GEn Proton Recoil Polarimeter Components

Similar documents
ESTB Proposal from the Stony Brook University: Test of a RICH-Prototype Based on CsI-GEMs

R&D of GEM detector high rate for CBM Experiment at FAIR Muon Chamber R&D in India

ND280 Construction Status Report

LCTPC Setup at the DESY Testbeam. AWLC 14, Fermilab , R. Diener, DESY

Status of Texas active target data manager development. S. Ahn, G.V. Rogachev, E. Koshchiy, J. Hooker, and S. Upadhiajula

US CMS Trigger. DOE-NSF Review Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 9, 2003

arxiv: v1 [physics.ins-det] 20 Mar 2017

2008 JINST 3 S The CMS experiment at the CERN LHC THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS.

Cryogenics. Overview of the Jefferson Lab 12GeV Upgrade. J. Creel, K. Dixon, P. Knudsen, J. Wilson Jr.

CMS, In Brief. Bill Gabella Vanderbilt Quarknet session, July 20, 2015 (disgracefully borrowing from Will Johns)

Texas active target (TexAT) detector part 1: Design and construction progress

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Technical Manual Ionisation Chamber MUSIC80

Surface Concept Product Catalog 2014

RICH Status Report. Tyler Lemon Detector Support Group. Rich Status Report. Tuesday, August 23, 2016

Expected needs in Electronics for the CERN Experiments. 5 October 2015

MERIT Experiment Status of Activities at CERN

Slow Controls. N. Baltzell 5 th 1 st CLAS12 Experiment Workshop March 28, 2017

The LHCb Outer Tracker: Production & Ageing studies

Requirements for Active Safety Systems of the General Infrastructure in Secondary Beam Areas

The DM-Ice Test Detector. Detector Concept Mechanical Assembly Vessel Options Logistics Considerations Schedule

US CMS Trigger. DOE-NSF Review. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 14, 2007

Active Scanning Beam 2: Controlling Delivery

Status of the PRad Experiment (E )

Micromegas detectors for the upgrade of the ATLAS Muon Spectrometer

AIDA Advanced European Infrastructures for Detectors at Accelerators. Presentation. LumiCal alignment system, status report

Gas Ring-Imaging Cherenkov Detector Construction Introduction

arxiv: v1 [physics.ins-det] 2 Oct 2013

ANKE Technical Issues

INFN Rome Silicon Microstrip Detector for SBS F. De Persio S. Kiprich - F. Meddi G.M. Urciuoli

International Journal of Advance Engineering and Research Development

MODEL 5100 VOTING LOGIC MODULE

Detectors Plans for LS1

Drift Chamber construction for ATLAS*

EDELWEISS-III dark matter search: first results and future

Learning from High Energy Physics Data Acquisition Systems Is this the future of Photon Science DAQ?

Gemini Instrument Program Status Report. Gemini Science Committee October 12, 2009

Status Report about the TPC Detector and Module at CEPC

ICS Integrated Cryocooling System

TRITIUM IN WATER MONITOR REAL TIME CONTINUOUS Model # LIQ-X-(H3)

The TOTEM Detector at LHC

US CMS Trigger LPC Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager February 17, 2006

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

XX 0.25 GI VX. The other members of the series are also optimal for quad-element pyroelectric detectors of the type:

STATUS OF THE LHC EXPERIMENTS.

Testing strategy and timeline of E-det 80k. Christian Koffmane for the MPG HLL team

TPC BASED IMP. Limin Duan, Gas Detector Group. Institute of Modern Physics, CAS TPC tracker detector technology mini-workshop

Introduction. Phil Spicer. Manager Railway Electronic Systems

The SLAC Detector R&D Program

I am Rick Jeffress and I handle sales for Fike Video Image Detection. We thank the AFAA for coordinating the venue for this presentation, and we

The Flash Beam Loss Monitor System

MAJORANA An Ultra-Low Background Enriched- Germanium Detector Array for Fundamental Physics Measurements

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. Status of CMS Commissioning

ICS Integrated Cryocooling System

Full Service Central Station Fire Alarm Listing Evaluation

50(394) IEC. ore content meter ore sorting equipment overvoltage (of a Geiger-Müller county tube)...

