JACOB G. SMITH ELEMENTARY SCHOOL TCHEN UPGRADE SCCPSS PROJECT FOR SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM BOARD OF EDUCATI

Similar documents
M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

ABV AD AFF CO CODP COTG COWP CW DN EWC FD HB HW

SECTION COMMERCIAL-KITCHEN HOODS

SECTION ELECTRICAL GENERAL PROVISIONS

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

EXHAUST FANS: LARGEST MOTOR x0.25=5hp x0.25 AT 100% = 1.25 KW 3.7KW AT 100%= 3.7 KW 3 HP AT 100%= 3.0 KW TOTAL A/C LOADS=26.5 HP AT 100% = 26.

GRILLE, REGISTER AND DIFFUSER SCHEDULE

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

SECTION PLUMBING

Project General Notes DESCRIPTION ABBREVIATIONS AIR CONDITIONER ABOVE FINISHED FLOOR BALANCING DAMPER

A. Standards: Except where modified or exceeded by the requirements of this Specification, conform to the following standards:

SECTION (15833) - HVAC POWER VENTILATORS

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

Revitalize Building Mechanical Systems (4619)

COHASSET, MA March 6, The following is the HVAC outline specifications, which defines the scope of work of the HVAC system.

PART GENERAL 1.01 SECTION INCLUDES

XRRS Specification Fire Ready Hood

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

EXHAUST FAN SCHEDULE

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

HVAC LEGEND HVAC ABBREVIATIONS PLUMBING LEGEND PLUMBING ABBREVIATIONS PRELIMINARY NOT FOR CONSTRUCTION

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

SECTION DUCTWORK

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

UNIVERSITY OF MISSOURI Fire Protection System Design 2016 Q1

SECTION LABORATORY and DE-IONIZED WATER SYSTEMS STANDARD CONSTRUCTION STANDARD

KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SSL / SBS Sales Guide BLOWER-COILS REDUCED-FOOTPRINT, VERTICAL

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

SECTION AIR DUCT ACCESSORIES

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

SECTION DOMESTIC WATER PIPING SPECIALTIES

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION KITCHEN HOOD AND DUCT FIRE SUPPRESSION SYSTEM

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

1.1 This section applies to air handling units for HVAC Systems.

Project Name: Project Address: Installer Name: Installer Address: Date of Inspection:

SECTION ISOLATED POWER SYSTEMS

SECTION BIOLOGICAL SAFETY CABINETS AND LAMINAR AIRFLOW WORK STATIONS

LAV FCO WCO NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

SECTION HEATING BOILERS

FUEL OIL DAY TANKS. SST Level Controller: UL 508 LISTED

24V PCU CORE FIRE PROTECTION INSTALLATION SUMMARY

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

SECTION CUSTOM FABRICATED LABORATORY EQUIPMENT. This section specifies necropsy // dissecting tables // and // animalcage

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

Adveco Thermal Stores

SECTION : MEPS IDENTIFICATION & LABELING

CHAPTER 5: EXHAUST SYSTEMS

C. Shop Drawings: For boilers, boiler trim, and accessories. Include plans, elevations, sections, details, and attachments to other work.

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

SECTION AIR COILS

G101 SCHOOL AIR CONDITIONING UPGRADE - PROJECT #3 SUNSET ELEMENTARY COOLING UPGRADE 2014 NORTH 250 WEST SUNSET, UTAH 84015

Basic Hood Considerations The design process for a successful kitchen ventilation system starts when the engineering design HVAC team receives

MODEL: JRSVH SERIES JEAN S RESTAURANT SUPPLY 426 SOUTH STAPLES CORPUS CHRISTI, TEXAS PH: (361)

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

FIRE ALARM: BY OTHERS, IF REQUIRED.

Direct Fired Heater Model AD Specification

08/17/2011 Rev. 4 PULL STATION EXHAUST HOOD 10 TO 20 FEET FROM HOOD LOCATE ONE NEAR EVERY POINT OF EGRESS FROM HOOD

SECTION FUEL-FIRED DOMESTIC WATER HEATERS

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

SECTION DUCTWORK. A. Section Painting: Weld priming, weather resistant, paint or coating.


Design & Construction Standards, Revised January

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

Gas Station & C Store SECTION CWM Job No

HWC NOTES: CONTRACTOR SHALL REFER TO ARCHITECTURAL DRAWINGS FOR MOUNT HEIGHTS AND SPECIAL MOUNTING INSTRUCTION AND LIMITATIONS.

MONTECITO FIRE PROTECTION DISTRICT

FOR YOUR SAFETY WARNING FOR YOUR SAFETY. high efficiency, separated combustion gas-fired unit heaters models PTC and BTC

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

GENERAL PLUMBING NOTES

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

Pipe: ASTM B88, hard drawn copper, Type K. Fittings: ASTM B16.22 Wrought copper and copper alloy.

C. Manufactured double wall chimneys for fuel fired equipment. D. NFPA 54 - National Fuel Gas Code; National Fire Protection Association; 2009.

Schust Engineering, Inc. 701 North Street P.O. Box 128 Auburn, IN (260) Fax: (260)

DIVISION 15 MECHANICAL

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

CADDY CORPORATION. Utility Distribution Systems

GENERAL CONTRACTOR NOTES GEN WALK-IN NOTES 1. E.C. TO VERIFY EXACT SIZE & LOCATION OF COMPRESSORS FOR WALK-IN BOXES W/ KEC & ARCHITECT.

