Extension of Naugatuck Street Hartford, Connecticut

Similar documents
EXTERIOR PLANTS

Section 815. LANDSCAPING

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

2-B-18-UR. Revised: 3/27/2018

SECTION TREE TRANSPLANTING

ACTIVITY: Trees, Shrubs and Vines ES 10

DARTMOUTH COLLEGE DESIGN March 15, 2003 & CONSTRUCTION GUIDELINES

A. Section Includes: Labor, materials, necessary equipment and services to complete the tree relocation work.

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Construction Specification for Planting

SIUE LANDSCAPE UPGRADE

Punch-list Item Punch-list Photo Remedy for Signoff. Burlap and Wire Basket Visible (top 2/3 must be removed)

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Guelph Humane Society Section PLANTING Page 1

SECTION TREES, SHRUBS AND GROUNDCOVERS

SECTION TREES, SHRUBS, AND GROUNDCOVER

DIVISION II PLANTING SECTION 02950

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING


SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

TREE CONSERVATION REPORT

TREE PLANTING AND ESTABLISHMENT. Keith Wood Colorado State Forest Service

A. Surface parking areas shall be constructed of bituminous paving.

Home Depot Page 1 of Humacao, Puerto Rico 03/19/10

OVERALL KEY SHEET L201 (NOT USED) L202 L203 L208 L209 (NOT USED) L207 L206 L213 L214 (NOT USED) L210 L212 L211 L217 L218 L219 L215 L216.

HALIFAX REGIONAL MUNICIPALITY

PLANT MATERIAL AND PLANTING. C. Maintaining and replacing plants for completed planting work.

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

LAUREL STREET WATER TANK - LANDSCAPE RFP SECTION SECTION LANDSCAPING PLANTS

Guideline SpeciVications for Selecting, Planting, and Early Care of Young Trees

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

Van Buren Bridge Project. IFB # VBB Attachment K PROVISIONS DEPARTMENT OF PUBLIC WORKS FOR CITY OF FALLS CHURCH CITY PROJECTS

PLANT SCHEDULE CANOPY AND SMALL FLOWERING TREES ITEM NUMBER

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

City of Gering Tree Rebate Program

Success with Trees in Your Yard. Debbie D. Dillion Extension Agent, Horticulture Serving Culpeper, Madison, & Orange Counties

Select the location: Dig a wide planting hole: Place the tree in the hole at the proper height: Backfill with soil around the rootball:

SELECTING THE RIGHT TREE FOR THE RIGHT LOCATION and how to properly plant that tree!

SPL-2.2 MECHANICALS POOL LAWN. 3rd FLOOR TERRACES AMENITY RESTAURANT 230 EAST AVENUE AMENITY NORWALK, CT

SECTION TREES, PLANTS AND GROUND COVERS

SECTION LANDSCAPE

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

Planting Trees & Shrubs. Choosing Trees and Shrubs. Tree Quotes

City of Regina Standard Construction Specification SECTION TREES, SHRUBS AND GROUND COVERS

Planting and Establishment

Request for Proposals for Tree Planting

ANEW LANDSCAPE really

ISSUANCES FINAL 4.1 SITE PLAN SUBMISSION

Planting Trees & Shrubs. and Shrubs Study Guide

CHAPTER 4: GENERAL LANDSCAPING STANDARDS 4.1 ALL PLANT STOCK 4.2 TREES

Selecting Quality Trees from the Nursery. Created from research by Dr. Edward F. Gilman and Traci Partin (University of Florida)

The following general requirements will be met for all planter box installations:

1.3 SOURCE QUALITY CONTROL.1 Obtain approval from Engineer/Architect of plant material at source prior to digging.

RECOMMENDED LIST OF STREET TREES (LARGE TREES - 40 FEET OR GREATER IN HEIGHT) EDGMONT TOWNSHIP DELAWARE COUNTY, PENNSYLVANIA

Town of Fuquay-Varina

SECTION 910 LANDSCAPING

CITY OF THREE RIVERS, MICHIGAN Specifications for Quotes Tree Planting Request for quotes

Dan, this is a list of the items included in the submittal package for the Plan Commission Public Hearing on May 24, 2018:

C7.1 PUBLIC ROADWAY PLAN TRILLIUM AVENUE RESOURCE INTERNATIONAL INC. Description. Issued By Drawing Issue & Revision Status. Date.

