TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

Similar documents
Kitchen south wall, living room north and south wall outlets 3. not working properly; no GFCI.

2009 ELECTRICAL CODE REQUIREMENTS

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

LIGHT LEVEL REQUIREMENTS MINIMUM ACCEPTABLE FOOT CANDLES

Electrical System (N) PANELBOARD "L1" VOLTAGE: 208/120 A, 3P :MAIN C/B PHASE: 3 A :BUSSING WIRE: 4 :MOUNTING

Electrical Essentials corrected calculation slides only

FIRE ALARM: BY OTHERS, IF REQUIRED.

FIRE ALARM: BY OTHERS, IF REQUIRED.

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod

AGORA PALM UNIT TYPE A2, A2A, A2B, A2C, A2D, A2F, A2G, A2H, A2J UNIT TYPE A1 & A1-A UNIT TYPE A3-A, A3B, A3C, A3E, A3F, A3H UNIT TYPE A4, A4A

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

2011 and 2014 National Electrical Code Changes Residential Only

Instructor: L. Keith Lofland

Mechanical Systems Submittal Guide

INDEX. Page 2 to 7 Electrical Specifications. Page 8 Electrical Schemes: Basement Plan. Page 9 Electrical Schemes: First Floor Plan

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults?

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

P-16 ENGINEER NO. DATE DESCRIPTION 1 01/19/2016 FOR CONSTRUCTION 2 03/11/2016 REVISION # 2 DRAWN BY: CHECKED BY: DATE: SCALE: DRAWING NUMBER

Spring Test 6 due 04/26/2013

CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017

Residential Wiring According to 2011 NEC (Homestudy)

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Residential Wiring (2014 NEC) (Homestudy)

SDEC 2017 Questions, Group 1

Graded Project. National Electrical Code

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

NEC Study Guide CORRECT: C NEC (A)(1)

PANELBOARDS & BUILDING DISTRIBUTION

GE Industrial Solutions. Residential Electronic Circuit Interrupters

Dwelling unit feeder/service conductor calculations

Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013

ELECTRICAL SYMBOLS AND ABBREVIATIONS NOT ALL SYMBOLS, DEVICES OR ABBREVIATIONS MAY BE USED

Chapter 1 General... 5

ll. Consistency Questions

CITY OF LOS ANGELES LARUCP ELECTRICAL PLAN CHECK LIST

GRILLE, REGISTER AND DIFFUSER SCHEDULE

Element D Services Electrical

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

CONTINUING EDUCATION FOR OREGON ELECTRICIANS. AMERICAN ELECTRICAL INSTITUTE PO Box Spokane, WA


Module number 8 provides an on-line, self-paced training seminar on portions of Chapter 14-Fuel Gas, Chapter 25-Ohio Plumbing Code; Chapter 29-Fire

S U B S T I T U T E O R D I N A N C E BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHICAGO: ARTICLE I ELECTRICAL CODE

Axiom Property Inspections

Electricity Unit Notes. Agriculture Mechanics I

Community Map J ACKSON IEW. JACKSON VIEW Active Adult Community Thomas Drive & Emerald Court Jackson, CA 95642

2009 WESTERN SECTION CODE PANEL QUESTIONS

Lindsay Frederick. Lighting + Electrical. Ron Dodson Faculty Advisor. Native American Cultural Center Arizona. Technical Report 2

Electrical Systems. Electrical Plans. Electrical Plans. Essential to ensure. National Electrical Code (NES) Consider electrical needs.

The following narrative outlines a conceptual electrical Scope of Work for converting the Phase 2 TRW Building to an Exhibition Hall.

Residential Wiring (2017 NEC) (Homestudy)

2010 Residential Ques. & Ans.

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

District 1. 1 Tony Tadysak Craig Mulder

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Ho-Chunk Gaming THUNDERBIRD ENGINEERING, INC. MILWAUKEE: (414) MADISON: (608)

BAHIA SOUND HOMESITE # 7

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

Watson Home Inspection Services, LLC.

HVAC Equipment Access Equipment Location

NEC CODE QUESTIONS. Western Section IAEI 103 rd Annual Meeting September 17-19, 2007

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Residential Wiring According to the 2011 NEC

CHAPTER 20 SERVICE EQUIPMENT

Municipal Code of Chicago TITLE 14E ELECTRICAL CODE

SOUTHERN NEVADA PROPOSED AMENDMENTS TO THE 2011 NATIONAL ELECTRICAL CODE

Town of Cicero Local Code Amendments

Inspection Checklist Mechanical Rough in

Subpanels. Bring Big Amps to Distant Spaces. A subpanel is a secondary breaker box BY CLIFFORD A. POPEJOY

135'c " Conduit, 6-#3, 12-#4 Wires Rated-50% 45'c 345'w. 1" Conduit, 3-#4 3.43%VD. 66'c 411'w 4.08%VD. Wires Rated-50% 77'c. 421'w 14 4.

