Request for Approval of Design Modification

Similar documents
ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Milpitas College Extension Milpitas Dry Landscape

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Final Report: Appendix C. LID Parking Lot Design and Teaching Tool at Bridgewater State University, Bridgewater Supporting Information

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

SUPPORTING DOCUMENT POST-CONSTRUCTION SOIL QUALITY AND DEPTH WORKSHEET

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

John F. Kennedy STEM High School Green Infrastructure Information Sheet

Appendix G. Detailed Design

2.1.4 Roof Downspout Rain Gardens

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

ROME CANALWAY TRAIL ERIE BOULEVARD WEST AND SOUTH CHARLES STREET ROME, NEW YORK DELTA PROJECT NO SEPTEMBER 2017 ISSUED FOR BID

Bioretention. Matt Scharver Northeast Ohio Regional Sewer District. #ProjectCleanLake

GPCID Mall Boulevard & Gwinnett Place Drive Complete Street: Sectional View of Concepts

PLAN SUBMITTER'S CHECKLIST

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

University Park Subdivision Street Assessment Report

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL


BUSINESS PARK TOWN OF OKOTOKS

Request for an Exception to the Napa County Road and Street Standards

New England Grows February 8, (c) 2013, Chris Webb & Associates, Inc., PS 1

STI Street Maintenance & Overlay Project

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Stormwater Control Plan: Small (Tier 1) Land Development Project

6.1 Bioretention Areas

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Homeowners Guide to Stormwater BMP Maintenance

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

4. CONCEPT PLAN DEVELOPMENT

1. Which of the five checklists in the Municipal Construction Stormwater Site Inspection Toolkit will you use to document this inspection?

2008 SWMM, 2010 Revision City of Tacoma

4.6. Low Impact and Retentive Grading

Kittson Parkway / Watershed Park Parking Lot

C-10. Disconnected Impervious Surface

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

2. HORIZONTAL DATUM = NAD 83. VERTICAL DATUM = NAVD 88.

Final Report: Appendix G. LID Driveway Retrofit and Teaching Tool at Bristol County Agricultural High School, Dighton - Supporting Information

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

PROTECTIVE MEASURES FOR TREES DURING CONSTRUCTION

HILCORP ALASKA, LLC HAPPY VALLEY MIDDLE NATURAL GAS EXPLORATION PROJECT DEEP CREEK UNIT BOUNDARY PROPOSED ACCESS ROAD T02S T03S R14W

Inspection and Maintenance of Stormwater Best Management Practices

5000 Acres Initiative at PCC Sylvania in Portland OR

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Urban Water Management and Soils (ESRM 311 & SEFS 507)

HILCORP ALASKA, LLC KALOTSA PAD

Guidance on Preparation of Construction and Maintenance Costs

Chapter 2 Roof Downspout Controls

BIORETENTION CELLS. Green Infrastructure For Stormwater Management WHAT ARE BIORETENTION CELLS? WHERE ARE BIOCELLS INSTALLED?

Analyzing the Bioretention Construction Sequence

Case Study Bioretention Installation and Maintenance

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Design and Construction of Bioretention Areas

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Structural Storm Water Best Management Practices (BMPs)

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Stormwater and GSI - Setting the Stage and Rain garden and cistern sizing

SECTION AMENDED TOPSOIL

Specification and Construction Plans For: South Bethany Landscaping Improvement Plan Contract Number T

Public Works Department 104 W. Magnolia Street, Suite 109 Bellingham, WA (360)

SECTION PLANTING SOIL for SOIL CELLS. This specification defines material and performance requirements for soils which are to be used

WHEREAS, the CCSD has agreed to reimburse the City for the cost of the sidewalk, trail, and the bioretention area

STANDARD DETAILS QUICK REFERENCE

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Preparing a Stormwater Control Plan for a Small Land Development Project

Stormwater Drainage Assessment For Single Family Residence

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Taku Lake Rain Garden

WILSON PLACE FINAL DESIGN

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Before you build: Locating and Planning

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

ALLEGAN COUNTY ROAD COMMISSION 108TH AVENUE RECONSTRUCTION PROJECT 5,000' EAST OF 15TH STREET TO 6,750' EAST OF 15TH STREET

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

Seattle s Natural Drainage Systems and Complete Streets

From and

Pavement Removal Fact Sheet

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

GREEN INFRASTRUCTURE DESIGNS RAIN GARDEN

PROPOSED DRAINAGE PATTERNS

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

WELCOME PG&E HUNTERS POINT COMMUNITY OPEN HOUSE THANK YOU FOR COMING PG&E

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA. February 21, 2018

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Designing for Sustainability: A Consultant s Perspective

