Su5jecf: StatusRepor. t Projec ts. t Capital Improvemen. ISSUE: Shallthe City Councilreceivea statusreportof its adopted Capital

Similar documents
2017 General Obligation Bond

Capital Projects in and near Odenton Town Center

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Description of Preferred Alternative

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

Fall 2017 Construction Update

To: Planning Commission D.. June 3, 2009

BENJAMIN BANNEKER PARK FRAMEWORK PLAN (PLAN ADOPTION)

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

RANCHO PALOS VERDES MICHAEL THRONE, PE, DIRECTOR OF PUBLIC WORKS~ CAROLYNN PETRU, ACTING CITY MANAGE~

A larger version of this map is located on the last page of this PDF.

Index to Projects by Project Name

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

SIX YEAR COMPREHENSIVE TRANSPORTATION IMPROVEMENT PROGRAM AMENDED 2012 &

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

Lone Oak Road/ 70 th Street West. Efficient, Effective, Responsive. Preliminary Design Services (CP 26-54)

RZC Public View Corridors and Gateways

University of Washington Burke Gilman Trail Corridor Study

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

CITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION June 3, :00 PM INVER GROVE HEIGHTS CITY HALL COUNCIL CHAMBERS

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

Issues Requiring Future Study

OFFICIAL CONTROLS IMPLEMENTATION LEGAL REQUIREMENTS

2040 Long Range Transportation Plan

Places29: List of Implementation Projects

CITY OF WOODINVILLE CLAIMS

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) Metropolitan Parks and Open Space Commission

TAC/CAC, TPO Project Update February 2016

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

PUBLIC MEETING NO. 4 OCTOBER 29, 2013

The Turtle Creek Master Plan- A Summary. July 7, 2011

PROJECTS AND THE PUBLIC ART MASTER PLAN

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

VILLAGE BOARD MEETING STAFF REPORT

Guidelines and Princi les FINANCIAL ACTION SUMMARY

Transportation. Strategies for Action

EXHIBIT A 2019 FINANCING: PROJECT AUTHORIZATIONS

At first Work Session on October 22, At second Work Session on November 19, At third Work Session on December 3, 2015

Prince William Street Project (Grant Avenue to Wellington Road)

Phasing and Implementation

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

PARTF Scoring System for Grants

John Portman Boulevard Corridor

Regional and Local Perspectives

Shift Rapid Transit Public Participation Meeting May 3, 2017

Cottage Grove Road Reconstruction. City of Madison Engineering

DRAFT PLAN PRESENTATION

CHAPTER 2 TRANSPORTATION ELEMENT

COMPLETE GREEN STREET CHECKLIST

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

Kinzie Industrial Corridor

Capital Projects impacting Odenton Town Center

Special Revenue Funds

Table 5.2. Short-Term Work Program Jackson County,

ESTABLISH AN EFFICIENT TOWN CENTER

Elm Street Business District: Streetscape and Signage Plan

POCKET COMMUNITY PLAN

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

Community Open House March 26 th, 2018

8 February 9, 2011 Public Hearing APPLICANT: 7-ELEVEN, INC.

Blue Line LRT Extension

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

Implementation Guide Comprehensive Plan City of Allen

City of Waukee, Iowa Capital Plan PROJECTS BY DEPARTMENT

TOWN OF JUPITER. Honorable Mayor and Members of Town Council Andrew D. Lukasik, Town Manager

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Regular Session. Executive Session

Spring 2018 Construction Update

CND Committee Meeting April 10, 2018

City of Hermosa Beach Administrative Policy #

5.0 IMPLEMENTATION STRATEGIES

Northwest Rail Corridor and US 36 BRT Development Oriented Transit Analysis 4.4 STATION AREA FINDINGS

Planning Districts INTRODUCTION

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

Yahoo! Inc. CO-7. Santa Clara Valley Urban Runoff. Site Location: 701 First Avenue Sunnyvale, CA

Chapter 11. Implementation Plan

SEATTLE PACIFIC UNIVERSITY MIMP Condition Status Matrix: July 1, 2015 June 30, 2016

CITY OF SIMI VALLEY MEMORANDUM

Const. ROADS - Description

New Partners for Smart Growth Conference February 5, 2010

City of Meriden Harbor Brook Flood Control Project Overview

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Point A Point B Point C Point D. City of Hapeville Public Meeting July 25, 2017

Mavis Road Class Environmental Assessment

Farmersville Parkway Phase III

City of Ennis. Downtown Master Plan Catalyst Projects

Awarded Small Works Projects

4, t,,\' CITY OF WOODINVILLF, INVOICES. Finance Director. M:lADM DEPTPOSiti0nS'ACCOunting Clerk- B'ACCOUNTSPAYABLE'iCLjUMCRTV2.dOC