Executive Summary. CNBC Global Headquarters Christine Cajilig

Electric Floor Warming Systems Installation and Operation Instructions. Mat Heating Systems and Cable Heating Systems. UL Listed for USA and Canada

FAIRA TRANSPARENCY REPORTS. November 21, 2016

FAIRA TRANSPARENCY REPORTS Hazel Loop SE, #D, Auburn, WA 98092

NEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012

Electrical Tech Note 107

IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016

Smart Classroom Design

National Electrical Code Forum. Your Questions Answered

A HOMEOWNERS HANDBOOK

8. Multi-Family Residential Buildings

Student Guide. Wiring Edition. Compliments of. Georgia EMC East Exchange Place Tucker, GA (770)

PowerWave 2 Busway System

SECTION ISOLATED POWER SYSTEMS

General Kitchen, Bath & Bedroom Remodeling Notes County of Marin, Building Inspection Division

Land Map Number BUILDING PERMIT # PROJECT Street Address: Owner: Street Address: City State Zip Phone. Building Contractor: Street Address:

Inspection Report 123 My Street Midland, GA

All In One Home Inspections

Machinery Room Electrical Best Practices

Proposed Amendments To The 2008 National Electrical Code

Overview of Significant 2017 NEC Changes

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

Bay Wide Commercial and Home Inspection Thackeray Avenue/ Mail address Hayward, Calif TH AVENUE SAN LEANDRO, CALIFORNIA

Transcription:

TABLE 9.4.5 LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE 90.1 Uncovered Parking Areas Parking Lots and drives Building Grounds Walkways less that 10 feet wide Walkways 10 feet wide or greater Plaza areas Special Feature Areas Building Entrances and Exits Main entries door width other doors door width 0.15 W/sq.ft. 1.0 W/linear ft. 0.2 W/sq.ft. 30 W/linear foot of 20 W/linear foot of 1323 - The Sorrento Apartments Hobbs, New Mexico Sheet # M-1.1 M-1.2 M-2 M-3 MC-1 Description Mechanical Site plan Mechanical Specifications Mechanical Plans - Units A1-A2 Mechanical Plans - Units B1-B2-B3 Mechanical Plans - Clubhouse E-1.1 E-1.2 E-2 E-3 E-4 E-5 E-6 E-7 E-8 E-9 EC-1 EC-2 P-1.1 P-1.2 P-2 P-3 P-4 P-5 P-6 P-7 P-8 PC-1 PC-2 Scale 1"=50' NTS Site Plan 1"=50' Specifications NTS Plans - Units A1-A2 Plans - Units B1-B2-B3 Plans - Bldg Type 1 1/8"=1'0" Plans - Bldg Type 2 1/8"=1'0" Plans - Bldg Type 3 1/8"=1'0" Plans - Bldg Type 4 1/8"=1'0" Calcs - Unit Load Analysis NTS Calcs - Bldg Load Analysis, Onelines NTS Plans - Clubhouse Calcs - Clubhouse NTS Site Plan Specifications Plans - Units A1-A2 Plans - Units B1-B2-B3 Plans - Bldg Type 1 Plans - Bldg Type 2 Plans - Bldg Type 3 Plans - Bldg Type 4 Risers Plans - Clubhouse Sewer Layout Plans - Clubhouse Water/Gas Layout 1"=50' NTS 1/8"=1'0 1/8"=1'0 1/8"=1'0 1/8"=1'0 NTS HOBBS, NEW MEXICO ENFORCED CODES: 2009 NMIBC, 2009 NMUMC, 2009 NMUPC, 2006 IFC, 2009 NMIRC, 2011 NMEC, IECC 2009-NMECC, ICC/ANSI A117-1-1998 NM BLDG CODE