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

PLAN REVIEW SUBMITTAL GUIDE

Inspection Checklist Mechanical Rough in

Lombard Fire Department Bureau of Fire Prevention COMMERCIAL HOOD & DUCT SYSTEMS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Code verification sign-off

Dear Concessionaire,

B. The sprinkler system shall be designed to meet the more stringent of the requirements of NFPA 13 and FM Global requirements.

DIVISION 21 FIRE SUPPRESSION SECTION FIRE PROTECTION SPECIALTIES

Transcription:

f orwh h heywer e ssued.repr odu ons of h s dr aw ng w hou he wr en onsenofcha ham Eng ng Com pany,llc s noper m ed Pr n s ar e o be r e ur ned o Cha ham Eng ng Com pany,llc upon om pl e on ofuse Th s dr aw ng and al lpr n s of ar e he pr oper yof Cha ham Eng ng Com pany,llc PHONE ( 9)800 FAX ( 9)8 Savannah,eor g a 05 09 Par k ofcom m er e Dr ve,su e6 ACOB. SMITH ELEMENTARY SCHOOL KITCHEN UPRADE SCCPSS PROECT Revsons Dae NAME T0. TITLE SHEET ELECTRICAL LEEND, SCHEDULE, AND FLOOR PLANS M0. SPECIFICATIONS & FLOOR PLAN - HVAC P0. LEENDS AND SPECIFICATIONS - PLUMBIN P. FLOOR PLAN PLUMBIN SCOPE OF WORK:. REMOVE HOOD, ASSOCIATED DUCTWORK, FAN AND FIRE PROTECTION SYSTEM FROM KITCHEN.. DISCONNECT KITCHEN EQUIPMENT UNDER HOOOD.. PROVIDE NEW KITCHEN HOOD WITH FIRE PROTECTION, DUCTWORK AND SUPPLY AND EXHAUST FANS.. PROVIDE PLUMBIN AND ELECTRICAL SYSTEM TO SERVE RELOCATED AND NEW KITCHEN EQUIPMENT. : LOCATION: EORI A CHATHAM ENINEERIN COMPANY, LLC 09 PARK OF COMMERCE DRIVE, SUITE 6 SAVANNAH, A 05-96 (9) 8-00 Samp CODE REQUIREMENTS: Inernaonal Buldng Code...0 Inernaonal Plumbng Code...0 Inernaonal Mehanal Code... 0 Inernaonal Fuel as Code...0 Inernaonal Energy Conservaon Code...009 Inernaonal Fre Code... 0 Naonal Eleral Code... 07 Edon Edon Edon Edon Edon Edon Edon Shee Tle TITLE SHEET ob No. 0 LAMARA DR, SAVANNAH, A 05 805.00 Drawn LC Cheked PM Dae Shee No. E:\BOE aob Smh - Khen - 805.00\CADD\T0_.dgn T0. RELEASED FOR CONSTRUCTI ON SHEET NUMBER CONTACT LIST: SAVANNAH FOR SAVANNAH CHATHAM COUNTY PUBLIC SCHOOL SYSTEM DRAWIN LIST: By Desrpon BOARD OF EDUCATI ON ACOB.SM I TH ELEM ENTARY SCHOOL KI TCHEN UPRADE No.

