SUSTAINABLE MECHANICAL & ELECTRICAL ENGINEERING PROJECT PORTFOLIO 2010 Ware Court, Sargents Lane, Georges Street, Waterford.
Waterford City Council - WWRD Services Factory Lead Eng: Waterford Wedgwood Royal Doulton 1.6Million Thomas Garland & Partners, Waterford. Complete Building Services including Process and Instrumentation Design to new Waterford Crystal Services Factory. The New Manufacturing Facility is to be located in and existing industrial building. Existing Building Services to be Stripped Back and installation of New Acid Glass Polishing Facility, Chemical Scrubbing, Preparation of Raw Materials, Maintenance Workshop, Laboratory Facilities, Administration Offices, Raw Material Storage, Finishing and Packaging and Finished Goods Storage. Ballygunner Church Parish of St. Mary s, Ballygunner 1.3Million Complete Building Services to Existing 18 th Century Church with new Extensions to this structure (Total Area of 624m 2 ). Focus on low energy building services including LED/CFL Lighting and Underfloor Heating. Photovoltaic Cells and Air Source Heat Pump are proposed as sustainable solutions. The Building was modelled in IES (Integrated Environmental Solutions) to Simulate the Buildings Energy Performance. IES Model WIT Sports Pavilion ion Campus Services WIT, Carriganore, Co. Waterford 4.5Million Henry J Lyons, Cork Complete Building Services to new 2000m 2 sports pavilion. Accommodation: 8 No. 35 Person Dressing Rooms, Shower Rooms, Toilet Facilities, Physiotherapy Rooms, Meeting, Office and Administration Rooms, Function Rooms, Commercial Kitchen. Low Energy Lighting with motion control, Solar Hot Water Collectors, HE Modulating Boilers, Heat Recovery Ventilation WIT - Life Science and Computer Laboratories Waterford Institute of Technology, Waterford City 1.7Million WIT and SACE Waterford Health Park Area: Refurbishment of Existing 1969 Building W, C and B Blocks to facilitate new Pharmaceutical, Pathology, Physics, Biological, Bio- Medical, Optics, Forestry and Computer Science Research Labs. Our design includes for Medical and Special Gases, Heating, Lighting Control, Waste and Extraction management and Close Environmental Control (Temperature, Humidity etc.) Rowe Medical Centre Waterford City DHB Architects, Waterford. Conversion of existing Heritage Building, former Presentation Convent, to multi-discipline Medical Centre. Complete Fire Safety Engineering including Fire Safety Compliance Documentation. Listed Building - Exempt from BER. July 2010 Page 1 W2010
Marine Point Office Block Development Marine Point Partnership 5.5Million Complete Building Services for new 5,000m 2 office block subdivided into 12 office units and Penthouse Office. ESB Substation and LV Metering Rooms, 2 No. 13 Person Lifts. Preparation of each unit for leasing (Lighting, Protective Services and Modular Electrical Distribution Board). Raised Access Floors. Summerhill Retail Development R McDonald & Son Ltd. Tramore, Co. Waterford 2.6Million Patrick Halley & Associates, Parnell Street, Waterford Enabling Infrastructure Works to new Retail development comprising new roads, Public Lighting, Traffic Control and principle Utility Services to new Tesco, Lidl and Mixed Development sites. Complete Building Services design to Mixed Retail Development. Commercial BER to all units. MM Halley Solicitors New Offices M.M. Halley Solicitors, Waterford City 2.4Million Patrick Halley & Associates, Parnell Street, Waterford Complete Building Services to Listed Building for conversion to State of the Art Modern Offices. ESB Substation and LV Metering, 8 Person Lift. New Low Energy Lighting and control of same, high efficiency condensing natural gas boiler, raised Access Floors. Rigney Dolphin Contact Centre Rigney Dolphin Group, IDA Industrial Estate, Waterford City 2.7Million James Reynolds Architects, Waterford City High Specification 3,000m 2-500 Person Call Centre. Complete refurbishment of 2 No. existing industrial units into a state-of-the-art Call Centre Facility; open plan call centre, private offices, meeting rooms, Kitchen, training rooms, staff facilities. Heat Recovery Ventilation and Air Conditioning, Daylight v s Artificial Lighting control study. UPS and Backup Generator. Sheridan Motors Showrooms and Workshops Sheridan Motor Group 4.7Million Fewer Harrington & Partners, Waterford. Complete Building Services for New Car Retail Showroom, 15 Bay Workshop, DOE Truck Testing Centre, Parts Stores, private offices, private meeting rooms, canteen, toilet, shower and stores. WIT - Lighting Management System Waterford Institute of Technology, Waterford City 0.46Million WIT and SACE 1969 and 1977 Buildings. Implementation of lighting control systems to reduce energy usage. Installation of new low energy fittings. PIR Control in Lecture Theatres and Class Rooms. New Emergency Lighting systems and control via Building Management System. July 2010 Page 2 W2010
