CVCSD Bakersfield March 19, 2015 Facility Incident Case Studies

Similar documents
Preventing Hydraulic Shock: Millard Refrigerated Services, Inc. Anhydrous Ammonia Release

Hazard Zone Locations: HAZARD ZONE CHECKLIST

SECTION 7 EVACUATION PROCEDURES

Combustible Dust Explosions and Hazards Case Study: CTA Acoustics, Inc.

Flammable Liquid Compliance Program

Steam System Best Practices Document No. 11

WATER HAMMER something that never should occur in a steam system

Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety. Safety Orientation

DEFROSTING METHODS Adapted from material originally provided by Kenneth S. Franklin, C.M., Director of Service, Hussmann Corporation

Policy and Organizational Statements

Preventing False Alarms in Ammonia Gas Detection Systems

FIRE PROTECTION BUREAU ACCREDITATION AND CERTIFICATION PO Box Olympia WA (360) FAX: (360) AIRPORT FIREFIGHTER

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

Industrial Refrigeration Defrost Solutions TM Package. Brochure R-222

2010 Fire Log Fire Log. Annual Fire Safety Report

SCALES NW EMERGENCY ACTION PLAN

IIPP. Injury & Illness Prevention Program Hartog Drive San Jose CA Responsibilities. Workplace Hazards. Training. Incident Investigations

Corporate. Management. Line. Management. Plant. Manager HSSE. Maintenance Manager. (Plant. Operations Manager. Process Safety) Plant.

Date and Time of Incident. March 10, 1975

Emergency Action Plan

Based on NFPA 1003: Standard for Airport Fire Fighter Professional Qualifications 2015 Edition

40KMC KMQ

MECHANICAL INTEGRITY INSPECTIONS OF AIR COOLERS

Licensed Electrician Dies When Electrocuted by 480Volts Incident Number: 03KY115

INVESTIGATION FINDINGS III IMPACT OF INADEQUATE VENTILATION AND DISCHARGE SYSTEMS

Your Turnkey Solution for Mitigating the Hazards of Arc Flash Incidents in the Workplace

LABC Gas Well Incident City Council Report

Air-Cooling Evaporators

"EVACUATION PROCEDURES"

Safe Handling of Ammonia & Reporting Leaks. Andrew Keeley, Senior Project Professional

Aluminum Dust Management in a Metallizing Facility

Application Engineering

The Electronic Newsletter of The Industrial Refrigeration Consortium Vol. 9 No. 1, 2009

POSITION VACANCY NOTICE CITY OF KETCHIKAN

Railroad Commission of Texas Pipeline Evaluation System Incident Updates Inspection Package ID =

Leader s Guide Marcom Group Ltd.

User Guide ems25plus. Page 1. Normal operation. Product interface

Investigation Report Worker Fatally Injured after Fall from Height November 10, 2014

Saving lives with coatings

Campus Emergency Procedures Guide

Emergency Procedures Protocol

Pollution Incident Response Management Plan

RETA, IIAR, IARW, WFLO, IAFC and ASTI are Coalition Members; these associations will be posting updates in the near future.

TFFR01 MANUAL PORTABAL 12/24 VOLTS DC REFRIGERATOR / FREEZER.

Fire ground electrocution

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

LONGONI ENGINEERING SRL

Adaptable in Adelaide

Emergency Action Plan Leading the Fight

96KY125. Date: 10 March Subject: Pug Mill Operator Killed After Entanglement SUMMARY

SPONSORED BY SOLUTIONS FIRE SAFETY AN INTRODUCTION

FIRE AND FIRE FITTING By Mr. Prashant Sansare

Business Emergency Plan

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION METAL AND NONMETAL MINE SAFETY AND HEALTH REPORT OF INVESTIGATION

Webinar: HVAC Claims Repair versus Replace Presenter: Curtis VanNess, General Manager HVAC Forensics Webinar Questions & Answers

Process Safety Management

EMERGENCY ACTION PLANS HOW READY ARE YOU?

Condensate Induced Water Hammer in a Steam Distribution System Results in Fatality

Machine Safety Fatality Reports

Annual Fire Safety Report

Emergency Planning and Release Reporting. Farmington Hills Fire Department James Neufeld

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

HOW-TO CONDUCT A WEEKLY SAFETY MEETING

Impact of Manual Defrost vs. Auto Defrost Freezers on Sample Temperature

Using Adaptive Defrost Control Technology to Improve Energy Savings in the Food Service Industry.

Peachtree City is home office for America located about 30 miles south of the Atlanta airport this is were all KM cubers as well as Flakers are built.