UNIT A1 LOAD ANALYSIS FT 657 SQ LIGHTING,3VA / SQ FT = 1971 (2) SMALL APPL CKTS = 3000 LAUNDRY CIRCUIT = 1500 EXH FANS / CEILING FANS = 200 GARBAGE DISPOSAL = 850 WATER HEATER = 5500 MICROWAVE = 1000 DISHWASHER = 1200 RANGE/OVEN = 10600 DRYER = 5000 SUBTOTAL = DEMAND FACTOR OPT. METHOD 30821 1ST 10 KVA @ 100% = 10000 REMAINDER VA 20821 @ 40% = 8328 A/C 1.5 TON 2.0KW @ 100% = OMIT CENTRAL HEAT 5KW @ 65% = 3250 TOTAL DEMAND = 21578 @120/240V, 1PH, 3W = 90 FEEDER #2 AL SER** = 100 TOTAL CONNECTED LOAD = 35821 MAIN CIRCUIT BREAKER = 100/2 UNIT A2 LOAD ANALYSIS FT 783 SQ LIGHTING,3VA / SQ FT = 2349 (2) SMALL APPL CKTS = 3000 LAUNDRY CIRCUIT = 1500 EXH FANS / CEILING FANS = 200 GARBAGE DISPOSAL = 850 WATER HEATER = 5500 MICROWAVE = 1000 DISHWASHER = 1200 RANGE/OVEN = 10600 DRYER = 5000 SUBTOTAL = DEMAND FACTOR OPT. METHOD 31199 1ST 10 KVA @ 100% = 10000 REMAINDER VA 21199 @ 40% = 8480 A/C 1.5 TON 2.0KW @ 100% = OMIT CENTRAL HEAT 5KW @ 65% = 3250 TOTAL DEMAND = 21730 @120/240V, 1PH, 3W = 91 FEEDER #2 AL SER** = 100 TOTAL CONNECTED LOAD = 36199 MAIN CIRCUIT BREAKER = 100/2 UNIT B1 UP LOAD ANALYSIS FT 917 SQ LIGHTING,3VA / SQ FT = 2751 (2) SMALL APPL CKTS = 3000 LAUNDRY CIRCUIT = 1500 EXH FANS / CEILING FANS = 200 GARBAGE DISPOSAL = 850 WATER HEATER = 5500 MICROWAVE = 1000 DISHWASHER = 1200 RANGE/OVEN = 10600 DRYER = 5000 SUBTOTAL = DEMAND FACTOR OPT. METHOD 31601 1ST 10 KVA @ 100% = 10000 REMAINDER VA 21601 @ 40% = 8640 A/C 2.0 TON 3.0KW @ 100% = OMIT CENTRAL HEAT 6KW @ 65% = 3900 TOTAL DEMAND = 22540 @120/240V, 1PH, 3W = 94 FEEDER #2 AL SER** = 100 TOTAL CONNECTED LOAD = 37601 MAIN CIRCUIT BREAKER = 100/2 OPTIONAL METHOD PER 2011 NEC 220.80 UNIT B1 DN LOAD ANALYSIS FT 917 SQ LIGHTING,3VA / SQ FT = 2751 (2) SMALL APPL CKTS = 3000 LAUNDRY CIRCUIT = 1500 EXH FANS / CEILING FANS = 200 GARBAGE DISPOSAL = 850 WATER HEATER = 5500 MICROWAVE = 1000 DISHWASHER = 1200 RANGE/OVEN = 10600 DRYER = 5000 SUBTOTAL = DEMAND FACTOR OPT. METHOD 31601 1ST 10 KVA @ 100% = 10000 REMAINDER VA 21601 @ 40% = 8640 A/C 1.5 TON 2.0KW @ 100% = OMIT CENTRAL HEAT 6KW @ 65% = 3900 TOTAL DEMAND = 22540 @120/240V, 1PH, 3W = 94 FEEDER #2 AL SER** = 100 TOTAL CONNECTED LOAD = 37601 MAIN CIRCUIT BREAKER = 100/2 UNIT B2 LOAD ANALYSIS FT 1052 SQ LIGHTING,3VA / SQ FT = 3156 (2) SMALL APPL CKTS = 3000 LAUNDRY CIRCUIT = 1500 EXH FANS / CEILING FANS = 200 GARBAGE DISPOSAL = 850 WATER HEATER = 5500 MICROWAVE = 1000 DISHWASHER = 1200 RANGE/OVEN = 10600 DRYER = 5000 SUBTOTAL = DEMAND FACTOR OPT. METHOD 32006 1ST 10 KVA @ 100% = 10000 REMAINDER VA 22006 @ 40% = 8802 A/C 2.0 TON 3.0KW @ 100% = OMIT CENTRAL HEAT 6KW @ 65% = 3900 TOTAL DEMAND = 22702 @120/240V, 1PH, 3W = 95 FEEDER #2 AL SER** = 100 TOTAL CONNECTED LOAD = 38006 MAIN CIRCUIT BREAKER = 100/2 UNIT B3 LOAD ANALYSIS FT 1043 SQ LIGHTING,3VA / SQ FT = 3129 (2) SMALL APPL CKTS = 3000 LAUNDRY CIRCUIT = 1500 EXH FANS / CEILING FANS = 200 GARBAGE DISPOSAL = 850 WATER HEATER = 5500 MICROWAVE = 1000 DISHWASHER = 1200 RANGE/OVEN = 10600 DRYER = 5000 SUBTOTAL = DEMAND FACTOR OPT. METHOD 31979 1ST 10 KVA @ 100% = 10000 REMAINDER VA 21979 @ 40% = 8792 A/C 2.0 TON 3.0KW @ 100% = OMIT CENTRAL HEAT 8KW @ 65% = 5200 TOTAL DEMAND = 23992 @120/240V, 1PH, 3W = 100 FEEDER #1 AL SER** = 110 TOTAL CONNECTED LOAD = 39979 MAIN CIRCUIT BREAKER = 110/2 ** MINIMUM: SEE VOLTAGE DROP LIMITATIONS. ************ UNIT A1 LOADCENTER *********** 100 MLO, 120/240V, 1PH, 60HZ, 3W 10KAIC, FLUSH N-1 MOUNTED ========================================== SMALL APPL #12 20/1 1500 1 SMALL APPL #12 20/1 1500 3 LAUNDRY #12 20/1 1500 5 REFRIGERATOR #12 20/1 1200 7 DISPOSAL #12 20/2 850 9 DISHWASHER #12 -- 1200 11 BATH GFI #12 20/1 1500 15 AC 1.5 TON #12 20/2 2000 17,19 RANGE/OVEN #8 40/2 10600 21,23 ------------------------------------------ GENERAL LTG #12 20/1 1800 2 GENERAL LTG #12 20/1 1800 4 SPACE 12 AHU 5.0 KW #10 30/2 5000 14,16 DRYER #10 30/2 5000 18,20 WATER HEATER #10 30/2 5500 22,24 ****** ************ UNIT A2 