INSTALLATION AND SERVICING INSTRUCTIONS TO BE LEFT WITH THE USER

Similar documents
Installation and Servicing Instructions. Alpha GasSaver GS-1

Installation and Servicing Instructions. Alpha GasSaver GS-2

ferroli Boiler Replacement Maxima 35C- Modena HE

Instructions for Use Installation and Servicing To be left with the user HIGH EFFICIENCY CONDENSING

Installation and Servicing Instructions

Installation and Servicing Instructions. Alpha FlowSmart

Vortex 15/21 Utility and Outdoor Module Vortex Combi 21 and Outdoor Vortex Combi 21

Instructions for Use Installation and Servicing To be left with the user

5 YEAR ADVANCE PLUS WARRANTY. High efficiency condensing combi and system boilers

Alpha CombiMax 350 and 600

Installation Instructions

Kills bills. How Vaillant technologies reduce home heating bills

Greenstar Xtra. Installation instructions. Passive flue gas heat recovery device. For use with Greenstar CDi Compact, Si Compact and i combi boilers

FlowSmart. The high efficiency, high performance space saving heating system.

Alpha FlowSmart 25 and 50

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

JLBIHD624 60cm Cooker Hood

Compact. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

ASSEMBLY and INSTALLATION INSTRUCTIONS. Pipe wrench Ratchet 3/8 socket 9/16 socket 11/16 socket 3/16 Allen key 3/32 Allen key 9/64 Allen key

Compact A High effi ciency combi boiler Users Instructions Installation & Servicing Instructions Compact A 25 G.C. N Compact A 29 G.C. N 47-

Compact HE. High efficiency combi boiler. Installation & Servicing Instructions THESE INSTRUCTIONS TO BE RETAINED BY USER

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation Instructions

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Quartz. Digital. Bath with bath waste filler. Quartz Digital Bath with bath waste filler installation instuctions page 1

"WHHR125DC" Whole House Heat Recovery Unit with Low Energy DC Motor. Installation, Operating and Maintenance Instructions domestic and commercial use

Francis Pegler Memento Single Sequential Exposed Thermostatic Shower

Unica i28 - i32 - i36 High effi ciency combi boiler

87cm. Cooker hood. Stainless steel JLCEILHD87. User guide

METRO BASIN MONO MIXER CHR

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

IMAGINATION SOLAR LTD. Installation Guide B1. Planning the Plumbing and Wiring

Lo-Carbon Quadra Centrifugal Fan

AIRE. Thermostatic bath shower mixer. Installation and Operating Instructions INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

AGS 2 SOLAR PUMP STATION FOR SOLAR DOMESTIC HOT WATER SYSTEMS UK/IE

Compact HRE Boiler Range. The smart choice for heating and hot water

Dove Eco thermostatic bar mixer shower

AquaCyl solar system solar water heating solution for the larger home with greater hot water demand (2 or more bathrooms in use simultaneously)

5 YEAR GUARANTEE. Inovia. High efficiency condensing combi and system boilers

Lo-Carbon Quadra SELV

DOMESTIC HEATING CONTROLS ARE EASY PART 1 - THE BASICS

WHHR Midi & Midi Lite

hxi High Efficiency Heating Only 24hxi hxi High Efficiency Heating Only 30hxi hxi High Efficiency Heating Only 38hxi

Alpha CD13R,18R and 24R

Chimney Extractor HJA LAM LAM2407/8. User & Installation Guide.

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2

Installation instructions. RECOUP Retrofit+ Shower Waste Water Heat Recover unit

Dene Bath Shower Mixer

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

These instructions must be left with the user.

Sema thermostatic bar mixer Installation and operating instructions

Bosch Group. 35CDi WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS.

Thermostatic Shower Tower Installation and Operating Instructions

NENE. Installation and Operating Instructions. Thermostatic bar mixer shower PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER

Centrif Duo & Centrif Duo Plus

Bath Shower Mixer

CARVER CASCADE 2 & CASCADE 2 GE CARAVAN WATER HEATER INSTALLATION INSTRUCTIONS LEAVE THESE INSTRUCTIONS WITH THE USER

5.5.1 General CD/30 (Oil Condensing Boiler Installation Assessment Form) General Technician Stationary...

Mynute 24m Installation & Servicing Instructions

kw Btu/h Metres Feet l/min. Gal/min C C

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

Link-Up. Solid Fuel Association Guide to Central Heating.

