FACILITIES PLANNING STUDY RIVER VALLEY SCHOOL DISTRICT River Valley High School 660 Varsity Blvd. Spring Green, WI 53588 South Dewey Street Eau Claire, Wisconsin 5401 15.832.1605 sdsarch.com
RIVER General Overview Note: Property lines have been approximated Site Acreage: Approx. 0 Acres Parking Stalls: Approx. 0 Building Area: 140,810 GSF Construc on: Masonry/CMU HS Principal: Darby Blakley Students: 422 GSF/Student: 334 Grades: 9 through 12 Paved Area P.1 Descrip on: Parking Type: Asphalt Net Area: Approx. 0 SF Ra ng: Paved Area P.2 Descrip on: Parking Type: Asphalt Net Area: Approx. 0 SF Ra ng: Paved Area P.3 Descrip on: Parking Type: Asphalt Net Area: Approx. 0 SF Ra ng: Paved Area P.4 Descrip on: Parking Type: Asphalt Net Area: Approx. 0 SF Ra ng: P.3 P.2 P.1 P.4 * See the final page of Chapter 1 for ra ng system of paved surfaces. Chapter Page 2
Site Analysis 1 2 3 4 5 6 8 1 2 4 1 Site photos Chapter Page 3
RIVER Building Construction, Remodels and Additions * Fire ra ngs as indica ed by original construc on may currently be compromised by subsequent modifica ons. Year Project Scope Area 1961 1993 Original Building Construc on Addi on 63,615 SF 14,235 SF 2 1998 Remodel and Addi on 62,960 SF Legend 1 1 Founda on: CMU Block Exterior Shell: Varies (Brick/Block, Wood/Block, Stone/Block) R-VALUE: 3.15 Interior: CMU Block & Wood Studs 2 Founda on: CMU Block Exterior Shell: Brick Cavity Wall R-VALUE: 14.1 Interior: CMU Block 3 Founda on: Cast-In-Place Exterior Shell: Brick Cavity Wall R-VALUE: 14.1 Interior: CMU Block 3 Basement Mezzanine Chapter Page 4
Roof Analysis Legend BSPM (Ballasted Single Ply EPDM) ASPM (Adhered Single Ply EPDM) Roof Area Roof Area R.6 Roof Area R.2 Roof Area R. Roof Area R.3 Roof Area R.8 Roof Area R.4 Roof Area R.9 Roof Area R.5 Roof Area 0 Roof photos Chapter Page 5
RIVER Room Assignments and Building Use Legend Classroom/Instruc on Administra on/conference Athle cs Food Service 40 39 31 32 30 29 Music/Arts General/Support Circula on 33 28 Room No. Room Name Room No. Room Name 38 2 13 14 15 16 1 18 19 21 22 23 24 25 26 2 28 29 30 31 32 33 36 3 38 39 40 42 44 52 53 54 55 Spanish Classroom Spanish Classroom Special Educa on Special Educa on Special Educa on Special Educa on Business Classroom Business Classroom Special Educa on Special Educa on Storage Computer Lab Social Studies Social Studies Social Studies English Classroom English Classroom English Classroom English Classroom Computer Lab Lecture Hall Tech Ed. Network Room Tech Ed./Welding Tech Ed. Art Art Agriculture Science Classroom Science Classroom Science Classroom 5 58 59 60 61 63 63 65 69 100 Math Classroom Auto Shop Auto Shop Classroom Math Classroom Math Classroom Math Classroom Math Classroom Music Health Classroom Cafeteria/Commons 58 59 60 61 63 65 42 44 5 54 53 55 52 62 64 69 0 1 100 3 36 IMC 26 25 24 23 22 21 19 13 14 15 16 1 18 Chapter Page 6
Room Assignments and Building Use Legend Classroom/Instruc on Administra on/conference Music/Arts Athle cs Food Service Circula on General/Support 105 Room No. Room Name 2 101 106 Basement 2 101 105 106 West Gymnasium East Gymnasium Band Choir Mezzanine Chapter Page
RIVER Floor Plan Analysis 1 2 3 4 5 6 8 9 10 Damaged/worn flooring Restroom is not ADA compliant Damaged/worn cabinets/casework Damaged/worn ceiling Damaged/worn plumbing fixtures Office is being used as a storage room Skylight above Vinyl 9x9 les likely contain asbestos Inadequate casework for science classroom No water service in science classroom 2 6 2 13 8 1 5 Interior Photos Safety/Health Issue ADA/Accessibility Issue Program Related Problem Area Chapter Page 8
Basement 1 2 3 4 5 6 8 9 10 Floor Plan Analysis Damaged/worn flooring Restroom is not ADA compliant Damaged/worn cabinets/casework Damaged/worn ceiling Damaged/worn plumbing fixtures Office is being used as a storage room Skylight above Vinyl 9x9 les likely contain asbestos Inadequate casework for science classroom No water service in science classroom Mezzanine Interior Photos Safety/Health Issue ADA/Accessibility Issue Program Related Problem Area Chapter Page 9
