START UP FORM PACKET

Similar documents
START UP FORM PACKET

START UP FORM PACKET

Liebert CRV Warranty Inspection Check Sheet

Liebert Small System MCD and PFH Condensers (1-5 Ton) Warranty Inspection Check Sheet

SA Series Startup Form

Service Step by Step Trouble-Shooting Check-List

M2 Series Startup Form

MACH N-407 Heat Pump Air-Cooled Chiller

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

Otherwise, you can continue reading the file on the following pages.

Liebert Xtreme Density Chiller (XDC) Unit Warranty Inspection Check Sheet

M2 Series Startup Form

SA Series Start up Report

Condensing Unit Installation and Operating Instructions

SUBMITTAL DATA SHEET FEATURES. SPLIT-SYSTEM EVAPORATOR BLOWERS 7.5, 10, 15 & 20 TONS MODELS: NH-07 thru -20, 2-PIPE NJ-10 thru -20, 4-PIPE

Condensing Unit Installation and Operating Instructions

WIBR SERIES. Unit Coolers - Technical Catalog Hunt St - Pryor, OK Fax

Liebert Fin/Tube Condenser Warranty Inspection Check Sheet

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

MAC N-407 Air-Cooled Chiller

Installation and Operation Manual

DANFOSS OPTYMA PLUS INVERTER UNITS

Installation and Operation Manual

Installation and Operation Manual

INSTRUCTIONS! DO NOT DISCARD!

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

VertiCool CLASSIC. Engineering Guide. Effective March Air-Cooled, Water-Cooled, Chilled Water and Water Source Heat Pump

VariCool VAV Engineering Guide

Air-Cooled Condensing Units with Screw Compressors. Technical Bulletin Low Temperature Models SSV DSV

30GT FLOTRONIC AIR-COOLED CHILLERS

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

DEALER SERVICE BULLETIN

4A6H5042G1000A 208/230/1/ DURATION - SCROLL 3/4 208/230/1/ NO (Use BAYKSKT263) YES YES PROPELLER DIRECT

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE. Master Rack Compressor Sequencer 7/21/2017

INSTRUCTIONS! DO NOT DISCARD!

Air-Cooled Condensing Units with Compact Screw Compressors

C13-Series Engineering Guide

PS SERIES PARALLEL RACK SYSTEM GLYCOL CHILLER START UP GUIDE 11/03/2015 Rev 00

INSTRUCTIONS! DO NOT DISCARD!

4A6H5049E1000B 208/230/1/ /8 7/8 7/8 7/8 DURATION 208/230/1/ /230/1/ SPINE FIN 13 LBS., 10 OZ. YES

A Series T 3. Unit Coolers - Technical Catalog. Product Benefits: Comdustrial TM Refrigeration. Adaptability- Durability- Serviceability-

Warm Case Troubleshooting Guide 9/18/2014

User s Information and Installation Instructions

Air Cooled Condenser Installation and Operating Instructions

4TTB3060D1000B 208/230/1/60 35 SCROLL /230/1/ /8

VertiCool Aurora Engineering Guide

N4H4. Product Specifications 14 SEER HEAT PUMP. ENVIRONMENTALLY SOUND R 410A REFRIGERANT 1½ THRU 5 TONS SPLIT SYSTEM 208 / 230 Volt, 1 phase, 60 Hz

Installation and Operation Manual

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

TECHNICAL GUIDE. Description SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS YD360, 480 & THRU 50 NOMINAL TONS YTG-B-0811

208/230/1/60 5/8 5/8 5/8 5/8 5/8 20 CLIMATUFF /230/1/

7/8 NO NO NO PROPELLER DIRECT / /230/1/ SPINE FIN /8 8 LBS., 0 OZ. YES 7/8 3/8

MicroTech Series-200 Flooded Screw Chiller

Product Data PH13(N,P)R FEATURES AND BENEFITS. SPLIT SYSTEM HEAT PUMP For Use With R Refrigerant 1---1/2 TO 5 TONS ( )

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

User s Information and Installation Instructions

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

Commercial High-Efficiency Condensing Units

Hayward/Summit Heat Pump Troubleshooting Guide Hayward Industries

UP TO 17.5 SEER / 13.5 EER / 9.5 HSPF HEAT PUMP ENVIRONMENTALLY BALANCED R- 410A REFRIGERANT 2 THRU 5 TONS SPLIT SYSTEM

Trouble Shooting Guide FAA, 3-phase (D3631)

RSMV Technical Guide

CAUTION. All safety information must be followed as provided in Service Manual RS ! WARNING

PS SERIES PARALLEL RACK SYSTEM START UP GUIDE

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC.