0.000000000000000 AN. ELECTRICAL CAFETERIA NEW PANEL KA STARTER FOR HOOD SUPPLY FAN. CONNECT TO SHUT OFF FAN ON FIRE PROTECTION ACTIVATION PANEL DK PANEL MK EMS BOX TO REMAIN PANEL TO REMAIN LEEND HOME RUN SPECIAL RECEPTACLE IN CAST BOX OVERHEAD CONDUIT MANETIC STARTER - NOTE 0 0A, 5V DUPLEX RECEPTACLE - SPEC RADE DISCONNECT SWITCH (AMPS)/(POLES)/NEMA ENCLOSURE UNCTION BOX MOTOR PANELBOARD SWITCH (ELECTRICAL PLAN). SEE SHEET M. FOR ELECTRICAL DEMOLITION NOTES.. KITCHEN EQUIPMENT TO BE: CONVECTION OVEN () EACH HP, 0V () BRAISIN PAN.A, 0V () COMBI-STEAMER 7.5A, 0V (NEW). PROVIDE CAST BOX 8" AFF WITH WP METAL IN-USE COVER. SPLIT WIRE RECEPTACLE FOR TWO 0V CIRCUITS SHOWN. PLU IN CONVECTION OVEN. PROVIDE STAINLESS FLOOR STAND TO SUPPORT BOX.. PROVIDE CAST BOX 8" AFF WITH ASKETED COVER. SEATITE FLEX TO BRAISIN PAN AND COMBI STEAMER FROM CIRCUIT SHOWN. ENERAL NOTES & SPECIFICATIONS. ALL WORK TO COMPLY WITH 07 NEC. ALL STATE AND LOCAL ORDINANCES AND BOE STANDARDS.. COORDINATE ALL WORK WITH CONDITIONS AND OTHER TRADES.. CONDUITS INSIDE TO BE EMT WITH COMPRESSION FITTINS. ALL CONDUITS EXPOSED UNDER HOOD BELOW 0 FT AFF TO BE RIID ALVANIZED STEEL.. LABEL ALL OUTLET AND UNCTION BOXES SHOWIN CIRCUIT NUMBER. 5. ALL CONDUCTORS TO BE STRANDED COPPER TYPE THWN. COLOR CODE AS FOLLOWS: PH A PH B PH C NEUTRAL 08/0V BALCK RED BLUE WHITE 6. PROVIDE REEN EQUIPMENT ROUNDIN CONDUCTOR IN ALL CONDUITS. 7. WHERE BREAKERS ARE ADDED TO PANELS. BREAKERS TO MATCH AND BE COMPATIBLE TO. MAKE ALL MODIFICATIONS REQUIRED. 8. COORDINATE WORK SCHEDULE WITH OTHER TRADES AND PROECT SCHEDULE. 9. CONNECT FIRE PROTECTION SYSTEM TO ALARM FIRE ALARM SYSTEM IF HOOD SYSTEM IS ACTIVATED. SYSTEM IS NOTIFIER. ALL WORK SHALL BE PERFORMED/SUPERVISED BY NOTIFIER APPROVED COMPANY. DEMONSTRATE OPERATION TO AH AND ENINEER. CERTIFY SYSTEM WHEN COMPLETE. 0.MANETIC STARTER SHALL BE NON-COMBINATION NEMA SIZE I, WITH HOA SWITCH, 0V FUSED CPT AND SOLID STATE RELAYS. 09 Park of Com m ere Drve, Sue 6 Savannah, eorga 05 Ths drawng and all prns of are he propery of Chaham Engng Com pany, LLC Prns are o be reurned o Chaham Engng Com pany, LLC upon om pleon of use for whh hey were ssued. Reproduons of hs drawng whou he wren onsen of Chaham Engng Com pany, LLC s no perm ed 5. PROVIDE NEMA X SS BOX WITH HINED COVER AND PROVIDE POLE AUXILIARY RELAY. CONNECT RELAY TO MICROSWITCH IN FIRE PROTECTION SYSTEM SO RELAY IS ENERIZED WHEN FIRE SYSTEM ACTIVATES. CONNECT RELAY TO:.LABEL ALL NEW PANELS, DISCONNECTS AND STARTERS. SHOW CIRCUIT NUMBER ON ALL NEW DEVICES. Revsons. SHUNT TRIP BREAKERS SERVIN EQUIPMENT UNDER HOOD. No. Dae Desrpon By. LOCK OUT HOOD SUPPLY FAN.. CONNECT TO FIRE ALARM. SEE NOTE 9.. SPARE FLOOR PLAN - CAFETERIA 6. COORDINATE ALL CONNECTIONS WITH HOOD PROVIDED INCLUDIN LOCATION AND ALL INTERLOCKS. CONNECT TO REMOTE HEAT SENSOR AND SUPPLY FAN STARTER. KA-8 REUSE CONDUIT. INTERCEPT NEAR PANEL MK AND EXTEND TO PANEL KA SCALE: / 8 " = ' - 0" (DEMOLITION PLAN) D. SOLID INDICATES TO BE REMOVED. DASHED INDICATES TO REMAIN. 6-0R FOR MICROWAVE 00W, PH, 08V MOUNT ABOVE COUNTER. SF- HP, PH, 08V REMOVE RECEPTACLE AND CONDUCTORS BACK TO PANEL MK AS LINE AT CEILIN SEE NOTE D FOR EQUIPMENT SCHEDULE HOOD NOTE D,D5 NOTE D CEILIN IS 7 " AFF ± REMOVE RECEPTACLE AND CIRCUIT SERVIN CONECTION OVER REMOVE SWITCH AND CIRCUIT CONNECTED TO HOOD LIHTS REMOVE FIRE PROTECTION SYSTEM INCLUDIN CABLIN AND CONDUIT EXTENDIN TO AS VALVE AT HOOD. DISCONNECT CONNECTION TO FIRE ALARM SYSTEM. D. REMOVE HOOD AND HANAR SUPPORTS EXTENDIN THROUH CEILIN. REMOVE " ROUND EXHAUST DUCT AND FAN LOCATED IN ATTIC AREA. CAP OFF BOTTOM OF DUCT WITH CAP EXTENDIN THROUH METAL ROOF. DO NOT REMOVE DUCT THRU METAL ROOF REMOVE CIRCUIT TO HOOD FAN. D. REMOVE KITCHEN EQUIPMENT. DISCONNECT UTILITIES SEE NEW PLAN FOR RELOCATED EQUPMENT. ITEM EQUIPMENT DIMENSION NOTES CONVECTION OVEN () 8"W X 7"D A STOVE "W X 0"D B BRAISIN PAN 8"W X 6"D A A - RELOCATE AND RECONNECT. B - REMOVE STOVE AND DISPOSE OF OFF SITE. D. REMOVE AS PIPIN INCLUDIN RISER, SHUTOFF VALVE AND TRAIN LOCATED ON FLOOR BEHIND EQUIPMENT. D5. REMOVE FAN LOCATED IN ATTIC AREA INCLUDIN ELECTRICAL CONNECTION. NOTE 6 KA- FOR CONTROLS KA-5 FOR HOOD LIHTS 0A WP NOTE K-,7 NOTE K- 0//R KA-5 (0/) THRU STARTER AT PANEL KA 0//R KA- (0/) THRU HOOD CONTROL PANEL EF- HP, PH, 08V FIRE PROTECTION SYSTEM NOTE 9 ACOB. SM ITH PANEL K PANEL K. REMOVE HOOD CIRCUITS. UPDATE DIRECTORY Samp PARTICAL ELECTRICAL PLAN - KITCHEN SCALE: / " = ' - 0" DEMOLITION PLAN - KITCHEN SCALE: / " = ' - 0" 60TH STREET LANE ST INDICATES BREAKERS WITH INTERAL SHUNT TRIP 7-UL-08 09:6 lauley SPARE 00/ BREAKER IN PANEL DK - UPDATE DIRECTORY "C W/ NO., NO.8() PARTIAL ONE-LINE DIARAM NOT TO SCALE PANEL KA SEE SCHEDULE LAMARA DRIVE KEY PLAN Shee Tle ELECTRICAL LEEND, SCHEDULE, AND FLOOR PLANS ob No. 805.00 Drawn L.C. Cheked P.M. Dae 7-UL-08 Shee No. E:\BOE aob Smh - Khen - 805.00\CADD\E_.dgn