WHITE PAPER. ANSI/AHRI Standard for Fan and Coil Evaporators - Benefits and Costs

EMERGENCY ACTION PLAN GOLDEN CITY CASINO HIGHWAY 162 OROVILLE, CALIFORNIA

Contractor Safety. Workplace Safety & Environmental Division

Fire Policy. Fire Safety Order (2005) Dangerous Substances and Explosive Atmospheres Regulations (2002)

Propane Industry Safety Talks Hazardous Chemicals & Materials

Combination Cooling/Gas Heat Package Units

Rob Marvin Corporate Safety & Health Engineer April 23, 2009

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

U.S. Firefighter Disorientation Study Prepared by William R. Mora, Captain San Antonio Fire Department San Antonio, Texas.

ASBESTOS POLICY. 2. Authority. 3. Scope. 4. Definitions. 4. Responsibilities. 1. Purpose. Department supervisors

ULTRA LOW TEMPERATURE FREEZER. User Manual

Fire Prevention Policy

Hospital Codes, Safety, Exposure Control, Emergency Plans Handout

Emergency Evacuation Plan

Installation, Operation, and Maintenance Information

Burn Injury Investigation Report Preparing a Live Fire Prop for Use Miami-Dade County Fire Rescue Department, November 18, 2011

Industrial Dehumidifier Operating Instructions. Model: VG 1500

Annual Fire Safety Report

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

REFRIGERANT PROCEDURE

Campbell Soup Company Extends Use of CO2 Systems Into Their Operations

Portable Generator Safety Lloyd Shank, P.E. Director of Electric and Gas Utilities 4/12/2005

How to keep you, your family, and your possessions safe usa.siemens.com/circuitbreakers

Date and Time of Incident. Jan 28, Breakout at 00:55 (approx) Detected at 00:55 Notified by a call to the police station Extinguished by 01:50

2012 SunTrust Center ERT Annual Review. 919 East Main St. Richmond, VA

Energy consumption storage facilities examined in ICE-E

Contractor Environment, Safety & Health (ESH) Briefing. Suite 100 Bldg. 726 Billerica, MA

EM-3.1 SAFETY ALERT HEAVY EQUIPMENT VEHICLE FIRES AND SUPPRESSION SYSTEMS

TECHNICAL SERVICE GUIDE

OPERATION INSTRUCTIONS DEMAND DEFROST CONTROL BOARD MODEL FOR USE WITH MODELS: AFFINITY, ECHELON, ACCLIMATE HEAT PUMP SERIES

REPLACEMENT OF HCFC-22 REFRIGERANTS WITH AMMONIA: A CHALLENGE FOR HOCKEY ARENAS IN QUEBEC

Figure 1. Ejector cross-sectional drawing. Figure 2. Precondenser to left of vacuum flasher. pressure.

Sunday January 30, 2011

Combustible Dust Hazard Recognition and Control NFPA Standards for Combustible Dusts

Transcription:

CVCSD Bakersfield March 19, 2015 Facility Incident Case Studies Discussion on two incidents: 1) Hydraulic Shock - Milard Refrigeration 2) Worker Death Gibson Winery

Controlling Chaos! Chaos Factor Copyright ASTI January 2015 Craig Miller 4/13/2015 Slide 1-1

Key Lessons to Prevent Hydraulic Shock Millard Refrigerated Services Inc., located in Theodore, 9:00 am on the morning of August 23, 2010 Alabama hydraulic shock which is defined as a sudden, localized pressure surge in piping or equipment resulting from a rapid change in the velocity of a flowing liquid. The highest pressures often occur when vapor and liquid ammonia are present in a single line and are disturbed by a sudden change in volume. often prior to a hydraulic shock incident there is an audible hammering in refrigeration piping Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 3

Hydraulic Shock The reset triggered a valve to open and low temperature liquid ammonia was fed back into all four evaporator coils before removing the hot ammonia gas. This resulted in both hot, high-pressure gas and extremely low temperature liquid ammonia to be present in the coils and associated piping at the same time. Roof-mounted 12-inch suction pipe to catastrophically fail, resulting in the release of more than 32,000 pounds of anhydrous ammonia Hot high-pressure ammonia gas rapidly condensed into a liquid. Because liquid ammonia takes up less volume than ammonia gas a vacuum was created where the gas had been. The void sent a wave of liquid ammonia through the piping causing the hydraulic shock. Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 4