Stato di LHCb. P. Campana CSN1 14 maggio Il Trigger L0 dei Calorimetri Il sistema dei RICH Il sistema a Muoni

multi-purpose detector to search for Higgs and new physics

MD456: Monitoring of abort gap population with diamond particle detectors at the BGI in IP 4

Bonn testbeam, QUAD development

ICS Integrated Cryocooling System

L0 TRIGGER ELECTRONICS FOR THE SETUP IN RUN MARCH 2017

LHCb Rich Detectors Control and High Voltage Systems

Taking Action on Fire and Life Safety

Hall A Tritium Target (HATT) Operator Training. Skill PHY020

Performance Requirements for Monitoring Pulsed, Mixed Radiation Fields Around High-Energy Accelerators

Mechanical Concept of the TESLA Detector

LCLS Instruments. Jerry Hastings June 20, 2008 LCLS

SuperCDMS SNOLAB: Road to 100 mm Germanium Detectors

Victoreen 942A-200. Operators Manual. Universal Digital Ratemeter

! "! # $ % & ' ( % % % % ( ( ( % & % ) *

Description. Optex Incorporated

Today s Outline - September 12, C. Segre (IIT) PHYS Fall 2016 September 12, / 21

LARGE VOLUME HEMISPHERICAL NUCLEAR RADIATION DETECTOR CZT/500(S)

Architectural and Engineering Specification for a. Flash / Flare

CERN GIF ++ : A new irradiation facility to test large-area particle detectors for the high-luminosity LHC program

RISING. Stopped beam design status. 29 th September 2005

TRIUMF-ISAC GAMMA-RAY ESCAPE SUPPRESSED SPECTROMETER (TIGRESS) TECHNICAL PROGRESS REPORT

SAFETY MANUAL. Multispectrum IR Flame Detector X3301

October Network of Companies

The Majorana Demonstrator Update and Detector Technologies

Stand-off Detection of Trace Explosives by Infrared Photothermal Imaging. Trace Contamination

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work.

CALICE: status of a data acquisition system for the ILC calorimeters. Valeria Bartsch, on behalf of CALICE-UK Collaboration

DSP EC Pro. Advanced, Digital Gamma-Ray Spectrometer for HPGe Detector Systems

ORTEC DSPEC LF. High-Performance Digital Signal Processor for Gamma Spectroscopy. ... in a compact package at an economical price.

SAFETY MANUAL. X2200 UV, X9800 IR, X5200 UVIR SIL 2 Certified Flame Detectors

More Precision. Innovative Sensor Technologies. Displacement Distance Position. Dimension Temperature Colour

Property Name & Address [ Property Name ] - [ Property Address ]

LAUNDRY MONITORING SYSTEM Model # LIM-64S

RFP Addendum 2 March 31, 2016

February 12, PHY357 Lecture 11. Experimental Methods. Accelerators. Particle Interactions. Particle Detectors. Full experiment (eg.

Detector infrastructures and safety systems

PIP PCTPA001 Testing of Process Analyzer Systems

Performance Analysis of the AD Detector Control System in the ALICE Experiment

GEM detectors activity at the Laboratori Nazionali di Frascati of INFN

Advanced Virgo BASELINE DESIGN

Development of the CMS Phase-1 Pixel Online Monitoring System and the Evolution of Pixel Leakage Current

NASA Plans for Dosimetry in Support of Manned Spaceflight

Product Guide. Ceiling PIR HS presence detector DALI / DSI dimming. PIR Sensor. IR Receiver. Light Level Sensor. Status LEDs.

Transcription:

GEn Proton Recoil Polarimeter Components GMn Preparation Review Brad Sawatzky, Michael Kohl 1

Components for Recoil-Proton Portion Recoil proton detectors 2 packages total:» One on SBS Left» One on SBS Right Each package contains» 1x Hodoscope array timing, coarse location» 2x GEM planes tracking Inline GEMs (shared w/ ChEx GEn) 6x 'rear' GEMs» charged particle veto Active Analyzer np recoil vertex identification C-Det (Coordinate detector) 'stock' GMn configuration charged particle veto HCal 'stock' GMn configuration additional neutron id. BigBite 'stock' GMn configuration electron arm» primary trigger 2