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

Thomas J Kelly. Fundamentals of Refrigeration. Sr. Engineering Instructor Carrier Corporation. August 20, Page number: 1.

WCH5**4. Product Specifications

Installation, Operation, and Maintenance Information

ThermoSaver TM Hot Gas Defrost System

User s Information/Installation Instructions

Refrigeration / Air Conditioning Systems Circuit Drawings. Student Resource Package No: NR 24

Trouble Shooting Guide PWA, 3-phase (D10571)

Horizon Elite Ice Machine Installation Instructions for Remote Condensing Unit

LK-TSSTB July 2009 FPO HP Two Stage Condensing Units and Systems Technical Guide. with Bitzer Compressors.

Chapter-8 Capacity Control of Refrigeration Systems

ORTEC HIGH CAPACITY REFRIGERATED AIR/GAS DRYERS

NON-CYCLING REFRIGERATED AIR/GAS DRYERS QPNC 75 to QPNC 250 OPERATOR S MANUAL

Technical Development Program. COMMERCIAL HVAC PACKAGED EQUIPMENT Split Systems PRESENTED BY: Ray Chow Sigler

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTB6-SF-3. Split System Cooling 4TTB6048A1000A, 4TTB6049A1000A CAUTION

30GN FLOTRONIC II AIR-COOLED CHILLERS

Horizon Elite Ice Machine Installation Instructions for Remote Condensing Unit

Checking the Charge on a Heat Pump in the Winter

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6024-SF-1B. Split System Cooling 4TTR6024A1000B CAUTION CAUTION WARNING

MYSTICOOL Max Valve System with Xstream and A.R.M.E.D. Technology Service & Installation Instructions Page 1

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

R4H4. Product Specifications

Electric Heat Inspection Form Revised September 2012

50TM TFF COMBINATION HEATING/COOLING UNITS

XSTREAM Valve System With A.R.M.E.D. Technology Service & Installation Instructions Page 1

TECHNICAL GUIDE GENERAL SPECIFICATIONS COMMERCIAL SPLIT-SYSTEM COOLING UNITS FOUR PIPE SYSTEM OUTDOOR UNIT: INDOOR UNIT:

User s Information and Installation Instructions

STACT. Model Designations. Model Number: STACT8S6. ST = Portable Scroll Chiller. AC = Air Cooled WC = Water Cooled. T = With Process Tank

ICC COOLING STORAGE UNIT ICC/ICU SYSTEM

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

4TTR6036B1000A 208/230/1/ CLIMATUFF - SCROLL 3/4 3/4 3/4 3/4 3/4 208/230/1/ NO YES NO PROPELLER DIRECT

YCIV Hz & Hz

50TM COMBINATION HEATING/COOLING UNITS

Transcription:

START UP FORM PACKET Condensing Unit and Evaporator DIVISIONS OF RAE CORPORATION 4492 Hunt St. - Pryor, OK 74361 - (918) 825-7222 - Fax (918) 825-6366 www.rae-corp.com

RAE Corporation Condensing Unit & Evaporator Start-Up Form Century Refrigeration Technical Systems Refrigeration Systems Condensing Unit Model #: Condensing Unit Serial #: Evaporator Unit #: Evaporator Serial #: Voltage/PH/Hz: First Day of Start-Up: Job Name: Refrigerant: Last Day of Start-Up: Job Street Address: Job City: Equipment Installation Service Company Information: Job State and ZIP: Company Name: Company City: Company Address: Company State and ZIP: Maintenance & Labor Warranty Service Company Information: Company Name: Company City: Company Address: Company State and ZIP: PART A - Pre Start-Up System Check: Has the unit been checked for shipping damage? Yes No If there is any shipping damage, please list all damage in detail: Crankcase heaters are verified operational and have been on continuously for at least 12 hours? Yes No N/A Has field water piping been verified correct? (if equipped) Yes No N/A Has the air handler been verified operational? (if equipped) Yes No N/A Has an air balance been completed? Yes No N/A Are pressure lines free from compressor, with pressure line coils spaced at least 1 inch apart? Yes No N/A Has all piping been thoroughly leak checked? Yes No N/A

