RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

Similar documents
NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

Florida Stormwater Association 2015 Annual Conference June 17 19, 2015

REQUEST FOR PROPOSAL RFP NO. PS CONSULTANT FOR JOHN HENDRY PARK MASTER PLAN QUESTIONS AND ANSWERS NO. 1

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

City of West Palm Beach. Floodplain Management Plan Draft Action Plan August 3, 2016

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Capital Projects impacting Odenton Town Center

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Folly Beach Planning Commission

Figure 1 Cypress Street Study Area Location Map

2013 Summer Recap. Rockaway Beach

Catherine Bray John Buss Manager City of Tallahassee/Stormwater Management

Preliminary Regulatory and Engineering

CITY OF VALPARAISO STORMWATER MASTER PLAN

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

CITY OF SIMI VALLEY MEMORANDUM

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

A G E N D A Council Update Training Room September 26, :45 p.m.

TOWN OF OCEAN RIDGE 6450 NORTH OCEAN BOULEVARD OCEAN RIDGE, FLORIDA (561) FAX (561)

Project Memo. IDNR State Revolving Fund

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Adaptation and Resilience at the City of Fort Lauderdale

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

August 13, Mayor and Council. City Manager SUBJECT: INFRASTRUCTURE CAPITAL IMPROVEMENT PLAN REPORT

Chapter 11. Implementation Plan

South Bismarck Watershed Model Update and Stormwater Improvement Project

Western Pennsylvania Conservancy Clairton & Harrison Community Greening Assessment Projects Request for Proposals July 2018

Why a new Food & Farm Ordinance?

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

MATHEWS COUNTY RURAL DITCH ENHANCEMENT STUDY

SEMSWA s Role in the Land Development Process

2017 General Obligation Bond

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

Improvement of the Atlantic Coast of New York City,

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

Biological Constraints Survey for 5th Street Drainage Improvements. City of Highland, San Bernardino County, California

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

Washington County, Maryland Division of Public Works Policy Manual

Minot City Council -Special Meeting- Friday, July 21, :00 PM Minot City Council Chambers- City Hall

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

City of Ingleside Avenue B Outfall Project

VALLEY VIEW POND Q&A. This item will be discussed under the First Reading portion of the agenda at the July 17, 2012 Village Council meeting.

Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Audit & Finance Standing Committee November 28, 2018

Memorandum CITY OF DALLAS

4/8/2015 Item #10D Page 1

CITY OF URBANA STORMWATER UTILITY FEE FREQUENTLY ASKED QUESTIONS

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

M E M O R A N D U M. DATE: July 19, Patrick D. O Keeffe, City Manager. Economic Development & Housing

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Executive Office of Energy and Environmental Affairs Massachusetts Vulnerability Preparedness Program. June 6, 2018

Capital Projects in and near Odenton Town Center

Flooding Hearing: Long and Short Term Strategies

East Corridor Final Environmental Impact Statement

University Park Subdivision Street Assessment Report

SCADA / Electrical Refurbishment Construction Contract. Tommy B. Strowd, P.E., Director Operations & Maintenance

Intelligence Community Campus- Bethesda (ICC-B)

POLE BRIDGE ROAD NEAR FIVE LOT FARM

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Lake and Stream Restoration Project

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Prince William Street Project (Grant Avenue to Wellington Road)

Arroyo Grande Creek Flood Control Channel Vegetation Management: A Photo Series

EXCERPTS. Sep City and County of Denver (CCD) Storm Drainage Master Plan

Village of Forest Park. July 27, Sewer Separation Evaluation

EROSION CONTROL Professional Development Training. Sean Crimmins, President Brian Barker, Southeastern Consultant

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

DESIGN CRITERIA PACKAGE

30% Design Technical Report

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

5. FINAL DEVELOPMENT PLAN APPROVAL MENORAH MEDICAL CENTER OFFICE BUILDING Vicinity of the southwest corner of 119 th Street and Nall Avenue

Welcome! Agenda. South Downtown

STORMWATER UTILITY PRESENTATION November 18, 2014

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

Update on the Bayfront Canal Bypass Project. Recommendation This an informational item only. No City Council action is required at this time.