WATER HEATERS INSTALLATION MANUAL

INTRODUCTION STORAGE PRIOR TO INSTALLATION. Expansion Vessel Hose. Part No High Flow Rate Inlet Control Set. Part No.

HRU ECO 3 RF APPENDIX Q ELIGIBLE NEW

TECHNICAL BOOK 4: OIL FIRED APPLIANCE & SYSTEM INSTALLATION REQUIREMENTS

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

POWER SHOWERS Models 4500M 5002M 4500T 5002T

Rise. Digital. Bath with overflow filler. Rise Digital Bath installation instuctions page 1

installation INSTRUCTIONS

METRO BATH FILLER MOUNTED CHR

Stainless steel range of condensing boilers. Designed to meet carbon reduction targets. Lifetime service and support. Outputs from 50kW to 660kW

RAMOR Shower Tower Thermostatic mixer Installation and Operating Instructions

Mynute. Installation & Servicing Instructions. 28e THESE INSTRUCTIONS TO BE RETAINED BY USER

FANNED COMBI RSF 82E - RSF 82ET

Mira Reflex Thermostatic Bar Valve

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

JLBIHD920 90cm Chimney Hood

THE MONTICELLO CEILING FAN INSTALLATION INSTRUCTIONS

Bosch Group. 24CDi RSF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

HX Field Replacement Kit

Technical information. Remeha P 500. Pressurized boiler. Heat output: kw

Thermostatic Shower Tower

Highflow 400 ELECTRONIC BF FLOOR STANDING COMBINATION APPLIANCE FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER

Electronically controlled instantaneous water heater. MCX: 27300, and models. Installation instructions

ADVANCE ELECTRIC THERMAL STORE

GB User and maintenance manual

THERMOSTATIC SHOWER VALVE

INSTALLATION AND SERVICING INSTRUCTIONS

S T O R E R A N G E C Y L I N D E R & G R A N T FEATURES: GRANT MONOWAVE UNVENTED DIRECT AND INDIRECT SINGLE-COIL CYLINDERS

DC Heat Recovery Unit MVHR Wholehouse heat recovery unit

Why Vaillant? Home Heating Guide. Because they can reduce our heating bills and our carbon footprint

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

SYSTEM MANUAL Description

SEALED THERMAL STORE

Heat Exchanger Block Replacement Instructions

Oltis thermostatic bar mixer

Transcription:

ENERGYCATCHER INSTALLATION AND SERVICING INSTRUCTIONS TO BE LEFT WITH THE USER This is an energy saving product SAP RECOGNISED CERT ACCREDITATION Technical and illustrative data are not binding and can be modifi ed without prior notice. The descriptions and illustrations in the present booklet are for guideline purposes only. RAVENHEAT MANUFACTURING LTD, CHARTISTS WAY, MORLEY, LEEDS, LS27 9ET TEL. 0044( 0)113 252 7007 - FAX: 0044 (0)113 238 0229 Website : www.ravenheat.co.uk - E-mail : sales@ravenheat.co.uk

Thank you for purchasing Energycatcher combiplus or combistore patented energy saving system which when used in conjunction with the arrangement listed below will save substantial amounts of energy along with meaningful carbon reductions. 3

GENERAL INFORMATION All Ravenheat appliances have been designed and manufactured to the highest quality and standards to be both reliable and to save on operating costs. The Energycatcher must be installed in accordance with the manufacturer s guidelines. Failure to do so could negate the warranty supplied with this unit. Energycatcher must be installed and serviced by a competent person in accordance with the following recommendations: - Current Gas Safety (Installation and Use) regulations - All current Building Regulations issued by the department for the Enviroment i.e. Approved Document L1. - Building Standards (Scotland) (Consolidation) Regulations issued by the Scottish Development Department. - UK Water Regulations/Bylaws (Scotland) The installation should also be in accordance with the following British Standards Codes of practice: - BS 5440:1:2000 Flues - BS 5449:1990 Forced Circulation Hot Water System - BS 5546:2000 Installation of Hot Water Supplies for Domestic Use - BS 6700:1997 Design, Installation, Testing & Maintenance of Suppling Water - BS 6798:2000 Installation of Gas Fired Hot Water Boilers - BS 6891:1998 Gas Installation - BS 7593:1992 Code of practice for treatment of Water In Heating System - BS 7671:2001 Requirements for electrical Installation, IEE Wiring Regulations Energycatcher is designed to be used on water systems not exceeding 6.0 bar static pressure. If the pressure is greater than this, a 6.0 bar limited pressure reducing valve must be fi tted prior to the Energycatcher pipework (item 11 page 20). Note: Energycatcher is designed to fi t Ravenheat 120/150 models only. It can be fi tted to any Band A condensing combi though the installer must have written approval from manufacturer of the boiler and the manufacturer of Energycatcher. IMPORTANT : 2.5 bar pressure reducing valve (supplied) must be fitted on mains inlet supply before the Energycatcher or boiler see fig. 11-12 - 13. 4