Transcription:

To: BY: CITY OF WOODINVILLE, WA RE,PORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.CI.WOODINVILLE.WA.US Honorable City Council Rick Roberts,P.E.,PublicWorksDirec tor6 Su5jecf: StatusRepor t Projec ts t 2017-2018Capital Improvemen Date: October 17, 2017 ISSUE: Shallthe City Councilreceivea statusreportof its adopted2017-2018 Capital ImprovementProgram? RECOMMENDATION:To receivethe report. BACKGROUND/DISCUSSION: The approved2017-18 CapitalImprovementBudgetincluded $23 millionfor 31 projects. Staffwillbepresentingto thecitycouncilinformationonstatus,recentdevelopments, andissues relatedto the20"l7-2018capitalimprovementprogram.theattachedspreadsheetsummarizes theoverallstatusof theprogram,tncludingcompletedpro3ects, soonto be completedpro3ects, and projectsto be desrgned/constructed in 2018. Staffis recommendingthatfour pro3ectsbe addedto the 2017-2018 CapitalImprovementProgram.The prolectsaddressimmediateneeds thatwerenotknownto staffwhenthe 2017-2018Budgetwasprepared.Theyare: Emergency Slope Repair Emergency Road Repair Pavement Management Inventory Drainage Study $ 57,000 $125,000 $ 50,000 $IO0,000 Ten projectshave been completed,one eliminated,and one deferredto the next biennium. Two of the rematntngprojectsareantrcipatedto goto adin Novemberțhe restwill begindesignwith theexpectationthatwewillbeableto comp!etedesignandbeginor completeconstructionduring the remainder of the 2017-2018 biennium. Staffis askingfor a budgetamendmentat thistimeto coverthe additional funds requiredfor the four newpro3ects, aswellasadditronal fundsrequiredfor costincreases(to beexplainedin detail rn the staff presentauon)ẉith the additionof the pro3ects,the City's CapitalImprovement Programprojectswill haveplannedexpendituresof $27,031,000for 33separatepro3ects. ALTERNATIVES: 1. To receive andfile the report. 2. Provide direction to staff. 3. Request additional information. RECOMMENDED MOTION: Thisis a discussionitem and no formal action is necessary, AttachmentI : 2017-2018CapitalProjectStatusReport 1

d 2POre1p7a -2reO d18 byca Rpi l.t CaklPRrOobjeecntsSt PaEtusReport I i_ Date:October17,2017 $ DPro OIJl.aercs tinna$mle,000_ j 4- B-dg-t Bid/Proposal Date Complet ed Project sasof Oct ober2017 ] Streets Woodinville- Duvall Road Widening(2013-14 CIP) 5aoi- -!530' NA Streets I ArterialStreetOverlay Program(2015/16-175th) 5io 910 NA Streets ResidentialStreetOverlayProgram(2015/16ChateauWoods) t NA Parks Wilmot Park - PlayStructureReplacemen Parks I Woodinville Heights - PlaceStructureReplacement 5125 -' -' 51311 NA Parks West Slope Bike/PedestrianParkand Trail 6100 S50 NA Surface Water NE171st DrainageSystemUpsizing- City Share 5250 SO NA Facilities PublicWorksShopRoofReplacement(2015/2016CIP) 910 510. Added Projects (Completed) I Streets EmergencySlopeRepair SO!>57 NA Streets Emergency RoadRepair _ a - - 5125 NA Projectsto becompleted in2017 currentl y underway I -'-" I Streets Trestle Replacement/Widening on SR202 Corridor - Study 5iool!,100 NA Streets SR522/NE195th St Intersection Interim Improvements - Study!>20 520 NA Projectsin Desi@n- to beconstructed/ completed in2018 ' Street s i NE171st Street UrbanParkwaylmprovements/133rdRoundabout S5,000!>8,160 4Q 2017 Streets Wayfinding Signs S24!>24 2Q 2018 Streets SammamishBridge Replacement(2013-14 CIP) 56,400 S7,300 4Q 2017 Streets Center Curb Replacement- Trip Roundabouts!>60 S60 2Q 2018 Streets NENorth WoodinvilleWay -Wood/Snoto NEWood/DuvallRd Sl,110!>1,110 3Q 2018 Streets 195th & 164th Overlay and Walkways - ResidentialOverlay 91,500 51,500 3Q 2018 Streets 124th Ave NE Sidewalk - 156th to 160th 5i,oio Sl,010 3Q 2018 Streets Eastside Rail Cooridor - Design 9500 500 3Q 2018 Parks DeYoung Park Restoration S750!'750 4Q 2018 Parks NE145th Street Pedestrian Path - Study i S300 9300, TBD SurfaceWater Alb ert sonponds endi mentv ault I!>270 TBD Facilities CivicCent erdesign/study [ l' - S225 NA Facilities Facilities CityHall HVACSyst emreplacemen t ---!'120 4Q 2018 l CityHall FireCont rol SprinklerReplacemen t [ - SIIO 4Q 2018 t [-!;125 2Q 2018 Facilities City Hall Carpet Replacemen Facilities CityHall Int eriorpaint J J - 5asI 2Q2018 Facilities I Inclemen t WeatherMaterialsShelter j saso 9sso 3Q 2018 Facilities Fire PanelReplacement(CEC) Facilities Shop Expansion e"" F- - :oo i 4Q2018 i N/!I Added Projects L Streets Pavemen t Conditi oninvent ory -"- 950 4Q 2017 Surf acewat er 2017-20l8D rainagestudy [- 7-SIOC. 2Q ;_ois I Proper ty Acquisiti on 7- - -l I -Property - - --- Little-Bearereek-Proper ty-acquisition - -- - - - - - -- -- - -- - i--- - - -S-8Ċ - - - - - --58C i - - - - - -2Q 201E Property Mi scellaneousproper tyacquisiti on q,-ooc J - S4,00 li TB[ l TOTAL 3 ] 510 5 SIO NA NA

