BRIAR CHAPEL US STEEL - SECTION 2. CONSTRUCTION DRAWINGS U.S. HWY and MANN'S CHAPEL ROAD CHATHAM COUNTY, NORTH CAROLINA

Similar documents
BRIAR CHAPEL PHASE 13 SECTION 1 & 2. CONSTRUCTION DOCUMENTS U.S. HWY and MANN'S CHAPEL ROAD CHATHAM COUNTY, NORTH CAROLINA

COMMERCIAL SD NORTH. PRELIMINARY PLAT SUBMITTAL U.S. HWY and BRIAR CHAPEL PARKWAY CHATHAM COUNTY, NORTH CAROLINA DATE: JANUARY 20, 2015

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Request for an Exception to the Napa County Road and Street Standards


NAPA COUNTY PUBLIC WORKS Standards & Specifications

GRACE CHURCH EXPANSION

Action Plan for Retrofitting Structural BMPs

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Severn River Sub-Watershed: BMP 09-Retrofit


FEG AIR COMMERCE PARK - PD FRAMEWORK MASTER PLAN ORLANDO, FLORIDA FLORIDA ENGINEERING GROUP. Orlando, FL Phone: Fax:

12/14/2015. Annette Lucas, PE Sediment and Erosion Control Workshop December 10, Department of Environmental Quality

APPENDIX J REFERENCES

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Gwinnett County Land Disturbing Permits. Presented by the Departments of Planning & Development Public Utilities October 2001

Michael D, Harvey, Current Planning Supervisor. This project was originally approved in 2012 by the BOCC and is summarized as follows:

138 ATTACHMENT 17. DEPARTMENT OF THE ARMY WlLMlNGTON DISTRICT, CORPS OF ENGINEERS

Boston Water and Sewer Commission

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

3/22/2011. City Council City Hall Wilmington, North Carolina Dear Mayor and Councilmembers:

Project phasing plan (if applicable) 12 copies of site plan

CHECKLIST FOR PHASE II DRAINAGE REPORT

PLAN SUBMITTER'S CHECKLIST

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Maintenance Plan for Vegetated Portions of the MS4

DEPARTMENT OF PUBLIC WORKS & UTILITIES

Phase II Storm Water Permit Program MS4 Permit

Project Memo. IDNR State Revolving Fund

Northeast Ohio Regional Sewer District Stormwater Management Plan Review Policy

UNIVERSITY PRESBYTERIAN CHURCH - RENOVATION & ADDITION 209 EAST FRANKLIN ST., CHAPEL HILL, NC 27514

Town of Chapel Hill. Prepared By: A Division of Pennoni. Chapel Hill, NC (919) Firm License: F-1267.

Town of West Point Plan of Development

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

HICKORY TAVERN OUTPARCEL #14B

Sewer & Storm Drain Systems

Appendix I. Checklists

Rezoning Case #16CZ08

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Gloucester County PLAN SUBMITTER'S CHECKLIST

Erosion & Sediment Control Plan Application Form & Checklist

Action Plan to Address Erosional Outfalls

The use of low head weirs to. perennial streams with their floodplains:

Town of Scarborough, Maine

Essential Skills: Reading and Interpreting Maps and Plans

Offering Memorandum Commercial Opportunity Acre Parcel Zoned MU-OI-1/R-3

Presentation Outline

Drexel, Barrell & Co.