ENERAL HVAC: A. THE MECHANICAL EQUIPMENT AND INSTALLATION SHALL CONFORM TO THE FOLLOWIN CODES:. THE INTERNATIONAL BUILDIN CODE 0 EDITION WITH EORIA AMENDMENTS.. THE INTERNATIONAL MECHANICAL CODE 0 EDITION WITH EORIA AMENDMENTS.. THE INTERNATIONAL ENERY CONSERVATION CODE 009 EDITION WITH EORIA AMENDMENTS. B. THE MECHANICAL EQUIPMENT AND INSTALLATION SHALL CONFORM TO THE FOLLOWIN STANDARDS:. NFPA STANDARD 70, NATIONAL ELECTRIC CODE. NFPA STANDARD 90A, INSTALLATION OF AIR CONDITIONIN AND VENTILATIN SYSTEMS.. NFPA STANDARD 96, INSTALLATION OF EQUIPMENT FOR THE REMOVAL OF SMOKE AND REASE LADEN VAPORS FROM COMMERCIAL COOKIN ESTABLISHMENTS.. NFPA STANDARD 0, CODE FOR SAFETY OF LIFE FROM FIRE IN BUILDINS AND STRUCTURES. INTERIOR PAINTIN: A. YPSUM BOARD SUBSTRATES SHALL BE INSTITUTIONAL ENAMEL PURE WHITE B5W0, OR SIMILAR PRIME COAT: INTERIOR ALL SURFACE ENAMEL PRIMER/SEALER.AND TOPCOAT: INSTITUTIONAL ENAMEL PURE WHITE B5W0, OR SIMILAR. APPLY PAINTS ACCORDIN TO MANUFACTURER'S WRITTEN INSTRUCTIONS. APPROVED MANUFACTURERS ARE BENANIN MOORE & CO, PORTER PAINTS, OR SHERWIN-WILLIAMS. SPECIFICATIONS: AIR DISTRIBUTION: A. ENERAL. DUCTWORK SHALL BE CONSTRUCTED OF LOCK FORMIN QUALITY ALVANIZED STEEL SHEETS. ALVANIZED COATIN SHALL BE NOT LESS THAN.5 OUNCES (TOTAL FOR BOTH SIDES) PER SQUARE FOOT OF SHEET.. DUCTWORK SHALL BE SQUARE, RECTANULAR, ROUND, OR FLAT OVAL, AS INDICATED ON THE DRAWINS.. TURNIN VANES SHALL BE INSTALLED IN ALL 90 DEREE SQUARE AND RECTANULAR ELBOWS AND AT OTHER LOCATIONS SHOWN ON THE DRAWINS. IN ANY SUPPLY, RETURN OR EXHAUST AIR DUCTWORK WITH VELOCITIES OF 800 FPM OR HIHER, THE TURNIN VANES SHALL BE THE DOUBLE THICKNESS TYPE, WITH VANES WELDED TO THE RUNNERS AND RUNNERS WELDED TO THE DUCT.. DUCTWORK SHALL BE CLASSIFIED AND CONSTRUCTED IN THE FOLLOWIN SMACNA PRESSURE CLASSES, OR 50% OF THE SCHEDULED FAN S.P., WHICHEVER IS REATER: SYSTEM OR ZONE PRESSURE CLASS SUPPLY AIR DUCTWORK + KITCHEN HOOD EXHAUST DUCTWORK - B. ALVANIZED STEEL DUCTWORK. EXCEPT WHERE INDICATED OTHERWISE DUCT CONSTRUCTION SHALL CONFORM TO THE RECOMMENDATIONS OF THE SMACNA HVAC DUCT CONSTRUCTION MANUAL FOR PRESSURE CLASSES SPECIFIED HEREIN BEFORE. C. KITCHEN HOOD EXHAUST DUCTWORK. EXCEPT WHERE INDICATED OTHERWISE, HEREIN, OR ON THE DRAWINS, DUCT CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF NFPA 96 WITH ALL WELDED OINTS AND SEAMS.. DUCTWORK SHALL BE CARBON STEEL NOT LESS THAN 0.05 INCHES (NO. 6 MS) OR STAINLESS STEEL NOT LESS THAN 0.0 INCHES (NO. 8 MS) IN THICKNESS. TEST AND BALANCE: KITCHEN HOOD: A. HOOD, FANS, FIRE SUPPRESSION AND CONTROLS SHALL BE ACCUREX OR APPROVED EQUAL. B. HOOD SHALL BE MODEL XBEW 56" LON, 5" WIDE AND 0" HIH. MOUNTIN HEIHT SHALL BE 80" ABOVE FINISHED FLOOR AND BE PROVIDED WITH 6" CEILIN ENCLOSURES. HOOD SHALL HAVE STAINLESS STEEL FINISH FOR CORROSION RESISTANCE. FILTERS SHALL BE STAINLESS STEEL BAFFLE FILTERS. HOOD SHALL HAVE INTERAL FACTORY MOUNTED " WIDE AIR SPACE ON THE BACK AND SHALL HAVE AN EXTERNAL SUPPLY PLENUM WITH PERFORATED AIR CURTAIN. C. MANUFACTURER TO PROVIDE CONTROL CABINET FOR CONTROL OF FANS, LIHTS, FIRE SUPPRESSION, AND