TABLE OF CONTENTS SECTIONS 1 2 3 4 5 6 7 8 9 10 11 12 13 INTRODUCTION GENERAL LAYOUT TECHNICAL DATA OPERATING DELIVERY INSTALLATION ENERGYCATCHER FIXING WATER CONNECTIONS ENERGYCATCHER WITH REMOTE TANK STORE ENERGYCATCHER PIPEWORK SERVICING ALTERNATIVE ENERGYCATCHER SYSTEMS LIST OF SPARE PARTS PAGE 6 7 8 8 9 10 13 14 14 14 18 18 20 COMBIPLUS COMBISTORE PFGHRD A0-1 System FGHRS B1-1 System PFGHRD : Passive Flue Gas Heat Recovery Device FGHRS : Flue Gas Heat Recovery System 5

Section 1 INTRODUCTION Energycatcher is an ingenious patented unit which requires no electrical connection, has no running costs, and no maintenance costs. All Ravenheat boilers conform to SEDBUK band A, they are over 91 % efficient in converting gas to heat. When Energycatcher is fitted to a boiler, it adds up to 7 % to the boiler efficiency and thereby an overall 7% saving on gas per year. Which, apart from the costs of buying the unit delivers FREE domestic hot water. This saving is good news for the householder s gas bill, and the environment. In addition, the flue exhaust temperature, or plume, is also considerably cooler with Energycatcher. UK building Regulations demand that this plume is exhausted from the house so as not to affect either the home s fabric or people. Tests by Ravenheat show that the plume temperature is reduced by up to 45 C, making it far safer and resulting in much less heat being pumped into the atmosphere. When Energycatcher is attached to a condensing boiler, the low temperature of this exhaust results in the polluting gases condensing to the drain, rather than going into the atmosphere; 1.2 Summary of benefits of Energycatcher: - Fuel bills reduced. - CO2 saving - Pluming is almost eliminated due to operation (thermal gain). Outlet fumes are too low to support water vapour. - Less cold water usage. - Instant hot water delivery. - Payback of initial outlay around 2 to 3 years. - Delivers substantial heat savings (twice that of solar) when there are no thermal gains due to poor weather. - Compatible to work with solar system in conjunction with Energycatcher for all year round savings. - Uses no power to recover heat. - No electrical power connections. 1.1 Summary savings using Energycatcher: - Energy neutral (free energy). - The Energycatcher is efficient at extracting heat to water. - Extra heat is extracted from outlet fumes reducing them to as low 23 C. - When the boiler is working in hot water mode the outlet flue fume temperatures are no greater than 3-5 C higher than the incoming cold feed. - Extra boiler efficiency whenever the boiler is operating (DHW or CH). This efficiency is stored as thermal gain. - Saves on gas bills. - Helps the environment. 6

