ZBJ Press. Operation Manual

Similar documents
LDDC Series Double-Deck Drum Pre-cleaner. Instruction Manual LAMBTON MACHINERY(ZHENGZHOU)CO. LTD

Installation of Glass Lined Equipment

HORIZONTAL MULTISTAGE CENTRIFUGAL PUMP

XC-18. NOTE: *Machine shown without Lift-Up Safety Guard. This guard is included with machine. Machine should not be operated without this guard.

ASL T6 / T7 / T8 / T9 FLOOR GRINDING MACHINES MANUAL

SERVICE MANUAL TWIN TUB WASHING MACHINE PWM6010M PWM8010PM PWM1010PM PWM1210PM

TLA-1245 EFFICIENT HEAT CYCLE SHRINK TUNNEL OPERATION MANUAL

INSTALLATION AND USER MANUAL

MANUAL SWEEPER GUIDE. Model 920. Please make sure you read the instruction manual below and clear the operation before you use this sweeper.

BELT DRIVEN STATIONARY AGITATOR

COMMUTATOR GRINDING AND TURNING TOOLS - RIGHT ANGLE INSTRUCTIONS

FYS-13 FYS-13L POWERFUL SHREDDER OWNER S MANUAL

QUICK 3202 OPERATION MANUAL. Lead Free Soldering Station

D O U B L E A U G E R M O R TA R M I X E R OWNER S MANUAL

FAMSUN SDZB3000 Zoned Belt Dryer. Quick Manual

ICED CAPPUCCINO MACHINE Taylor MODEL: 390

Warranty Details page 2. Pump Description & Technical page 3 Specifications. Transportation, Storage & Installation page 4. Pump Maintenance page 5

MODEL PR16 POWER ROTARY

RTP9 ROTARY TABLET PRESS USER MANUAL

IMPORTANT SAFETY INSTRUCTIONS

Crushing Plant--ZYS High-Efficient Cone Crusher

BEIER MACHINERY SRL-Z MIXING UNIT BEIER MACHINERY JIANGSU BEIER MACHINERY CO., LTD SUZHOU BESTAR BLOW MOLDING TECHNOLOGY CO.

Operation Manual for the ProVetro Profi-Beveler Ø 60 cm

ROTARY TUMBLER LORTONE INSTRUCTIONS AND PARTS LIST. Model 3-1.5B. Model 45C. Model 33B Cyrus Way Mukilteo, WA (425)

Household devices, <-<>al breaker rolls, stone crusher, four early types of power devices.

ROBOTIC POOL CLEANER Raptor SE HJ2032 USER MANUAL

WOOD FLOORING SANDER. Aries. Operating and maintenance manual

hp Dust Collector With Vacuum Attachment

EYS SEPARATOR EYS 01 G. USER MANUAL for EYS SCREW-PRESS SEPARATOR MODEL EYS 01 G. User Manual for EYS 01G Screw-Press Separator

SPECIFICATIONS FEATURES

A-150 Installation Instructions

Cleaning unit for coolant. :_decftez`_>r_fr] Book No.: V2

DEUTSCH Bio-Master Bio-Max

Installation/Instruction Manual

GRIND PRO DUAL OR DISC SANDER. Operator Manual

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

LTP50 TABLET PRESS USER MANUAL

For our present, For their future. Version 11.04

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

RING BLOW VFC 8 TH Series

USER MANUAL Juice Presso Classic 0801

PUGMILL/MIXER. Instruction Manual NVS-07

A-250, A-350, & A-450 Warm Air Furnace

Instructions for Combo heat press machine

Slow Juicer. User s Guide

OWNER S MANUAL ABSFBM-200T

Bliss Box Former Troubleshooting. 6.1 Troubleshooting Chart. Troubleshooting INTRODUCTION SAFETY PROCEDURES

PELLET BURNER PV 350

Enviro KES INSTALLATON MANUAL

CHAFF CUTTING MACHINE

GALAXY FLOOR MACHINE

Use and maintenance Manual Longitudinal profile welding Model: LRW-130

10 and 12 Meat Slicer MS250 & MS300 Operating Manual

HT650 TM FAN DRIVE SERVICE INSTRUCTIONS

INSTALLATION MANUAL FOR ROTARY TWIN LOBE (ROOTS) BLOWERS / COMPRESSORS

Service Manual. Note: Before service the unit, please read this manual first. Contact with your service center if meet problem

Grain crusher Universal. Purpose: This machine is designed for the crushing of grain in agricultural operation.