LOADCENTER *********** 100 MLO, 120/240V, 1PH, 60HZ, 3W 10KAIC, FLUSH N-1 MOUNTED ========================================== SMALL APPL #12 20/1 1500 1 SMALL APPL #12 20/1 1500 3 LAUNDRY #12 20/1 1500 5 REFRIGERATOR #12 20/1 1200 7 DISPOSAL #12 20/2 850 9 DISHWASHER #12 -- 1200 11 BATH GFI #12 20/1 1500 15 AC 1.5 TON #12 20/2 2000 17,19 RANGE/OVEN #8 40/2 10600 21,23 ------------------------------------------ GENERAL LTG #12 20/1 1800 2 GENERAL LTG #12 20/1 1800 4 SPACE 12 AHU 5.0 KW #10 30/2 5000 14,16 DRYER #10 30/2 5000 18,20 WATER HEATER #10 30/2 5500 22,24 ****** ************ UNIT B1 UP LOADCENTER********** 100 MLO, 120/240V, 1PH, 60HZ, 3W 10KAIC, FLUSH N-1 MOUNTED ========================================== SMALL APPL #12 20/1 1500 1 SMALL APPL #12 20/1 1500 3 LAUNDRY #12 20/1 1500 5 REFRIGERATOR #12 20/1 1200 7 DISPOSAL #12 20/2 850 9 DISHWASHER #12 -- 1200 11 BATH GFI #12 20/1 1500 15 AC 2.0 TON #12 20/2 3000 17,19 RANGE/OVEN #8 40/2 10600 21,23 ------------------------------------------ GENERAL LTG #12 20/1 1800 2 GENERAL LTG #12 20/1 1800 4 SPACE 12 AHU 6.0 KW #8 35/2 6000 14,16 DRYER #10 30/2 5000 18,20 WATER HEATER #10 30/2 5500 22,24 ****** ************ UNIT B1 DN LOADCENTER********** 100 MLO, 120/240V, 1PH, 60HZ, 3W 10KAIC, FLUSH N-1 MOUNTED ========================================== SMALL APPL #12 20/1 1500 1 SMALL APPL #12 20/1 1500 3 LAUNDRY #12 20/1 1500 5 REFRIGERATOR #12 20/1 1200 7 DISPOSAL #12 20/2 850 9 DISHWASHER #12 -- 1200 11 BATH GFI #12 20/1 1500 15 AC 1.5 TON #12 20/2 2000 17,19 RANGE/OVEN #8 40/2 10600 21,23 ------------------------------------------ GENERAL LTG #12 20/1 1800 2 GENERAL LTG #12 20/1 1800 4 SPACE 12 AHU 6.0 KW #8 35/2 6000 14,16 DRYER #10 30/2 5000 18,20 WATER HEATER #10 30/2 5500 22,24 ****** ************ UNIT B2 LOADCENTER *********** 100 MLO, 120/240V, 1PH, 60HZ, 3W 10KAIC, FLUSH N-1 MOUNTED ========================================== SMALL APPL #12 20/1 1500 1 SMALL APPL #12 20/1 1500 3 LAUNDRY #12 20/1 1500 5 REFRIGERATOR #12 20/1 1200 7 DISPOSAL #12 20/2 850 9 DISHWASHER #12 -- 1200 11 BATH GFI #12 20/1 1500 15 AC 2.0 TON #12 20/2 3000 17,19 RANGE/OVEN #8 40/2 10600 21,23 ------------------------------------------ GENERAL LTG #12 20/1 1800 2 GENERAL LTG #12 20/1 1800 4 SPACE 12 AHU 6.0 KW #8 35/2 6000 14,16 DRYER #10 30/2 5000 18,20 WATER HEATER #10 30/2 5500 22,24 ****** ************ UNIT B3 LOADCENTER *********** 125 MLO, 120/240V, 1PH, 60HZ, 3W 10KAIC, FLUSH N-1 MOUNTED ========================================== SMALL APPL #12 20/1 1500 1 SMALL APPL #12 20/1 1500 3 LAUNDRY #12 20/1 1500 5 REFRIGERATOR #12 20/1 1200 7 DISPOSAL #12 20/2 850 9 DISHWASHER #12 -- 1200 11 BATH GFI #12 20/1 1500 15 AC 2.0 TON #12 20/2 3000 17,19 RANGE/OVEN #8 40/2 10600 21,23 ------------------------------------------ GENERAL LTG #12 20/1 1800 2 GENERAL LTG #12 20/1 1800 4 SPACE 12 AHU 8.0 KW #6 50/2 8000 14,16 DRYER #10 30/2 5000 18,20 WATER HEATER #10 30/2 5500 22,24 ****** ALL A/C BREAKERS SHALL BE HACR RATED. INSTALL MOCP PER A/C NAMEPLATE. INSTALL 2-POLE BKR FOR COMMON RECEPTACLE USED FOR DW & DP. ALL WIRE TYPE NM COPPER. ALUM PROHIBITED ON BRANCH CIRCUITS. INSTALL SER AND 220V CKTS IN SEPARATE BUSHED OPENINGS IN TOP OF PANEL. INSTALL 4W CKT AND RECEPTACLE FOR RANGE AND DRYER. INSTALL REFRIGERATOR RECEPTACLE AHEAD OF GFI PROTECTION. ALL 120V, SINGLE PHASE, 15- AND 20-AMPERE BRANCH CIRCUITS SUPPLYING OUTLETS INSTALLED IN DWELLING UNITS FAMILY ROOMS, DINNING ROOMS, LIVING ROOMS, PARLORS, LIBRARIES, DENS, BEDROOMS, SUNROOMS, RECREATION ROOMS, CLOSETS, HALLWAYS, OR SIMILAR ROOMS OR AREAS SHALL BE SHALL BE PROTECTED BY A LISTED ARC-FAULT CIRCUIT INTERRUPTER, COMBINATION-TYPE, INSTALLED TO PROVIDE PROTECTION OF THE BRANCH CIRCUIT. NEC 210.12(B) IN ALL AREAS SPECIFIED IN 210.52, ALL 125V, 15- & 20-AMPERE RECEPTACALES SHALL BE LISTED TAMPER-RESISTANT RECEPTACLES. NEC 406.11 2011 NATIONAL ELECTRICAL CODE #12 MIN. WIRE SIZE REFRIGERATOR ON SEPARATE CIRCUIT