Has all field connected main power and control wiring been completed and checked? Yes No N/A Have filter driers been installed if equipped? Yes No N/A Has a grounded conductor been installed from the main panel to earth ground? Yes No N/A Has the unit been solidly mounted to the mounting structure? Yes No N/A Has the unit been charged with the proper refrigerant? Yes No N/A Main Voltage Check: Voltage L1 to L2: Voltage L2 to L3: Voltage L3 to L1: Voltage L1 to G: Voltage L2 to G: Voltage L3 to G: Main fuse or breaker size: Control Voltage Check: PART B - Start-Up: amps Voltage H to N: Voltage H to G: Voltage N to G: Ambient temperature: F Setpoint: F Amount of refrigerant in system: lbs. of R- in each circuit. Compressor and Circuit Operation: Compressor Number Amps/leg Suction Discharge Superheat 1 / / PSI PSI F 2 / / PSI PSI F 3 / / PSI PSI F 4 / / PSI PSI F 5 / / PSI PSI F 6 / / PSI PSI F 7 / / PSI PSI F 8 / / PSI PSI F Fan Amps/leg Volts/leg Is fan rotation correct? 1 / / / / Yes No 2 / / / / Yes No 3 / / / / Yes No 4 / / / / Yes No 5 / / / / Yes No 6 / / / / Yes No 7 / / / / Yes No 8 / / / / Yes No 9 / / / / Yes No 10 / / / / Yes No

If hot gas bypass is used, what is it set at? High pressure control setting (cut in/cut out, circuits 1-8): Cut in: Cut out: Low pressure control setting (cut in/cut out, circuits 1-8): Cut in: Cut out: What percentage of load was available at start-up? If a VFD is used, what are the basic settings on the VFD, and/or what was changed on the VFD during start-up and why? N/A At what PSI does the condenser fan start? Safety Check: Have compressor overloads been verified correct? Yes No N/A Settings: #1 #2 #3 #4 Have condenser fan overloads been verified correct? Yes No N/A Settings: #1 #2 #3 #4 Have evaporator fan overloads been verified correct? Yes No N/A Settings: #1 #2 #3 #4 Controller Check: Are controllers labeled and correspond to the diagram? Yes No N/A Was a program downloaded in the field? Yes No N/A If program was field downloaded, what version was used? Have controllers been scrolled through line by line ensuring that all transducers, sensors, pumpdown switches, failures, GPM, etc. read correctly? Yes No N/A List any fields not reading correctly: Have all changes to any parameter been documented and sent to the lab, programming, and service? Yes No N/A List any parameters or settings that were changed: Have all adjustable refrigeration valves been adjusted appropriately? Yes No N/A Which valves were adjusted?

Evaporator Model # Evaporator Serial # Fan Amps/leg Defrost Amps/leg Superheat Is evaporator drain line trapped outside of box? Yes No N/A System Data: Ambient Temperature: F Design Suction Temperature: F Design Box Temperature: F Thermostat Setting: F Defrost Setting 1: /day Clock Fail-Safe: Defrost Setting 2: /day Clock Fail-Safe: Compressor Discharge Pressure: PSIG Compressor Discharge Pressure: PSIG Compressor Suction Pressure: PSIG Compressor Suction Pressure: PSIG Suction Line Temp. at Compressor: F Suction Line Temp. at Compressor: F Superheat at Compressor: F Superheat at Compressor: F Suction Line Temp. at Evaporator: F Suction Line Temp. at Evaporator: F Superheat at Exaporator: F Superheat at Exaporator: F Other: Does any work need to be completed on the unit after start-up? Yes No Please list any additional work in detail:

Start-Up Notes: Start-up performed by (Print): Start-up performed by (Signature): Date: Contact Phone Number: Contact Email: To validate equipment parts warranty, return completed form within (10) day of start-up to: RAE Corporation Attn: Service Department 4492 Hunt St. Pryor, OK 74361 (918) 825-7222 service@rae-corp.com

4492 Hunt St. - Pryor, OK 74361 - (918) 825-7222 - Fax (918) 825-6366 www.rae-corp.com Bulletin# CON/EVAP-START UP-0315