Information for File # RMM

Similar documents
Information for File #MVP MVM

Information for File #MVP DAS

Information for File # ARC

Information for File # MHK

Information for File # MMW

Information for File # ARC

Information for File MMJ Main Stem Bassett Creek Restoration Project

Information for File # JTF

Information for File # MMJ; Methodist Hospital Flood Storage Mitigation and Wetland Enhancement Project

Information for File # MVP MMJ; Elim Care

Information for File MVP MMJ; CSAH 10 Reconstruction (Waconia and Watertown Townships)

Information for File # KDZ

Information for File # ARC

Information for File # SEK

Balancing Conservation and Development on the Jordan River

Appendix E Section 4(f) Evaluation

Information for File # MVP MMJ

PROPOSED DRAINAGE PATTERNS

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

L-1 LEGEND HOMES AT DEER HILL LAFAYETTE, CALIFORNIA

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Information for File # ARC

2. Analysis. DRAFT Gerald Richards & Pleasantview Park Master Plan

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

/s/ Michael T. Loeffler. Michael T. Loeffler Senior Director, Certificates and External Affairs. Attachment. September 14, 2018.

2.4 FUTURE LAND USE ELEMENT Goals, Objectives and Policies

I-494 Rehabilitation Project SP (I-394 to Fish Lake Interchange) June 2014 Section 4(f) De Minimis Determination

Design Specifications & Requirements Manual

Watertown City Council

Design Specifications & Requirements Manual

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

FORT MISSOULA REGIONAL PARK

Verona Area School District New High School Site Plan Review Written Description EUA Project No.:

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

Moreno Valley College: Conceptual Master Planning - Site Analysis Lasselle Street, Moreno Valley, CA 92551

Non-Metallic Mining Reclamation Checklist

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

WILLIAM PAYNE SPORTS PARK MASTER PLAN BOARD OF DIRECTORS PRESENTATION

Ohlone College Measure G Project Scope Revisions

EIR Scoping Meeting MULTI-BENEFIT/MULTI USE PROJECT

Appendix I. Checklists

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Outdoor Recreation Facilities Inventory

Northern Branch Corridor SDEIS March 2017

BLOOMSBURY BOROUGH. Regional Master Plan Overlay Zone Designation. 1 inch = 0.28 miles. Zone. Sub-Zone FRANKLIN TOWNSHIP GREENWICH TOWNSHIP

Technical Memorandum 5

City of Bonney Lake Allan Yorke Park. MASTER PLAN SUMMARY REPORT June 30, 2016

Understanding Drainage Options What s Feasible and Legal. February 2019

DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) RESOLUTION

Protecting Massachusetts Vernal Pools. Leo Kenney Matt Burne Moderated by Marc Bergeron

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

UCONN Athletic District Improvements Scoping Meeting

Department of Community Development. Planning and Environmental Review Division Revised Notice of Preparation

APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers

Montana Rail Link Park

INTER-AGENCY COORDINATION MEETING


Pennsy Greenway Trail

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

ROBERTS FIELD BRANDING GOALS NEW BRANDING PROJECT

PLANNING COMMISSION Work Session Meeting Agenda

The proposed project will impact a large amount of aquatic resources.

Variance Staff Report St. Croix County Board of Adjustment Ben Hanke / Calda Donna LLC Hearing Date: January 20 & 21, 2016

Santa Cruz River Master Plan. Presented to the Arizona Floodplain Management Association Spring Conference June 8-10, 2011

Letter of Notification For East Lima Station Expansion Project

Sheet Index. Legal Description. General Notes: Vicinity Map Scale 1" = 600'

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

7.0 SECTION 4(F) EVALUATION

Working Group Meeting

January 18, JOINT PUBLIC NOTICE Savannah District/State of Georgia

Preliminary Regulatory and Engineering

CATEGORICAL EXCLUSION DETERMINATION I 435/I 35/K 10 INTERCHANGE (JOHNSON COUNTY GATEWAY)

APWA Expo August 27, Ground Water Recharge With Storm Management: A Sustainable Development

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Coffee Creek Park Development Low Impact Development (LID)

LICENSES FOR UTILITY CROSSINGS OF PUBLIC LANDS AND WATERS ACCORDING TO MINNESOTA RULES CHAPTER [Rules Effective July 1, 2004]

Rule D Wetland and Creek Buffers

Erosion control practices meet District requirements.

