Spring Green Elementary School 830 Daley St. Spring Green, WI 53588

Similar documents
Plain Elementary School 1370 Cherry St. Plain, WI 53577

Arena Elementary School 314 Willow St. Arena, WI 53503

River Valley High School 660 Varsity Blvd. Spring Green, WI 53588

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Florence High School / Middle School Page 1 of 3 Florence, WI

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

2014 Bond Project Guide

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Appendix B. Facilities Assessment Report

Forest Hills Facilities Plan

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Sprinkler: The building does not have a fire protection system installed. MECHANICAL / PLUMBING / SPRINKLER SYSTEMS RECOMMENDATIONS

NYC Department of Education

NYC Department of Education

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

NYC Department of Education

Francis M McKay Elementary School

NYC Department of Education

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

NYC Department of Education

NYC Department of Education

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Facilities Master Planning

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

NYC Department of Education

NYC Department of Education

Cook - Wissahickon Elementary School

Joseph Brennemann Elementary School

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

NYC Department of Education

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

REAR. Exit 5'-9" 6'-1" 8'-3" 6'-1" Freezer Entrance Stall

NYC Department of Education

Blue House Site Designs

Calmeca Academy of Fine Arts and Dual Language

Josefa Ortiz De Dominguez Elementary School

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

2014 Bond District-wide Facility Repairs

SHOE PALACE HUNTINGTON PARK M.200

Richard Henry Lee Elementary School

2015 Building Condition Survey Summary Mosaic Associates Architects 02/19/16

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

TRIO TV SERIES VERTICAL IMPACT CRUSHERS. Highly Efficient Crushing Solutions.

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

John Palmer Elementary School

Oscar DePriest Elementary School

Master Facility Planning Update School Board Meeting May 26, 2016

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Transcription:

FACILITIES PLANNING STUDY RIVER VALLEY SOOL DISTRICT Spring Green Elementary School 830 Daley St. Spring Green, WI 388 7 South Dewey Street Eau Claire, Wisconsin 4701 71.832.160 sdsarch.com

SPRING General Overview Note: Property lines have been approximated Site Acreage: Approx. 0 Acres Parking Stalls: Approx. 46 Building Area: 42,28 GSF Construc on: Masonry/CMU ES Director: Mr. Jaime Hegland Students: 248 GSF/Student: 171 Grades: K through th Paved Area P.1 Descrip on: Visitor Parking Type: Asphalt Net Area: Approx. 2,160 SF Ra ng: Paved Area P.2 Descrip on: General Parking Type: Asphalt Net Area: Approx. 19,60 SF Ra ng: Paved Area P.3 Descrip on: Play Ground Type: Asphalt Net Area: Approx. 20,400 SF Ra ng: P.2 P.1 P.3 * See the final page of Chapter 1 for ra ng system of paved surfaces. Chapter Page 2 Project No. 121 December 201

Site Analysis 1 2 3 4 6 7 8 1 2 4 1 Code/Safety Issue Site photos Chapter Page 3 Project No. 121 December 201

SPRING Building Construction, Remodels and Additions * Fire ra ngs as indica ed by original construc on may currently be compromised by subsequent modifica ons. Year 1988? Project Scope Original Building Construc on Addi on Area 40,8 SF 1,700 SF Legend 1 Founda on: CMU Block Exterior Shell: Brick Cavity Wall R-VALUE: 14.7 Interior: CMU Block 1 Chapter Page 4 Project No. 121 December 201

Roof Analysis R.3 Legend BSPM (Ballasted Single Ply EPDM) ASPM (Adhered Single Ply EPDM) R.1 R.2 Roof Area R.1 Roof Type: ASPM Net Area: 31,07 SF Year Installed: 2011 Condi on: Very Good Roof Area R.2 Roof Type: ASPM Net Area: 7,340 SF Year Installed: 1988 Condi on: Poor Roof Area R.3 Roof Type: ASPM Net Area: 1,700 SF Year Installed: Unknown Condi on: Average R.2R.1 Chapter Page Project No. 121 December 201 Roof photos

