DeWitt Clinton Elementary School

Similar documents
Genevieve Melody Elementary School

Agustin Lara Elementary Academy

Washington Irving Elementary School

Charles W Earle Elementary School

Richard Henry Lee Elementary School

Josefa Ortiz De Dominguez Elementary School

Alessandro Volta Elementary School

Francis M McKay Elementary School

Sidney Sawyer Elementary School

John Palmer Elementary School

Calmeca Academy of Fine Arts and Dual Language

Edward Jenner Elementary Academy of the Arts

Oscar DePriest Elementary School

Joseph Brennemann Elementary School

George B Swift Elementary Specialty School

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

DOCUMENT TABLE OF CONTENTS

RECAPP Facility Evaluation Report

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

PLAN REVIEW SUBMITTAL GUIDE

NYC Department of Education

Mechanical Inspection Plumbing

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

RECAPP Facility Evaluation Report

1354 CHECKLIST for Project Closeout

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Estimated Repair, Replacement, and Upgrade Costs

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

Briar Crest Elementary

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

2014 Bond Project Guide

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

NYC Department of Education

Cook - Wissahickon Elementary School

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

NYC Department of Education

NYC Department of Education

GARCIA GALUSKA DESOUSA Consulting Engineers

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

NYC Department of Education

NYC Department of Education

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

NYC Department of Education

RECAPP Facility Evaluation Report

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

NYC Department of Education

New High School Concept

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

Inspection Report 123 My Street Midland, GA

NYC Department of Education

REPAIR ESTIMATE GUIDE

NYC Department of Education

NYC Department of Education

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

August 15, 2013 Page 1 of 19

NYC Department of Education

NYC Department of Education

Ashland School District Facility & Capacity Assessment Report 2005

First Floor. Historic Hall of Waters Assessment and Feasibility Study

Mechanical System Description

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

NYC Department of Education

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Summary of Repairs and Deficiencies

NYC Department of Education

NYC Department of Education

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

NYC Department of Education

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. 5: The item/system requires repairs and has not reached the end of its serviceable life. 4: The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CHIMNEY Brick Chimney - Concrete/ Mortar Liner Metal Flue CORNICE Cornice - Terra Cotta 1 2 3 4 5 BLU 5 102 6 4 1 2 3 4 5 6,809 7 7 102 LF $182,325 14 LF $901 $183,226 2,809 LF $86,162 $86,162 Assessment Date: 2/19/2013 Page 1 of 18

DOORS Exterior FRP Door Exterior Steel Door Overhead Rolling / Garage Door Store Front Door Transom Lite ENTRANCE 1 2 3 4 5 6 5 1 3 7 15 EA $8,353 2 EA $661 1 EA $1,027 11 EA $5,710 13 EA $3,681 $19,431 Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Ramp Handrails Stair Handrails Stone Stairs 1 2 3 4 5 6 7 GRE 6 67 24 GRE 7 31 1 4 31 GRE 7 13 85 91 LF $7,186 31 LF 2 EA $1,430 55 LF 13 LF 185 LF $33,069 $41,685 FOUNDATION Concrete Foundation Masonry Foundation 1 2 3 4 5 6 7 GRE 7 960 GRE 7 1,214 960 LF 1,214 SF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 1 2 3 4 5 6 5 7 25 EA $12,513 2 EA $429 $12,942 Assessment Date: 2/19/2013 Page 2 of 18

LINTELS Lintels - Steel 1 2 3 4 5 6 7,207 727 1,934 LF $45,567 $45,567 PARAPET Coping - Clay Tile Coping - Metal Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height ROOF SYSTEM 1 2 3 4 5 6 GRE 6 8 GRE 6 683,765 GRE 6 888,182 67 7 8 LF 683 LF 1,765 LF 888 LF $138,286 1,182 LF $306,782 267 LF $55,439 $500,507 Asphalt Shingle Roof Interior Downspouts Modified Bitumen Roof Roof Structure: Concrete Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 1 2 3 4 5 6,108 GRE 6 940 BLU 5 27,791 7,509 7 GRE 7 29,225 GRE 7 22,527 GRE 7 17,293 2,108 SF $8,350 940 LF 35,300 SF $381,017 29,225 SF 22,527 SF 17,293 SF $389,367 SUPERSTRUCTURE Concrete Steel Steel with Clay Tile Arch 1 2 3 4 5 6 7 GRE 7 79,104 GRE 7 GRE 7 22,527 79,104 SF SF 22,527 SF Assessment Date: 2/19/2013 Page 3 of 18

