Green Infrastructure Program Updates

Similar documents
Physical Approaches to Flood Mitigation

Metropolitan Water Reclamation District of Greater Chicago. Supervising Civil Engineer

Meg Kelly Senior Manager, Space to Grow Healthy Schools Campaign

Improving an Urban Watershed The Past, Present and Future of Addison Creek

Melissa Bernardo Hess, PE, CFM February 18, 2016

The Benefits and Challenges Associated with Green Infrastructure Practices

Green Infrastructure & Low Impact Development

Green Infrastructure and Low-Impact Development Technologies

EXISTING PLANS Harriet Festing Center for Neighborhood Technology Midlothian Community Meeting March 12, 2015

An Integrated Green Infrastructure Plan to Address Combined Sewer Overflow, Stormwater and Nutrient Reductions in Lancaster City, PA

Phase II Storm Water Permit Program MS4 Permit

STORMWATER STRATEGY PROJECTS IN ACTION

STORMWATER UTILITY PRESENTATION November 18, 2014

Brigitte A. Berger, Director of Engineering

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Ted Turner Drive Resilience Corridor Challenge

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Rainscaping. Rainscaping includes rain gardens, bioswales, combinations of. A guide to local projects in St. Louis

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

SUNY Green Infrastructure Summit. April 17, 2014

Can Urban Redevelopment Restore Aquatic Resources

PUBLIC NOTIFICATION PLAN

Sustainable Stormwater Retrofit Best Practices

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

Third Ave CSO Integrated Green Infrastructure

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Building Green: An Update on Atlanta's Green Infrastructure Approach

Building Green: An Update on Atlanta's Green Infrastructure Approach

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

What s Green Infrastructure?

Southeast Michigan Council of Governments

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

CITY OF VALPARAISO STORMWATER MASTER PLAN

Green Infrastructure on Brownfields

Village of Forest Park. July 27, Sewer Separation Evaluation

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Green Infrastructure Overview

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

CHAPTER 8. Mrs. Zimman s Class - Central Elementary

Urban Stormwater Retrofit Program Highlights

2016 WORKSHOP LVR Field Trip

Green Bus Tour. International Water Association. Sponsored by the Metropolitan Sewer District of Greater Cincinnati and Greater Cincinnati Water Works

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Reducing New York City s CSOs Using Green Infrastructure

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Green Innovation Grant Program

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Green Infrastructure Incentives. Abby Hall EPA Headquarters Office of Policy, Economics and Innovation

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

CMAP Resources for Green Infrastructure Planning

Highlights from WERF Stormwater Research and Future Opportunities

Using Green Infrastructure To Protect Water Quality

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

Ames City Hall Campus: Stormwater Improvements

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

green Infrastructure in the Milwaukee Region

Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Developers

LID IN REGION 6 HARRIS COUNTY STORY. Alisa Max, PE Manager, Watershed Protection Group Harris County Public Infrastructure Dept.

APWA Expo August 27, Ground Water Recharge With Storm Management: A Sustainable Development

Attachment 2: Permeable Pavement Design Guidelines

Planning, Design, and Construction of Green Infrastructure.

Small Streams Big Accomplishments The Newsletter of the MWRD s Small Streams Maintenance Program (SSMP)

VACANT TO VIBRANT : GREEN INFRASTRUCTURE & URBAN REVITALIZATION

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

LID. Low Impact Development: Protecting Oregon s waters as we grow

Pat Rector, Environmental & Resource Management Agent Morris and Somerset Counties

Cost Effective Low Impact Development

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

Neighborhood Infrastructures Blue Green Infrastructure

Soak it Up! Toolkit. Community-wide implementation of green stormwater infrastructure

Des Plaines River Watershed: Opportunity Areas North Community Cluster 1:80,000. Miles. Public Parks or Preserve. Wetland Area

Non-Residential&Multi-Family PropertyCreditManual

Types and Basic Design of Post-Construction BMPs

Homeowners Guide to Stormwater BMP Maintenance

Storm Water Managament at the University of Michigan

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Green Infrastructure and Adaptive Management

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Water in storm drains does not go to a treatment plant

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Draft Impervious Cover Assessment for Fair Haven Borough, Monmouth County, New Jersey

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

BERNALILLO COUNTY PLANNING COMMISSION ENVIRONMENT AND OPEN SPACE HEARING MAY 2014

Sustainable Storm Water Management

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

March 30, 2017

Stormwater Management Phase 1 Projects. Stormwater Management Phase 2 Projects. Flood-Prone Property Acquisitions. Tunnel and Reservoir Plan (TARP)

Retrofitting Commercial Shopping Centers

Going Green with the NYS Stormwater Design Standards

Stormwater Low Impact Development - A Natural Solution

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Transcription:

Metropolitan Water Reclamation District of Greater Chicago Green Infrastructure Program Updates Calumet Stormwater Collaborative June 1, 2018 - Chicago