ONE LINE DIAGRAM - BLDG TYPE 1 (16 UNITS) ONE LINE DIAGRAM - BLDG TYPE 3 (16 UNITS) BUILDING LOAD ANALYSIS 120/240/1PH/3W BUILDING TYPE 1-16 UNITS BLDG QUAN TYPE VA/UNIT VA DEMAND KVA AMPS SE MCB METER CENTER - 16 UNITS 8 A1 35821 286568 8 B2 38006 304048 16 TOTAL 590616 39% 230.3 960 +PNL H 60 1020 1200/2 BUILDING TYPE 2-16 UNITS PHOTO ELECTRIC CELLS PNL H 100A N-3R 10 KAIC* METER CENTER (16 UNITS) 120V TO LTG TYP EACH PEC CKT W/ PNL H SERVICE ENTRANCE MAIN CB 1200/2 MCB, 42 KAIC* N3R 120/240V, 1PH, 3W TO TYP. APT. PANEL, 10 KAIC* TYP. APT. METER W/ MCB PHOTO ELECTRIC CELLS PNL H 100A N-3R 10 KAIC* METER CENTER (16 UNITS) 120V TO LTG TYP EACH PEC CKT W/ PNL H SERVICE ENTRANCE MAIN CB 1000/2 MCB, 42 KAIC* N3R 120/240V, 1PH, 3W TO TYP. APT. PANEL, 10 KAIC* TYP. APT. METER W/ MCB BLDG QUAN TYPE VA/UNIT VA DEMAND KVA AMPS SE MCB METER CENTER - 16 UNITS 4 B1 DN 37601 150404 4 B1 UP 37601 150404 8 B3 39979 319832 16 TOTAL 620640 39% 242.0 1009 +PNL H 40 1049 1200/2 BUILDING TYPE 3-16 UNITS BLDG QUAN TYPE VA/UNIT VA DEMAND KVA AMPS SE MCB METER CENTER - 16 UNITS 4 B1 DN 37601 150404 4 B1 UP 37601 150404 8 A2 36199 289592 16 TOTAL 590400 39% 230.3 959 +PNL H 40 999 1000/2 BUILDING TYPE 4-16 UNITS XFMR 1.5"C,3#1 THWN AL,1#8G CU TO POWER CO. XFMR TAP BOX SEE SERVICE ENTRANCE CONDUCTOR SCHEDULE TAP/ TRANSITION BOX #4 CU 5/8"x8' COPPER GROUND ROD. #3/0 CU BOND TO METAL SPRINKLER PIPING #4 CU APPROVED CONNECTOR STUB OUT 1/2" REBAR CONNECTED TO MIN.20' 1/2" BARE REBAR ENCASED WITH AT LEAST 2" OF CONCRETE LOCATED WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION OR FOOTING PER 250.52(A)(3). STUB UP AND OUT FOR CONNECTION TO #4 CU GROUNDING. XFMR 1.5"C,3#1 THWN AL,1#8G CU TO POWER CO. XFMR TAP BOX SEE SERVICE ENTRANCE CONDUCTOR SCHEDULE TAP/ TRANSITION BOX #4 CU 5/8"x8' COPPER GROUND ROD. #3/0 CU BOND TO METAL SPRINKLER PIPING #4 CU APPROVED CONNECTOR STUB OUT 1/2" REBAR CONNECTED TO MIN.20' 1/2" BARE REBAR ENCASED WITH AT LEAST 2" OF CONCRETE LOCATED WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION OR FOOTING PER 250.52(A)(3). STUB UP AND OUT FOR CONNECTION TO #4 CU GROUNDING. BLDG QUAN TYPE VA/UNIT VA DEMAND KVA AMPS SE MCB METER CENTER - 16 UNITS 16 A1 35821 573136 16 TOTAL 573136 39% 223.5 931 +PNL H 40 971 1000/2 ONE LINE DIAGRAM - BLDG TYPE 2 (16 UNITS) ONE LINE DIAGRAM - BLDG TYPE 4 (16 UNITS) * OPTIONAL CALCULATIONS-DEMAND FACTORS PER TABLE 220.84 NEC 2011 PHOTO ELECTRIC CELLS METER CENTER (16 UNITS) 120V TO LTG TYP EACH PEC CKT W/ PNL H SERVICE ENTRANCE MAIN CB 1200/2 MCB, 42 KAIC* N3R 120/240V, 1PH, 3W TO TYP. APT. PANEL, 10 KAIC* PHOTO ELECTRIC CELLS METER CENTER (16 UNITS) 120V TO LTG TYP EACH PEC CKT W/ PNL H SERVICE ENTRANCE MAIN CB 1000/2 MCB, 42 KAIC* N3R 120/240V, 1PH, 3W TO TYP. APT. PANEL, 10 KAIC* PANEL L QUAN DESCRIPTION TOTAL WATTS (2) DRYER @ 5000VA EA = 10000 (4) WASHER @ 1500VA EA = 6000 THRU-THE-WALL A/C UNIT = 3550 LIGHTING & RECEPTACLES = 3750 WATER HEATER (GAS) = 400 TOTAL = 23700 + 25% LARGEST MOTOR = 1250 TOTAL NEC DEMAND = 24950 @120/240V/1PH = 104A *******************PANEL L****************** 150A MCB, 120/240V, 1PH, 60HZ, 3W 22KAIC, FLUSH N-1 MOUNTED ISOLATED NEUTRAL, GROUND BUS, 36 CKT DRYER #10 30/2 5000 1,3 DRYER #10 30/2 5000 5,7 WASHER #12 20/1 1500 9 WASHER #12 20/1 1500 11 WASHER #12 20/1 1500 