RIVER UH CH Mechanical Analysis Air Handling Unit AC-1 Air Handling Unit AC-2 Air Handling Unit AC-4 Air Handling Unit AC-5 AC AH B CH CR CU CV DC ED EF Air Handling Unit AC-3 Control Air Compressor Air Handling Unit Boiler Cabinet Unit Heater Condensate Return Sta on Condensing Unit Convector Dust Collector Exhaust Duct Exhaust Fan EH Electric Heater FT Fin Tube Heat KH Kitchen Hood GS Gas Service MS Mini-Split P Pump RTU Roof Top Unit UH Unit Heater UV Unit Ven lator 1) In por ons of the school, corridors are u lized as return air plenums. 2) Sheet metal duct work is not provided for all air supply. 3) The shop areas did not appear to be provided with required ven la on rates. 4) A majority of the classroom por on of the school is served by gas-fired hea ng only air handling units with underfloor air tunnels and supply baseboard cabinets. Some loca ons are provided with cooling via remote condensing units. The library addi on is served by unit ven lators and a hea ng water boiler. The gymnasiums and adjacent areas are served by air handling units with hot water hea ng and chilled water cooling. The air handling units serving the classrooms are past their useful life....con nued on Page 11 Photos Chapter Page 10
Mechanical Analysis Air Handling Unit AC-1 Air Handling Unit AC-2 Air Handling Unit AC-4 Air Handling Unit AC-5 Air Handling Unit AC-3 AC Control Air Compressor EH Electric Heater AH Air Handling Unit FT Fin Tube Heat Basement B CH Boiler Cabinet Unit Heater KH GS Kitchen Hood Gas Service CR Condensate Return Sta on MS Mini-Split CU Condensing Unit P Pump CV Convector RTU Roof Top Unit DC Dust Collector UH Unit Heater ED Exhaust Duct UV Unit Ven lator EF Exhaust Fan The unit ven lators appear to be past or nearing the end of their useful life. The units serving the gymnasiums and adjacent spaces are in good working condi on. Mezzanine 5) A Kewaunee boiler serves the classroom wing addi on and two Burnham boilers serve the gymnasiums and adjacent areas. A Carrier chiller provides cooling to the air handling units. The Kewaunee boiler and accessories are in good working condi on, but nearing the end of its useful life. The boilers, chiller, pumps and accessories serving the gymnasiums are in good working condi on, but nearing the end of their useful life. Photos Chapter Page 11
RIVER 45 AP Electrical Analysis D Data Center EM Electric Meter FA Fire Alarm Control Panel G Generator MC Master Clock MS Main Service P Panel PS Paging System SS Security System UT U lity Transformer TP Phone/Data Termina on Port TS Transfer Switch 1) Automa c ligh ng control is not present in all required areas of the building. 2) Emergency egress ligh ng does not appear to be adequate for egress paths. LIGHTING 3) Ligh ng generally consists of fluorescent recessed fixtures in the newer remodel areas, fluorescent surface mounted fixtures in the original building areas, and some incandescent fixtures. 4) Some of the original ligh ng appears to be nearing the end of its useful life and is not as efficient as modern ligh ng. 5) Exterior pole mounted area ligh ng was being upgraded to LED during the me of the observa on. 6) Other ligh ng upgrades appear to have taken place and include high bay fluorescent ligh ng in the gym....con nued on Page 13 Photos Chapter Page 12
Electrical Analysis Basement D Data Center EM Electric Meter FA Fire Alarm Control Panel G Generator MC Master Clock MS Main Service P Panel PS Paging System SS Security System UT U lity Transformer TP Phone/Data Termina on Port TS Transfer Switch POWER ) Equipment in the remodel por ons of the building appear to be in good working condi on. However, most electrical panels and equipment in the original por ons of the building appear to be original to the building and over 50 years old. This equipment is in moderate to poor condi on and past its expected useful life. Mezzanine Photos Chapter Page 13
RIVER Plumbing Analysis HE CP AB Acid Neutralizing Basin CP Circula on Pump GS Gas Service GI Grease Interceptor LS Li Sta on S Water So ener SE Sewage Ejector SP Sump Pump ST Hot Water Storage Tank WH Water Heater WS Water Service PLUMBING 1) The domes c water serving the classroom wing is so ened by a water so ener and heated by two Ventura gas fired water heaters. The domes c water serving the gymnasium area is so ened by a water so ener and heated by a Bock gas fired water heater. The plumbing equipment is nearing the end of its useful life. FIRE PROTECTION 2) The building is not provided with fire protec on. Photos Chapter Page 14
Plumbing Analysis Basement AB Acid Neutralizing Basin CP Circula on Pump GS Gas Service GI Grease Interceptor LS Li Sta on S Water So ener SE Sewage Ejector SP Sump Pump ST Hot Water Storage Tank WH Water Heater WS Water Service Mezzanine Photos Chapter Page 15
RIVER Photographs 1 11-02-2015 2 11-02-2015 3 11-02-2015 4 11-02-2015 5 11-02-2015 6 11-02-2015 11-02-2015 8 11-02-2015 9 11-02-2015 Chapter Page 16