2017-2018 CAPITAL PROJECTS STATUS REPORT Presentation to City Council October 17, 2017

2017-2018 Capital Projects Status Report Original Budget Number of Projects 31 Total Planned Expenditures ( Budget ) Proposed 2017-18 Budget Adjustment Add 4, delete 1 defer 1 Revised Total $23,019,000 $4,012,000 $27,031,000 33

2017-2018 Capital Projects Completed Projects Woodinville-Duvall Road Widening NE 175 th Street Overlay (2016 Arterial Street Overlay Program) Chateau Woods Overlay (2016 Residential Street Overlay Program) Wilmot Park Play Structure Replacement Woodinville Heights Play Structure Replacement West Slope Bike/Pedestrian Park and Trail (Study) NE 171 st Drainage System Upsizing Public Works Shop Roof Replacement Emergency Slope Repair * Emergency Road Repair * * Added Project

Projects Completed in 2017

Woodinville-Duvall Road Widening $30,000

Woodinville Heights Play Structure Replacement $131,000 Wilmot Park Play Structure Replacement $309,000

Emergency Road Repair $125,000 Emergency Slope Repair $57,000

Projects Added, Deferred or Cancelled Projects to be Cancelled Fire Panel Replacement (CEC) ( $ 35,000 ) Projects to be Deferred Shop Expansion ( $ 135,000 ) Projects Added Emergency Slope Repair $ 57,000 Emergency Road Repair $ 125,000 Pavement Condition Inventory $ 50,000 Drainage Study $100,000

2017-2018 Projects Added /Deferred/ Canceled

Pavement Condition Inventory (Study) $50,000 Drainage Study $100,000

Projects to be Constructed 2018 Arterial Overlay - NE North Woodinville Way, Wood-Sno to Wood-Duvall Residential Overlay - 195 th & 164 th Overlay and Walkways 124th Ave NE Sidewalk 156th to 160th NE 171st Street Urban Parkway Sammamish Bridge Replacement Project DeYoung Park Restoration Center Curb Replacement Trip Roundabouts Wayfinding Signs

Projects to be Constructed 2018 (Cont.) Eastside Rail Corridor Design NE 145 th Street Pedestrian Path Study Albertson Pond Sediment Vault Civic Center Design/Study City Hall HVAC System Replacement City Hall Fire Control Sprinkler Replacement City Hall Carpet Replacement City Hall Interior Paint Inclement Weather Materials Shelter Pavement Condition Inventory Drainage Study

Projects to be Constructed in 2018

Arterial Overlay NE North Woodinville Way Wood-Sno to Wood-Duvall Residential Overlay 195th and 164th Overlay and Walkways

Sammamish River Bridge Widening Project Currently - Designed - Permits Acquired - Getting WSDOT bid approval Ad Date: November 2017 NE 171 st Urban Parkway Improvements Currently - Design Modifications - Permit Revisions - Utility Coordination Ad Date: November/December 2017

DeYoung Park Restoration Preferred Design Alternative

Questions?