Landscape Maintenance Plan Proposed Childcare Centre Leichhardt Park

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1300 OF PUTNAM COUNTY, WEST VIRGINIA Page 119 ARTICLE 1300 LANDSCAPING AND SCREENING

OVERALL LANDSCAPE PLAN

SECTION 605 PLANTING

SECTION TREES, PLANTS AND GROUNDCOVER. A. Preparation of subsoil, topsoil and planting soil mixture.

ACADEMY OF MONTESSORI EXPANSION CONSTRUCTION PLANS

Selection and Care of Trees and Shrubs. Ray Ridlen Oklahoma County OSU Extension Educator


REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

University of New Hampshire Scholars' Repository

Planting Containerized Trees

FHWA 534_J031. TEA-5A01(833) EN , P101,M501 See Tabulation Below for Section Numbers

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

PRISTINE EXPRESS CAR WASH CITY OF FORNEY, KAUFMAN COUNTY, J. GREGG SURVEY, ABSTRACT NO Ac. / 62,140 Sq. Ft. SITE PLAN TEXAS.

Unit E: Urban Forestry. Lesson 2: Selecting Trees for Urban Growing Conditions

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

Unit D: Fruit and Vegetable Crop Production. Lesson 4: Growing and Maintaining Tree Fruits

WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 32 EXTERIOR IMPROVEMENTS

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE


Oak Shade Tree Production by Mark Halcomb UT Area Nursery Specialist

Planting Landscape Trees Larry A. Sagers Extension Horticulture Specialist Utah State University Thanksgiving Point Office

a. Section Irrigation b. Section Operation and Maintenance of Planting c. Section xx xx xx Trees


Guidelines for planting within the 100 Ft. Buffer

February 20, :30 a.m. 3 p.m.

Master Gardener Recommended Horticulture Best Management Practices

CITY OF SOUTH BURLINGTON, VERMONT SOUTH BURLINGTON CITY OFFICE STORMWATER IMPROVEMENTS JUNE 2014

PLANT LIST (CONTRACTOR RESPONSIBLE FOR ALL PLANTS SHOWN ON PLAN) SHRUBS PERENNIALS/ORNAMENTAL GRASSES

CITRUS PRUNING. Pruning techniques for tree health, pest control, fruit production and size control.

Exhibit A. Scope of Work

SECTION LANDSCAPING

45.2. MATERIALS Shrubs, Trees and Other Plants Planting Pit Mulch and Cover Grass Materials

The Right Tree in the Right Place

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

Eastern Illinois University Tree Care Plan

SECTION SODDING

COURSE OUTLINE FORM (Page 1 of 5)

BID PACKET 2015 DOWNTOWN ENHANCEMENT PROGRAM

Water Conservation in the Landscape

Transcription:

Extension of Naugatuck Street Hartford, Connecticut DEVELOPMENT TEAM LIST OF DRAWINGS Property Owner - Right of Way Construction Manager- Roadway Residential Developer Civil Engineer Landscape Architect Surveyor City of Hartford Capital Region Development Authority Toraal Developement LLC F. A. Hesketh & Associates, Inc. F. A. Hesketh & Associates, Inc. F. A. Hesketh & Associates, Inc. Title Sheet GR- Grading and Sedimentation & Erosion Control Plan PP- Plan & Profile (Naugatuck Street) PP-2 Plan & Profile (Clark Street & Hampton Street) MD- thru MD-3 Plan & Profile (MDC Water, Sanitary & Storm) UT- Utility Plan (Gas, Electric, Telephone & CATV) LS- and LS-2 Landscape Plan SD-, SD-3 thru SD-6 Site Details SR- Standard Roadway and Street Details ST-6 Standard Traffic/Equipment Details NT- Notes TS Topographic Survey B0- and BO-2 Boring Plan and Logs For Information Only (NIC) GR-2 thru GR-3 Grading and Sedimentation & Erosion Control Plan David S. Ziaks P.E. #3336