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

RESIDENTIAL PLANNED UNIT DEVELOPMENT / SUBDIVISION AND REZONING CONCEPT AND DEVELOPMENT STAGE PLAN SUBMITTAL NARRATIVE

30% DRAFT GAINSBORO PARK IMPROVEMENT PROJECT THE CITY OF PLEASANT RIDGE CITY OF PLEASANT RIDGE, OAKLAND COUNTY, MICHIGAN

Thorncrest Village Neighbourhood Improvements Public Drop-In Event

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

Gloucester County PLAN SUBMITTER'S CHECKLIST

Transcription:

March 7, 2017 Piper Peterson U. S. Environmental Protection Agency 1200 Sixth Avenue, ECL-122, Suite 900 Seattle, Washington 98101 Subject: Request for Approval of Design Modification T-117 Early Action Area, Phase 2: Adjacent Streets and Residential Yards Study Area, Part 2: Adjacent Streets and Stormwater Dear Ms. Peterson: As requested in your March 2, 2017, letter, this memorandum includes drawings for the pending revisions to the non-motorized path and vegetated depression in the vicinity of the Dallas Avenue S. and S. Donovan Street intersection that were included in the revised Removal Action Construction and Completion Report (RACR; Figures 2-5 through 2-7). The City would like to proceed with contractor negotiations and construction in the near term. Therefore, we are providing the drawings under a separate cover to expedite approval of these drainage revisions. Please let us know if the City is authorized to proceed. The project objective concerning this non-motorized intersection is that stormwater runoff will be directed to Bioretention Cell H2 and/or the vegetated depression. As currently constructed, there is a low spot between the two stormwater management features. In addition, a second low spot is present south of the seat wall area. Observations of the stormwater runoff patterns near the Dallas/Donovan intersection indicate that some localized rework is needed to minimize the potential for ponding on the path and improve the function of drainage elements. The rework will consist of the following elements: Demolition, regrading, and repaving of a portion of the non-motorized path Placement of thickened-edge asphalt and/or extruded curb Reshaping of the streambed cobble area adjacent to bioretention cell H2 Placement of streambed cobbles near the southern end of the seatwall area Grading of a portion of the landscaping between the vegetated depression and seatwall area Installation of a second overflow structure. Corrective measures will be performed later this year. Documentation of the work performed will be provided in a subsequent submittal. If you have any questions about this request, please contact me at (206) 369-3132.

Sincerely, Mary Mitchener T-117 Project Coordinator Seattle City Light Attachments cc: Jeff Massie, SPU Beth Schmoyer, SPU Linda Baker, Integral Kristen Kerns, USCOE Roy Kurowia, Port of Seattle PAGE 2 OF 2