Section 2 GENERAL LAYOUT Fig. 1 7

Section 3 TECHNICAL DATA D.H.W. pressure Dry weight Water content Water inlet pipe Water outlet pipe Suitable for use with Ravenheat boiler models Other boiler manufacture Flue resistance Deduct from overall boiler flue length Boiler flue length max 6,0 (bar) 12,3 (Kg) 1,6 (Litre) 3/4 " BSP 3/4" BSP Ravenheat 120/150 Low Nox boiler Any band A SEDBUK gas boiler, of whatever type or make, can be fitted with a Ravenheat Energycatcher subject to all round consent. 1,5 m length for 60/100 flue 1,0 m length for 80/125 flue See boiler manual and overall maximum flue length then deduct value in flue resistance as above Section 4 OPERATING 4.1 The boiler s fl ue gases, instead of going straight outside at around 60 C, the fl ue gases are fed into the Energycatcher, where they fl ow over a heat exchanger. This otherwise wasted heat is transferred to the water in the heat exchanger, which moves under convection into Energycatcher and/or a storage tank. The tank can be of any size to suit the need for example, after the central heating has run for a short period the store will be heated, giving a good supply of preheated hot water. The exhaust gases, now considerably cooler, then vent to the atmosphere. If the householder runs the central heating system in the early morning, so the house is warmed for breakfast time. All the time the boiler is running, the waste heat in the fl ue is being transferred to the water in the heat exchanger, which then passes to the storage tank. This water can reach between 40 and 50 C within 20 mins - to a max of 60 C. When the householder runs the hot tap, either for a wash, shower or bath etc... The preheated hot water runs directly from Energycatcher and/or storage tank through the boiler (combi type) to the tap, this preheated water is supplied totally free of charge, it is cycled through the boiler where the higher than normal inlet temperature is sensed, and only suffi cient heat applied, bringing the water up to the normal preselected outlet temperature set on the boiler. Far less gas is used to supply this piping hot water. Either way, the householder saves money; Ravenheat estimates that over the year, a typical average gas bill will be cut by up to 7% over and above a 91% effi cient Sedbuk band A condensing boiler (over 50% saving by replacing non-condensing appliances with a Ravenheat condensing boiler and Energycatcher). In addition, hot water fl ows from the tap quicker than normal (less cold water is used). 8

Section 5 DELIVERY 5.1 The appliance will be delivered in two cartons: (1) Large rectangular box contains: a) Energycatcher main unit. 5.2 (2) Long rectangular box containing accessories: a) stand off wall bracket for boiler and Energycatcher consisting of 1 left and 1 right hand painted side bracket. b) 1 upper cross member and 1 lower T shaped cross member. c) 1 paper template d) 1 polythene bag containing: 2 22 mm fl anged angle valves and fi bre washers. 1 15 mm angled valve (blue) and washer. 1 angled bend and washer. 1 bag of 4 fi xing bolts and dowels. 1 15 mm drained down valve. 1 condensing trap. e) 1 polythene bag containing: 4 Energycatcher / boiler fi xing bolts and nuts. 1 pipe clamping clip. 1 dual lock strip (condensing trap fi xing) 8 screws and washers (back frame assembly screws). f) 2 Data ID label for Energycatcher (affi x correct one to boiler). 9

Section 6 INSTALLATION 6.1 WHEN INSTALLING ENERGYCATCHER IT MUST BE FITTED IN CONJUNCTION WITH RAVENHEAT 120/150 CONDENSING BOILER THEREFORE ITS IMPORTANT TO FAMILIARISE YOURSELF WITH THE BOILER MANUAL IN CONJUNCTION WITH INSTALLATION OF ENERGYCATCHER. 6.2 Assembling backframe. Select the left and right hand side stand off bracket, placing them face down with the fi xing studs facing upwards and screw holes cross referencing, take the 8 screws fi x the top and bottom cross members on the inner side of the side stand off brackets. Fig. 2 6.3 Attach the template to the wall making sure that the centre line is vertical using adhesive tape. - mark the holes for the side fi xing brackets to the wall as well as the centre fl ue duct, detach the template from the wall. - use a 10 mm drill to make the 4 holes. Insert the plastic expansion plugs. - cut or core drill the 105 mm diameter hole for inserting the fl ue duct (rear left, right or vertical). Fix the 4 coach bolts provided, leaving them a couple of mm proud of the wall. - locate the boiler fi xing stand off bracket over the 4 bolts and tighten it to the wall, taking care not to over twist or distort the frame if the wall is uneven. Note: It is important to ensure screw holes line up correct as these have been deliberately offset to avoid incorrect positioning of cross members within the backframe assembly. Fig. 4. Fix 4-15mm clips provided ( pointing clips to the wall ) in the backframe cross members. Fig. 5 Fig. 2 Fig. 3 10

6.4 Locate the 4 boiler/energycatcher fi xing bolts and nuts into the upper studs of the secured backframe, leave them slightly loose of the frame. 6.5.1 You may wish to run cold feed/preheat pipes into the backframe. It is best to use 15 mm plastic pipe as this should bend when located in plastic clips, otherwise put offset bends on feed pipes. Fig. 4 11