2 3 4 5 Naugatuck Street 6 7 8 9 0 2 3 4 2 3 4 5 6 7 8 9 0 2 3 4

2 3 4 5 6 7 8 9 0 2 3 4

2 3 4 5 6 7 8 9 0 2 3 4

2 3 4 5 6 7 8 9 0 2 3 4 Sheet 8 of 6 0-6-208 Rev. 02-25-209

2 3 4 5 6 7 8 9 0 2 3 4 Sheet 9a of 6 0-6-208 Rev. 02-25-209

2 3 4 5 6 7 8 9 0 2 3 4 Sheet 9b of 6 0-6-208 Rev. 02-25-209

2 3 4 5 6 7 8 9 0 2 3 4

QP LT LT QP 2 3 4 5 NOTE: Roadway extension project includes 25 street trees (2 and 3 ). 6 7 8 9 0 2 3 4 All other proposed trees are included in the lot development. ARF ARF EXISTING TREE TO REMAIN (TYP.) 5 6 7 8 9 20

LANDSCAPE SCHEDULE (Includes street trees and lot development) Symbol Botanical Name Common Name Quantity Size Root Mature Height Mature Spread Acer x freemanii 'Autumn Blaze' Autumn Blaze Maple 6 2 2 to 3 inch caliper Balled & Burlapped Approximately 55 feet Approximately 45 feet ARF Acer rubrum 'Franksred' Red Sunset Maple 2 2 2 to 3 inch caliper Balled & Burlapped Approximately 45 feet Approximately 30 feet Gleditsia triacanthos 'Shademaster' Shademaster Honeylocust 3 2 2 to 3 inch caliper Balled & Burlapped Approximately 50 feet Approximately 50 feet LT Liriodendron tulipifera Tuliptree 2 2 2 to 3 inch caliper Balled & Burlapped Approximately 80 feet Approximately 45 feet QP Quercus palustris Pin Oak 2 2 2 to 3 inch caliper Balled & Burlapped Approximately 65 feet Approximately 35 feet LANDSCAPE NOTES. All plants shall meet or exceed the specifications of Federal, State and County laws requiring inspection for plant disease and insect control. 2. Plant material shall conform with the "American Standard for Nursery Stock" by the American Association of Nurserymen, Inc. (ANSI Z60.-2004). 3. All plants shall be certified true to name by the nursery source. Plant names shall be in accordance with "Hortis Third" (976) by the staff of the Liberty Hyde Bailey Hortorium, Cornell University. One plant from each species shall be tagged with name and size of the plant in accordance with the standards of practice of the American Association of Nurserymen. Botanical names shall take precedence over common names. 4. Plant material shall be typical of their species and/or variety, with a normal habit of growth, sound, healthy and vigorous. They shall be well branched and densely foliated when in leaf, free of disease, insect pest, eggs or larvae. They shall have healthy well-developed root systems. All trees shall have straight single trunks with their main leader intact unless otherwise noted or approved. 5. All landscaped areas to have 2" shredded bark mulch (color: black) over weed control fabric. No weed control fabric in areas of groundcover or perennial plantings. 6. Provide protective covering of plant material during delivery and storage. Root balls shall not be cracked or broken. Do not prune plants prior to delivery. Remove unacceptable plant material immediately from the job site. 7. Plant locations on the Drawings are approximate and are to be used only as a guide. Contractor shall provide all field engineering services to accurately stake out locations for all plants prior to installation. Do not begin excavation until Project Landscape Architect has approved specific layout. 8. If requested by Project Landscape Architect, stake and guy each tree as shown on the applicable Drawings immediately after planting. Keep trees plumb and taut. 9. If requested by Project Landscape Architect, wrap the trunks of all trees spirally from the ground line to above the lowest main branch. 0. Perform all cultural care necessary to properly maintain plant viability and keep planted areas in a neat and orderly condition, including but not limited to: a. Watering b. Weed removal c. Apply lime or sulphur to adjust soil ph to specific plant requirements d. Restore or reshape earth saucers e. Pruning f. Adjust and tighten tree supports to maintain plants at their proper grades and vertical position g. Replace mulch to maintain proper depth. Contractor shall limit, to the greatest extent possible, all construction activities within driplines of trees to remain. Care shall be taken to limit compaction of soil and disturbance within these areas.

Sheet 7 of 6 0-6-208 Rev. 0-5-209

Hampton Street Naugatuck Street Sheet 7 of 6 0-6-208 Rev. 0-5-209

Clark Street 6 7 8 9 9 0 Naugatuck Street 0 2 3 4

Hampton Street 2 3 4 5 Naugatuck Street