Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Similar documents
PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

SR 916/NW/NE 135 Street Public Hearing

DRAFT MAP AMENDMENT FLU 04-4

Project Overview. Get Involved. Public Information Meeting. Contact Information

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Project Overview. Fairfax County Parkway Widening Fairfax County. Get Involved. Public Information Meeting. Contact Information

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

Figure 5. Previously Identified Viable Corridors

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

FEASIBILITY / PROJECT DEVELOPMENT & ENVIRONMENT STUDY LAKE / ORANGE COUNTY CONNECTOR (US 27 TO SR 429) ENVIRONMENTAL ADVISORY GROUP MEETING NO.

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Citizen Information Meeting

Poinciana Parkway Extension Project Development & Environment Study

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

KING GEORGE COUNTY BOARD OF SUPERVISORS. Update on Governor Harry W. Nice Bridge Replacement Project February 6, 2018

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

WURZBACH PARKWAY WURZBACH PARKWAY

SECTION 4(f) DE MINIMIS DOCUMENTATION

RRW Stonebrook, LLC Tentative Map Findings

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Ann Arbor Intermodal Station Environmental Review

Kick-off Meeting. FM No: ETDM No: 14050

Welcome to the. Citizen Information Meeting for the Martinsville Southern Connector Study. The purpose of this meeting is to:

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Date: Thursday, August 21, 2014

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

Open House Public Involvement Meeting Howland High School Cafeteria, 200 Shaffer Drive NE, Warren, Ohio. Informational Handout

Pennsy Greenway Trail

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

SAWYER RANCH ROAD Pedestrian and Bicycle Improvements

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

MEMORANDUM AGENDA ITEM #6c

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Capital Projects impacting Odenton Town Center

Capital Projects in and near Odenton Town Center

NOTICE OF PREPARATION

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

LOCATION AND DESIGN DIVISION

Drexel, Barrell & Co.

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Right-of-Way Acquisitions and Relocations Technical Memorandum

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Purpose of Tonight s Meeting

Public Information/Cultural Resources Committee Workshop August 15, Florida Department of Transportation District One

All inquiries or complaints will be handled according to CFX procedure and in a prompt and courteous manner.

1. Project Description

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

RECREATION AND OPEN SPACE ELEMENT

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Fairfax County Parkway (Route 286) Widening Project

DESIGN PUBLIC HEARING APRIL 24, 2018 MUNICIPAL OFFICE BUILDING HARDWICK, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

Parks, Trails, and Open space Element

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Mississippi Skyway Preliminary Engineering Report

RIVER ARTS DISTRICT TRANSPORTATION PROJECT

Yadkin River Greenway Feasibility Study Fact Sheet Village of Clemmons, Town of Lewisville, Town of Bermuda Run

City of Loveland Public Information Meeting February 19, 2009

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

COLLIER BOULEVARD (CR 951) CORRIDOR

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Drexel, Barrell & Co.

List of Priority Projects

ITS Concept Development Activity Descriptions

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

Chesterfield County Project Update

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

Iowa s Statewide Urban Design Standards Promote Improved Access Management

Information for File # KDZ

Intergovermental Coordination

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

City of Toronto. Emery Village Transportation Master Plan

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

Beckett Bridge PD& E Study. Presentation to: Board of County Commissioners

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

SECTION 1 Introduction...1. SECTION 2 Regional Context Criteria for Planning Districts Description of Planning District...

Appendix E Memorandum of Agreement between FHWA and the SHPO

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Parks, Trails, and Open Space Element

SR 483 Clyde Morris Boulevard FDOT District 5

Technical Memorandum 5

Asbury Chapel Subdivision Sketch Plan

UCONN Athletic District Improvements Scoping Meeting

Transcription:

Public Hearing Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, 2019 open house at 4 p.m., formal presentation at 5 p.m. Welcome to the Public Hearing for the Harborview Road (CR 776) Project Development and Environment (PD&E) study. The Florida Department of Transportation (FDOT), District One, is holding this hearing in cooperation with Charlotte County and the Charlotte County-Punta Gorda Metropolitan Planning Organization (MPO). The purpose of this meeting is to provide you the opportunity to review project information, ask questions and offer comments about the proposed improvements to Harborview Road from Melbourne Street to I-75 in Charlotte County. Maps, display boards and other project information are on display here this evening. Project representatives are available to discuss the study and answer questions. A comment form is included in this handout. We encourage you to complete the form and drop it in one of the boxes provided or, if you prefer, you may mail your comments, written statements, or exhibits, postmarked by March 25, 2019, to the address on the comment form. Introduction FDOT is doing a PD&E study to evaluate widening Harborview Road from two to four lanes. Widening the road will improve connectivity between US 41 and I-75 and enhance safety along the corridor. The project is 2.3 miles in length. The objectives of this PD&E study are to evaluate and document engineering and environmental considerations that will assist the department in reaching a decision about the type and location of necessary improvements to Harborview Road. The study is being conducted in order to meet the requirements of the National Environmental Policy Act of 1969, as amended.

