Michael D, Harvey, Current Planning Supervisor. This project was originally approved in 2012 by the BOCC and is summarized as follows:

Similar documents
2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

CITY COUNCIL STUDY SESSION MEMORANDUM

Net Land Area (NLA): Area within zoning lot boundaries NLA= 1,076,181 sq. ft.

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT. Single Family Residential, Townhomes

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

AWH REPORT OF THE PLANNING AND DEVELOPMENT DEPARTMENT FOR APPLICATION FOR REZONING ORDINANCE TO PLANNED UNIT DEVELOPMENT

ZONING COMPLIANCE PERMIT APPLICATION

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

PLANNED UNIT DEVELOPMENT PUD For The Proposed Antietam Subdivision Escambia County, Florida. Introduction

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM ORIGINATING DEPT. AGENDA ITEM CITY ADMINISTRATOR APPROVAL

Asbury Chapel Subdivision Sketch Plan

Gadsden County Planning Commission Agenda Request

CONCEPT PLAN APPLICATION

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

Offering Memorandum Commercial Opportunity Acre Parcel Zoned MU-OI-1/R-3

Project phasing plan (if applicable) 12 copies of site plan

CITY PLANNING COMMISSION AGENDA ITEM: C STAFF: ROBERT TEGLER FILE NO: CPC PUD QUASI-JUDICIAL

COLVER ROAD INDUSTRIAL CONCEPT PLAN

Major Subdivision Sketch Plan Checklist

AREASTRUCTURE PLAN AMENDMENT COCHRANE NORTH

ARTICLE 6: Special and Planned Development Districts

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

SPECIAL COMMITTEE OF THE WHOLE DECEMBER 9, 2002 BLOCK 57/58 WEST BLOCK PLAN BLOCK PLAN FILE BL.57/58W.99 HUNTINGTON BUSINESS PARK LAND OWNERS

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

SUSSEX COUNTY COMPREHENSIVE PLAN COUNTY PLANNING AND ZONING COMMISSION WORKSHOP

Procedures IV. V. Rural Road Design Option

General Location Annex, Rezone & Preliminary Plat Lansdowne Addition, Unit Three

Planning Commission April 4, 2013 BOCC Workshop Page 1

2.0 Hi s t o r y & Existing Co n d i t i o n s

Leduc Industrial Outline Plan SE W4

Urban Planning and Land Use

Request Modification of Proffers Approved by City Council on May 8, 2012 Modification of Conditions (Mini- Warehouse) Staff Recommendation Approval

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

EXHIBIT B PROJECT NARRATIVE POULSBO MEADOWS

THREE-STEP DESIGN PROCESS FOR OPEN SPACE SUBDIVISIONS

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

General Location Courtyard at LMH Final Development Plan and Final Plat

PLANNING AND DEVELOPMENT DEPARTMENT SITE PLAN REVIEW SECTION / CURRENT PLANNING APPLICATION FOR PRELIMINARY SITE DEVELOPMENT PLAN APPROVAL

Major Development Plan

REQUEST FOR COUNCIL ACTION 6A AGENDA ITEM

Chapter 13: Implementation Plan

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

MEMORANDUM AGENDA ITEM #6c

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

VILLAGE OF CLEMMONS PLANNING BOARD DRAFT STAFF REPORT

Planned Residential Neighborhoods Land Use Goals

#3) DA AMENDMENT TO DEVELOPMENT AGREEMENT PARK HIGHLANDS - WEST PUBLIC HEARING

D1 September 11, 2013 Public Hearing APPLICANT:

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

GENERAL INFORMATIONaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

Rezoning Petition Post-Hearing Staff Analysis July 31, 2018

PLANNING COMMISSION Work Session Meeting Agenda

Request Conditional Rezoning (R-10 Residential & I-1 Light Industrial to Conditional I-1 Light Industrial) Staff Recommendation Approval

CITY OF MAPLE GROVE PLANNING COMMISSION AGENDA SEPTEMBER 12, :00 P.M.

CASE NUMBER: 16SN0565 (AMENDED) APPLICANT: C.A.H. Investments, LLC

CASE NUMBER: 16SN0701 APPLICANT: Hanky, LLC

CHUGIAK-EAGLE RIVER SITE-SPECIFIC LAND USE PLAN

Article 7.05 Manufactured Home Park Districts

City of Lake Elmo Planning Commission Meeting Minutes of August 10, 2015

Drexel, Barrell & Co.

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division


Subject: Hendry County Evaluation and Appraisal Report Letter of Understanding - Identification of Major Issues

SECTION 6 - LAND USE - RURAL RESIDENTIAL

Drexel, Barrell & Co.

5. Would the proposed project require modifications to the existing regulations?

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

STAFF REPORT INTRODUCTION

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

SECTION 4(f) DE MINIMIS DOCUMENTATION

ADMINISTRATION RECOMMENDATION(S) 2017 February 09. That Calgary Planning Commission recommends APPROVAL of the proposed Land Use Amendment.

