Hastings Park-PNE Public Board Meeting March 4, 2019

Similar documents
LINCOLN COUNTY COMMONS - REVISED MASTER PLAN. Lincoln County Public Meetings June 26-27, 2018, 6pm

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Report Date: June 25, 2013 Contact: Nick Kassam Contact No.: RTS No.: VanRIMS No.: Meeting Date: July 10, 2013

Dyersville Downtown Plan. Open House October 24, 2017

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

TOWN COUNCIL / PLANNING COMMISSION

This Review Is Divided Into Two Phases:

PARK AND RECREATION MASTER PLAN UPDATE

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

A larger version of this map is located on the last page of this PDF.

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

Denver Moves: Transit Task Force

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

WEST BLACKHALL STREET PUBLIC REALM + TOWN CENTRE CONNECTIONS Public Exhibition 28 th June 2018

The Recreational Heart of Cannington - MacLeod & Claire Hardy Parks

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

Rio/29 Small Area Plan. Design Plan & Implementation Framework Open House - January 25, 2018

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Town Centre Park Master Plan Update - Terms of Reference

8implementation. strategies

CHAPTER 7: Transportation, Mobility and Circulation

Welcome. Walk Around. Talk to Us. Write Down Your Comments

UBC Athletics + Recreation Facilities Strategy

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

7Page 1 CLEMMONS COMMUNITY COMPASS 1 PLAN OVERVIEW

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

Concord Community Reuse Project Goals and Guiding Principles. Overarching Goals (OG)

THE TOWN OF WASAGA BEACH

Future Proposed Development

Community Conversation. Thursday, March 30, James St N 7:00 pm 9:15 pm

New Brighton Park Shoreline Habitat Restoration Project

Inspiring Technovation

Comprehensive Plan ADOPTED APRIL 2014

implementation r expression in landscape

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Parks Renaissance. Strategy. Director, Operations. General Committee. Presentation to. May 16, Barb Rabicki

Chapter 1: Introduction

Arlington, Virginia is a worldclass

SECTION ONE: INTRODUCTION. introduction

10.0 Open Space and Public Realm

Draft Bergamot Area Plan

SBPO BOARD MEETING MARCH 20, 2018

1 Welcome! UBC Okanagan Master Plan Update - Open House

COMMUNITY OPEN HOUSE. March 28, 2012

CITY COUNCIL AGENDA REPORT

City of Toronto Official Plan Indicators

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

Pedestrian and Bike Bridge LOGO

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Cherokee. Corporate Headquarters 111 East Hargett Street Suite 300 Raleigh, NC

4- PA - LD - LIVELY DOWNTOWN. LD - Background

The transportation system in a community is an

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

Public Open House. YWCA, 87 Elm Street December 2nd, 2017, 10 a.m. 2 p.m.

Municipal Development Plan 2013

Silverdale Regional Center

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

WELLINGTON STREET WEST COMMUNITY DESIGN PLAN

Committee Meeting: Downtown Today & Concept Refinement September 11, 2017

Moody Centre Station TOD Area Today

Removal of the Georgia and Dunsmuir Viaducts

South th E ast Communit ity Centre (SECC)

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

Goals AND Guiding principles

Engagement Summary Gastown Streets: Local Business Visioning Workshop

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

CAL POLY MASTER PLAN UPDATE, March 2015

38 Queen s University Campus Master Plan Part 1

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

The Private Role in a Public-Private Partnership. Ask Me Anything Conference May 30, 2018

dr. robert paterson Spring 2016

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

Oregon SCORP. Assessing Recreation Demand & Supply

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

Preliminary Plan Framework: Vision and Goals

Smart Growth Development Checklist

THEMES, VISION, + PRINCIPLES

October 25 Downtown Partnership and Action Plan Workshop Record of Group Table Results

Report Date: January 28, 2014 Contact: Matt Shillito Contact No.: RTS No.: VanRIMS No.: Meeting Date: February 4, 2014

BAYFRONT INDUSTRIAL AREA RENEWAL STRATEGY

UNION STUDIO Greater Kennedy Plaza!