13 WASHER #12 20/1 1500 15 SPACE 17-35 -------------------------------------------- A/C UNIT #10 30/2 3550 2,4 WATER HEATER (GAS)#12 20/1 400 6 LIGHTING #12 20/1 1500 8 LIGHTING #12 20/1 1500 10 LIGHTING (PEC) #12 20/1 1500 12 SPACE 14-36 ALL WIRE THWN CU, #12 UNLESS NOTED OTHERWISE ******** GROUNDING NOTE: 250.64(C) CONTINUOUS - THE GROUNDING ELECTRODE CONDUCTOR(S) SHALL BE INSTALLED IN ONE CONTINUOUS LENGTH WITHOUT A SPLICE OR JOINT EXCEPT AS PERMITTED IN (1) THROUGH (4): (1) SPLICING SHALL BE PERMITTED ONLY BY IRREVERSIBLE COMPRESSION-TYPE CONNECTORS LISTED AS GROUNDING AND BONDING EQUIPMENT OR BY THE EXOTHERMIC WELDING PROCESS. (2) WHERE ALUMINUM BUSBARS ARE USED, THE INSTALLATION SHALL COMPLY WITH 250.64(A). XFMR PNL H 100A N-3R 10 KAIC* 1.5"C,3#1 THWN AL,1#8G CU TO POWER CO. XFMR TAP BOX SEE SERVICE ENTRANCE CONDUCTOR SCHEDULE TAP/ TRANSITION BOX #4 CU 5/8"x8' COPPER GROUND ROD. TYP. APT. METER W/ MCB #3/0 CU BOND TO METAL SPRINKLER PIPING #4 CU APPROVED CONNECTOR STUB OUT 1/2" REBAR CONNECTED TO MIN.20' 1/2" BARE REBAR ENCASED WITH AT LEAST 2" OF CONCRETE LOCATED WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION OR FOOTING PER 250.52(A)(3). STUB UP AND OUT FOR CONNECTION TO #4 CU GROUNDING. LAUNDRY/MAIL KIOSK BLDG - ONE LINE DIAGRAM 120/240V,1PH,3W #4 CU,W/APPROVED CONNECTOR PNL L, SE RATED 150/2 MCB, 42 KAIC* N-1 120/240V, 1PH, 3W TAP/ TRANSITION BOX XFMR XFMR PNL H 100A N-3R 10 KAIC* 1.5"C,3#1 THWN AL,1#8G CU TO POWER CO. XFMR TAP BOX SEE SERVICE ENTRANCE CONDUCTOR SCHEDULE TAP/ TRANSITION BOX #4 CU 5/8"x8' COPPER GROUND ROD. TYP. APT. METER W/ MCB #3/0 CU BOND TO METAL SPRINKLER PIPING SERVICE ENTRANCE CONDUCTOR SCHEDULE #4 CU APPROVED CONNECTOR STUB OUT 1/2" REBAR CONNECTED TO MIN.20' 1/2" BARE REBAR ENCASED WITH AT LEAST 2" OF CONCRETE LOCATED WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION OR FOOTING PER 250.52(A)(3). STUB UP AND OUT FOR CONNECTION TO #4 CU GROUNDING. SINGLE PHASE ALUMINUM AMPS NEU MCB BLDG METER CENTER TYPICAL 1000A (4)-2.5"C EACH W 3#350 1000A 820A 1200A (4)-3"C EACH W 3#500 1240A 1000A ALL CONDUCTORS THWN, XHHW-2 OR EQUAL ALUMINUM. VERIFY MAX #/SIZE OF CONDUCTORS TO PWR CO XFMR. PROVIDE CABLE TAP BOX & COPPER TRANSITION PER PWR CO SPECS. AMPACITIES PER TABLE 310.16 NEC. NOTE: NEC SECTION 110.22 - ALL S.E. MAIN CIRCUIT BREAKERS/TENANT BREAKERS/ PANEL BREAKERS ARE SERIES RATED. THE EQUIPMENT ENCLOSURE(S) SHALL BE LEGIBLY MARKED IN THE FIELD TO INDICATE THE EQUIPMENT HAS BEEN APPLIED WITH A SERIES COMBINATION RATING. THE MARKING SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIROMENT. MARKING SHALL BE READILY VISIBLE AND STATE THE FOLLOWING: "CAUTION - SERIES COMBINATION SYSTEM RATED --- AMPERES, IDENTIFIED REPLACEMENT COMPONENTS REQUIRED." STUB OUT 1/2" REBAR CONNECTED TO MIN.20' 1/2" BARE REBAR ENCASED WITH AT LEAST 2" OF CONCRETE LOCATED WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION OR FOOTING PER 250.52(A)(3). STUB UP AND OUT FOR CONNECTION TO #4 CU GROUND 5/8"x8' COPPER GROUND ROD. #6 CU 2"C,W/3#3/0 THWN AL TO PWR CO XFMR * - UL SERIES RATED FOR MAXIMUM AVAILABLE 42,000 AMPS FAULT CURRENT ALL EQUIPMENT SHALL BE APPROVED BY POWER COMPANY PRIOR TO ORDERING EQUIP. COMPLY WITH ALL POWER COMPANY SPECIFICATIONS FOR INSTALLATION OF EQUIPMENT METERS, AND SE CONDUCTORS.