Stormwater Management Programs Flooding remains our #1 issue Stormwater Phase I (DWP) Projects Design and Construction of Regional Flood Control and Streambank Stabilization Projects Stormwater Phase II Projects Funding of Shovel-Ready Projects Design of Conceptual Projects Green Infrastructure Partnerships with Local Communities Flood-Prone Property Acquisitions Voluntary buyouts where no practical engineered solution exists 2

Stormwater Management Program MWRD conveyed authority in November 2004 to plan, manage, implement, and finance activities relating to stormwater management in Cook County Cook County Stormwater Management Plan (CCSMP) adopted in 2007 establishing program framework Primary Stormwater Management Activities: Develop Capital Improvement Program (CIP) to address REGIONAL stormwater problems Comprehensive uniform stormwater regulations to ensure future development and redevelopment does not exacerbate flooding 3

Detailed Watershed Plan Development Poplar Creek Upper Salt Creek Lower Des Plaines River North Branch Chicago River Calumet-Sag Channel Little Calumet River 4

Recommended DWP Projects 15 Flood Control Projects to address overbank flooding 12 Streambank Stabilization Projects to address critical erosion Prioritized based on Benefitto-Cost Ratio and Distributed across Cook County

Regional Streambank Projects Streambank Stabilization Projects Address erosion threatening structures, roadways, utilities on regional waterways Natural channel design is our goal where practical Structural measures when necessary Concrete walls Sheet piles Gabions 6

Phase II Flood Control Program Initial (2014) Call for Projects 21 Shovel Ready Projects (3 GI) >3,000 Structures Protected $81M Construction Costs $41M in MWRD Dollars 13 Conceptual Projects 5 Pilot Study Master Plans >$15M in Engineering Fees Final Design in progress or under development 7

Green Infrastructure Program Space to Grow Managed by Healthy Schools Campaign and Openlands Funding and technical assistance from Chicago Public Schools Chicago Dept. of Water Management MWRDGC Chicago Housing Authority Dearborn Homes Rainwater Harvesting Local Municipalities Evanston, Blue Island, Kenilworth, Wilmette, Northbrook, Niles, and Berwyn (complete) Skokie (under construction)

Green Infrastructure Program 2017 GI Call for Projects: Projects solicited from Cook County Municipalities, Townships, and other Governmental Organizations Applications mailed to elected officials, posted on mwrd.org, and publicized through press releases, and at various public events Application period May 25 th -July 14 Fillable Application Form (PDF) format Eligibility Information and Instructions

Green Infrastructure Program 2017 GI Call for Projects: 47 Projects submitted 20 Projects were accepted 730 Structures to Benefit $11.7M estimated total Construction Costs 3.6M gal Design Retention Capacity estimated Applicants whose projects were not selected notified their proposals may be eligible for future consideration

2017 GI Call for Project Results Primary Selection Criteria Structures protected by project Project timeframe Project visibility/educational opportunity Median income of area Other factors Total cost of project Combined Sewer Area Resources and experience in performing maintenance Partner agency new to MWRD GI funding

2017 GI Call for Project Results 2017 Recommended Projects: Arlington Heights permeable parking lot pavers and a bioinfiltration basin at Arlington Heights Police Station. Calumet Park detention pond, bioswales, permeable pavement and rain gardens as part of the Winchester Avenue improvements. City of Chicago, Department of Planning and Development Stormwater storage at Garfield Park Community Eco Orchard. City of Chicago, 10th Ward green alleys Chicago Park District improving stormwater infiltration through the establishment of native habitat at three Chicago parks. Metra permeable pavement, naturalized plantings and other GI improvements for the new Peterson Ridge Metra station in Edgewater neighborhood. University of Illinois at Chicago permeable pavers and rain gardens at Arthington Mall and Parking Lot B2. Des Plaines green alleys. Forest Park green alleys.

2017 GI Call for Project Results 2017 Recommended Projects: Harwood Heights green alleys. Maywood green alleys. Midlothian permeable pavement, bioswales and rain garden. Orland Park green roof on the Orland Park Village Hall and Nature Center. Palos Heights permeable pavers in the Lake Katherine Nature Center parking lot. Forest Preserve District of Cook County porous parking lot retrofit and pavement removal and naturalization at the Dam No. 4 Woods East. Posen rain gardens and permeable parking lots as municipal facilities. Riverside permeable pavers in the commuter parking lot. River Forest green alleys. Wheeling Park District reconstructing the Chamber Park parking lot with a rain garden.