FUNDING CORRIDOR REVITALIZATION

CHAPTER 7: PARKS, OPEN SPACES AND RECREATION

Coliseum Station Area Area Redevelopment Plan. Public Engagement #1 June 12, 2017

Introduction. Chapter 1. Purpose of the Comprehensive Plan Plan Organization Planning Process & Community Input 1-1

Town of Oakville Streetscape Strategy

Vision Plan Kickoff Meeting Summary Report

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

Cumberland Region Tomorrow is a private, non-profit, citizen based regional organization working with Greater Nashville Regional Council

AT A GLANCE... Our People, Culture & Place. A plan to sustain Ballarat s heritage (final draft)

QUINCE ORCHARD/FIRSTFIELD CORRIDOR CITY OF GAITHERSBURG MTAP 2017

Local Growth Planning in North Central Green Line Communities

CITIZEN S ADVISORY COMMITTEE PUBLIC REALM CONCEPT PRESENTATION. October 25, 2018

Highest & Best Use Study Marina Park Lands

Transcription:

Hastings Park-PNE Public Board Meeting March 4, 2019

Agenda 1. Review of Projects to date 2. Update on Master Plan Projects Playland Redevelopment Amphitheatre Renewal 3. Hastings Park Technical Studies 4. Next Phase Projects

Review of Projects to Date

Completed Greening Projects to Date Creekway Park Previously a gravel parking lot Completed September 2013 Includes day lighted stream, pathway, bike way, natural landscaping HP Identity and Signage Plan Hastings Park Branding and wayfinding to venues and greenspaces Completed 2014/2015

Hastings Completed Greening Park Projects / to PNE Date Master Empire Fields Plan Two community sports fields & Track Lighting for evening use Plateau Sports Park- includes playground, sport courts, bike park, parkour Completed July 2015 Temporary Greenways East/West connector linking Renfrew, Empire Field & New Brighton Park Future plans incorporate permanent greenways Completed 2013-2014

Hastings Completed Projects Park to Date / PNE Master Plan Livestock building Phase 1 Roofing and seismic upgrades to ensure safety Feasibility Study is next step Completed 2014 Garden Auditorium Asbestos Abatement Completed 2014

Update on Master Plan Projects

Playland Redevelopment Phase 1 2011-2013 Phase 2 2017-2020 Phase 3 2020-2022 Phase 4 2022-2028 Phase MASTER PLAN & PROJECT FEASIBILITY BUSINESS CASE DETAILED PLANNING & DESIGN CONSTRUCTION Purpose Determine if there is a redevelopment opportunity & screen various scenarios Clearly define the redevelopment opportunity and delivery approach Plan and design the delivery of the project Construct asset and handover to operations Key Phase 2 Outcomes: Refresh market analysis Confirm redevelopment scenario Identify project delivery strategy and funding strategy Progress design to 30% Develop more reliable cost estimates (-15 to +20%)

Playland Redevelopment Progress Update 1. Completed refresh of market and benchmark analysis 2. Completed scenario and financial evaluation on 4 redevelopment scenarios Confirmed original redevelopment scenario as the ideal and preferred option 3. Progressed technical studies as part of a site-wide risk assessment

Market Analysis Refresh Findings Overall market size, by Primary and Secondary Market drive-time, is largely consistent with a slightly larger overall projected market in year 2022; Macroeconomic conditions have continued to improve based on GDP and employment metrics; Very strong growth in overnight tourists with over 1.9 million more annual visitors than 2010*; and Based on industry and Playland performance, trends look positive for growth *Source: Pro Forma Advisors LLC

Competitive Benchmarks THRC (Capacity) PFAAN by Ride (Quality; 0=low) Attendance by Day Per Cap Spending Comparison (2011 2017) Source: Pro Forma Advisors LLC

