PROJECTS OF DUBRUTO URBAN PLANNING 22 February 2016 Centurion Lake Redevelopment - Symbio City

Similar documents
HOLDING 88 OF THE LYTTELTON AGRICULTURAL HOLDINGS

PROJECTS OF DUBRUTO URBAN PLANNING Inc.

PART 5: DEVELOPMENT FRAMEWORK Figure 57: Proposed Height

Welcome. Walk Around. Talk to Us. Write Down Your Comments

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

OPEN SPACE MANAGEMENT WORKSHOP. Johannesburg Botanical Gardens 22 May 2009 TOWN PLANNING SCHEME REQUIREMENTS

SOCIO-ECONOMIC MOVEMENT ENVIRONMENT INFRASTRUCTURE TOWN PLANNING

GUIDELINES VICTORIA PARK AVENUE & STEELES AVENUE LOCATION URBAN DESIGN GUIDELINES

1 Introduction. Chapter. In this chapter:

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

burlington mobility hubs study Downtown Burlington Mobility Hub

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

6 Growth Management Challenges and Opportunities

A. WHAT IS A GENERAL PLAN?

CHAPTER 7: Transportation, Mobility and Circulation

Edward R. Sajecki Commissioner of Planning and Building

178 Carruthers Properties Inc.

CITY COUNCIL AGENDA REPORT

Welcome to the Oakridge Centre Open House

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

New Official Plan Quest November 2013

KANATA CENTRUM 255 KANATA AVENUE OFFICIAL PLAN AMENDMENT ZONING BY-LAW AMENDMENT

UDF PLANS AND GUIDELINES

1 October Dear Citizens of Charlotte and Mecklenburg County,

Plano Tomorrow Vision and Policies

ROAD CLOSURE AND LAND USE AMENDMENT SILVER SPRINGS (WARD 1) NORTHEAST OF NOSEHILL DRIVE NW AND SILVER SPRINGS ROAD NW BYLAWS 2C2018 AND 29D2018

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

ARISE: The Rock Renaissance Area Redevelopment & Implementation Strategy

Public Open House. Yonge Street and Bernard Avenue (Bernard KDA) Planning Study Update Town of Richmond Hill. March 30, 2017

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

Edmonton s Transit Oriented Development Journey

Bloor St. W. Rezoning - Preliminary Report

A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development:

Official Plan Review

Northern Territory Compact Urban Growth Policy

Complete Neighbourhood Guidelines Review Tool

WITNESS STATEMENT Of. Ronald Blake. On behalf of the Intervenor The Corporation of the City of Markham

Planning Primer Legislative Background, Policy Documents and Development Review Processes. Presented by: Planning Services Date: April 6, 2017

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

ONTARIO MUNICIPAL BOARD

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

WELLINGTON HOSPITAL DESIGN GUIDE TABLE OF CONTENTS

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

EXECUTIVE SUMMARY DRAFT CHAPTER 1 INTRODUCTION EXECUTIVE SUMMARY

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

Tyvola & Archdale Transit Station Area Plan. May 15, 2008

REQUEST FOR QUALIFICATIONS

AGINCOURT SECONDARY PLAN

Synopsis of 50 years of Planning in the Greater Golden Horseshoe (GGH), Ontario, Canada. Olusola Olufemi 2015

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

Section 9 NEIGHBORHOOD DESIGN

REPORT BACK BROADSHEET 3 May 2016

Cambie Corridor Planning Program Phase Two Draft Plan. Standing Committee on City Services and Budgets May 5, 2011

Draft Urban Hamilton Official Plan. Amendment No. XX

The protection of the agricultural resources of the Province;

St. Kevin s Area Planning Collaborative

DRAFT Subject to Modifications

Realities and Assets in an In-Town Shopping Center

Urban Growth Boundaries

Sacramento Area Council of Governments (SACOG)

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ)

Clairtrell Area Context Plan

Town of Portola Valley General Plan. Nathhorst Triangle Area Plan

AMENDMENT NO.XX TO THE CLARINGTON OFFICIAL PLAN

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation

Brian Madigan, RLA, CPESC Director Land Planning & Design

1.0 Circulation Element

5th and Division. Crabill, Daren

TRANSPORTATION: Roads and Highways Services

hermitage town center

Sheffield Victoria Station Development Prospectus January 2014

page 258 THE OLIFANTS RIVER VALLEY

SPG 1. * the northern and western sections which are open fields used for pasture and grazing;

The broad range of permitted and special uses allowed in the district remain, but some descriptions have been clarified.

K. SMART ASSOCIATES LIMITED

Urban Context 3.4/ 20 Muckleneuk. Mears Train Station Elandspoort Road UNISA. Urban Frame3.5/ 21 Movement Lines Active Edges Building Fabric

Official Plan Review: Draft Built Form Policies

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

We are a determined group residents, industry, and government and by working together an incredible future lies ahead for Troy.