CLUB BUILDING 2428 SQ FT PH N LIGHTING, 3VA/SQ FT @ 125% = 9105 9105 OR ACTUAL IF LARGER @ 125% = -- -- (47) CONV OUTLETS @ 180VA = 8460 8460 EXH FANS/CEILING FANS = 500 500 OUTSIDE LIGHTING @ 125% = 3750 3750 (1) 40 WATER HEATER (GAS) = 400 -- (3) SMALL APPL CKT @ 1500VA = 4500 4500 (1) DISHWASHER = 1200 1200 (1) GARBAGE DISPOSAL = 850 850 (1) REFRIGERATOR = 1200 1200 (1) MICROWAVE = 1000 1000 (2) ELECTRIC DRINKING FOUNTAIN (EDF) = 2400 2400 (3) COMPUTER CKT @ 1200VA = 3600 3600 (4) EXERCISE EQUIP CKT @ 1200VA = 4800 4800 (1) TELECOMM CKT @ 1200VA = 1200 1200 (2) DEDICATED CKT @ 1200VA = 2400 2400 (3) FAX/PRINTER = 1350 1350 (3) COPIER = 1350 1350 (1) ENTRY SIGN = 1200 1200 (2) ENTRY/EXIT GATE @ 2000VA = 4000 -- (2) CARD READER @ 1200VA = 2400 2400 (2) POOL PUMP @ 5000VA = 8526 -- POOL LIGHTING & RECEP @ 125% = 3750 3750 FACP = 750 750 A/C'S 2 @ 3.5 TON 1 @ 5.0 TON = 16800 -- AHU'S 3 GAS AHU'S = 3750 -- 25% LARGEST MOTOR = 1600 -- TOTAL DEMAND = 90841 55765 @ 120/240V, 1PH, 3W = 379A 232A SERVICE ENTRANCE CONDUCTOR (2)-3"C, EACH WITH 2#250 & 1#3/0, = 410A 310A (THWN AL) =================== LOAD CALCULATIONS PER NEC ART. 220.12 & 220.14 * LIGHTING LOAD FACTOR PER NEC ART 220.12 ** RECEPTACLE DEMAND FACTOR PER NEC ART 220.44 TOTAL @120/240V/1PH PANEL C1 QUAN DESCRIPTION TOTAL WATTS LIGHTING = 9105 RECEPTACLES/CKTS = 8460 EXHAUST FANS = 500 OUTSIDE LTG = 3750 (2) CARD READER @ 1200 VA/EA = 2400 (1) ENTRY SIGN (PEC) = 1200 (2) ENTRY/EXIT GATES @ 2000 VA/EA = 4000 (1) WATER HEATER (GAS) = 400 (1) FACP = 750 (1) 5.0 TON A/C = 6400 (1) AHU (GAS) @ 1250VA EA = 1250 TOTAL = 38215 @120/240V/1PH = 159A QUAN DESCRIPTION PANEL C2 TOTAL WATTS (3) SMALL APPL CKT @ 1500 VA/EA = 4500 (1) DISHWASHER @ 1200 VA/EA = 1200 (1) GARBAGE DISPOSAL @ 850 VA/EA = 850 (1) REFRIGERATOR @ 1200 VA/EA = 1200 (1) MICROWAVE @ 1000 VA/EA = 1000 (1) EDF = 2400 (4) COMPUTER CKT @ 1200 VA/EA 4800 (4) EXERCISE EQUIP CKT @ 1200 VA/EA = 4800 (1) TELECOMM CKT = 1200 (2) DEDICATED CKT @ 1200 VA/EA = 2400 (3) FAX/PRINTER = 1350 (3) COPIER = 1350 (2) 3.5 TON A/C = 10400 (2) AHU (GAS) @ 1250VA EA = 2500 = 39950 = 166A ******************PANEL C1****************** 200A MCB, 120/240V, 1PH, 60HZ, 3W 22KAIC, FLUSH N-1 MOUNTED ISOLATED NEUTRAL, GROUND BUS, 42 CKT LIGHTING #12 20/1 1500 1 LIGHTING #12 20/1 1500 3 LIGHTING #12 20/1 1500 5 LIGHTING #12 20/1 1500 7 LIGHTING * #12 20/1 1500 9 LIGHTING ** #12 20/1 1500 11 ATTIC LTG #12 20/1 1500 13 OUTSIDE LTG ** #12 20/1 1500 15 OUTSIDE LTG ** #12 20/1 1500 17 OUTSIDE LTG ** #12 20/1 1500 19 AC 5.0 TON #8 60/2 6400 21,23 AHU GAS #12 20/1 1250 25 SPACE 27 SPACE 29-41 -------------------------------------------- RECEPTACLES #12 20/1 1200 2 RECEPTACLES #12 20/1 1200 4 RECEPTACLES #12 20/1 1200 6 RECEPTACLES #12 20/1 1200 8 RECEPTACLES #12 20/1 1200 10 RECEPTACLES #12 