SHUNT TRIPS. D. ANSUL R-0 FIRE SUPPRESSION CABINET SHALL BE PROVIDED. E. EXHAUST FAN SHALL BE SIDEWALL EXHAUST FAN MODEL XSED-6-V SIZED FOR 50 CFM AT 0.687 ESP. FAN SHALL BE HP TEFC MOTOR ENCLOSURE. F. SUPPLY FAN SHALL BE MODEL XMSF-P7-H0-VFD SIZED FOR 600 CFM AT 0.5 ESP. FAN SHALL BE HP. FAN SHALL BE SUITABLE FOR OUTSIDE AND HAVE ALUMINUM MESH FILTER. INSULATION: A. KITCHEN HOOD EXHAUST AND SUPPLY DUCT SHALL BE INSULATED WITH M FIRE BARRIER DUCT WRAP 65+ OR APPROVED EQUAL. INSULATION SHALL BE LIHTWEIHT, NON-ASBESTOS, HIH TEMPERATURE, BIO-SOLUBLE, CALCIUM-MANESIUM-SILICATE (CMS), NON-WOVEN BLANKET, ENCAPSULATED IN A SCRIM-REINFORCED FOIL, BLANKET THICKNESS OF.5 INCHES FOR VENTILATION AND REASE DUCT APPLICATIONS. 09 Park of Com m ere Drve, Sue 6 Savannah, eorga 05 Chaham Engng Com pany, LLC Ths drawng and all prns of are he propery of Prns are o be reurned o Chaham Engng Com pany, LLC upon om pleon of use for whh hey were ssued. Reproduons of hs drawng whou he wren onsen of Chaham Engng Com pany, LLC s no perm ed THE CONTRACTOR SHALL PERFORM TEST AND BALANCE ON THE AIR AND WATER DISTRIBUTION SYSTEMS. A. INSTRUMENTS USED FOR BALANCIN SHALL HAVE BEEN CALIBRATED WITHIN 6 MONTHS PRIOR TO THE BALANCIN OF THE SYSTEMS. B. ALL INSTRUMENTS REQUIRED TO BALANCE THE SYSTEM SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE. C. FINAL READINS SHALL BE SET WITH -5% TO +0% OF DESIN CONDITIONS. D. ANY DEVIATIONS FROM DESIN DATA SHALL BE EXPLAINED IN THE REPORT - POSSIBLE REASONS FOR AND SOLUTIONS TO. E. REPORT SHALL BE SINED AND DATED BY BALANCE ENINEER. F. TEST AND BALANCE SHALL NOT BE PERFORMED UNTIL SYSTEM INSTALLATION IS COMPLETE. Revsons No. Dae Desrpon By STACKED CONVECTION OVEN. 8" X 8" TO BE RELOCATED. STOVE TO BE REMOVED BRAISIN PAN 8" X 6" TO BE RELOCATED " DIAMETER EXHAUST DUCT REMOVE DUCT AND FAN UP TO ROOF. CAP ROOF OPENIN AS REQUIRED AND MAKE WEATHER TIHT. SUPPLY DUCT DOWN TO CONNECTION AT HOOD. TYPICAL OF. RELOCATED STACKED CONVECTION OVEN. 8" X 8" RELOCATED BRAISIN PAN 8" X 6" NEW COMBI STEAMER 5" X 5" CONTRACTOR SHALL MAKE ALL EFFORTS TO MINIMIZE DUST WHEN CUTTIN HOLES IN CEILIN FOR DUCTS AND HOOD INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR CLEANIN ALL AREAS IN THE KITCHEN WHERE CONSTRUCTION CAUSES DUST AND DEBRIS. 0X6 " OPENIN IN CEILIN ENLARE TO 8" DUCT PLUS INSULATION. 8"/ SF SUPPLY FAN SHALL BE SUPPORTED BY WALL MOUNTED BRACKET. COORDINATE WITH FAN MANUFACTURER AND WALL CONSTRUCTION. DUCTS SHALL BE ROUTED IN SPACE BETWEEN OLD FLAT ROOF AND PITCHED METAL ROOF. COORDIANTE ROUTIN AND DUCT SIZE WITH STRUCTURE PRIOR TO FABRICATION OF DUCTS. EF ACOB. SM ITH 0' X ' HOOD TO BE REMOVED CEILIN IS 7 " AFF ± REMOVE FIRE PROTECTION SYSTEM INCLUDIN CABLIN AND CONDUIT EXTENDIN TO AS VALVE AT HOOD. CONTRACTOR SHALL PAINT WALLS/CEILINS WHERE DAMAED BY CONSTRUCTION AS NECESSARY TO MATCH. FIRE PROTECTION SYSTEM Samp :07 DEMOLITION PLAN - HVAC FLOOR PLAN - HVAC M. SCALE: / " = ' - 0" M. SCALE: / " = ' - 0" Shee Tle SPECIFICATIONS & FLOOR PLAN - HVAC ob No. 805.00 Drawn SMP Cheked SMP Dae Shee No. M. E:\BOE aob Smh - Khen - 805.00\CADD\M_.dgn