Need for Improvement Harborview Road connects US 41 to I-75 directly north of the Peace River and is also designated as an emergency evacuation route. Within the project limits, Harborview Road is a two lane roadway. This segment is the only portion of Harborview Road between US 41 and I-75 that is a two lane roadway. The need for the proposed widening of Harborview Road is indicated by a projected traffic volume increase from the current range of 7,800 to 8,500 vehicles per day to a range of 19,000 to 28,000 vehicles per day by the year 2045. The proposed widening improvements will accommodate increased traffic demand, including truck traffic, generated by projected growth in Charlotte County. The Charlotte County-Punta Gorda MPO identifies this project in their 2040 Long Range Transportation Plan (LRTP) Cost Feasible Plan. Preferred Alternative The Preferred Alternative for Harborview Road includes four 11-foot travel lanes, curb and gutter along the inside and outside edges of pavement, and a 30-foot grassed median. Six-foot sidewalks and seven-foot buffered bicycle lanes will accommodate pedestrian and bicycle traffic along the corridor. The widening alignment shifts both north and south of the existing roadway to minimize impacts to the surrounding residences. The proposed improvements require 34 feet of proposed right-of-way, to be combined with the existing right-of-way for a total width of 114 feet. Additional right-of-way is also needed for offsite stormwater ponds. Existing access to properties along Harborview Road will change due to the addition of a median, a result of widening the road. Roundabouts will be included at Melbourne Street and the MPO entrance. No-Build Alternative Throughout this study, a no-build alternative is also considered and will remain a viable alternative as evaluations continue. The no-build alternative assumes that no improvements will be made to Harborview Road from Melbourne Street to I-75 through 2045, except for routine maintenance.

Environmental Evaluations FDOT evaluated environmental and socioeconomic factors related to the proposed widening in accordance with the National Environmental Policy Act of 1969, as amended, and other federal requirements. The evaluation considered the project s effects on threatened and endangered species, wetlands and floodplains, cultural and historic resources, contamination sites, right-of-way acquisition and relocations, land use, stormwater management and permitting, noise, air quality, construction effects and aesthetics. Based on these evaluations, we do not anticipate significant effects to the environment associated with widening Harborview Road. What Happens Next? Following the public hearing and comment period, the study team will finalize engineering and environmental evaluations and project documentation. FDOT District One will make its final recommendation and submit the completed project document to OEM for acceptance. A legal advertisement announcing the acceptance of the study document will appear in the Charlotte Sun newspaper. FDOT anticipates completing the study by Summer 2019. Right-of-Way Maps on display this evening illustrate right-of-way, or property, FDOT needs to acquire to build the proposed roadway widening. FDOT carries out a right-of-way and relocation program in accordance with Section 339.09, Florida Statutes and the Uniform Relocation Assistance and Real Property Act of 1970 to address these effects. Brochures are available this evening, as are the representatives from FDOT to discuss the right-of-way acquisition process with you. Please contact FDOT District One Right-of-Way Office by telephone at (863) 519-2401 during business hours, if you have additional questions about right-of-way. Title VI of the Civil Rights Act of 1964 This hearing is developed in compliance with Title VI of the 1964 Civil Rights Act and related statutes. FDOT solicits public participation without regard to race, color, national origin, age, sex, religion, disability, or family status. Memorandum of Understanding The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by FDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT. Project Information Information and graphics available on the project website at: http://www.swflroads.com/harborview/melbournesttoi75/. If you would like to be added to the project mailing list, please fill out a comment form with your contact information and place it in the comment boxes provided tonight. You may also submit it by mail to the address on the back of the comment form.

Evaluation Matrix Evaluation Criteria Business Impacts Notes: 1) Mitigation Cost is based on mitigation bank credit cost and an estimate of wetland function and value loss associated with wetland impacts. 2) Right-of-way cost estimates were prepared by FDOT in December 2018. 3) Construction costs were prepared by FDOT in February 2019. Estimated Project Costs Estimated costs shown in the Evaluation Matrix are based on present-day dollars and the best available information at the time of the PD&E study. Funding for the design phase is included in fiscal year 2020 of the FDOT Tentative Five-Year Work Program. Right-of-way acquisition is currently included in fiscal year 2023. There is currently no funding for the construction phase of this project. Phase Fiscal Year Design 2020 Right-of-Way Acquisition 2023 No-Build Alternative Preferred Alternative Number of business relocations 0 0 Residential Impacts Number of residential relocations 0 3 Environmental Effects Archaeological/Historic sites (potential) None Medium Public parks, recreation areas, or wildlife refuges None None Religious facility relocations None None Noise (potential) None Medium Wetland (acres) 0 3.5 Historic Storage Basin (acre feet) 0 1.2 Threatened and endangered species (potential) None Medium Contamination sites (high / medium) None 0 / 0 Right-of-Way Needs Right-of-way to be acquired for roadway improvements (acres) 0 11.0 Right-of-way to be acquired for stormwater facilities (acres) 0 8.6 Right-of-way to be acquired for Historic Storage Basin Compensation (acres) 0 0.9 Estimated Total Project Costs (2018 Cost) Design $0 $4,020,000 Wetland Mitigation Cost $0 $269,000 Right-of-way cost for roadway $0 $6,957,000 Right-of-way cost for stormwater facilities $0 $1,522,000 Total Right-of-Way Cost $0 $8,479,000 Total Construction Cost $0 $29,050,000 Construction Engineering & Inspection $0 $4,358,000 Preliminary Estimate of Total Project Cost $0 $46,176,000 Construction Not Funded

COMMENT FORM Name: Address: Phone: Email: Comments: Please place this form in the comment box at this meeting or you may mail or email it, postmarked by March 25, 2019 to the address below. Steven A. Andrews Project Manager Florida Department of Transportation P.O. Box 1249 Bartow, Florida 33831 Steven.Andrews@dot.state.fl.us Add me to the mailing list

Steven A. Andrews Project Manager Florida Department of Transportation P.O. Box 1249 Bartow, Florida 33831 Place Stamp Here

Notes Questions or Comments? Contact: Steven A. Andrews Florida Department of Transportation P.O. Box 1249 Bartow, Florida 33831 (863) 519-2270 Steven.Andrews@dot.state.fl.us