SPRING Room Assignments and Building Use Legend Classroom/Instruc on Athle cs Administra on/conference Food Service STORAGE Music/Arts General/Support Circula on ME. STORAGE KITEN MULTI-PURPOSE 4TH GRADE 4TH GRADE 4TH GRADE SPECIAL EDUCATION S LOCKER ROOMS PHY. ED. OFFICE TH GRADE TH GRADE MUSIC 3RD GRADE ART 2ND GRADE 1ST GRADE IMC TOILETS TOILETS KINDERGARTEN KINDERGARTEN ADMIN/ OFFICES K 4K 4K 1ST GRADE Chapter Page 6 Project No. 121 December 201

Floor Plan Analysis 1 2 3 4 6 7 Damaged/worn flooring Restroom is not ADA compliant Damaged/worn cabinets/casework Damaged/worn ceiling Damaged/worn plumbing fixtures Door should swing out to meet exi ng/occupancy requirements Locker Room used as an Office 7 6 6 Interior Photos Code/Safety Issue Safety/Health Issue ADA/Accessibility Issue Program Related Problem Area Chapter Page 7 Project No. 121 December 201

SPRING AC AH Control Air Compressor Air Handling Unit Mechanical Analysis EH Electric Heater Fin Tube Heat EH P P B B 8 B CR CU Boiler Cabinet Unit Heater Condensate Return Sta on Condensing Unit KH Kitchen Hood GS Gas Service MS Mini-Split P Pump CU UH AC AH UH Convector UH Unit Heater AH ED Exhaust Duct UV Unit Ven lator AH Exhaust Fan UH KH 1) Corridors are u lized as return air plenums. 2) The building is served by hea ng only air handling units with constant volume reheat booster coils. Exterior spaces are provided with baseboard radia on to provide addi onal heat. One air handling unit is provided with a remote condensing unit for cooling. The air handling units and reheat coils are in good working condi on, but nearing the end of their useful lives. The condensing unit is past its useful life. Hea ng is provided by two Burnham boilers. The boilers, pumps, valves and accessories are in decent working condi on, but nearing the end of their useful life. Pneuma c controls are used throughout the building. Code/Safety Issue Photos Chapter Page 8 Project No. 121 December 201

G TS Electrical Analysis 10 D Data Center EM Electric Meter FA Fire Alarm Control Panel G Generator P C P E MC Master Clock MS Main Service P Panel UT *pad mounted FA P A P MD MS TP 9 PS Paging System SS Security System UT U lity Transformer TP Phone/Data Termina on Port TS Transfer Switch PS TP P D P B1 P B TV Junc on Box 1) Automa c ligh ng control is not present in all required areas of the building. 2) Code required electrical clearances are not met in front of the main electrical equipment. Refer to picture 9. 3) Code required selec ve coordina on and separa on for NEC 700 emergency loads does not appear to be met. LIGHTING 4) Ligh ng generally consists of fluorescent recessed fixtures that are in good working condi on. ) Some recent ligh ng upgrades appear to have taken place and include high bay fluorescent ligh ng in the gym. POWER 6) All electrical equipment appears to be original to the building and is in working condi on. However, this equipment is nearing 30 years old and will be nearing the end of its expected useful life within the next 10 years. Code/Safety Issue Photos Chapter Page 9 Project No. 121 December 201

SPRING Plumbing Analysis AB Acid Neutralizing Basin CP Circula on Pump GS Gas Service GI Grease Interceptor LS Li Sta on S Water So ener SE Sewage Ejector SP Sump Pump WH Water Heater WS Water Service WH WH CP GS SE WS 11 S GI WH PLUMBING 1) The domes c water is so ened by a Hellenbrand water so ener and heated by a single A.O. Smith gas fired water heater. The plumbing equipment appears to be in good working condi on. FIRE PROTECTION 2) The building is not provided with fire protec on. Code/Safety Issue Photos Chapter Page 10 Project No. 121 December 201

Photographs 1 09-29-201 2 09-29-201 3 09-29-201 4 09-29-201 09-29-201 6 09-29-201 7 09-29-201 8 11-02-201 9 11-02-201 10 11-02-201 11 11-02-201 Chapter Page 11 Project No. 121 December 201