Chapter 4 - Preparation of Stormwater Site Plans

Town of Rico Three Mile Plan for Annexation

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

AMERICAN TRANSMISSION SYSTEMS, INCORPORATED A FIRSTENERGY COMPANY LETTER OF NOTIFICATION BROADVIEW SUBSTATION EXPANSION PROJECT

UNIVERSITY OF MICHIGAN:

PURPOSE AND NEED FOR ACTION PUBLIC SCOPING LETTER SILVER GLEN SPRINGS RECREATION ENHANCEMENT PROJECT. Ocala National Forest

Pleasant Garden Community Center MASTER PLAN

5-Year Street Reconstruction Plan ( )

Minot City Council -Special Meeting- Friday, July 21, :00 PM Minot City Council Chambers- City Hall

Tonya Hunter, LLA, CA Environmental Consulting & Technology, Inc.

Samuel E. Paul War Memorial Recreation Area Natural Resource Inventory

GREENBANK DEVELOPMENT MASTERPLAN

SITE FEASIBILITY TEST FIT LAYOUT NORTHERN AREA INTERNATIONAL SCHOOL DECEMBER 2016

Concept Master Plan. for. Draft of. Wildlife Management Area. Prepared for. June, 2008

Elm Fork Land Use. Trinity River Corridor Project Committee May 13, 2013

STATUS REPORT ENVIRONMENTAL REVIEW FOR IMPROVED ACCESS. at the NORTH WHITE PLAINS STATION

Huntington Stormwater Utility

Transcription:

Information for File #2015-00067-RMM Applicant: New Ulm Public Schools Corps Contact: Ryan Malterud Address: 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678 E-Mail: ryan.m.malterud@usace.army.mil Phone: (651) 290-5286 Project Location: Section 19, Township 110N, Range 36W, Brown, Minnesota Information Complete On: August 20, 2015 Posting Expires On: September 21, 2015 Authorization Type: LOP-05-MN This application is being reviewed in accordance with current practices for documenting Corps jurisdiction under Section(s) 9 & 10 of the Rivers and Harbor Act of 1899 and Section 404 of the Clean Water Act. We have made a preliminary determination that the aquatic resources that would be impacted by the proposed project are subject to Corps of Engineers jurisdiction under Section(s) 9 & 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. If an approved jurisdictional determination is completed as part of the review process for this application, a copy will be posted on the St. Paul District web page at the following link: http://www.mvp.usace.army.mil/missions/regulatory.aspx. Project Description (as described by the applicant) New Ulm Public Schools is proposing to construct a new high school located south of North Highland Avenue and west of 11 th Street North. The purpose of the project is to provide a new high school that can accommodate the future growth of the community. The facility layout and infrastructure for the high school, football fields, soccer fields, and track and field activities are avoiding all wetland impacts. The addition of on-site practice fields are required to accommodate the anticipated types of sports and volume of student participants. The proposed wetland impacts are the result two baseball fields. The baseball fields will result in the filling of 1.76 acres of wetland. The applicant has stated the following, field size is dictated by the Minnesota State High School league rules; therefore, the footprint of the proposed fields meets these requirements. The proposed plan also includes concessions, restrooms, and American Disability Act (ADA) compliant trails for access to each field. The structures, fields, and all other necessary features were designed in an arrangement so that they impact less than 30% of the current wetland. Additionally, the impacts have been kept to the periphery of the wetland; therefore, no further minimization is feasible. Alternatives as Described by Applicant 1. No Build Alternative The anticipated student involvement in extra circular athletics has resulted in four proposed softball/baseball fields and 3 soccer fields that are sized and designed to the State High School 1