6.5.2 Take out from the Energycatcher valve pack the blue isolation valve and connect it to a 15 mm pipework (not supplied) making sure compression connection is water tightened. length of pipe approx 120 cm. 6.7 Remove the straight exhaust white header and gasket from the top of the boiler by removing the 4 screws located on the top of the boiler itself. Fig. 6. - Clip the pipe into backframe right side clips. - Connect cold mains inlet and locate in clips leaving more than 100 mm above top backframe so this can be connected to the cold inlet later. Note: It may be necessary to slacken backrame from the wall to locate pipes in clips. 6.6 Unpack and prepare the selected boiler for installation as set out in the main boiler manual. Fig. 6 6.8 Lift up the boiler onto the 2 lower backframe bolts and locate tighten them to secure boiler to backframe. Fig. 4. 6.9 Remove boiler front cover by removing lower 2 screws on bottom of cover slide up the front panel to dislocate it from studs. Fig. 7. Fig. 5 Fig. 7 12

Section 7 ENERGYCATCHER FIXING 7.1 Before fi tting remove the front cover of Energycatcher by removing the 2 screws located on the top of the front panel. 7.2 Slide up the front panel to dislocate it from fi xing studs and remove. Fig. 8. Fig. 9 Fig. 8 7.3 IMPORTANT Make sure the black rubber 60 mm seal is located into the boiler top flue exhaust manifold. 7.4 Before offering Energycatcher up to the boiler it is important to lubricate the inlet and outlet manifold on Energycatcher and boiler. IMPORTANT Generally speaking oils and greases are not suitable for the peroxide- EPDM, therefore we suggest a correct lubrication using silicone-substances, for instance silikon spray (Arexons) or similar product. 7.5 Taking Energycatcher, lift it up on the top of the boiler while at the same time ensuring that the 2 fl exible pipes ( condensing outlet pipe and drain down braided hose) drop down the backframe so that they can be connected later. Lift Energycatcher onto the 2 fi xing bolts at the upper top of the stand off backframe while at the same time locating the Energycatcher fl ue inlet manifold into the boiler black rubber washer. 7.6 Tighten Energycatcher fi xing bolts. Fig. 10 7.7 Fit desired fl ue as set out in main boiler installation manual. Note : If the flue from Energycatcher is vertical then the flue connection must start with a header sampling point. Part. no. PR5094110A. Fig. 10. 7.8 Flue resistance. It is important to deduct appropriate fl ue length to allow for Energycatcher s increased fl ue resistance. Details of which are set out in section 3. 13

Section 8 WATER CONNECTIONS Note: Energycatcher comes with its own extended valve pack water connections, change these with ones supplied in boiler box. Use 2 of the angled water boiler connection valves to correct Energycatcher inlet and outlet. Fig. 9. Energycatcher external pipework ( not provided) can be installed in 15 mm plastic or copper. 8.1 The boiler water connections are as set out in the main manual. Cold mains inlet feed must be taken immediately to Energycatcher up through the backframe. Fig.4a. 8.2 The outlet pipe (preheat) from Energycatcher outlet to be taken down the backframe and connected to the boiler cold water inlet (use the blue angled valve provided) in Energycatcher accessory box. Fig. 10 ( section 6.5.1). 8.3 All other water and gas connections along with electricity supply to the boiler are all as set out in the boiler instruction manual. 8.4 Fix the straight 1/2 / 15mm isolating drain using the fi bre washer provided to the 1/2 BSP outlet from the braided pipe, this will act as a drain down discharge point if this is required. Ensure this is correctly closed and capped where necessary to prevent this being opened accidently ( cap not provided ) 8.5 Fix the condensate trap to the fl exible discharge pipe from Energycatcher ensuring that this trap is fi xed to the Energycatcher (not the boiler discharge pipe as this is already trapped within the boiler). By teeing these together ensure that the condensate discharge is disposed of safely as set out in the main installation manual. Also ensuring that condensate trap is securely secured. Section 9 ENERGYCATCHER WITH REMOTE TANK 9.1 The tank pipework should not exceed 5 m total length. Positioning of the tank must be above the Energycatcher, or at the left or right hand side. When fi tting at the side use the hose which can be taken through the side of backframe. Fig. 12-13. Important : if using the fl exible hose to the tank connection you must cap off the 3/4 preheat outlet on the top right of energycatcher. 9.2 If you are to use Energycatcher with an additional 15ltr cylinder continue as follows: 9.3 Offer the cylinder up to the wall and fi x with bracket provided, taking care not to exceed measurements. 9.4 It is important that both pipes connected to Energycatcher from the cylinder must have a slight fall back to Energycatcher. Section 10 STORE ENERGYCATCHER PIPEWORK 10.1 - Take cold mains inlet supply up through back of the boiler. - Immediately above energycatcher fi x a 15 mm T with the junction pointing horizontally forward and connect to Energycatcher inlet. Immediately above tee fi t reversing valve with arrow pointing down (valve is sold separately). - Immediately after the valve fi t a further T. - Take the pipework back down on to the boiler cold water inlet. - Take the upper T connecting to the top of the cylinder. Fig. 12-13. Connect the return pipe from the tank to either top of energycatcher outlet or use fl exible connector. Connecting through the hole in the side bracket fi xing a draincock within the connection (not supplied). 10.2 Filling the system It is important that the system is fully fi lled prior to the commissioning of the boiler otherwise the boiler could be damaged in the process of fi lling and charging the cylinder. Make sure all air is removed by opening outlet taps. Check that the water is adequately running through the hot water supply and taps prior to commissioning. When replacing front panel refi t boiler front panel fi rst then Energycatcher panel. 10.3 Fix the Energycatcher ID label to boiler. See page 5. 14