LEEND & ABBREVIATIONS ABBREVIATION SYMBOL DESCRIPTION ABBREVIATION DESCRIPTION W, S, D S SANITARY WASTE, SOIL & DRAIN AB ABOVE V VENT - SANITARY A/C ABOVE CEILIN CW DOMESTIC COLD WATER AFF ABOVE FINISHED FLOOR HW DOMESTIC HOT WATER (0 F) B/F BELOW FLOOR HWR DOMESTIC HOT WATER RETURN NATURAL AS - LOW PRESSURE CONN CONT CONNECT(ION) CONTINUATION V BV CV PV ATE VALVE BALL VALVE CHECK VALVE PLU VALVE DN DWS ELEC EL DOWN DRAWINS ELECTRICAL ELEVATION WHA RV CO FCO CO WATER HAMMER ARRESTOR 'SIZE' PRESSURE OR TEMPERATURE RELIEF VALVE CLEANOUT FLOOR CLEANOUT RADE CLEANOUT EXIST HVAC HB ID IE HEATIN, VENTILATION & AIR CONDITIONIN HOSE BIBB INDIRECT DRAIN INVERT ELEVATION WCO WALL CLEANOUT SAN SANITARY FD FLOOR DRAIN 'TYPE' TYP TYPICAL S 0 SOIL OR WASTE STACK DESINATION STACK NUMBER U/ VTR UNDERROUND VENT THRU ROOF AS PIPIN NFWH NON FREEZE WALL HYDRANT W WASTE ENERAL. ALL UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS ONLY. VERIFY EXACT LOCATION AND INVERT ELEVATION IN FIELD BEFORE BEINNIN WORK.. COORDINATE ALL WORK WITH OTHER TRADES. CODES PLUMBIN SPECIFICATIONS A. THE PLUMBIN INSTALLATION AND EQUIPMENT SHALL CONFORM TO THE FOLLOWIN:. INTERNATIONAL PLUMBIN CODE, 0 EDITION WITH EORIA AMENDMENTS. TESTIN PIPE SYSTEMS A. ENERAL, CONCEALED PIPIN AND INSULATED PIPIN SHALL BE TESTED IN PLACE BEFORE CONCEALIN OR COVERIN. TEST SHALL BE CONDUCTED IN THE PRESENCE OF THE ARCHITECT OR HIS DESINATED REPRESENTATIVE. PIPIN LOCATED UNDERROUND SHALL BE TESTED BEFORE BACKFILLIN. EQUIPMENT, MATERIALS AND INSTRUMENTS FOR TESTIN SHALL BE FURNISHED BY THE CONTRACTOR WITHOUT ADDITIONAL COST TO THE OWNER. B. PLUMBIN SYSTEMS. SANITARY WASTE AND VENT PIPIN. THE PIPIN SHALL BE TESTED WITH WATER BEFORE INSTALLIN FIXTURES. WATER TESTS SHALL BE APPLIED TO THE SYSTEM EITHER IN ITS ENTIRETY OR IN SECTIONS. IF THE TEST IS APPLIED TO THE ENTIRE SYSTEM, ALL OPENINS IN THE PIPIN SHALL BE CLOSED EXCEPT THE HIHEST OPENIN, AND THE SYSTEM SHALL BE FILLED WITH WATER AND TESTED WITH AT LEAST A 0 FT. HEAD OF WATER. IN TESTIN SUCCESSIVE SECTIONS, AT LEAST THE UPPER 0 FT. OF THE NEXT PRECEDIN SECTION SHALL BE TESTED SO THAT EACH OINT OR PIPE IN THE BUILDIN EXCEPT THE UPPERMOST 0 FT. OF THE SYSTEM HAS BEEN SUBMITTED TO A TEST OF AT LEAST 0 FT. HEAD OF WATER. THE WATER SHALL BE KEPT IN THE SYSTEM, OR IN THE PORTION UNDER TEST FOR AT LEAST HOURS BEFORE THE INSPECTION STARTS. THE SYSTEM SHALL BE TIHT AT ALL OINTS.. WATER PIPIN. UPON COMPLETION OF THE ROUH-IN AND BEFORE SETTIN FIXTURES, THE ENTIRE DOMESTIC COLD WATER, HOT WATER, AND HOT WATER CIRCULATION PIPIN SYSTEMS SHALL BE TESTED AT HYDROSTATIC PRESSURE OF 00 PSI AND PROVED TIHT AT THIS PRESSURE FOR A PERIOD OF NOT LESS THAN HOURS IN ORDER TO PERMIT INSPECTION OF ALL OINTS. WHERE A PORTION OF THE WATER PIPIN SYSTEM IS TO BE CONCEALED BEFORE COMPLETION, THIS PORTION SHALL BE TESTED SEPARATELY IN A MANNER DESCRIBED FOR THE ENTIRE SYSTEM. DOMESTIC WATER SYSTEM A. PROVIDE COMPLETE SYSTEMS OF COLD AND HOT WATER PIPIN AND ACCESSORIES SO THAT EVERY FIXTURE AND PIECE OF WATER USIN EQUIPMENT IN THIS AREA OF THE BUILDIN WILL BE FURNISHED WITH A WATER SUPPLY. B. EXTEND THE DOMESTIC COLD AND HOT WATER PIPIN AND CONNECT TO THE PIPIN, AS SHOWN ON THE DRAWINS. C. PIPIN FITTINS AND OINTS. PIPE AND FITTINS SHALL BE AS LISTED HEREIN AND SHALL BE USED ON THE SERVICES INDICATED.. TYPE "L" HARD COPPER TUBIN, FED. SPEC. NO. WW-T-799, WITH SOLDERED OINTS AND WROUHT COPPER SOCKET FITTINS FOR ALL WATER PIPIN.. SOLDER OINTS (FOR TYPE 'L' COPPER