WALLS Brick Stone - Cast Terra Cotta 1 2 3 4 5 6 7 GRE 6 40,510 19,876,393 344,239 60,386 SF $267,633 2,737 SF $34,220 2,239 SF $64,035 $365,889 WINDOWS Storefront Windows Window - Guards perforated Window - Guards wire guard Windows - Casement Aluminum Double-pane Windows - Sash Aluminum Double-pane Windows - Wood - Single-pane EXTERIOR 1 2 3 4 5 6 7 GRE 7 210 GRE 6 4,433 1,682 10 GRE 7 4,914 BLU 5 10,555 YEL 4 56 210 SF 6,115 SF 210 SF 4,914 SF 10,555 SF $364,512 56 SF $12,012 $376,524 $2,021,297 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power 1 2 3 4 5 6 ORA 3 2 1 ORA 2 3,816 ORA 2 22,829 ORA 2 6,869 ORA 2 3,124 GRE 6 44 GRE 6 6 ORA 2 45 5 ORA 2 2 2 7 3 EA $19,162 3,816 SF $26,466 22,829 SF $70,188 6,869 SF $12,278 3,124 SF $11,168 44 EA $4,719 6 EA $1,399 50 EA $42,993 4 EA $3,718 1 EA $1,430 Assessment Date: 2/19/2013 Page 4 of 18

Public Announcement System Security System - CCTV Security System - Intrusion detection UPS 30 KW and below MAIN SERVICE Main Electrical service - Live Front - 1500 A 120/208/3PH Main Electrical service - Live Front - 2000 to 3000 A 120/208/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels above 600 amp Main distribution panels less than 400 amp ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump 36,047 01,631 01,631 ORA 2 1 1 2 3 4 YEL 4 1 5 6 1 2 3 4 5 6 BLU 5 9 14 BLU 5 2 2 YEL 4 3 1 2 3 4 5 6 GRE 6 BLU 5 79,104 1 2 3 4 5 BLU 5 1 6 7 7 7 7 136,047 SF $81,710 101,631 SF $145,332 101,631 SF $94,466 1 EA $50,050 $565,079 1 EA $130,416 1 EA $24,310 $154,726 23 EA $58,916 4 EA $41,470 3 EA $19,734 $120,120 $839,925 SF $12,304 113,520 SF $321,236 1 EA $2,145 $335,685 1 EA $15,015 1 EA $744 Assessment Date: 2/19/2013 Page 5 of 18

$15,759 SPRINKLER SYSTEM Sprinkler Heads Wet Sprinkler System FIRE PROTECTION MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 100 to 200 tons Condensing - Roof Mounted less than 5 tons Window A/C AIR HANDLING SYSTEMS 1 2 3 4 5 6 GRE 6 GRE 6 1 2 3 4 5 6 ORA 2 1 BLU 5 16 7 7 SF $1,969 SF $19,686 $21,655 $373,098 1 EA $27,885 1 EA $8,580 16 EA $17,160 $53,625 Air Handling Package - Single Zone - Hot Water 4,000 to 8,000 cfm Air Handling Package - Single Zone - Hot Water 12,001 to 20,000 cfm Air Handling Package - Single Zone - Hot Water 8,001 to 12,000 cfm Air Intake - Built Up Air Handling Fan Coil - Hot Water-Heating Fan Power Box With Hot Water Coil Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling - Steam 8,000 to 15,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 8,000 to 15,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Return Duct Work - Sheet Metal - Exterior Vertical Shaft and Ducts 1 2 3 4 5 6 GRE 6 5 8 8 GRE 6 35 7 GRE 7 400 1 EA $5,005 1 EA $7,579 1 EA $6,292 5 EA $7,150 2 EA $2,688 28 EA $10,811 2 EA $22,594 1 EA $7,579 2 EA $5,720 1 EA $2,288 18 EA $18,790 35 LF $2,202 400 LF Assessment Date: 2/19/2013 Page 6 of 18

Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor 5,000 to 10,000 CFM Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling - Steam 8,001 to 15,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries- Steam 8,001 to 15,000 cfm BOILER SYSTEMS 4 GRE 6 3 5 EA $21,879 3 EA $5,148 1 EA $5,005 1 EA $7,150 1 EA $2,145 1 EA $3,575 $143,601 Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 1,001MBH-2,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 76-100 HP Boiler Auxiliary - Steam Boiler 76-100 HP Boiler Auxiliary Non-Condensing Hot Water Boiler 1,001MBH-2,000 MBH Chemical Feeder - Steam Boiler Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System 1 2 3 4 5 6 7 GRE 7 2 GRE 7 2 BLU 5 2 1 ORA 2 1 2 EA $15,730 2 EA $23,738 2 EA 2 EA 2 EA $601 2 EA $601 3 EA $11,440 1 EA $8,437 1 EA $3,861 $64,407 HEATING DEVICES Cabinet Heaters With Hot Water Coils Radiators - Steam Heater - Electric Heater - Gas Heater - Hot Water Wall Heater - Electric 1 2 3 4 5 6 GRE 6 5 YEL 4 3 24 7 GRE 7 2 BLU 5 1 GRE 6 4 BLU 5 14 2 5 EA $2,503 27 EA $37,838 2 EA 1 EA $4,290 4 EA $5,720 16 EA $7,413 $57,763 Assessment Date: 2/19/2013 Page 7 of 18

MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Chilled Water less than 10 HP Pumps - Hot Water less than 5 HP TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Zone Dampers VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof Mounted above 8,000 cfm Exhaust Fans - Roof mounted less than 500 CFM MECHANICAL PLUMBING HOT WATER 1 2 3 4 5 6 BLU 5 1 1 BLU 5 150 500 GRE 6 500 BLU 5 650 GRE 6 4 1 2 3 ORA 3 136,047 4 5 6 GRE 6 80 GRE 6 46 1 2 3 4 5 6 GRE 6 3 GRE 6 3 7 7 7 2 EA $29,315 650 LF $30,960 500 LF $4,433 650 LF $32,161 2 EA $4,004 4 EA $5,720 $106,592 136,047 SF $1,361,830 80 EA $11,440 46 EA $6,578 $1,379,848 2 EA $1,001 3 EA $1,287 2 EA $458 2 EA $4,290 3 EA $472 $7,508 $1,813,344 1 2 3 4 5 6 7 Hot Water Heater - Gas 150,000-300,000 BTU/HR YEL 4 1 1 EA $22,880 Assessment Date: 2/19/2013 Page 8 of 18

Hot Water Heater - Gas less than 150,000 BTU/HR PIPING BLU 5 1 1 2 EA $18,447 $41,327 Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping 1 2 3 4 5 6 BLU 5 79,104 BLU 5 79,104 BLU 5 79,104 BLU 5 79,104 BLU 5 79,104 BLU 5 101,631 BLU 5 101,631 BLU 5 101,631 7 01,361 BLU 5 79,104 22,257 BLU 5 79,104 22,257 113,520 SF $29,954 113,520 SF $56,317 113,520 SF $22,381 113,520 SF $41,612 113,520 SF $48,399 136,047 SF $250,579 136,047 SF $207,449 136,047 SF $121,680 135,777 SF $62,327 135,777 SF $67,062 135,777 SF $53,204 $960,965 PUMPS Domestic Booster Pump duplex Sump Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES 1 2 3 4 5 6 7 1 EA $3,146 2 EA $2,717 $5,863 $1,008,155 Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile Ceramic/Porcelain 1 2 3 4 5 6,568 GRE 6 437 2,028 7,107 300 GRE 6 437 1,568 SF $3,363 2,465 SF $8,217 1,407 SF $1,583 437 SF $1,112 Assessment Date: 2/19/2013 Page 9 of 18

Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile AUDITORIUM - DEDICATED GRE 6 85 2,104 1 8 GRE 6 33 10,124,171 6,095 GRE 6 658 2,189 SF $4,212 19 SF $8 43 SF $24 2,124 SF $6,075 7,266 SF $19,907 658 SF $4,705 $49,205 Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System CORRIDOR Stair Handrails Stairs - Tile DOORS 1 2 3 4 5 6 GRE 6 90 88 1 2 3 4 5 6 24 GRE 6 56 7 7 90 EA $3,313 288 EA $10,601 1 EA $35,750 2 EA $22,651 1 EA $114,400 $186,715 124 LF 56 LF $423 $423 Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 1 2 3 4 5 6 GRE 6 56 7 89 53 14 GRE 7 342 GRE 7 15 GRE 6 618 56 EA $15,856 157 EA $60,214 342 SF 15 EA 618 SF $11,489 $87,559 Assessment Date: 2/19/2013 Page 10 of 18