GI Applicant Eligibility Requirements Project located within District s corporate limits Project designed to include onsite stormwater control measures using Green Infrastructure Project must be bid and awarded in accordance with District s Purchasing Act, MPLA, and Diversity Requirements Applicant must be willing and capable of performing maintenance of the project Applicant must be able to enter into an Intergovernmental Agreement with the District District will consider whether potential partner agency is in compliance with WMO & IICP when prioritizing 14

Green Infrastructure Program Program Components Rain Barrel Program Comprehensive Land Use Policy Community Assistance and Public Outreach Projects and Design Retention Capacity

Blue Island Rain Garden 16

Blue Island Permeable Parking Lot 17

Evanston Permeable Parking 18

Evanston Bioswale 19

Egan WRP Permeable Parking Lot 20

Berwyn Green Alleys During Construction 21

Berwyn Green Alleys After Construction 22

Wadsworth School Before Construction 23

Wadsworth School After Construction 24

Design Retention Capacity: Definition & Calculation Volume of stormwater prevented from entering the sewer Includes retention volume and 6-hr infiltration 50% credit given for void volume above underdrain (much will drain to sewer) 100% credit given for void volume below underdrain (retained and infiltrated) 25

Design Retention Capacity: Calculation Spreadsheet 10 Section 3 BMP Specifications L Dimensions of the bioinfiltration facility (length, W width, or area) A BMP feet feet square feet 11 Depth of prepared soil D 1 feet 12 Prepared soil porosity (0.25 maximum unless detailed materials report provided) P 1 [unitless] 13 Depth of underlying aggregate (optional) D 2 feet 14 Aggregate porosity (0.38 maximum unless detailed materials report provided) P 2 [unitless] 15 Surface storage volume (provide supporting calculations, max depth 12 inches) (=6" for projects with safety-limited surface storage (CPS)) V AIR cubic feet 16 Total media void volume = A BMP * [(D 1 * P 1 ) + (D 2 * P 2 )] V SOIL 0 cubic feet DRC Volume Including Infiltration Depth of Prepared Soil Below Drain 20 (if drained, if not drained, total depth of prepared soil) D 3 feet 21 Soil Void Volume Below Drain = (A BMP *D 3 *P 1 ) V 3 0 cubic feet Reference (Page#, report, etc) Reference (Page#, report, etc) 22 23 Depth of Prepared Aggregate Below Drain (if drained, if not drained, total depth of prepared aggregate) (must be less than or equal to total depth, D 1 +D 2 ) D 4 feet Aggregate Void Volume Below Drain = (A BMP *D 4 *P 2 ) V 4 0 cubic feet 24 6-hr infiltrated volume = (i*a BMP* 5[hrs]/12[in/ft]) V 5 0 cubic feet 25 26 50% of Volume Above Drain = 0.5*(VSOIL-V4-V3) V 6 0 cubic feet Total Retained and Infiltration Volume (V 3 +V 4 +V 5 +V 6 +V AIR ) V DRC 0 cubic feet 27 V DRC = Above [in Gallons] V DRC 0 gallons 26

Design Retention Capacity (Constructed So Far) Part 1 Project Title Type of GI DRC Estimate (gal) CPS Green Infrastructure 2014 (Phase I) All Types 731,004 CPS Green Infrastructure 2015 (Phase IIA) All Types 364,504 CPS Green Infrastructure 2016 (Phase IIB) Blue Island GI Evanston Civic Center Parking Lot (GI) Northbrook - Wescott Park Stormwater Reuse (GI) All Types 388,648 Rain Gardens, Permeable Pavement 150,809 Permeable Pavement, Rain Gardens 167,278 Real-Time Control, Retention and Re-use 162,926 27

Design Retention Capacity (Constructed So Far) Part 2 Kenilworth (GI) Porous Asphalt streets, rain gardens, "porous parkways" 1,319,897 Wilmette Green Alleys Permeable Pavement 74,677 Skokie GI Rain Gardens / Bioswales 46,424 Niles Bioswale and Permeable Parking 53,811 Berwyn Green Alleys Green Alleys 679,122 Rain Garden and Permeable Egan Parking Lot and Rain Gardens Parking 360,855 Rain Barrels Rain Barrels 5,311,570 TOTAL Built 9,811,524 Total Projected by Dec 2018 11,129,027 28

Bioretention Facility Detail 29

Permeable Pavers Detail 30

New Initiatives Develop Green Book targeting multiple audiences: Guide for residents to build rain gardens, etc. Enhanced green infrastructure details for developers Suite of GI/BMP details for use by municipal engineers Develop and Implement a Flood Relief Plan for Cook County Work with local communities to find solutions to stormwater issues using an outcome-based approach Deliver results that address stormwater and other community issues at an affordable cost 31

Stormwater Management Contact Information Joe Kratzer, P.E., CFM Managing Civil Engineer MWRDGC 111 E. Erie Street Chicago, IL 60643 kratzerj@mwrd.org (312) 751-3084 Jim Yurik, P.E. Principal Civil Engineer MWRDGC 111 E. Erie Street Chicago, IL 60643 yurikj@mwrd.org (708) 588-3608