TUBIN) SHALL BE MADE USIN A 95-5 TIN-ANTIMONY SOLDER WITH A COMPATIBLE FLUX.. PROPRESS SYSTEM IS APPROVED FOR USE. D. DISINFECTION. ALL DOMESTIC WATER SERVICE AND SUPPLY PIPIN INSTALLED UNDER THIS DIVISION SHALL BE DISINFECTED WITH CHLORINE BEFORE IT IS PLACED INTO OPERATION. THE CHLORINATIN MATERIAL SHALL BE LIQUID CHLORINE CONFORMIN TO FEDERAL SPECIFICATION BB-C-0 AND SHALL BE INTRODUCED TO THE SYSTEM BY EXPERIENCED OPERATORS ONLY. THE CHLORINE SOLUTION APPLIED TO THE PIPIN SECTIONS OR SYSTEM SHALL CONTAIN AT LEAST FIFTY PARTS PER MILLION OF AVAILABLE CHLORINE AND SHALL REMAIN IN THE SECTIONS OR SYSTEM FOR A PERIOD OF NOT LESS THAN SIXTEEN (6) HOURS. DURIN THE DISINFECTION PERIOD ALL VALVES SHALL BE OPENED AND CLOSED AT LEAST FOUR TIMES. AFTER THE DISINFECTION PERIOD THE CHLORINATED WATER SHALL BE FLUSHED FROM THE SYSTEM WITH CLEAR WATER UNTIL THE RESIDUAL CHLORINE CONTENT IS NOT REATER THAN TWO-TENTHS - (0.) - PARTS PER MILLION. THE CONTRACTOR SHALL SUBMIT TO THE ARCHITECT CERTIFICATION THAT THE SYSTEM WAS DISINFECTED. SANITARY, WASTE, AND VENT SYSTEM A. PROVIDE A COMPLETE SYSTEM OF SANITARY, WASTE, AND VENT PIPIN AS SHOWN ON THE DRAWINS. B. PIPE FITTINS AND OINTS. PIPE FITTINS SHALL BE AS LISTED HEREIN AND SHALL BE USED FOR THE SERVICES INDICATED. C. INSTALLATION. HORIZONTAL SOIL AND WASTE PIPIN -/ INCHES IN SIZE AND SMALLER SHALL BE SLOPED AT A MINIMUM OF / INCH PER FOOT. HORIZONTAL SOIL AND WASTE PIPIN INCHES IN SIZE AND LARER SHALL BE SLOPED AT A MINIMUM OF /8 INCH PER FOOT.. HORIZONTAL VENT BRANCHES SHALL BE KEPT ABOVE THE HIHEST FIXTURE SERVED BY THE VENT BRANCH IN ORDER TO PRECLUDE THE POSSIBILITY OF VENTS BEIN USED AS WASTE PIPES. HORIZONTAL VENT BRANCHES SHALL BE SLOPED TO PREVENT THE ACCUMULATION OF WATER OR SCALE THEREIN.. ON SOIL, WASTE AND VENT PIPIN CHANES IN PIPE SIZE SHALL BE MADE WITH REDUCIN FITTINS AND CHANES IN PIPE DIRECTION SHALL BE MADE WITH FITTINS. NO BUSHINS WILL BE ALLOWED.. DURIN CONSTRUCTION ALL PIPE OPENINS, NOT BEIN WORKED ON, SHALL BE PLUED OR CAPPED TO PREVENT FOREIN OBECTS FROM ENTERIN INSULATION. SCHEDULE 0 PRESSURE RATED PVC PIPE AND DWV FITTINS WITH SOLVENT LUED OINTS FOR ALL SANITARY, WASTE AND VENT PIPIN.. SOLVENT LUED OINTS SHALL BE MADE WITH PRIMER AND LUE ACCORDIN TO THE MANUFACTURER'S REQUIREMENTS. SYSTEM. A. ALL WATER PIPIN SHALL BE INSULATED WITH FIBERLASS ACKETED PIPE INSULATION. NATURAL AS PIPIN A. PROVIDE A COMPLETE SYSTEM OF NATURAL AS PIPIN AS SHOWN ON THE DRAWINS. B. ABOVE ROUND NATURAL AS PIPIN SHALL BE SCHEDULE 0 BLACK STEEL PIPE ASTM0 WITH 50lb THREADED MALLEABLE IRON FITTINS ASTM A7. C. INSTALLATION. HORIZONTAL PIPIN SHALL BE SLOPED /8" PER FOOT TOWARD THE VALVED DRIP LES.. TAKEOFFS FOR EQUIPMENT SHALL BE FROM THE TOP OF THE MAIN.TAKEOFFS TO DRIP LES SHALL BE FROM THE BOTTOM OF THE MAIN.. PIPIN SHALL BE TESTED AT 00 PSI FOR HR. ALL LEAKS SHALL BE REPAIRED. D. UNDERROUND NATURAL AS PIPIN SHALL BE SDR POLETHLYLENE PIPE WITH SOCKET FUSED OINTS. E. ALL WORK SHALL COMPLY TO CODES. 09 Park of Com m ere Drve, Sue 6 Savannah, eorga 05 Prns are o be reurned o Chaham Engng Com pany, LLC upon om pleon of use for whh hey were ssued. Reproduons of hs drawng whou he wren onsen of Chaham Engng Com pany, LLC s no perm ed Revsons No. Dae Desrpon By ACOB. SM ITH Ths drawng and all prns of are he propery of Chaham Engng Com pany, LLC Samp :0 Shee Tle LEENDS AND SPECIFICATIONS - PLUMBIN ob No. 805.00 Drawn LC Cheked P Dae Shee No. E:\BOE aob Smh - Khen - 805.00\CADD\P0_.dgn P0.