20/1 1200 12 BATH GFI RECEP #12 20/1 1200 14 GFI RECEPTACLES #12 20/1 1200 16 GFI RECEPTACLES #12 20/1 1200 18 EXHAUST FAN #12 20/1 500 20 CARD READER #12 20/1 1200 22 CARD READER #12 20/1 1200 24 ENTRY SIGN ** #12 20/1 1200 26 FACP *** #12 20/1 750 28 ENTRY/EXIT GATE #10 20/2 2000 30,32 ENTRY/EXIT GATE #10 20/2 2000 34,36 WATER HEATER #12 20/1 400 38 SPACE 40-42 ALL WIRE THWN CU, #12 UNLESS NOTED OTHERWISE ******** *******************PANEL C2***************** 200A MCB, 120/240V, 1PH, 60HZ, 3W 22KAIC, FLUSH N-1 MOUNTED ISOLATED NEUTRAL, GROUND BUS, 42 CKT SMALL APPL CKT #12 20/1 1200 1 SMALL APPL CKT #12 20/1 1200 3 SMALL APPL CKT #12 20/1 1200 5 DISHWASHER #12 20/1 1200 7 DISPOSAL #12 20/1 850 9 REFRIGERATOR #12 20/1 1200 11 EXERCISE EQUIP #12 20/1 1200 15 EXERCISE EQUIP #12 20/1 1200 17 EXERCISE EQUIP #12 20/1 1200 19 EXERCISE EQUIP #12 20/1 1200 21 COMPUTER CKT #12 20/1 1200 23 COMPUTER CKT #12 20/1 1200 25 COMPUTER CKT #12 20/1 1200 27 COMPUTER CKT #12 20/1 1200 29 TELECOMM EQUIP #12 20/1 1500 31 SPACE 33-41 -------------------------------------------- FAX/PRINTER #12 20/1 450 2 FAX/PRINTER #12 20/1 450 4 FAX/PRINTER #12 20/1 450 6 COPIER #12 20/1 450 8 COPIER #12 20/1 450 10 COPIER #12 20/1 450 12 DEDICATED CKT #12 20/1 1200 14 DEDICATED CKT #12 20/1 1200 16 EDF #12 20/1 1200 18 AC 3.5 TON #10 40/2 5200 20,22 AC 3.5 TON #10 40/2 5200 24,26 AHU GAS #12 20/1 1250 28 SPACE 30 SPACE 32-42 ALL WIRE THWN CU, #12 UNLESS NOTED OTHERWISE ******** * 24HR CKT ** VIA PHOTO CELL *** LOCK ON BREAKER *******************PANEL P****************** 150A MCB, 120/240A, 1PH, 3W 22KAIC, SURFACE N3R MOUNTED POOL PUMP #8 50/2 5000 1,3 POOL PUMP #8 50/2 5000 5,7 POOL LTG,GFI,PEC**#12 20/1 950 9 POOL RECEP GFI #12 20/1 950 11 SPACE 13-23 -------------------------------------------- POOL LTG GFI #12 20/1 1200 2 GFI OUTLETS #12 20/1 1200 4 SPACE 12-24 ALL WIRE THWN CU, #12 UNLESS NOTED OTHERWISE ******** PANEL P (2) POOL PUMPS @ 5000 VA/EA = 10000 LTG & RECEP FOR POOL = 3750 TOTAL = 13750 + 25% LARGEST MTR = 1250 TOTAL DEMAND = 15000 @120/240V/1PH = 63A PNL P LOCATED @ POOL EQUIP PAD PNL C1 PNL C2 #3/0 CU BOND TO ALL METAL PIPING WITHIN BLDG #4 CU APPROVED CONNECTOR STUB OUT 1/2" REBAR CONNECTED TO MIN.20' 1/2" BARE REBAR ENCASED WITH AT LEAST 2" OF CONCRETE LOCATED WITHIN AND NEAR THE BOTTOM OF A CONCRETE FOUNDATION OR FOOTING PER 250.52(A)(3). STUB UP AND OUT FOR CONNECTION TO #4 CU GROUND. MDP 600A 5/8"x8' COPPER GROUND ROD #4 CU BUSSED CT CAN METER MDP,600A MCB, N-3R, 42 KAIC, SE RATED FEEDER SCHEDULE: PNL C1 200/2, 2"C, 3#3/0, 1#4 CU G PNL C2 200/2, 2"C, 3#3/0, 1#4 CU G PNL P 150/2, 2"C, 3#1/0, 1#6 CU G ALL WIRE THWN COPPER TO PWR CO XFMR SEE LOAD ANALYSIS QUANTITY & SIZE NOTE: ALL BREAKER KAIC RATINGS SUBJECT TO CHANGE PER POWER CO. XFMR LAYOUT AND AVAILABLE FAULT CURRENT.