Defrost Not Properly Timed Hydraulic Shock Operators reported some problems. While doing some troubleshooting an operator cleared alarms in the control system, which reset the refrigeration cycle on a group of freezer evaporators that were in the process of defrosting. The control system reset caused the freezer evaporator to switch directly from a step in the defrost cycle into refrigeration mode while the evaporator coil still contained hot, high-pressure gas. Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 5

Cloud Movement Large cloud traveled a quarter mile from the facility south 800 contractors - clean-up site for the Deepwater Horizon oil spill A total of 152 offsite workers and ship crew members reported symptomatic illnesses from ammonia exposure. Thirty two of the offsite workers required hospitalization, four of them in an intensive care unit. Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 6

Life Safety Assessment Injuries One Millard employee sustaining injuries when he fell while attempting to escape from a crane after it became engulfed in the traveling ammonia cloud Lessons Learned Value of Shelter-in-Place Need for community readiness Ability to assess risks Value of Emergency Shutdown Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 7

Lessons Learned The CSB believes that if companies in the ammonia refrigeration industry follow the key lessons from its investigation into the accident at Millard Refrigeration Services, dangerous hydraulic shock events can be avoided - preventing injuries, environmental damage, and potential fatalities. Millard facility experienced a loss of power that lasted over seven hours. Refrigeration system was shut down Next day the system regained power and was up and running Evaporators at the Millard facility were designed so that one set of valves controlled four separate evaporator coils Contents of all four coils connected to that valve group were involved in the hydraulic shock event leading to a larger, more hazardous pressure surge. One key lesson is to avoid the manual interruption of evaporators in defrost and ensure control systems are equipped with password protection to ensure only trained and authorized personnel have the authority to manually override systems. Each evaporator coil should be controlled by a separate set of valves Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 8

Emergency Shutdown The CSB found that immediately after discovering the ammonia release, a decision was made to isolate the source of the leak while the refrigeration system was still operating instead of initiating an emergency shutdown. Shutting down the refrigeration system may have resulted in a smaller release, since all other ammonia-containing equipment associated with the failed rooftop piping continued to operate. A final key lesson from the CSB s investigation is that an emergency shutdown should be activated in the event of an ammonia release if a leak cannot be promptly isolated and controlled. Doing so can greatly reduce the amount of ammonia released during an accident. Example: Isolate flow, turn off Ammonia Pumps Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 9

Gibson Winery Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 10

Gibson Winery Robert Munoz Robert Munoz Robert s life is worth some deep thought and consideration for safe work practices. Lessons Learned Accidental release leads to an aerosol cloud entrapping Robert while he attempted to escape the bathroom. Operator who opened the wrong valve had done it 500 times he was distracted by a conversation and opened the wrong one. Not sure why he could not close it. Perhaps it was not spring loaded. Perhaps ice was created by the pressure drop on the oil drain valve as the ammonia exited under system pressure. Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 11

Routine Operations of Heat Exchanger Shell and Tube Exchanger Cooling Liquids like Wine Wine flows through chiller occasionally the wine freezes - hot gas is used to thaw the frozen wine The valves for hot gas control are located under the chiller adjacent to the oil drain control valve Hot gas and oil drain are globe valves located next to each other with the same type and size of hand-wheel control Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 12

The Accident A Tragedy and a Lesson Operators face many tasks Routine tasks can become dangerous Experienced Operator - performed hot gas valve operations 100 s of times Was distracted while talking to another individual opened wrong valve Oil drain valve opened fully and the Operator walked away with the individual Delay in oil plug release then a sudden hiss and cloud formed very quickly The operators escaped by running upwind Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 13

The Evacuation Head Count - Rescue Escaping the Aerosol Cloud Escape Choices People evacuated using different escape path choices all met in the parking lot Head count revealed one missing person; Workers spotted him down in a hallway outside of a bathroom looks as if he may have collapsed hitting his head Employer adopted an Emergency ACTION Plan no training or engagement for rescue People attempted rescue without training or safety gear Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 14

Lessons: Prevent Mitigate - Prepare Routine operation of valves located next to each other have consequences when the wrong valve is opened Mitigate: Spring-loaded Valve for oil drain; oil drain line plugged when not in use Operator focus Real-Time readiness while working on the systems Prevention: Do not interrupt the Operator while he is operating the system; Operator attention to system operations while doing other tasks Options to consider when caught in Robert s position Preparation: Never enter a dense gas cloud shelter-in-place and get to water Rescue Operations: MUST consider a policy regardless of being non-response Emergency Action Plan Preparation: Rescue procedure organized with fire department; use of fans and proper PPE, and MOST importantly an Emergency Shutdown procedure Ammonia Safety & Training Institute (ASTI) www.ammonia-safety.com Office 831-761-2935 15