Key Principles. 290 Phasing Principles and Programme

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

Corridors. Re-vitalize our Corridors and Gateways

HARTENBOS NORTH (population: Census 2011)

Newcourt Masterplan. November Exeter Local Development Framework

6 PORT SYDNEY SETTLEMENT AREA

5.1 Site Plan Guidelines

MAIN STREET ECONOMIC DEVELOPMENT STRATEGY

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Corridor Plans: An Opportunity to Develop Low Carbon Open Spaces Network-The Case Study in Tehran, Iran

Integrated Urban Structuring in Australia An Overview of Principles and Practice

MALL REVITALIZATION CASE STUDIES

Transcription:

PROJECTS OF DUBRUTO URBAN PLANNING 22 February 2016 Centurion Lake Redevelopment - Symbio City Background This is the well-known project to redevelop erf 53 Verwoerdburg Stad. DUBRUTO URBAN PLANNING Inc. has been directly involved in this project from the beginning. We provided some influence in the strategic thinking process that took the lake from an unsolvable problem to a situation where it will become through the proposed development - a huge asset to the Tshwane Metro and all its residents. We also provided the collective planning memory from the development history and practise of the original Centurion Mall and Lake and its ongoing development over the last 35 years to take the present process forward. We also provided a collective definition and motivation of the present urban planning realities and enormous development potential that supports the present proposals for the redevelopment of the Lake. Finally we supported the municipal administration to provide their Council and decision making structures with applicable and comprehensive urban planning knowledge to come to fully informed decisions in this regard. Several informative reports were provided and presentations were held by municipal planners to various sub committees of the Tshwane Metro Council. This firm assisted the municipal personnel with some of the content of that. We did not propose the specific aspects of the idea or design of the present concept of 3 tower blocks and a shopping centre nor the private rapid transport system. However we formulated this idea into proper presentations, motivations and proposed town planning zoning rights. This firm - as part of the developing company - is monitoring the process as it is progressing presently and has identified several critical aspects of the project that needs addressing to achieve the goals set by the Tshwane Metro and the developing company. These critical and complex aspects will be dealt with by applying our strategic thinking skills. The proposal as it stands: 3 tower block buildings on top of a new shopping centre. 1

The Concept The concept is about a development company leasing - and buying a part of it - the land from the Tshwane Metro and - because of its locality so close to the Gautrain station to develop the above proposal and in doing so provide an acceptable and practical solution of the huge problems affecting the Centurion Lake. The Land The proposal to lease the land comprise the following: Note that this text originated from the initial concept and that there was a small adjustment in regard to the total land being leased and that being sold. PROPERTY PARTICULARS Property Description The area is the Centurion Lake (erf 53 Verwoerdburg Stad) as well as the 5 properties abutting the lake on its northern banks. The total area as is indicated by each land parcel s Surveyor General Plan totals 99 530m². The total area to be leased is: 92 122m² (Has since been slightly adjusted) The total area to be bought is: 7408m² (Has since been slightly adjusted) Total areas on map on next page have since been slightly adjusted. Zoning Erf 53 Verwoerdburg Stad is zoned: Public Open Space. Areas 2 to 7 on Map 1 is regarded to be zoned agricultural. Land use Erf 53 Verwoerdburg Stad: Is in its entirety a lake built within the Hennops River. Areas 2 to 7 are being used as landscaped open space with braai facilities. 2

Registered Owner The City of Tshwane Metropolitan Municipality. Some Aspects Regarding the Proposed Development of Symbio City Only erf 53 Verwoerdburg Stad is to be developed for a specific land use. The abutting land parcels to be leased would be used for access to the development, different services, open space 3

