantity of all existing trees, shrubs or other vegetation intended for use in meeting the requirements of the City s landscaping and screening requirements. E. The location, common name, scientific name to the species level, size and quantity of all proposed landscape materials. F. The location and height of any proposed earthen berms, masonry fences, or other features used to meet the City s landscaping or buffer yard requirements. G. The location of any existing and/or proposed easements. H. Street frontage (linear feet): North East South West I. Required street trees (quantity): North East South West J. Required perimeter parking lot trees (quantity): North East South West K. Required perimeter parking lot shrubs (quantity): North East South West L. Required interior parking lot trees (quantity): M. Required interior parking lot shrubs (quantity) N. Required area (in square feet) for interior landscape islands: O. Buffer yard width (linear feet) North East South West P. Buffer yard length (linear feet) North East South West Q. Required buffer yard evergreen trees (quantity): North East South West R. Required buffer yard shade trees (quantity) North East South West S. Required buffer yard ornamental trees (quantity): North East South West T. Required buffer yard shrubs (quantity): North East South West U. Buffer yard fence material (if proposed): V. Trash enclosure screening material (specify material) STORMWATER MANAGEMENT PLAN/PERMIT REQUIREMENTS A stormwater management plan/permit is required for all residential developments with three or more units, commercial projects, industrial projects, and institutional projects. The City of Lincoln will not issue a stormwater permit until the stormwater management plan has been reviewed and approved. The application for a stormwater permit is separate from this site plan review application, but must be submitted in conjunction with the site plan. The stormwater management plan must be prepared and stamped by a professional engineer who is registered in North Dakota. A stormwater management plan waiver request may be made under the following conditions or as deemed appropriate by the City Engineer: The associated plat along with its stormwater management plan was approved within the past 24 months containing an adequate level of detail to evaluate the site development and no significant changes occur to the plan due to the proposed site plan construction. The disturbed area is less than 2,000 square feet and construction will not significantly change drainage patterns or imperviousness. An approved waiver of the storm water management plan by the City Engineer does not grant a waiver of the stormwater permit, permit fee requirement, or erosion and sediment control requirements as part of the permit. 05/12 Page 4

The stormwater management plan must be prepared by a professional engineer who is registered in North Dakota. V. STORMWATER MANAGEMENT PLAN General A. Include Stormwater Plan review fee - $500 B. Include Stormwater Permit fee - $50 Existing Site Plan A. Applicant. B. Contact person (during construction). C. Site location. D. Existing topography, with a maximum of two-foot contours to determine drainage patterns, with scale bar, north arrow, and indication of datum used (NGVD29 or NAVD88). E. Watershed map on one sheet indicating drainage boundaries, their areas and flow arrows. F. Stream delineation, public waters, wetlands and their description. G. 100-year floodplain, floodfringes and floodways, with indication of datum used (NGVD29 or NAVD88 with NAVD88 required for areas with floodplain information in that datum). H. Existing stormwater facilities. I. Soil types. J. Current vegetative cover. K. Current land use and zoning. Construction Site Plan A. Location and dimension of proposed land disturbing activities and phasing or schedule of those activities. B. Schedule of anticipated start and completion dates. C. Approximate location of all temporary soil or dirt stockpile areas. D. Specific location and description of construction site wind and water erosion control measures. Location of concrete washout area(s). E. Provisions for maintaining the construction site erosion control measures prior to, during and after construction including a final seeding or stabilization plan. Plan of Final Site Conditions A. Final grading plan, showing relationship to existing conditions, with scale bar, north arrow, and with indication of datum used (NGVD29 or NAVD88). B. Proposed ground cover/resurfacing (ie grass, pavement, stones, etc). C. Existing and proposed impervious areas. D. Drainage plan for developed site with flow arrows. E. Proposed watershed map indicating drainage boundaries and their areas. F. County approval required for drainage in right-of-way. Stormwater Management Plan Report A. Pre- and post-development hydrology and hydraulic analysis for the 5-yr minor and 100-yr major rainfall events of both the 6-hr and 24-hr Type II storm events. Analysis of 10-day snowmelt event may also be required. All calculations must be submitted. An AutoCad drawing with drainage areas and location of storm water conveyance features shall also be submitted. Any elevation noted is to be shown with the vertical datum used (NGVD29 or NAVD88). B. Tables indicating Times of Concentration, Curve Numbers or Runoff Coefficient, Drainage Areas, and Runoff rates at all analysis points and detention/retention areas for both pre- and post-development conditions of all rainfall events listed above. C. Exhibit of erosion and sediment control during and after construction. D. Contact Person and Phone number(erosion control) E. Protective measures for proposed and existing structures. F. Water quality concerns 05/12 Page 5