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

O Dell Parkway PUD Association, Inc. PO Box 1335

PARISH OF ASCENSION OFFICE OF PLANNING AND DEVELOPMENT PLANNING DEPARTMENT. Joint Planning and Zoning Meeting

ARTICLE 13 STREETS General

2.7 ac park. TOTAL 5,403 DU 1,297,900 sf 1,105,450 sf 3.87 ac 5,563 DU 1,121,200 sf 1,105,450 sf 3.87 ac

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Gwinnett County Land Disturbing Permits. Presented by the Departments of Planning & Development Public Utilities October 2001

A BILL FOR AN ORDINANCE TO AMEND CHAPTER 9, KAUAI COUNTY CODE 1987, RELATING TO STREET REQUIRE:MENTS FOR SUBDIVISIONS

CHAPTER 22 Rural Open Space Community Developments

7.0 OPEN SPACE 7.1 OPEN SPACE DEDICATION CHAPTER 7: OPEN SPACE

SUBDIVISION, PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL, REZONING & SIDEWALK WAIVER STAFF REPORT Date: February 7, 2013

ARTICLE 13 STREETS General

M E M O R A N D U M November 9, 2018

R E S O L U T I O N. Single-Family Residence/ Church. 2,488 sq. ft. 2,488 sq. ft. Area Parking Required: Church

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara

Staff Report. Conditional Use PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT. Salt Lake City Planning Commission

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

Rezoning Petition Pre-Hearing Staff Analysis July 16, 2018

STAFF REPORT. December 20, North York Community Council. Director, Community Planning, North York District

Appendix I. Checklists

ANNE ARUNDEL COUNTY OFFICE OF PLANNING AND ZONING - DEVELOPMENT DIVISION. Site Development Plan Submittal Application Requirements

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

4.0 Future Land Use Element

Humber Bay Shores Precinct Plan Final Report

Transcription:

PLANNING & INSPECTIONS DEPARTMENT Craig N. Benedict, AICP, Director Current Planning (919) 245-2575 (919) 644-3002 (FAX) www.orangecountync.gov 131 W. Margaret Lane Suite 201 P. O. Box 8181 Hillsborough, NC 27278 MEMORANDUM TO: FROM: CC: DATE: SUBJECT: Bonnie Hamersley, County Manager Board of County Commissioners Michael D, Harvey, Current Planning Supervisor Craig Benedict, Planning Director September 4, 2014 PROJECT FACT SHEET DUNHILL This project was originally approved in 2012 by the BOCC and is summarized as follows: BACKGROUND: The basic facts concerning the current application are as follows: Applicant(s): David Weekley Homes LLC 15401 Weston Parkway Suite 175 Cary, NC 27513 Agent(s): Summit Engineering (Engineer of Record) Joe Lyle Appraiser Soil Services PLLC Environmental Planning Location: 2301 Mt. Sinai Road 2,800 feet east of the intersection of Mt. Sinai Road (SR 1718) and NC Highway 86 across from Running Green Road. Parcel Information: a. PIN: 9881-15-7138 b. Size of parcel: 68.5 acres in area c. Zoning of parcels: Rural Buffer (RB) d. Township: Chapel Hill

e. School District: Orange County Schools f. Future Land Use Map Designation: Rural Buffer g. Growth Management System Designation: Rural h. Joint Land Use Plan Designation: Rural Buffer Rural Residential Area i. Existing Conditions/Physical Features: Varying topography with clustered vegetation primarily along the eastern property line. The majority of the property was utilized as pasture to support a farming operation j. Roads: Vehicular access to the parcel is through Mt. Sinai (SR 1718), a state-maintained road k. Water and Sewer Service: The property is not located within a primary utility service area. Surrounding Land Uses: a. NORTH: Single-family residences zoned RB on lots ranging from 1 to 5 acres in area; undeveloped RB zoned property b. SOUTH: Single-family residences zoned RB; the J and J Mobile Home Park with 16 residences on a 7.3 acre parcel of property; the Green Valley Farms boarding and grooming kennel (6416 Alexander Drive) c. EAST: Single-family residences zoned RB with lots ranging from 1 to 3 acres in area d. WEST: Triangle Land Conservancy property (266 acres in area); single-family residences zoned RB on lots ranging from 2.25 to 3.7 acres in area Proposal: The petitioner has submitted an application that includes a conventional residential subdivision layout based on the current RB zoning dimensional standards. The applicant is proposing the development of 26 single-family residential lots, each at least 2 acres in area, with an overall proposed density of 1 dwelling unit per every 2 acres of land. A summary of the proposal is as follows: Subdivision Type Number of Lots Average Lot Size Area in Open Space Conventional Plan 26 2 acres 5.09 acres (222,155 sq. ft.) Open Space Percentage 7.4% STAFF COMMENT: This proposal is in accordance with the anticipated densities for properties located within the Rural Buffer land use category as defined within the adopted Comprehensive Plan, Rural Designated area as denoted on the Growth Management Systems Map, and the requirements of the Joint Planning Land Use Plan.