features and overflow of flooding of the river above the 1:100 year mark. Presently the abutting land parcels all have access to Lenchen Avenue by way of right of way servitude over portion 2 of Holding 48 of the Lyttelton Agricultural Holdings. (Area 6 on Map 1) Portion 2 of Holding 48 of the Lyttelton Agricultural Holdings accommodates part of the hotel built over the Hennops River at the entrance to the lake. The building is resting on a pillar on an area of portion 2 of Holding 48 over which an air space servitude is registered. The hotel is therefor only situated on the remaining extent of erf 5 of Verwoerdburg Stad and on part of portion 2 of Holding 48 of the Lyttelton Agricultural Holdings. The Lake is also situated partly on the remaining extent of erf 5 of Verwoerdburg Stad. The remaining part of portion 2 of Holding 48 of the Lyttelton Agricultural Holdings is being used as the entrance from Lenchen Avenue to the open space system on the other land parcels abutting the Lake. See diagram SG 7723/90. Erf 53 Verwoerdburg Stad is zoned as public open space and if the application is approved the park will have to be closed and then sub-divided into 2 portions to create the residential erf to be sold off and then both the erven would be rezoned for the appropriate land use rights. Any future land use applications for the applicable abutting land parcels would be as would become necessary for the specific service or function. This information is not known at present. Erf 53 Verwoerdburg Stad would be used as indicated in the report: Symbio City: CITY OF TSHWANE -CENTURION LAKE REDEVELOPMENT PROPOSAL as follows: Retail Development o A Shopping Centre with at least 100 000 m² of GLA. o Height: Maximum of 3 storeys. Office and Hotel Development o An office component with at least a total floor area of 350 000m² of GLA. o A maximum 295 bed Hotel. o 1 building with maximum height of 110 storeys. o 1 building with height of 64 storeys. The residential component of erf 53 Verwoerdburg Stad o Allow for maximum of 1 000 dwelling units, with average size 150m² per unit. o One building of maximum height of 60 storeys. 4

A Private Rapid Transport system to connect the development with the Gautrain Station as well as with the proposed development Zwartkop x28 and also the present Centurion Mall area. The development company of Symbio City is in negotiations with the existing owners of the Centurion Mall to enable a reasonable monetary situation to become viable in regard to both shopping areas in future. The Lake (Note that all aspects discussed here have to be finalised and designed in detail still) As has been thoroughly discussed elsewhere that the status quo of the Centurion Lake area and the low water quality of the river cannot be allowed to continue. The silting up of the lake is causing the lake s capacity to diminish in such a way that flooding is now occurring in a dangerous and unpredictable way. To just clean the Lake up and re-instate it to its former glory would cost more than R100 million and would not solve the problem of silting. The lake has been constructed in the past to provide the then new shopping centre with an advantage over other shopping centres and never has been an essential aspect of the Centurion Mall Development. The 6,3ha of area under water actually are wasting available area that can be utilised much better for other productive and recreational activities. The original development has been implemented 30 years ago and a rethink of the situation should be in order. Most of the stakeholders whose businesses are situated around the lake would welcome any solution that would remove the present status quo and replace it with a development that would not include any water from the river. It has been proposed that the Hennops River be canalised into a canal that would run underneath the proposed building structure on erf 53 Verwoerdburg Stad. This canal would be able to accommodate a 1:150 year flood. The canal would accept the Hennops River near the existing entrance of the river into the lake (on portion 2 of Holding 48) and dispose of it into the river at a suitable place on the downstream side of erf 53 of Verwoerdburg Stad. (It is now being contemplated the river to be canalised from where the river flows underneath the N1 freeway.) See also article on Open Spaces and Symbio City under DOWNLOADS. Applicable structures would be implemented upstream from the canal to filter the normal load of the river especially the incredible load that is occurring when the river is flooding. A secondary river basin to accommodate flooding above the 1:150 year level would be constructed on top of the land parcels abutting erf 53 on its northern banks. This secondary basin would either not be obvious or it would be in the form of a canal like the Cheonggyecheon River Park in Seoul, South Korea with cleaned water circulating continuously as needed.) The abutting land areas also to be leased would be secondary to many other uses like open space, access to buildings, services, etc. (The concept of Symbio City is that all services are generated on site which includes cleaning processes of water too.) Taking the above said into account it is obvious that the lake would then be available as land to be redeveloped as proposed. Because of the original urban design features of the original development situated around the lake much effort will be put into the new design to again create an aesthetical pleasing development on ground level. It is the plan to again provide many water and recreational features on the ground surface although this time the water systems would be artificial like in a swimming pool. The water of the river would not be used directly and if used at all it would be thoroughly cleaned first. 5

Local Transport System Many decentralised urban nodes like Sandton City, Sunning Hill Rivonia, Centurion Mall area, etc. tends to quickly spread horizontally beyond easy access for pedestrians. The result is a movement system mostly based on private vehicle transport that has no cohesion between the buildings situated on it. There is a total lack urban design on street level not creating urban places, etc. All such places can only be accessed within the buildings or on privatised land. The proposed Centurion Lake Development would include a Personal Rapid Transit (PRT) system that would connect the new development with several other existing developments. This would include Zwartkop extension 28 the application belonging to the applicants for 40 storey office and commercial buildings abutting the John Vorster traffic interchange. This system should revolutionize personal transport within the Centurion business area. The fast developing Personal Rapid Transport systems of the world provides a unique solution. PRT brings what has been a transportation solution of the future to a proven and safe solution of today. It is a viable option for urban transportation with potential for higher access and services at a lower cost than commonly transport modes, while avoiding traffic problems such as congestion, accidents and pollution. It seems that the Centurion Mall area and its surroundings could be particular suitable for such transport systems. Some of these systems are already in use in world cities. Graphic: A Concept of Personal Rapid Transit routes for Centurion Lake Development Note: Park and ride garages indicated are only concepts. 6