DRINKING FOUNTAINS Double Fountain 1 2 3 4 5 6 7 GRE 6 6 1 7 EA $3,947 $3,947 GYMNASIUM / AUDITORIUM Ceiling - Lay-In Flooring - Wood Lighting - Metal Halide/Sodium Vapor Scoreboards Sound System Walls - Plaster/Drywall Walls - Structural Glazed Tile KITCHEN 1 2 3 4 5 6,791,791 0 GRE 6 4,182,394 7 2,791 SF $21,951 2,791 SF $21,073 10 EA $1,788 1 EA $2,076 1 EA $5,005 4,182 SF $35,882 1,394 SF $9,967 $97,742 Ceiling - Plaster/Drywall Flooring - Concrete Lighting - Lay-In Lighting - Pendant/Surface Wall - Concrete Block 1 2 3 4 5 6,096,096 3 7 GRE 7 2 BLU 5 1,418 1,096 SF $4,138 1,096 SF $5,172 13 SF $9 2 SF 1,418 SF $10,706 $20,025 LIBRARY Casework Flooring Carpet Lighting - Lay-In 1 2 3 4 5 6 GRE 6 32,870 4 7 32 LF $982 1,870 SF $2,674 24 SF $17 $3,673 Assessment Date: 2/19/2013 Page 11 of 18

LUNCHROOM Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In Serving Line Wall - Concrete Block Wall - Plaster/Drywall 1 2 3 4 5 6,333,745 GRE 6 4,078 GRE 6 56 7 GRE 7 12 GRE 6 3,262 GRE 6 660 2,333 SF $5,004 1,745 SF $4,941 4,078 SF $5,832 56 SF $40 12 LF 3,262 SF $9,329 660 SF $1,557 $26,703 MDF/IDF Finishes Ventilation and Cooling MECHANICAL/SERVICE ROOMS 1 2 3 4 5 6 GRE 6 343 YEL 4 1 1 7 343 SF $1,167 2 EA $21,021 $22,188 Air Tunnels Boiler Room Crawl Space - Unfinished Janitor's Closet Mechanical/Service Rooms Storage Room 1 2 3 4 5 6 GRE 6 4,032,542 9,300 7 GRE 6 7 1 0,534 GRE 6 802 2,778 164 4,032 SF $38,054 2,542 SF $11,996 19,300 SF $36,431 8 SF $33 10,534 SF $49,710 3,744 SF $22,193 $158,416 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall 1 2 3 4 5 6 49 3,800 GRE 6 32 7 BLU 5 2,415 1,530 168 4,049 SF $35,689 32 SF $69 4,113 SF $18,008 Assessment Date: 2/19/2013 Page 12 of 18

Floor Drain Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet THEATER GRE 6 9 7 GRE 6 48 28 GRE 6 3,848 5 96 2 GRE 6 39 3 7 2 GRE 6 42 3 GRE 6 39 10 6 38 BLU 5 4,553 2,634 BLU 5 3,760 403 GRE 6 3,386 59 16 EA $2,703 48 SF $227 128 SF $725 3,848 SF $9,795 121 SF $354 12 EA $2,605 42 EA $14,500 19 SF $12 45 SF $30 49 EA $6,994 26 EA $9,667 238 SF $681 7,187 SF $27,701 4,163 SF $180,316 3,386 SF $8,619 61 EA $29,372 $348,063 Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Flooring - Wood Lighting - Pendant/ Surface Stage Wall - Plaster/Drywall VERTICAL CONVEYANCE Elevator - Roped Holeless Hydraulic 1 2 3 4 5 6 GRE 6 3,816,438 GRE 6 940,438 GRE 6 433 GRE 6 32 GRE 6 433 GRE 6 5,786 1 2 3 4 5 6 7 7 3,816 SF $32,632 1,438 SF $2,056 940 SF $4,436 1,438 SF $2,056 433 SF $3,269 32 SF $53 433 SF $1,839 5,786 SF $49,644 $95,986 1 EA $17,160 Assessment Date: 2/19/2013 Page 13 of 18