TCUT10UL 2.5 HP 10 Tile Saw Assembly & Operating Instructions

Register at

CombiGrinder. Instruction manual. Grinder for cattle, horse and pet clipper blades. swiss made. Version/Index: CombiGrinder/A 09-16

Washing Machine OWNER S MANUAL TRWTL-70. Before using your washing machine, please read this manual carefully and keep it for future reference.

Installation and operation Manual

Industrial Sewing Machine TECHICAL MANUAL SEWING MACHINE HEAD. Electronic Pattern Sewing Machine. Model PLK-G1010 A180E593P02

Part 2: Installation Instructions cl

INSTRUCTION SHOWER CABIN ILMA 901

INSTRUCTIONS AND PARTS LIST. Model 3A LORTONE Cyrus Way Mukilteo, WA (425)

MANUAL VERSION SERIAL # X-1 MINI PRO OWNER S MANUAL ASSEMBLY & OPERATOR INSTRUCTIONS 1.0

MACHINE GUARDING. Hazards of Unguarded Machines. Occupational Safety and Health Regulations (OSHA)

MOULD WITH ENTERING PUNCHES

AUTOMATIC SLICING MACHINE

Crushers, Mills and Stock Treatment

INSTALLATION & OPERATING INSTRUCTIONS

Wine Cooler. Instruction Manual PWC-24ZWX

WINE COOLER INSTRUCTION MANUAL

COMPLETE LINE FOR NON SINTERED PTFE TAPE. 1-Mixing tumbler

REF. NO Clamp Assembly 8 1 set Gasket (4 per set) S.S. Lock-washer 3/8 x 1/ Brass Impeller 3.

CONTENT. Ⅰ General information 1. Ⅱ Product description 2. System description 3. Installation 3

Removal. CAUTION: Do not let tensioner arm snap back to the freearm position, sever damage may occur to the tensioner.

Machine Guarding BLR B L B R usi ne B s u s si & n e L s e s g a & l L R e e g s a o l u r R c e e s s o(u 1rc 7 e 1 s 0) 1

Dynapac Chip Spreader is an accessory that enables the spreading of stone chippings, gravel or other similiar granulates in conjunction with the

User Manual J841Q. Magnetostrictive Scaler / Polisher Combo Unit. Jorgensen Laboratories Tel: Fax:

Operating Manual RS6 Pro

SHD315 BUTT FUSION WELDING MACHINE OPERATION MANUAL WUXI SHENGDA PLASTIC PIPES WELDING MACHINE CO., LTD

Twin-tub washing machine SERVICE MANUAL

Technical Data. Name: ERIKA Automat fully automatic machine to divide and to round dough pieces of the same size

What is a Closed circuit Cooling Tower (CCT)?

Please read this manual before using the machine. Please keep this manual within easy reach for quick reference.

Centrifugal Fans maintenance manual

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

LED New Light Source Reflow Oven. Model: T-960

Automatic Sublimation Transfer Machine Manual Model. No.: ASTM-40/48/64

MECHANICAL SEAL REPLACEMENT UNPACKING MAINTENANCE. Figure 1 & 2 - Mechanical Seal Replacement

Design and manufacture of agitators since INSTALLATION MANUAL Start-up and maintenance. Top-entry agitators

HP Series of highly efficient Hydraulic Cone Crusher has a better performance compared with spring cone crusher and ordinary Hydraulic Cone Crusher:

Vertical Inline Models

Section - A Vacuum Feed Attachment

MTM. Trapezium Mill. Shanghai Shibang Machinery Co., Ltd

HEDMAN DI-50. Endorser Instructions. Hedman DI-50 Operators Guide

NSS STANDARD-SPEED FLOOR MACHINES

Vacuum Homogenizing Emulsification Machine. Instruction Manual

Transcription:

ZBJ Press Operation Manual ZJB 50 Stick fuel forming machine I. Use and features This machine is made up of the heating collar,propeller,forming cylindar,inner wear sleeve thermocouple,body and the stand and it is use to make stick solid fuel with sawdust, rice shell or peanuts shell, and other crushed biomass(without any additive) under high pressure. This machine adopts temperature adjusting indicator, it can work steadily at the fixed temperature and has the feature of rational structure, being easy to operate and maintain. The solid fuel produced by this machine has the feature of being easy to light, and having high calorific value (over 20% higher than normal wood), little pollution when burning and high density which is favorable to transportation. This machine can make full use of the remainder