10.4 ENERGYCATCHER STAND ALONE UNIT Fig. 11 15

10.5 WITH REMOTE STORAGE TANK Fig. 12 16

Fig. 13 17

Section 11 SERVICING Energycatcher is a simple designed unit, no maintenance is required. The unit contains no mechanical, electrical or serviceable parts. It is recommended that the Energycatcher should be subjected to a general condition and fl ue inspection with boiler maintenance by a competent person. Ravenheat are a member of the Benchmark initiative and fully supports the aims of the programme, to improve the standards of installation and commissioning of central heating systems in the UK and to encourage in the regular servicing of all central heating system to ensure safety and effi ciency. 11.1 All routine boiler servicing requirements can be achieved by the removal of the Energycatcher front panel. To remove the boiler front panel see boiler manual. For further information contact: Ravenheat Ltd Telephone: 0044(0) 113 252 7007 Fax: 0044(0) 113 238 0229 E-mail: sales@ravenheat.co.uk Website: www.ravenheat.co.uk 18

Section 12 ALTERNATIVE ENERGYCATCHER SYSTEMS 12.1 Energycatcher can be installed to work in conjunction with solar panels; the panels produce a boost to water temperatures when the sun shines, while the Energycatcher comes into its own whenever the boiler is used to heat the home or provide DHW. Energycatcher is a good investment to install in conjunction with solar panels, and offers immediate returns. There are other systems designs which are available: 12.2 Increased energy saving with larger stores. 12.3 Increased domestic hot water fl ow rates. 12.4 Management system to decrease fl ue pluming even further. For details of our design service please contact us with your requirements via email. enquiries@ravenheat.co.uk 19

Section 13 LIST OF SPARE PARTS Pos. Ravenheat part nr. G.C. part nr. Description 1 1002SCA12010/0 Heat exchanger 2 0019PRO12005/0 Flue extension 3 0010TUB12015/0 Flow pipe 4 0010TUB12005/0 Return pipe 5 0019ATT12005/0 Flue adapter 6 0014GUA11020/0 Flue gasket 7 0014RAC06005/0 Condensing trap 8 0013GUA01025/0 Gasket 24x15x2 9 0010TUB12010/1 Flex hose 10 0013GUA01020/0 Gasket 18.5x11.5x2 11 0008RID12010/0 Limited pressure valve (optional) 20

21

Chartists Way, Morley, Leeds, LS27 9ET Telephone : 0044(0)113 252 7007 Tfax : 0044(0)113 238 0229 Website : www.ravenheat.co.uk E-mail : sales@ravenheat.co.uk Ravenheat reserves the right to make changes and improvements in our products which may affect the accuracy of the information contained in thi leafl et. COD. 0017LIB12005/0 - Rev. 16