$17,160 VOCATIONAL SHOP Work Sink INTERIOR 1 2 3 4 5 6 7 GRE 7 6 6 EA $1,117,805 ROOM CASEWORK Casework CEILING 1 2 3 4 5 6 79 1,001 7 1,180 LF $67,782 $67,782 Lay-In/Drop Plaster/Drywall 1 2 3 4 5 6 7 GRE 6 7,086 11,428,438 19,226 18,514 SF $15,199 20,664 SF $62,580 $77,779 CHALK BOARD 1 2 3 4 5 6 7 Chalk Board YEL 4 777 777 LF $94,444 $94,444 CLASSROOM Laptop Charging Station 1 2 3 4 5 6 7 GRE 7 4 4 EA Assessment Date: 2/19/2013 Page 14 of 18

CORRIDORS Concrete Block Concrete Epoxy/Painted Drop/Lay-In Exposed Lay-In Pendant/Surface Plaster/Drywall Single Water Cooler Stair Handrails Student Lockers Terrazzo Tile Ceramic/Porcelain Tile/Sheet Flooring 1 2 3 4 5 6 GRE 6 826 13,004 BLU 5 427 GRE 6 6,809 BLU 5 427 GRE 6 6,963 7 5,630 104 BLU 5 28,660 7,453 GRE 6 585 266 BLU 5 482 208 GRE 6 4,293 GRE 6 708 6,566 13,830 SF $43,428 427 SF $2,015 6,809 SF $14,605 427 SF $806 6,963 EA $4,979 15,734 EA $11,175 36,113 SF $152,832 1 EA $615 851 LF 690 EA $115,902 4,293 SF $24,310 708 SF $1,802 16,566 SF $23,689 $396,159 CORRIDORS CEILING Plaster/Drywall 1 2 3 4 5 6 7 5,469 124 15,593 SF $43,799 $43,799 FLOOR Concrete Tile/Sheet Wood LIBRARY_CEILING 1 2 3 4 5 6 GRE 6 376 3,537 5,265 7 376 SF $1,774 23,537 SF $33,658 15,265 SF $115,257 $150,689 Drop/Lay-In 1 2 3 4 5 6 7 GRE 7 1,870 1,870 SF Assessment Date: 2/19/2013 Page 15 of 18

LIBRARY_WALL Concrete Block 1 2 3 4 5 6,281 7 1,281 SF $3,664 Plaster/Drywall GRE 6 516 516 $1,218 LIGHTING $4,881 Lay-In Pendant/Surface MARKER BOARD Marker Board STAIRS Asphalt Terrazzo Tile WALL Concrete Block Plaster/Drywall ROOM 1 2 3 4 5 6 85 GRE 6 447 1 2 3 4 5 6 GRE 6 575 1 2 3 4 5 6 0 75 8 121 1 2 3 4 5 6 GRE 6 7,597 4,103 26,335 7 7 7 7 185 EA $13,228 447 EA $31,961 $45,188 575 LF $16,445 $16,445 10 SF $72 175 SF $1,982 149 SF $1,442 $3,496 7,597 SF $21,727 50,438 SF $175,879 $197,607 $1,098,269 Assessment Date: 2/19/2013 Page 16 of 18

SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 2 3 4 5 6 GRE 6 8 7 GRE 7 7 8 EA $4,347 7 EA $4,347 FENCING Ornamental Iron 1 2 3 4 5 6 7 GRE 7 1,147 1,147 LF LANDSCAPE Asphalt Play Area/Hardscape Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas PARKING LOT Asphalt Concrete Curbs Vehicular Screening PLAYGROUND 1 2 3 4 5 6 9,109 6,018 GRE 6 4,933 41,276 1 2 3 4 5 6 GRE 6 30,556 76 GRE 6 41 7 7 29,109 SF $24,976 26,018 SF $10,418 4,933 SF $9,312 43 EA $16,634 1,276 SF $61,338 30,556 SF $26,217 276 LF $1,666 41 LF $27,883 Playground Equipment - School Age 5-12 Playground Surfacing - Poured Surface 1 2 3 4 5 6 7 GRE 7 2 GRE 7 40,000 2 EA 40,000 SF Assessment Date: 2/19/2013 Page 17 of 18

SIDEWALKS Internal Walks Perimeter Sidewalks 1 2 3 4 5 6 7 GRE 7 57 8,575 57 LF 18,575 SF $35,062 $35,062 SIGNAGE Flag Pole Marquee - Free Standing Back Lighted w/ LED SITE Campus Need ² ³ 1 2 3 4 5 6 BLU 5 1 7 1 EA 1 EA $16,517 $16,517 $145,147 $8,417,040 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/19/2013 Page 18 of 18