Market Penetration Analysis Canada s Wonderland Market Primary 1 Within 30 minute drive Primary 2 Within 60 minute drive Secondary 1 Over 60 minute drive Tourism Adjusted for season Population (millions) Penetration Attendance (millions) 3.39 38% 1.29 3.90 29% 1.13 3.02 21% 0.64 6.31 11% 0.69 Total 3.79 Playland (No Fair) Market Primary 1 Within 30 minute drive Primary 2 Within 60 minute drive Secondary 1 Over 60 minute drive Tourism Adjusted for season Population (millions) Penetration Attendance (millions) 1.83 15% 0.27 0.96 7% 0.07 0.51 5% 0.03 6.21 1% 0.06 Total 0.42 La Ronde Attendance Index (2014-2017) Market Primary 1 Within 30 minute drive Primary 2 Within 60 minute drive Secondary 1 Over 60 minute drive Tourism Adjusted for season Source: Pro Forma Advisors LLC Population (millions) Penetration Attendance (millions) 2.56 35% 0.90 2.03 21% 0.43 1.76 16% 0.28 6.66 3% 0.20 Total 1.81

Scenario Evaluation Findings 1. Base case (Stabilized Attendance **conservative scenario**) Existing footprint, no attendance or per cap growth, does not meet any social, economic or environmental goals of Master Plan 2. 2013 design Redevelopment & expanded footprint, attendance & per cap growth¹ Does meet social, economic and environmental goals of Master Plan 3. 2013 design + extended season 2013 design plus coverage to lengthen season & add off season events, expected potential attendance growth, with higher costs Does meet social, economic and environmental goals of Master Plan 4. 2013 design with lighter theming 2013 design with less theming, lower attendance & per cap growth than 2013 design Does meet social, economic and environmental goals of Master Plan ¹Preliminary analysis indicates that the 2013 design remains the preferred scenario, with staff also evaluating potential weather mitigation opportunities to de-risk seasonal attendance and create the potential for an extended season.

32,600 sqm 14,100 sqm 44,120 sqm 23,000 sqm 14

Next Steps 1. Continue with Financial Feasibility & Financing Options Analysis Assess consolidated PNE cash flow impacts Assess parking infrastructure cost impacts Evaluate funding and alternative financing options 2. Delivery Planning & Options Assess broader Master Plan components that require investment in conjunction with Playland Evaluate redevelopment phasing options to reduce risk and optimize investment timeline Evaluate business/service delivery model options Next Milestone: Report back to Council in late 2019 with recommended delivery approach, procurement/partnership plan and request additional funding

Amphitheatre Renewal Project Overview HP-PNE Master Plan Priorities Increase green space and habitat to 50% of total site Redevelop Playland (15 to 22 acres) to serve as the economic engine Develop Heart of the Park to serve as a central celebration zone for flexible, programmable spaces suitable for festivals, events, and day-today usage. This space will be centered around a renewed Amphitheatre, Festival Plaza, urban plazas and Livestock Building. Daylight a stream linking the Sanctuary to Burrard Inlet through the Heart of the Park Build amenities and infrastructure to service broad needs

Amphitheatre Renewal - Business Case Overview Phase 1 Phase 3 Phase 2 Phase 4 Business Case Preliminary Design Detailed Planning & Design Construction Market Analysis Update Design Considerations Redevelopment Scenario Analysis Business Model Analysis Business Case Report

Key Findings Market Analysis Overall market size is growing and consistent with projected population growth Strong growth in overnight tourists with over 1.9M more annual visitors than 2010 The event industry is currently strong and anticipates future growth in attendance Despite growth in demand, the supply of local venues is seen as a concern by the local event industry Demand for VIP experiences is growing and represents a large, untapped revenue stream A scalable price structure for smaller community/non-profit shows would be well received and result in more shows

Key Findings Market Opportunity Existing Venue Supply Gap in the Vancouver Market: Affordable venues with a capacity range from 2,000 to 5,000 and 5,001-7,500 are in short supply and high demand Flexible venue space that can serve 2,000 to 10,000 capacity events will fill a major gap in the local venue market Ancillary Revenues Are Critical to Venue Success Large venue capacity and extended operating season will provide the greatest opportunity for financial viability Parking, improved food & beverage guest amenities, and VIP experiences represent an important financial opportunity Expressed Interest from Local Commercial/Community Event Organizers 60% of existing/potential community and commercial event organizers require capacity less than 5,000 seats; 30% event days for events between 5,000 10,000 capacity Over 70% of survey respondents would be interested in renting at a redeveloped Amphitheatre