SAWCUT AT EDGE CONC PANEL. APPROX LOC SHOWN 0.60% DALLAS AVE S 4 2 0 4 8 SCALE IN FEET 1.12% LEGEND: ASPH THICKENED EDGE RESHAPE EDGE OF H2 AND STREAMBED AGG TYPE 1 TO PROVIDE FLOW PATH TO BIORETENTION CELL H2. SALVAGE STREAMBED AGG TYPE 1 FOR USE IN DRYWELL 1.46% PAV 401D, 3" HMA CL 1/2" OVER MNRL AGG TYPE 2, 6" COMPACTED DEPTH WITH ASPHALT THICKENED EDGE MNRL AGG TYPE 2 REMOVAL TAPER PAVEMENT TO FORM TRANSITION TO ASPHALT THICKENED EDGE 0+80 6" EXTRUDED CURB ON PAVEMENT PER STANDARD PLAN 412 TRANSITION PAVEMENT TO ASPHALT THICKENED EDGE OVER 6' (MIN) MNRL AGG TYPE 2 6" GRAVEL SHOULDER GRADING EXTENTS\ REPLACE DISTURBED MULCH 0+40 2.00% 2.00% 0+60 1.82% CROWN ELEV 19.50 ADJUST RIM AS NECESSARY NOTES: 1. RESTORE VEGETATION, SOIL AMENDMENTS, MULCH AND SEEDING IN DISTURBED AREAS PER SHEET 3 2. RESHAPE AREAS ADJACENT TO NEW PAVING WITH PLANTING SOIL AND MULCH UNLESS OTHERWISE NOTED 3. EXISTING CONDITIONS BASED ON CONTRACTOR-PROVIDED RECORD SURVEY DATED AUG 31, 2016 SDMH RIM=19.15' 12"DI NW IE=15.6' 0+00 SAWCUT REMOVE ASPHALT, REGRADE AND REPAVE. PAV 401D, 3" HMA CL 1/2" OVER MNRL AGG TYPE 2, 6" COMPACTED DEPTH WITH ASPHALT THICKENED EDGE 0+20 1.99% POINT TABLE S DONOVAN ST 1.15% 2.00% CB241 RIM=19.10' 8"DI E IE=16.9' SD 19.0 1.00% SAWCUT 19.5 NO. 6001 6002 6003 6004 6005 6006 6007 6008 DESC ELEV NORTHING 195,219.9537 195,218.5376 195,217.5195 195,214.7651 195,214.3135 195,215.9067 195,217.3428 195,219.3731 EASTING 1,275,352.6759 1,275,355.1243 1,275,355.3962 1,275,353.8031 1,275,352.1123 1,275,349.3579 1,275,348.9743 1,275,350.5021 FILEPATH: P:\Clients\Seattle\Dallas Ave\DWG\EXHIBITS\Donovan Dallas\Donovan Dallas.dwg REMOVE TRAIL ROOT BARRIER ALONG NEW PAVING. DO NOT REPLACE T-117 ADJACENT STREETS CLEANUP & STORMWATER INFRASTRUCTURE FIELD MEMO #107 FEBRUARY 3, 2017 SHEET 1 OF 3 2' SHOULDER WITH 2.00% MAX CROSS SLOPE (TYP) REMOVE RECYCLED PLASTIC EDGING AND SEEDED VEGETATION FROM STA 27+39.66 ON DONOVAN TO STATION 11+80 ON DALLAS AVE 15029 Bothell Way NE Suite 600 Lake Forest Park, WA 98155 P: 206.523.0024 F: 206.523.1012 www.dcgengr.com 8" IE 17.00 8" INL CONN 6 LF @ 2.50% INL TYPE 250A WITH NO RISER STA 11+74.23, 19.69' RT RIM 18.60 8" IE (N) 17.10 EXCAVATE TO SUBGRADE NECESSARY FOR PLANTING SOIL, MULCH AND AMENDMENTS PER LANDSCAPE DRAWING (SHEET 3) AND SPECIFICATIONS. EXCAVATED SOIL MAY BE STOCKPILED AND REUSED. SCARIFY COMPACTED AREAS AS DIRECTED BY ENGINEER. REMOVE BERM. REMOVE PLANTS, STOCKPILE (HEEL IN), AND REPLANT PER LANDSCAPE PLAN. PROTECT PLANTS NOT FLAGGED FOR REMOVAL 18.5 TRIM EXISTING LOG INSTALL 2'x4'x2' DRY WELL INSTALL 6" EXTRUDED CONC CURB ON EX PAVEMENT PER STANDARD PLAN 412. DOWELS PER STANDARD PLAN 411

STREAMBED AGG TYPE 1 4" PERF OR SLOTTED PIPE WITH WELL CAP 2" EX PAVEMENT EX MULCH & PLANTING SOIL 15" 9" 6" 18" PAV401D 6" 8" 3" 3/4" TO 1-1/2" WASHED GRAVEL NON-WOVEN GEOTEXTILE FOR SEPARATION MNRL AGG TYPE 2 COMPACTED SUBGRADE 0+00 0+04 0+08 0+12 0+16 0+20 0+24 0+28 0+32 0+36 0+40 0+44 0+48 0+52 0+56 0+60 0+64 0+68 0+72 0+76 0+80 26 26 24 24 22 EXISTING GRADE 22 FILEPATH: P:\Clients\Seattle\Dallas Ave\DWG\EXHIBITS\Donovan Dallas\Donovan Dallas.dwg T-117 ADJACENT STREETS CLEANUP & STORMWATER INFRASTRUCTURE FIELD MEMO #107 FEBRUARY 3, 2017 SHEET 2 OF 3 20 18 16-2.48% -3.38% -3.00% 14 14 0+00 0+04 0+08 0+12 0+16 0+20 0+24 0+28 0+32 0+36 0+40 0+44 0+48 0+52 0+56 0+60 0+64 0+68 0+72 0+76 0+80 4 2 0 4 8 15029 Bothell Way NE Suite 600 Lake Forest Park, WA 98155 P: 206.523.0024 F: 206.523.1012 www.dcgengr.com FINISHED GRADE 1.40% SCALE IN FEET 20 18 16 2 1 0 2 4 SCALE IN FEET