of farm and forest, and solve the problem of farm and forest resource being in short supply in our country. Ⅱ. Working basis Using the intrinsic attributes of wood material, by spiral extruding at high temperature, under high pressure, wood element in wood material becomes plastic and makes the fine fiber combine, and then stick solid fuel is formed. Increase pressure solid fuel Raw material becoming plastic forming Heating Work basis frame picture Temperature feedback Ⅲ Main technical parameters and features 1 Motor power: Heat power: 2. Productive ability: 3 Electricity consumption: 4 Size: L/W/H=mm 5. Weight: kg 6 Demand on material: (1) Water proportion: 8---12 %( wet base) (2) Size: 2-5mm 7 Product feature: (1) External form size: external diameter mm Internal diameter mm Length>50mm (2) Specific gravity: 1200 1300kg/m 3 (3) Calorific value: 4400 5000kcal/kg Ⅳ Structure sketch (refer to picture 2) 1 Charging hopper 2 Heat insulation cover

3 Heating collar 4 Propeller 5 Heating tube 6 Taper sleeves 7 Stand internal sleeve 8 Stand 9 Electric control boards Picture two Ⅴ Installation and test 1. Tighten all binder bolts, esp., and the three withstanding screws in the internal sleeve of heating tube and all electrical equipment and power line.(see the electric disgram) 2. Check all lubricating parts. 3. Check power voltages to see if it is normal. 4. Start and run for 30 minutes without load. If there is no abnormal phenomenon as block or bump, you can begin normal work. If you find any abnormal phenomenon, stop the machine at once, examine carefully, after fixing the breakdown, run it again without load. 5. Adjust the temperature regulator to the demanded temperature. Only when temperature reaches the fixed point, can you start the machine and charge properly. 6. Gradually increase charging amount until qualified product is produced. Normal working for 30 minutes shows the test has succeeded, and then you can go into normal production. 7. Before stopping the machine, empty the charging hopper, and run it reversely for one minute to make the material in propeller come out. 8 The machine must be grounded well.

Ⅵ Cause for breakdown and way of fixing No Phenomenon Cause Way of fixing 1 Power indicator (1) Power not connected. (1) Connect power line. doesn t light. (2) Fuse is spoiled. (2) Change fuse. (3) Indicator spoiled. (3) Change the indicator. 2 Motor can t be (1) Control knob spoiled. started. (2) Two phase running. (3) Voltage, frequency is not right. 3 When heating, (1) Power voltage is too low. temperature rise very (2) Heating ring is spoiled. slow or can t reach (3) When you change electrical 350 heating line of the heating ring, line of wrong type was used. 4 Motor is hot. (1) Load is too heavy. (2) Two-phase running. (3) Bearing is spoiled. (4) Wind path is blocked (5) Circumstance temperature is too high. (6) The voltage is too high or too low. (7) Short circuit between stator winding or phases. (1) Change the knob. (2) Join power line well. (3) Check the voltage and frequency. (1) Check the voltage. (2) Change the heating ring. (3) Change according to the demand. (1) Check according No.5. (2) Check fuse, switch, contact point, fix the breakdown. (3) Change the bearing. (4) Clear the path. (5) Decrease the temperature. (6) Adjust the voltage. (7) Check and fix the

5 Stick can t be produced. 6 Sticks can t be formed. 7 Steam comes out from the hopper. (1) Material is too wet. (2) Heating temperature is too low. (3) Spiral groove is blocked. (4) The groove in the internal sleeve of heating tube and the groove in heating sleeve are in relatively wrong place. (5) Voltage is too low. (6) Stand internal sleeve is worn. (7) The internal sleeve of heating tube worn. (8) Propeller is worn. (1) Material is too wet. (2) The spiral groove in the internal sleeve of heating tube and that in heating sleeve is relatively not in right place. (3) Temperature is too high. (4) The front angle of the propeller is less than 20. (5) Thermal couple is fixed in wrong place or not properly. (6) Heating ring is in short circuit. (7) Too much oil in the material. (1) Material too wet. (2) Stand internal sleeve is badly worn. (3) Internal sleeve of heating tube is badly worn. (4) Spiral front angle of the propeller doesn t accord with the demands. breakdown. (1) Dry the material. (2) Raise the temperature. (3) Grind propeller and remove obstacle. (4) Install the internal sleeve of heating tube again. (5) Check the voltage. (6) Change the internal sleeve. (7) Change the internal sleeve. (8) Grind the propeller. (1) Dry the machine. (2) Install the internal sleeve of heating tube again. (3) Decrease the temperature. (4) Grind the front angle. (5) Fix the thermal couple well. (6) Check the circuit of the heating ring. (7) Improve the front angle of the propeller(refer to appendix 2) (1) Dry the material. (2) Repair the sleeve. (3) Repair the sleeve. (4) Grind the propeller. Ⅶ Cautions: 1. Before starting the machine, turn the belt pulley manually to see if it is blocked. 2. Before starting the machine, tighten the bind bolts on the heating tube esp., the three