Crèche Facilities, Farronshoneen, Waterford Health Service Executive 1.4Million CJ Falconer & Associates, Newtown, Waterford Complete Building Services Design for Childcare and After School Facilities. Including Day Rooms, Sleep Room, Kitchen, Classrooms, Private Offices, Multi-Function Rooms, External Play Areas, 8 Person Lift. Dungarvan Fire Station Extension Department of the Environment, Dungarvan, Co. Waterford 1.6Million Ailtire, An Rinne, Co. Port Láirge Extension to Existing Fire Station incorporating and upgrading existing Building Services. Extension provides multimedia lecture room, training rooms, private offices, canteen and new reception area. Solar Water Heating & PIR Lighting Control Waterford Regional Youth Services Building, Waterford. Waterford Regional Youth Services 2.3Million O Neill Hennessy Flavin, Tramore, Co. Waterford Complete Building Services for New Office Block. Accommodation includes private offices and administration, restaurant, gym, recording studio, showers and toilet facilities and educational facilities. Youth and Community Services Building, Farronshoneen. Waterford Regional Youth Services 1.4Million O Neill Hennessy Flavin, Tramore, Co. Waterford Complete Building Services for New Youth & Community Centre. Including Reception, Open Plan Administration Areas, private offices, private meeting rooms, canteen, Kitchen, toilet and shower facilities and stores. WLR fm Broadcasting Centre, Farronshoneen, Waterford WLR fm and Beat 102 103 4.0Million ODA, Mary Street, Waterford Complete Building Services for State of the Art Broadcasting Centre. Including 10 Radio Studios fully air conditioned, Underfloor Heating to Reception, Open Plan Administration Areas, private offices, canteen, toilet and shower facilities stores. UPS and Backup Generator. July 2010 Page 3 W2010
Multi Storey Car Park and Retail Unit, Waterford Symthacon Properties 5.0Million Complete Building Services to 7 Level Car Park, complete with basement level requiring mechanical smoke ventilation. Each level has Metal Halide Lighting with Control to maximise energy efficiency. The Arches, Residential and Retail Development, Kilkenny McInerney Construction Ltd. 9.0Million John Thompson & Partners, Ballincurra, Limerick Complete Building Services for a new 76 Apartment and 9 Retail unit development. Building divided into three separate blocks. Apartments varied in size from 1, 2 and 3 bed-roomed apartments and penthouses. Health Service Executive - Dental Surgery Extract Systems, Waterford City. Health Service Executive Technical Services Department, HSE Nitrous Oxide Extract Systems for various Dental Surgeries. High Level Supply and Low Level Extract. Health Service Executive - New Car Park, Waterford Regional Hospital, Waterford. Health Service Executive Technical Services Department, HSE Electrical Services to new Car Parking Facilities including barrier and signage systems. CCTV Security Systems and Rerouting of Existing Services to Various Buildings. Health Service Executive - - St. Otterans Hospital Health Service Executive Tritschler & Tritschler Associates New Substance Abuse Clinic Refurbishment of existing ward to cater for new clinic. New Electrical and refurbished Mechanical Building Services Installations. Health Service Executive - St. Otterans Hospital Health Service Executive Technical Services Department, HSE Electrical Survey and Report on Existing Installations to the various on site buildings. Report to include recommendations on upgrading/replacing existing systems and budget limits for same. Lawson House Nursing Home, Enniscorthy, Co. Wexford. Lawson Nursing Home Circa Design, Wexford, Co. Wexford. Refurbishment and extension to existing Nursing Home. Total 70 Bed high care facility. Wood Chip Biomass Boilers with LPG Heating Backup. All Low Energy LED and CCFL Lighting with Presence Detection and Daylight Auto Dimming. Demand Control Underfloor Heating. Rain Water Recycling for Flushing and Laundry. Heat Recovery Ventilation Mixed Development of Offices and Apartments Webber Street, London WND Ltd. Complete HVAC Design to Offices on Four Floors. Demand controlled Heat Recovery Ventilation in conjunction with Split Air Conditioning Systems July 2010 Page 4 W2010