Information for File # ARC

Similar documents
Information for File # ARC

Information for File # JTF

Information for File # ARC

Information for File MMJ Main Stem Bassett Creek Restoration Project

Information for File # MMW

Information for File # RMM

Information for File # ARC

Understanding Drainage Options What s Feasible and Legal. February 2019

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

PROPOSED DRAINAGE PATTERNS

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

Information for File # MHK

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Alternate Green Stream Bank Stabilization Methods

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Information for File #MVP MVM

Information for File # MVP MMJ; Elim Care

Information for File # KDZ

Information for File # MVP MMJ

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

Chapter Six: Tree Removal and Erosion Control

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Information for File # SEK

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

STREAM ALTERATION PRACTICES

Tour of Nonpoint Source Pollution Reduction Projects in the Western Lake Superior Watershed

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

City of Waco Stormwater Management Regulations

Coffee Creek Park Development Low Impact Development (LID)

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

Florence County Small Commercial Land Disturbance Permit Application

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

2018 Annual Landfill Inspection Report

A comparison of Traditional and Prefabricated Encapsulated Soil Lifts

The Napa River Flood Protection Project

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

4. Contractor (and subcontractors if applicable) certification statement(s)

Old Brick Township DRI Recommendation Report

Managing Shorelines: Control Erosion and Protect Water Quality. Ben Powell Clemson Extension

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL

Rule D Wetland and Creek Buffers

Information for File #MVP DAS

17 Jul 2002 PUBLIC NOTICE

POST-FIRE RESTORATION Dos and Don ts

Illinois Urban Manual

EROSION & SEDIMENT CONTROL

Existing Conditions and Environmental Consequences Floodplains

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

Gloucester County PLAN SUBMITTER'S CHECKLIST

Section 11 Grading and Drainage Standards

15. Wetlands Chapter Overview Introduction

Section 3 Non-Structural BMPs

Town of Hague Stormwater Outfall Evaluation Report

Huntington Stormwater Utility

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

Chapter 4 - Preparation of Stormwater Site Plans

Appendix E Preliminary Location Hydraulic Study

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Monica Smith, PE President Robinson Engineering Company

Plan Review Checklist

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Town of Essex Small Site Erosion Control Guide

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

City of Shady Cove Riparian Ordinance Ordinance XXX

Severn River Sub-Watershed: BMP 09-Retrofit

PLAN SUBMITTER'S CHECKLIST

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

Weston s Wetlands, Stormwater, & Open Space

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

REPORT AND SPECIFICATION FOR RESTORATION WORKS ON NELLIES GLEN ROAD and THE 6 - FOOT TRACK NELLIES GLEN

Property Owner s Guide to Creek and Shoreline Maintenance

SECTION 6. Routine Maintenance Activity Details

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

Town of Vershire Road Erosion Inventory Report

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Sustainable Storm Water Management

Applications of Coir Fibre Products in Environmental Erosion & Sediment Control and Restoration

Pittsburgh District Pittsburgh, PA Notice No Closing Date: May 29, 2015

Erosion Control for Home Builders in the. City of Jacksonville

Watertown City Council

POLE BRIDGE ROAD NEAR FIVE LOT FARM

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

CITY OF WEST ST. PAUL 1616 HUMBOLDT AVENUE, WEST ST. PAUL, MN

St. Croix County Shoreland Overlay Zoning Districts. Public Hearing Community Development Committee December 19, 2013

Advance Engineering & Surveying PLLC

FURNEAUX CREEK 5 CHANNEL

Transcription:

Information for File # 2016-02630-ARC Applicant Corps Contact Will Bomier-Carlton County Transportation Department Andrew R Chambers Address 600 South Lake Avenue, Suite 211, Duluth, MN 55802 E-Mail Andrew.R.Chambers@usace.army.mil Phone 218-720-5291 Primary County Carlton County Section 18 Township Range 49N 17W Information Complete On January 19, 2017 Posting Expires On February 12, 2017 Authorization Type LOP-10-FDL This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section 404 of the Clean Water Act. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are subject to Corps of Engineers jurisdiction under Section 404 of the Clean Water Act. If an approved jurisdictional determination is completed as part of the review process for this application, a copy will be posted on the St. Paul District web page at the following link: http://www.mvp.usace.army.mil/missions/regulatory.aspx. Project: Carlton County Transportation Department is proposing to replace a structurally deficient culvert within the exterior boundaries of the Fond du Lac Band of Lake Superior Chippewa Reservation located on County Road 114 (Jarvi Road) 0.6 miles east of Brookston Road. This work is needed to maintain the integrity of the roadway, and provide a safe roadway crossing of an unnamed tributary. The project would result in the permanent discharge of dredged and fill materials into approximately 1,495 square feet of an unnamed tributary to Fond du Lac Creek and into 8,926 square feet (0.205 acre) of adjacent shrub-carr wetlands. PROJECT DESCRIPTION AND PURPOSE: Access to the repair location would be from County Road 114, staying within the road right-ofway (ROW). Carlton County proposes to utilize Best Management Practices during construction to avoid erosion of sediment into the tributary or adjacent wetlands. A soon as construction commences, all disturbed areas would be seeded and protected with biodegradable erosion control blanket. 1

The existing culvert is a 30-inch by 56-foot corrugated metal pipe that is structurally deficient. The deficient culvert is at a high risk of failing and is undersized, causing the roadway to be impassible after rain events due to runoff flowing over the roadway. The replacement structure would be 115-inch by 48-foot reinforced concrete pipe culvert with 9.8 foot aprons on both sides. The side slopes of the roadway and culvert approach would be built at 4:1 slopes to meet current safety standards. This involves the toe slope of the roadway to extend into shrub-carr wetlands on either side of the road. Also, rip rap would be installed below the OHWM of the tributary on either end of the culvert to maintain stability and prevent high velocity water from eroding the embankment. NAME, AREA AND TYPES OF WATERS (INCLUDING WETLANDS) SUBJECT TO LOSS: The project would result in the permanent discharge of dredged and fill material into approximately 1,495 square feet of an unnamed tributary to Fond du Lac Creek and into 8,926 square feet (0.205 acre) of adjacent shrub-carr wetlands. The work for this project would include the replacement of the culvert and installation of the aprons within the tributary, accounting for 666 square feet of permanent stream impact, and the installation of rip rap below the OHWM of the tributary, accounting for 829 square feet of stream impacts. The work would also include creating 4:1 side slopes on the roadway embankment to meet current safety standards, accounting for 8,926 square feet of shrub-car wetland impact. ALTERNATIVES CONSIDERED: The no replacement alternative was abandoned due to the need to provide a safe road crossing of the unnamed tributary for the public. The replacement project would occur on this specific culvert, no off-site alternatives exist. COMPENSATORY MITIGATION: The applicant has proposed to meet the Fond du Lac Reservations requirement of 1.25:1 compensatory mitigation for permanent wetland loss through the MN Local Government Road Wetland Replacement Program. This project would occur in a >80% pre-settlement county, and the proposed wetland impacts would not exceed 10,000 square feet. Therefore, the applicant has proposed that no compensatory mitigation be required from the Army Corps of Engineers. Drawings See attached. 2

County Road 114 Culvert Replacement Legend Cloquet Carlton County Airport Cloquet Public Library Fire Dept Lost Tavern Inc University of Minnesota Extension Cloquet Regional Office Washington Elementary School Wear-A-Knit Corporation 2016 Google 2 mi N

Project Location and Wetland Impact Map S.A.P. 009-114-008 Carlton County Transportation Department 7 ") 114 Jarvi Rd 18 Pictometry, Carlton County GIS Rock Rip/Rap 414.8 ft2 Each Side of Structure (In Stream Placement) Total of 829.6 ft 1 in = 50 ft Carlton County Minnesota Structure Stream Impact (Structure + Aprons) 666 ft2 Total Stream Impact (Structure + Rock= 1,495.6 ft2) Map Created By: Will Bomier Date: 1/17 Legal Description: T49N-R17W Sec. 18 City of Cloquet Not for Survey Purposes This data is provided on an "AS-IS" basis, without warranty of any type, expressed or implied, including but not limited to any warranty as to their performance, merchantability, or fitness for any particular purpose.