The above graphic indicates that to address some of the huge parking requirements of the proposed Centurion Lake Development a system of park and ride connected to the PRT system is proposed. Parking could take place in buildings situated outside the Centurion business area and would house modern parking stack systems in place of the usual parking garage. The PRT system would not only serve the Centurion Lake Development but other developments and land uses too. The proposed Centurion Lake Development would also provide parking in the basins of the buildings by way of automatic parking stacking systems. Conclusion The application for the Symbio City Development contained a 113 page motivating memorandum. Some of the conclusions in the report can be listed as follows: The above mentioned facts and text is not a motivation for Symbio City but provides only some technical information of interest. The proposal is in line with the responsibility of the municipal leaders to provide their residents with the vision and framework in which they can do their part to prepare for the city for the global onslaught; The proposal is of a high quality and reflects true strategic thinking, creating an intelligent approach to create a better future for all; The proposal would create enormous economy of scale creating the ability to pay for many solutions of seemingly insurmountable problems; The proposal would elevate the Centurion Lake area as a central place of the highest hierarchy in the Gauteng global sub region and would thereby continue to draw in new property investment reflecting the same innovative approach; The proposal shows that the Centurion Lake area can pounce on to opportunity to become a leading element of the emerging Gauteng urban region and in doing so would also increase the Tshwane Metro s global competitiveness; The proposal shows that because of the urban region concept the location of the proposed development will be able to respond to the challenge and in doing so would also pull the surrounding area into a new urban future; The proposal also indicates that a interconnected knowledge economy has developed on the periphery of Tshwane and Johannesburg over decades and that a market large enough for the proposed Centurion Lake development already exists on a regional scale. The proposal can therefore capture leading international companies of the sub region to settle in the Tshwane Metro. It has been indicated that development in the northern Gauteng area (Witwatersrand) is a function of the potential urban energy present in the main development corridors. The proposed development would be situated on a junction formed by different corridors; The proposal shows that there is a vast existing and integrated movement system surrounding the site that is of the highest quality. That there is a traffic box formed by provincial roads and that the area within the traffic box experienced sustainable growth over decades and often during times of national economic stress. The area has exceptional access to the freeway system. The area has a strong transit element as the Centurion Gauteng station is only minutes on foot away while there are 3 stations of the old railway system within the traffic box. Several bus services run on the north bound routes of the traffic box. The proposal clearly indicated that a huge amount of job creation took place in the area over the decades and that a real mixed use land use pattern exists already. Development of offices accelerated in the last 5 years and the Samrand / Olievenhoutbosch corridor probably past a critical point of mass. The office component of the southern Tshwane area can together with the office floor area as proposed by the Centurion Lake Development will become a dominating factor in the northern Gauteng s post-industrial economy. The proposal indicated the importance of the West Avenue traffic interchange and the need to implement it as soon as possible. It showed that the proposed Centurion Lake development can also spawn additional development in the form of infill development and cause West Avenue to be extended to the N14 freeway and the traffic interchange be constructed. It also indicated how West Avenue can become an additional business strip within the bigger Centurion Lake area. Although the proposal showed 3 tower blocks to be built on erf 53 Verwoerdburg Stad, the total visible coverage of the proposed development on erf 53 Verwoerdburg Stad will only be ±17% although the total floor area ratio on the erf will be ±9,5. It showed that erf 53 Verwoerdburg Stad 7

is zoned public open space at present and therefore it is a park that first has to be closed by way of procedure before it can be rezoned to accommodate the proposed development. (This has been completed) The proposal implies that erf 53 would be subdivided and that one of the erven will be used for a residential high density development providing 1000 dwelling units. The 100 000m² retail shopping centre that is proposed will be situated partly below the public level on top of the ground and would not tower above the existing retail development. The proposal will not destroy the open space element of erf 53 Verwoerdburg Stad but will give back 35 000m² in the form of various open space or recreational elements. There is huge open space resources upstream and downstream from the Centurion Lake. The project has been accepted and approved by the Tshwane Metro s Council. Erf 53 Verwoerdburg Stad (lake area) has been closed in terms of Ordinance 17 of 1939 (Transvaal local Governance Ordinance). Presently the land alienation process is still being conducted in line with all applicable legislation. As soon as the lease documents have been signed by all parties the full detail planning process of the project will be initialised in line with the conditions as stipulated in the lease documents and as will be necessary in all aspects. Dubruto Urban Planning February 2016 8