Leadership This is currently a multi-disciplinary effort, led by the following students:

Chapter 3 MAJOR CONVEYANCE SYSTEMS

Pasco County Watershed Meeting for Flood Impacted Areas Port Richey Watershed

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Oroville Area Urban Greening Plan. Joint Meeting of the Oroville Planning, Park, and Arts Commissions October 12, 2015

Fall 2017 Construction Update

Request for Proposals

City of Petersburg, VA Stormwater Utility Frequently Asked Questions

Waterways and wetlands investigations

Memorandum. AECOM Technical Services Inc. Page 1

4.1 Build Alternative 1 Construction Phasing

Marion Street Green Infrastructure Project. Whittier Neighborhood Community Meeting April 18, 2018

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

March 30, 2017

Doing Business with Bartlett Cocke General Contractors

Transcription:

RFP 2018-02 DRAINAGE OUTFALL DESIGN AND PERMITTING Mandatory Meeting for Proposers August 15, 2015

IMPORTANT DATES August 15 th, 2:00pm August 17 th, 5:00pm August 22 nd, 5:00pm September 5 th, 2:00pm September 12 th, 4:30pm October 23 rd, 6:00pm Mandatory Meeting for Proposers Deadline for Questions Response to Questions Posted Deadline for Submissions Planning Commission review of proposals City Council considers recommendation of award

OBJECTIVES OF PROJECT Improve three major outfalls at on the Intracoastal Waterway side of the island adjacent to 30 th Avenue, 3605 Waterway Boulevard and 41 st Avenue to seal the system from tidal intrusion, but allow stormwater to exit Infrastructure will need to be sized and designed for future improvement to flow through The ultimate design should be to a level that would have kept flood waters associated with Hurricane Joaquin from damaging houses

SCOPE OF WORK Analyze the drainage basins associated with each of the three outfalls to determine the appropriate size and location of the future outfalls Survey all ditches and structures associated with the three outfalls from the Intracoastal Waterway to a point 100 feet inland (southwest) from Waterway Boulevard Provide several conceptual project alternatives to several City boards/commissions including costs and different levels of service After review of the different concepts, the City will provide direction of which alternative to pursue

SCOPE OF WORK (CONTINUED) Develop finalized engineering design to meet the identified objectives Secure all necessary permits through all applicable agencies including OCRM, US Army Corps of Engineers, Charleston County, SCDOT, and the City Provide final budget estimates to aid the City in assembling adequate funding Identify potential grant opportunities Advise on prioritizing work, if smaller, less costly projects could be undertaken to provide immediate relief while funding for the larger project is assembled Alternate#1- prepare all bidding documentation Alternate#2- provide construction administration services

WATERWAY OUTFALL AT 30TH Notice that there are two systems exiting on the water side of Waterway Boulevard

WATERWAY OUTFALL AT 30 TH AVE NOTICE SMALLER PIPE ON RIGHT BELOW THE LEVEL OF LOW TIDE AND SILTED IN. PIPE ON LEFT WAS UPGRADED SEVERAL YEARS AGO

WATERWAY OUTFALL AT 30 TH AVE TAKEN FROM THE SAME POINT AS PREVIOUS PICTURE LOOKING TOWARD THE INTRACOASTAL WATERWAY

WATERWAY OUTFALL AT 30 TH AVE TAKEN 50 YARDS DOWNSTREAM AT LOW TIDE- WATER IS NOT FLOWING AT THIS POINT. STORMWATER MEETING TIDAL WATER MAY CAUSE BUILD-UP

WATERWAY OUTFALL AT 30 TH AVE TAKEN FROM OTHER SIDE OF BRIDGE- THIS AREA IS WHERE EADIE S CLEARING OF THE DITCH HAS HISTORICALLY STOPPED

WATERWAY OUTFALL AT 30 TH AVE TAKEN ANOTHER 50 YARDS DOWNSTREAM FROM GOLF COURSE- WATER IS NOT FLOWING AT THIS POINT. NOTICE LACK OF CHANNEL. THIS AREA WAS CLEARED ONCE BY THE COUNTY SEVERAL YEARS AGO.

WATERWAY OUTFALL AT 30 TH AVE CLOSE TO THE ULTIMATE OUTFALL INTO THE INTRACOASTAL WATERWAY

WATERWAY OUTFALL AT 30 TH AVE TAKEN AT THE ULTIMATE DISCHARGE- WATER IS FLOWING WELL AT THIS POINT BUT ALL TIDAL

QUESTIONS?