" AS AT EAVES OF BUILDIN TO REMAIN. INSTALL NEW PSI AS PIPE LABELS ON PIPIN. " AS DN TO PRESSURE REULATOR IN DROP. REMOVE THE REULATOR AND RECONNECT THE PIPIN. INSTALL NEW PRESSURE REULATOR IN PIPIN THE REULATOR SHALL BE SIZED FOR PSI INLET PRESSURE AND 7" W.C. OUTLET PRESSURE AT 600 CFH FLOW. " LOW PRESSURE AS AT UNDERSIDE OF CEILIN. 5 CONNECT TO THE " AS AT UNDERSIDE OF CEILIN. 6 " AS AT UNDERSIDE OF CEILIN. 7 RELOCATE THE AS PIPIN AS REQUIRED FOR THE INSTALLATION. 8 AS SOLENOID VALVE. COORDINATE VALVE REQUIREMENTS WITH HOOD FIRE SUPPRESSION SYSTEM. 9 " AS MOUNTED BEHIND EQUIPMENT AT FLOOR. 0 PROVIDE VALVE CONNECTION WITH FLEXIBLE CONNECTOR AND UNION AT CONNECTION TO KITCHEN EQUIPMENT. COORDINATE CONNECTION SIZE WITH EQUIPMENT. " AS DN. PROVIDE DRIP LE WITH REMOVALABLE CAP AT BASE OF DROP. " AS DN TO WATER HEATER. PROVIDE PLU VAVLE, UNION AND DRIP LE AND CONNECT AS REQUIRED. 09 Park of Com m ere Drve, Sue 6 Savannah, eorga 05 Ths drawng and all prns of are he propery of Chaham Engng Com pany, LLC Prns are o be reurned o Chaham Engng Com pany, LLC upon om pleon of use for whh hey were ssued. Reproduons of hs drawng whou he wren onsen of Chaham Engng Com pany, LLC s no perm ed ƒ" CW DN TO COMBI-STEAMER. PROVIDE TO CONNECTIONS TO EQUIPMENT. EXTEND ƒ" CW AND CONNECT TO NEAREST CW PIPIN " OR LARER IN AREA. Revsons No. Dae Desrpon By CAFETERIA CONVECTION OVENS BRAISIN PAN COMBI-STEAMER 7 0 0 5 " 6 FLOOR DRAIN TO REMAIN. ROUTE DRAIN FROM COMBI-STEAMER OVER TO FLOOR DRAIN. 9 9 8 ƒ" WATER HEATER Samp ACOB. SM ITH " :0 FLOOR PLAN - PLUMBIN P. SCALE: / " = ' - 0" Shee Tle FLOOR PLAN - PLUMBIN ob No. 805.00 Drawn LC Cheked P Dae Shee No. E:\BOE aob Smh - Khen - 805.00\CADD\P_.dgn P.