Floor Layout Notes: Provision will be made to simplify craning in/out Beamline side GEMs + hodoscope to avoid interference with small angle SBS config. Hodoscope and Analyzer cables will run under pivot to the DAQ weldment GEM cables run to GEM racks on beam-right side of SBS (See Robin W. talk) Proton detectors GEM + Scint Analyzer Hodoscope/ Analyzer Cables 3

Required Detector Equipment Count Item Status 2 Hodoscope arrays 24+24 scint bars from (Old) BB Hadron stack 2 PMTs/bar 96 HV, signal channels) 10 'Rear' GEM planes 6 in-line with SBS detector stack 2 in front of 'left' hodoscope array (proton pol.) 2 in front of 'right' hodoscope array (proton pol.) Active analyzer 'Glasgow' active analyzer is in the current CAD model (32 channel segmented unit; in-hand) 4

Hodoscopes / Active Analyzer BigBite (old) Hadron stack bars» 24 'de' 500x86x3 mm3» 24 'E' 500x86x30 mm3 Currently in TEDF Hall A area» Very good shape» E-bars re-stacked for left plane» de-bars re-stacked for right plane Each stack: 50cm wide x 200cm Matches GEM coverage» Will need testing and remounting over Summer Fall 2020 Active Analyzer Assembled and Ready in Glasgow 5

Required Electronics/Cabling Count Item Status 6+2 F250 FADC Draw from 'NPS/LAD' FY19 plans (*) 1 C1190 TDC In hand (1+spare: Glasgow + Hall C spares) 6+2 CAMAC Discrim. 4 in hand; 4 to locate 1 VXS crate In hand (1+spare: Glasgow + Hall C spares**) CAMAC crate In hand 96+32 ch HV supply (neg) In hand 10+ Ribbon cables In hand 128 SHV cables (~100') In Hall C boxes in Phys Stor. (needs work) (***) 128 Signal cables (~100') In Hall C boxes in Phys Stor. (needs work) (***) Plan to use HV supply (252 ch) already ordered as part of NPS build up (arrives next month) (*) Could likely make do with FastBus 1881s if required (cable delays would need to be verified..) (**) VXS crate purchase in Hall C budget for FY19 order pending (***) Glasgow will support SHV and signal cable requirements if needed 6

Cables and Testbed/DAQ Multiple testbeds in ESB ideal for hodoscope checkout One available already 2nd available Summer 2019 Cables in Hall C boxes in Physics Storage ~100' from detector DAQ weldment (run under/near pivot) Needs sorting and labeling!» Spring/Summer 2019 Glasgow offered support cables from their inventory/ funds if needed SHV BNC 7

Required Infrastructure Count Item Status GEM crate rackspace Include with existing GEM Readout near SBS VXS crate rackspace 6+2 Slots FADC, 1 slot for 1190 CAMAC rackspace 6+2 Slots for Discriminators + 1 slot Controller (if not present) Stand modifications for additional GEMS and Analyzers Design nearly final, to be complete by Dec 2018. Assume JLab budget Related talks: GEM gas: Jack SBS GEMs: Kondo Weldments, Stands: Robin 8

Readout/FE Hardware Locations Count Item Status GEM crates Include with existing GEM Readout in shielded 'hut' on beam-right side of SBS support structure (moves with structure) VME/VXS crate In DAQ weldment 6+2 FADCs, 1 CAEN 1190 TDC CAMAC rackspace In HCAL racks, then ribbon DAQ weldment -OR- run RG-58 DAQ weldment 6+2 Slots for Discriminators + 2 slot Controller (if not already present) Additional Racks In hand (Phys. St; Hall C area), if needed 9

Personnel / Task List / Timeline Item People Completion Target Hodoscope Checkout Sawatzky, Kohl, Tireman (summer student) Summer 2019 Hodoscope ready for installation Sawatzky, Kohl, Tireman (summer student) Fall 2019 Collect DAQ electronics, hardware, cabling Sawatzky Dec 2018 Active Analyzer checkout Sawatzky, Hamilton, Tireman? Summer 2019 GEM materials procurement Kohl, T. Cao?? GEM construction Kohl, T. Cao?? GEM testing Kohl, T. Cao?? GEM ready for installation Kohl, T. Cao?? 10

Additional Comments Primary trigger assumed to be standard BigBite (electron) BB + SBS readout on each trigger 11