Key Findings Design Considerations The new venue should have complete installation of power, internet, water, cover, washrooms, concessions, box office, VIP suites, back-of-house facilities, and covered stage Flexibility is very important, particularly in stage size, seating configurations and floor plans Providing cover over the audience will benefit ticket sales and extend the window for outdoor shows Sound management is a concern and sound management will be a requirement in venue design Improved catering or reception area deemed beneficial for producers and the PNE

Preliminary Conceptual Design Renderings **Conceptual** Venue Design Renderings

**Conceptual** Best Case Scenario Venue Design Renderings

Next Steps Finalize financial components of Business Case Report (March 2019) Present recommended redevelopment scenario to project Steering Committee and HP- PNE Board (April 2019) Initiate Heart of the Park Feasibility Study (Q2 2019)

Hastings Park Technical Studies

Traffic, Parking and Access Study Background 1. Creating clear pedestrian and vehicle organization was a primary principle in the HP-PNE Master Plan 2. Traffic engineering consultant (Binnie) was engaged in 2017 to conduct a Traffic, Parking and Access Study to assess the current parking demand, assess traffic volume at peak events, and provide recommendations for future attendance 3. Two site surveys were conducted (one day during the Fair and one non-fair multiple-event day) to account for parking demand 4. Recommendations provided on what site changes will optimize traffic and parking when considering future HP-PNE Master Plan development

Traffic, Parking and Access Study Findings 1. During Playland Season: Baseline parking with Playland expansion will not meet the design target (95 th percentile) for estimated Playland attendance 2. During The Fair: Baseline parking with Playland expansion will not meet the design target (50 th percentile) for estimated Fair attendance 3. An additional 990 parking stalls will be needed to meet the design targets for anticipated event attendance following Master Plan development

Preliminary Recommendations 1. Design for 50 th / 95 th percentile (The Fair/Playland) parking demand 2. Two potential sites for future parking require further operational and financial assessment 3. Consider transportation demand management (TDM) strategies to reduce parking demand and mode share split Carpool-only lots Onsite designated passenger loading areas Bicycle storage / valet Increase % of small car spaces to maximize parkade design Potential for shuttle service from nearby Skytrain station Transit fare passes included with ticket purchases / incentives

Traffic, Parking and Access Study Next Steps 1. Brief COV stakeholders on findings and recommendations 2. Present findings to HP-PNE Master Plan Steering Committee and HP-PNE Board for a decision on parking strategy

Infrastructure Study for Hastings Park Site 1. Updated Infrastructure Master Plan completed in 2016 to assess considered redevelopment scenarios 2. Reviewed below and above grade services such as sewer, water, power, fiber and communication infrastructure 3. Evaluated current status of services and upgrades required to support the Master Plan 4. Most infrastructure is beyond its life expectancy and needs replacement and expansion to accommodate Master Plan vision 5. Projects $110M in upgrades across site

Other Site Investigation Highlights Geotechnical Report Investigation conducted to measure and monitor static ground water table, dividing site into 2 zones Zone 1 seen as medium to high risk, likely requiring ground treatment (removal of loose soil) prior to development Zone 2 seen as low to medium risk; seen as suitable for development Environmental Assessment Soil contamination was identified within the fill material that was identified during the drilling investigation. No groundwater or vapour contamination was identified. Remediation of the soil contamination will be conducted with the excavation activities in conjunction with the redevelopment of the site Pictured: Geotechnical report site zoning

Other Site Investigation Highlights Arborist Study Arboricultural assessment to take inventory of protected trees on the PNE site Identified 347 trees in the study area, of which 249 trees are in moderate or good health Remaining trees were recommended to be replaced to ensure safety and longevity in an urban landscape Pictured: Arborist report study area

Next Phase Projects

On the Horizon Heart of the Park Festival Plaza A new urban heart of the park featuring: comfortable seating, public art, high-quality paving and lighting, and food carts Outdoor space for community festivals, special events, and markets Built-in festival and event infrastructure Daylighted stream flows along plaza edge Livestock Building Feasibility Study for what is possible Building upgraded for seasonal use and retrofitted with large overhead doors allowing activities in the Livestock Building to spill out onto Festival

On the Horizon Festival Meadows Open space for flying kites, playing games, picnics, and relaxing Opportunity for smaller community festivals and events with built-in infrastructure such as power and water Playland needs to expand first to make way