withstanding screws. 3. Before stopping the machine after continuous work, empty the hopper first, and run it reversely for one minute, then the machine can be stopped. 4. When work begin again, the machine can t be started before the temperature of heating tube rises to 350 ; charge a little first, after stick is produced, you can charge at large quantity. 5. When working, pay attention to the voltage and the electricity current to see if they are normal to avoid motor damage. 6. When the propeller can t rotate, stop the machine at once, run it reversely, clear the material in the hopper, and raise temperature again. After the temperature is 20 higher, start the machine again and follow the above proper steps. 7. The product outlet should be pointed to a wall and a plank should be put in front of it against wall. 8. When you begin to work, no person should stand in front of the outlet. 9. Electric circuits should be kept dry and clean, after stopping the machine, power must be turned off. 10. Stone and iron chips are strictly forbidden to get into hopper. As soon as any abnormal phenomenon appears stop the machine at once. 11. All lubricating parts must be oiled every two months. 12. It is forbidden to start the machine without the machine being well grounded. TECHNOLOGY OF REPAIRING PROPELLER After working for 24 hours, propeller should be checked, if it is worn, it should be taken down and repaired. When any of the following conditions appears, it needs to repair the propeller. 1. The speed of producing sticks has obviously decreased. 2. The humidity of the material and temperature both accord with demands, but the machine is often blocked, and normal production can t go on. 3. Sticks can be formed, but are separated into several lengths, and can t be joined together. 4. Sticks can be produced very quickly, but the structure is very loose, the density is too low. 5. The front point part of propeller is worn less than 4mm. 6. The internal diameter of the product sticks is less than 15mm. 7. Because of stone, nail, or other objects going into propeller or other reason, the spiral part of the propeller is worn. REPAIRING PROPELLER 1. Preheat the end part of the propeller which needs surfacing temperature must reach 350. 2. Use special welding rod and AC welding machine, adjust electricity to about 150A. 3. Do surfacing by layer according to the condition that the front angle of the propeller end is

worn. When each layer is finished remove the welding slags then come to next layer. Surfacing thickness must be 1 2mm thicker than the needed thickness. After surfacing, there should be no such shortcomings as slag insertion, gas holes, etc. 4. After surfacing, insert that part into dry quick line or plant ash to cool, the inserted part must be over three guide screw. 5. When it is cooled to 50 degree or lower, take it out and grind it on green silicon carbide emery wheel. It is forbidden to push suddenly, make some part too hot, or cool with water or other liquid. 6. When you are grinding, the front angle increase at 360 degree circle point from 2 gradually, and must get to 22 degree +/-1.5 degree by the end of it. During the increasing of the front angle in this period, there should be no bumps or hollows, unsmoothness or shortcomings. 7. As is shown in above picture, if the 105mm long circumference of the spindle end is worn more than 6mm, repair according to following technology. (1) After preheating according to the technology stated above, do surfacing at the 105mm long circular surface with J442 carbon welding rod. Surfacing thickness should be 1 2mm thicker than the size marked in above picture. (2) Insert it into dry quick time or plant ash to cool, and grind it according to the size marked in the picture when it is cooled to 50 or lower. Its circular bounce to lerence must be less than 2mm, and there should be no obvious hollows or protruding. 8 It is strictly forbidden to strike or knock the repaired propeller to avoid the damage of the surfacing or other part. It should be stored carefully for future use. APPENDIX B Grinding special propeller

1. Do surfacing as is shown in above picture, as for surfacing technology, refer to appendix A. 2. The width of the second protruding spiral is half of the original width. 3. The second protruding spiral starts at the point that turns 90 from the end part. Appended Picture 1 Appended Picture 2

Stand Internal Sleeve Technical Demands Unmarkec1 Facet 1*45 Quench Hardness HRC57-60 OPTIONAL ACCESSARIES No Name Parts number Material Memo 1 2 3 4 Taper sleeve Stand internal sleeve Heating ring Propeller 005-6 005-7 005-9 Cr Mn Wear-resisting Alloy Cr Mn Wear-resisting Alloy 1.5kw 45 Repairable Refer to Appendix A