Tree Protection, Open Space, Landscaping, Storm Water Additional Elements Chatham Park Investors LLC s Responses to Comments

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

STEEPLECHASE Planned Development / Master Plan Document. Prepared for Town of Clayton October 2014

CITY OF BIDDEFORD PLANNING DEPARTMENT PLANNING BOARD REPORT. Larry Patoine, Chair & Members of the Biddeford Planning Board

5. Would the proposed project require modifications to the existing regulations?

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

PRELIMINARY STAFF PLANNING REPORT TO THE WALWORTH COUNTY ZONING AGENCY X CONDITIONAL USE

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Craven Street Stormwater Improvement Projects

Southland Lane Detention Pond Project is a classroom for future green infrastructure projects in the City of Brookings, South Dakota

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Washington County, Maryland Division of Public Works Policy Manual

Public Information Meeting

Urban Planning and Land Use

Planning & Zoning Commission

Gravel Roads and Parking

Advance Engineering & Surveying PLLC

Photo 1: Upper Rock Creek Trash, east of Ogontz Ave. Map 1: Map of Upper Rock Creek with photos of conduit openings

KENT COUNTY STORMWATER MAINTENANCE DISTRICT STORMWATER BMPs MAINTENANCE TASKS AND RESPONSIBILITIES GUIDANCE DOCUMENT BIO-RETENTION FACILITIES

Do you know there your MS4 is?

Inventory and Assessment of Stormwater Infrastructure

GRAND ARBOR RESERVE GRAND ARBOR RESERVE, LLC ULIAN KISSIOV D'ONOFRIO KOTTKE & ASSOC., INC.

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

4. Contractor (and subcontractors if applicable) certification statement(s)

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

New Development Stormwater Guidelines

County of Fairfax, Virginia

The Road to Stormwater Management: MDOT s MS4 Permitting. Meredith Cote Dan DeVaun Chris Potvin June 2017

SITE PLAN (REVISED 8/13/18) l. Development Data Table

Draft Rhode Island Stormwater Design and Installation Standards Manual

Flooding Hearing: Long and Short Term Strategies

Department of Planning & Development Services

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

PHASE III DRAINAGE REPORT

APPLICATION FOR MINOR SITE PLAN REVIEW

The Development of Riparian Stream Buffers in Greensboro, NC

UNIVERSITY OF NORTHERN IOWA

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern

Cottage Grove Road Reconstruction. City of Madison Engineering

A New Approach to LID We all know we don t want when it comes to urban streams

Why a new Food & Farm Ordinance?

Coco Palms Community Development District. Engineer s Report Infrastructure Improvements

Technical guidance to meet stormwater management design requirements; and,

Appendix K. Stormwater Management Plan

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

Review Zone Application for D&R Canal Commission Decision

FKW PROPERTIES LINDON. Site VINEYARD OREM. Vicinity Map. Timpridge Development 451 East 1000 South Suite A Pleasant Grove, Utah


STORMWATER UTILITY PRESENTATION November 18, 2014

Transcription:

CONSTRUCTION DRAWINGS U.S. HWY 15-501 and MANN'S CHAPEL ROAD COUNTY AND AGENCY CONTACTS A. Chatham County Planning Department Dunlap Building 80 East Street (919) 542-8204 phone Contact: Jason Sullivan Email: jason.sullivan@chathamnc.org B. Chatham County Environmental Services Dunlap Building 80 East Street (919) 542-0945 phone Contact: Brian Burkhart, PE Email: brian.burkhart@chathamnc.org C. Chatham County Soil Erosion and Sedimentation Control Dunlap Building 80 East Street (919) 545-8339 phone Contact: Rachael Thorn Email: rachael.thorn@chathamnc.org D. Chatham County Public Works 964 East Street, 2nd Floor, Suite 205 (919) 542-8270 phone Contact: Larry Bridges Email: larry.bridges@chathamnc.org E. NCDOT Division 8, District 1 300 DOT Drive P.O. Box 1164 Asheboro, NC 27204 (336) 318-4000 phone Contact: Matthew Kitchen, PE Email: mwkitchen@ncdot.gov F. NCDENR Division of Environmental Health Public Water Supply Section 1634 Mail Service Center Raleigh, NC 27699-1634 (919) 707-9064 phone Contact: Shashi Bhatta Email: shashi.bhatta@ncdenr.gov H. NCDENR Division of Water Quality Surface Water Protection 3800 Barrett Drive Raleigh, NC 27609 (919) 791-4200 phone Contact: Danny Smith Email: danny.smith@ncdenr.gov : APRIL 11, 2018 REVISED: MAY 7, 2018 VICINITY MAP NTS TO PITTSBORO TO CHAPEL HILL PROJECT DATA NAME OF PROJECT: OWNER: NNP, LLC 16 WINDY KNOLL CIRCLE CHAPEL HILL, NC 27516 PHONE: (919) 951-0700 FAX: (919) 240-4963 CONTACT: LEE BOWMAN EMAIL: lbowman@newlandco.com PREPARED BY: McKIM & CREED 1730 VARSITY DRIVE, SUITE 500 RALEIGH, CAROLINA 27606 PHONE: (919) 233-8091 FAX: (919) 233-8031 CONTACT: GARETH AVANT, PE EMAIL: gavant@mckimcreed.com PROJECT AREA: 18.5 AC These improvements shall be constructed in accordance with the following plans, and the Standard Specifications of NCDOT and Chatham County. SHEET INDEX C0.1 COVER SHEET C0.2 EXISTING CONDITIONS/DEMOLITION PLAN OVERALL SITE PLAN C1.1 SITE PLAN C1.2 SITE PLAN C2.1 UTILITY PLAN C2.2 UTILITY PLAN C3.0 OVERALL STAGE 1 EROSION CONTROL PLAN C3.1 STAGE 1 EROSION CONTROL PLAN C3.2 STAGE 1 EROSION CONTROL PLAN C3.3 OVERALL STAGE 2 EROSION CONTROL PLAN C3.4 GRADING, DRAINAGE & STAGE 2 EROSION CONTROL PLAN C3.5 GRADING, DRAINAGE & STAGE 2 EROSION CONTROL PLAN C4.1 PLAN & PROFILE STA. 17+00.00 TO 27+83.53 C4.2 PLAN & PROFILE ROAD 2 STA. 10+00.00 TO 20+76.20 C4.3 PLAN & PROFILE STORM OUTFALL STA. 10+00.00 TO 23+50.18 PLAN & PROFILE WATER LINE CONNECTION TO PHASE 16N C4.4 STA. 10+00.00 TO 14+49.92 PLAN & PROFILE BMP #37 OUTFALL STA. 10+00.00 TO 11+05.72 D1.1 EROSION AND SEDIMENTATION CONTROL DETAILS D1.2 EROSION AND SEDIMENTATION CONTROL DETAILS D2.1 NCDOT ROADWAY DETAILS D2.2 NCDOT DRAINAGE DETAILS D3.1 UTILITY DETAILS D3.2 UTILITY DETAILS D4.1 BMP #37 PLAN & DETAILS D4.2 BMP #37 PLAN & DETAILS D4.3 BMP #37 PLAN & DETAILS D4.4 STORM DRAINAGE & SANITARY SEWER TABLES 05/07/2018 -

END: 2 REVISED PER NCDOT COMMENTS 2018.05.07 1 REVISED PER CHATHAM COUNTY EROSION CONTROL AND STORMWATER 2018.05.04 0 INITIAL SUBMITTAL 2018.04.11 EXISTING CONDITIONS/DEMOLITION PLAN : APRIL 11, 2018 SCALE C0.2 1" = 100' C0.2 2

C1.1 C1.2 3 LOW PRESSURE SEWER 07/02/2018 07/02/2018 OVERALL SITE PLAN : 1" = 100' 3

MATCHLINE - SEE SHEET C1.2 3 LOW PRESSURE SEWER 07/02/2018 07/02/2018 SITE PLAN : C1.1 3

MATCHLINE - SEE SHEET C1.1 SITE PLAN : C1.2 2

END MATCHLINE - SEE SHEET C2.2 UTILITY PLAN : C2.X C2.1 2

END MATCHLINE - SEE SHEET C2.1 UTILITY PLAN : C2.X C2.2 2