Roads: The applicant is proposing to develop 2 public roads to service the project, each constructed to NC Department of Transportation (DOT) standards. The applicant intends to turn these roads over to NC DOT for maintenance at the appropriate time. Specifically, the plan also calls for: A main collector road composed of a 50 foot right-of-way with a 20 foot improved travel way and natural drainage ditches on each side of the road. The collector road will terminate in a cul-de-sac near designated open space towards the southern property line, A local road composed of a 50 foot right-of-way with a 20 foot improved travel way and natural drainage ditches on each side of the road. The local road shall be terminated in a cul-de-sac as denoted on the plan towards the southeastern property line, According to the project engineer, the anticipated traffic volume generated by this development is approximately 249 trips per day at build out, i.e. on average 10 trips per household per day. The site plan and application narrative denotes a 5 foot easement outside of the proposed DOT right-of-way to accommodate the proposed off-site sewer lines. STAFF COMMENT: Staff has determined that the proposed roadway construction and layout is consistent with the requirements of the UDO. In reviewing the matter with Mr. Chuck Edwards of NC DOT staff has been informed there are no concerns over accepting the roads for maintenance so long as they are constructed to DOT standards. There will be, however, conditions associated with the project, specifically: 1. An encroachment agreement allowing for the location of proposed utility lines shall be required prior to the commencement of utility work, 2. A utility plan will be required for DOT and County review and approval denoting the location of all utility easement(s) and line locations within, and adjacent to, the proposed rights-of-way (i.e. water, sewer, electrical, phone, cable, gas, etc.). This plan is necessary to ensure adequate spacing between utility lines, proposed stormwater conveyances, and to clearly define who is allowed to operate within these easement areas, 3. DOT shall be involved with the review and approval of the stormwater plan for the project. Orange County Erosion Control shall coordinate the review and approval of the plan with DOT officials. The applicant has been made aware of these conditions and has not indicated any objection. Utilities Water and Sewer: The project is located within the OWASA Long Term Interest Area as denoted on the Water and Sewer Management, Planning, and Boundary Agreement (WASAMPBA) Map. Water and wastewater services are intended to be provided by individual well and septic systems.

The applicant is proposing development of a community well to serve the project. The well is located on a 1.48 acre parcel designated as open space on the submitted site plan. The submitted site plan indicates wastewater disposal will be handled by individual septic systems located on lots 1 through 22 while lot(s) 23 through 26 will utilize a common, off-site septic area near the southern boundary of the project. As noted on the submitted site plan, a utility easement is located adjacent to the proposed roadways to accommodate the necessary septic and water lines for the project. STAFF COMMENT: Orange County Environmental Health has indicated preliminary approval for the proposed septic systems. According to the Environmental Health staff the proposed community well site must be approved by NC Division of Water Quality Public Water Supply Section. The typical cadence for the review and approval of a community well is as follows: 1. Applicant applies for the well through the Division of Water Quality, 1. If approved, a copy of the authorization is provided by the applicant to Orange County Environmental Health, 2. Once the well site is approved by the Division of Water quality, and a copy of the approval is submitted, Environmental Health will issue a well permit authorizing construction. 3. Inspections on the well are coordinated between Environmental Health, the well driller, and Professional Engineer of the water system. Stormwater Drainage: The site plan indicates stormwater will be conveyed through natural ditches along the roadway. A 6,000 sq. ft. treatment area is located within the 3.62 acre recreation/open space lot located along the southwestern boundary of the project. STAFF COMMENT: Orange County Erosion Control indicates the project, as proposed, appears to comply with local and State regulations. A recommended condition of approval shall be that a formal grading and stormwater management plan shall be approved prior to the commencement of earth disturbing activities. The applicant has indicated they have no objection to the imposition of this condition. Land Use Buffers/Open Space: The applicant is proposing to maintain a variable width natural buffer along the perimeter of the project. The total area reserved as land use buffer is 106,775 square feet or 2.5 acres. The submitted site plan also denotes 2 open space areas, totaling approximately 5.09 acres of total land area. The open space shall be maintained by a proposed local property owners association.

The site plan also denotes the placement of street trees as well as trees along interior and rear property lines in accordance with the requirements of Section 6.8.7 (A) and (B) of the UDO. STAFF COMMENT: Section 6.8.6 (D) of the UDO requires that this project maintain a seventy-five (75) feet land use buffer separating the project from adjacent roadways. The applicant is also proposing a 30 foot Type B buffer along the perimeter of the proposed subdivision. Staff has determined the proposed land use buffers meet the requirements of the UDO. Recommended conditions, with respect to tree planting, are as follows: 1. The applicant shall submit a detailed landscape plan for approval outlining the location and species of proposed street trees, as well as any necessary modification or augmentation of identified land use buffers, consistent with the approved site plan and in accordance with the provisions of the UDO. 2. The applicant shall submit a detailed landscape plan as part of the zoning compliance permitting process for each individual lot to guarantee compliance with the approved site plan and the provisions of the UDO with respect to the inbetween lot planting requirements. The applicant has indicated they have no objection to the imposition of this condition. Parkland and Recreation: $10,972.00 [$422 x 26 lots] shall be paid to Orange County as payment-in-lieu of parkland dedication prior to recordation of the Final Plat.