league requirements. Sufficient off-site athletic facilities that meet the needs of the student athletes do not exist near the project site. 2. Construct Two Ball Fields Eliminating the western two proposed ball fields would result in no wetland impacts; however, the anticipated volume of student athletes dictated that a minimum of four ball fields would be needed. This was not a feasible alternative due to the size and number of student athlete users. 3. Proximity to ancillary facilities The layout of the ball fields are within reasonable walking distance to restroom facilities and parking areas. Reconfiguring the ball fields in a linear layout to North Highland Avenue (outside of the delineated wetland) would eliminate the available upland area proposed for three soccer fields. Alternative layout were considered but deemed not feasible due to these issues. Federally Listed Threatened and Endangered Species According to the USFWS Midwest Region website, which was checked on September 9, 2015, the Northern long-eared bat (threatened) and Prairie bush clover (threatened) are found in Brown, Minnesota. Historic Properties The latest version of the National Register of Historic Places has been consulted and no listed properties (known to be eligible for inclusion, or included in the Register) are located in the project area. State Listed Impaired (Section 303(d)) Waters According to the Minnesota Pollution Control Agency s Impaired Waters Viewer, which was checked on September 9, 2015, there are no known impaired waters in the project location. Mitigation The applicant proposes to satisfy compensatory mitigation requirements by restoring a 4.15 acre area adjacent to the proposed impact site. The area will be restored by breaking an existing tile line to restore the hydrology to the basin. Minimal grading is proposed to ensure an undulating bottom with high and low spots. Native vegetation is proposed in the wetland area with state seed mix #34-271. Drawings See attached MVP-2015-00067-RMM, Page 1 of 3 through Page 3 of 3. 2

Lafayette Nicollet Minnesota River Site Location New Ulm 14 DATE: 8/19/2015 S:\Projects\18000 PROJ\18100-18199\18129 New Ulm HS Wetland Replacement Monitoring\18129 NR\Maps-Figures\Figure 1 Project Location.mxd Brown Sec 14 Hwy 12 Sec 13 Sec 23 Sec 24 Sec 19 T110N R31W Sec 26 ounty Hwy 29 14 Site Location Hwy 27 Sec 25 Boundary St Garden St PN: 15-18129 Sec 18 Payne St T110N R30W Sec 30 y Hwy 13 16th St N Highland Ave Hwy 13 St 14th St N N Garden St Sec 17 12th St N West St Center St 10th St N 8th St N Jeffrson St Front St Sec 20 1st St N Sec 29 Summit A Valley St German St State St Franklin St 10th St S Hwy 21 Scale: 0 2 Miles F 1 inch = 2 miles 68 ß Figure 1 Project Location Map New Ulm High School City of New Ulm, Brown, MN Courtland Blue Earth

MVP-2015-00067-RMM Page 2 of 3 PROPERTY LINE LEGEND EX APPROX. ELEV. 1004.6 6" TO 12" OF CLEANING EXISTING WETLAND BOUNDARY VARIES SLOPE ABANDON EXISTING INTAKE VARIES SLOPE ELEV. 1006.8 50H:1V SLOPE ELEV. 1004.5 50H:1V SLOPE 8H:1V SLOPE WETLAND BUFFER (50' AVG.) 4H:1V SLOPE 4H:1V SLOPE TILE ELEV. 999.75 CAP, BREAK AND ABANDON EXISTING 8" TILE CROSS SECTION A-A ARCHITECTURE PLANNING INTERIOR DESIGN 50' WETLAND SETBACK 25' WETLAND SETBACK A-A A-A 5.91 ACRES OF DELINEATED WETLAND 4.15 ACRES OF WETLAND TO REMAIN 1.76 ACRES OF WETLAND IMPACT I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. Brian M. Welch LIC. NO. DATE 51,802 ELEV. 1007.0 BASIN 1 NORTH HIGHLAND AVE. BUILDING FFE=1015.00 ELEV. 996.0 WETLAND MITIGATION PLAN RE ST K OA BASIN 5 WQE 995.7 BASIN 4 ET BASIN 2 BASIN 3 07-09-15 1"=80' NJH CHK. 14-16932 C1 BMW

I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. CHK. LEGEND 50' WETLAND SETBACK 25' WETLAND SETBACK ARCHITECTURE PLANNING INTERIOR DESIGN 5.91 ACRES OF DELINEATED WETLAND 4.15 ACRES OF WETLAND TO REMAIN 1.76 ACRES OF WETLAND IMPACT Brian M. Welch DATE LIC. NO. 51,802 ELEV. 1007.0 WETLAND MITIGATION PLANTING PLAN 07-09-15 1"=30' NJH BMW 14-16932 BUILDING FFE=1015.00 C2